Ahmed Mohamed Moustafa Makled
Over 11 years in Survey field of hands-on well diversified experience in the field
of construction of major international projects with world-class construction firms.
Completed several major traditional and design-build projects including
wastewater treatments plants, water systems, Egypt Oil &gas and high rise
buildings. Excellent communication skills and high ability to operate ina multi-
national environment
Ahmedmoustafa4syrvey@yahoo.com
Curriculum Vitae
Ahmed Mohamed MoustafaMakled
ahmedmoustafa4survey@yahoo.com
Mobile: +20 1003697349
+201277423247
Background:
Over 10 years of hands-on well diversified experience in the field of construction of major
international projects with world-class construction firms. Completed several major traditional
and design-build projects including wastewater treatments plants, water systems, Egypt Oil &
gas and high rise buildings. Excellent communication skills and high ability to operate in a
multi-national environment
Personal Data:
Age: 31
Nationality: Egyptian
Address: 10 Al Imam Al Shafeist. Al Mahrossa Al Gededa , Alexandria
Languages: English, Arabic
Civil Status: Married (with two kids)
Mobile: +20 103697349 - +20 01277423247
Email: ahmedmoustafa4survey@yahoo.com
Computer Skills
Windows – Microsoft Office – Internet
AutoCAD -LAND DESK-SOFTDESK –Surfer – Transfer Data-Arc map-Arc view
Micro station
Educational Attainment:
Licens of arts – geography branch surveying and maps and Gis.Alexandria University
2006
Diploma in geographic information systems that is contain (arc view 3.2 & arc map 9
& auto desk map)
Career Objectives
Improve my personality as a professional, and enhance my knowledge and capabilities,
Relevant to any field in more challenging and growth oriented environment to gain further
exposure and to take new challenges.
Training Courses& Skills
Handling computerized surveying instrument works and functions
Total station: (Sokkia: all versions)
(Topcon: all versions)
(Trimble: all versions)
Levels : (Sokkia- Topcon- Trimble- Lica)
Skills Acquired
-Excellence a spilt and traverse and point lowering with total stations.
-Make Drawing on auto cad, and limiting amount of cutting and filling up to Land.
- Enduring skills in customer service -Handling different kinds of People.
- Good communication.
- Fast learner and hardworking with patience, responsible on the duties and able to work
under pressure with minimum supervision.
Professional Experience
Current job:
ACE Consulting Engineers (MOHARRAM.BAKHOUM)
From Oct.2015 till now
Consulting Survey
Marassi (Sidi Abdel Rahman Resort Community, Mediterranean-North Coast, EGYPT)
Duties and Responsibilities:
As-built all structure facilities based on design plan
Approved all survey activities on sit
Approved all survey project submittals and drawings.
Profile and cross sectioning of areas covered by sit construction area to
determine potion to be cut for excavation.
Lay-out and setting out of vertical and horizontal alignment of concrete
column, footing, slabs, doors, elevators, windows, stairs, other concrete
structure, mechanical layout.
As-built all structure facilities based on design plan
Uhde THYSSENKRUPP OF TECHNOLOGEIS (German company)
From Jan. 2014 to Oct. 2015
Chief surveyor with additional duties as a draftsman
National Vegetables Oils Company “NVOC” located at Borg El-Arab, Alexandria,
Egypt
Duties and Responsibilities:
As-built all structure facilities based on design plan
Coordinates with Project Manager and Construction Manager on preparation
of all project submittals and drawings.
Download, edit and process of data using SOKIA software for as built
drawing.
Profile and cross sectioning of areas covered by sit construction area to
determine potion to be cut for excavation.
Lay-out and setting out of vertical and horizontal alignment of concrete
column, footing, slabs, doors, elevators, windows, stairs, other concrete
structure, mechanical layout.
As-built all structure facilities based on design plan
OFOK Properties
From June 2010 to Jan.2014
Chief surveyor with additional duties as a draftsman
Rayos (350 acres)
Duties and Responsibilities:
As-built all structure facilities based on design plan
Coordinates with Project Manager and Construction Manager on preparation
of all project submittals and drawings.
Download, edit and process of data using SOKIA software for as built
drawing.
Profile and cross sectioning of areas covered by sit construction area to
determine potion to be cut for excavation.
Lay-out and setting out of vertical and horizontal alignment of concrete
column, footing, slabs, doors, elevators, windows, stairs, other concrete
structure, mechanical layout.
As-built all structure facilities based on design plan
Barons Court Sports & Leisure
From Jan.2010 to June 2010
Chief surveyor
Alex West (600 acres)
Duties and Responsibilities:
As-built all structure facilities based on design plan
Coordinates with Project Manager and Construction Manager on preparation
of all project submittals and drawings.
Download, edit and process of data using SOKIA software for as built
drawing.
Profile and cross sectioning of areas covered by sit construction area to
determine potion to be cut for excavation.
Lay-out and setting out of vertical and horizontal alignment of concrete
column, footing, slabs, doors, elevators, windows, stairs, other concrete
structure, mechanical layout.
As-built all structure facilities based on design plan
Hallcrow(England company)
From July2008 jan.2010
Chief surveyor with additional duties as section engineer
Alexandria International Container Terminal Plinth Remedial
Works
Duties and Responsibilities:
Preparation and review all surveying work such as
 Download, edit and process of data using SOKIA software for as built drawing.
 Processing and plotting of data using AUTOCAD Establishment of horizontal
andvertical control points for fixed reference using total station and
automatic levels
 Profile and cross sectioning of areas covered by sit construction area to
determinepotion to be cut for excavation.
 Lay-out and setting out of vertical and horizontal alignment of concrete
column,footing, slabs, other concrete structure, mechanical layout.
 As-built all structure facilities based on design
planCo-ordination of all site activities.
 Discussing and resolving interference problems.
UHDE THYSSENKRUPP OF TECHNOLOGEIS (German company)
From December2007 to July2008
Land surveyor
(PDH/PP PROJECT) POLE PROPYLENE IN PORT SAID
Duties and Responsibilities:
Preparation and review all surveying work such as
 Download, edit and process of data using SOKIA software for as built drawing.
 Processing and plotting of data using AUTOCAD Establishment of horizontal
andvertical control points for fixed reference using total station and
automatic levels
 Profile and cross sectioning of areas covered by sit construction
area to determinepotion to be cut for excavation.
 Lay-out and setting out of vertical and horizontal alignment of
concrete column,footing, slabs, other concrete structure, mechanical
layout.
 As-built all structure facilities based on
design planCo-ordination of all site
activities.
 Discussing and resolving interference problems.
Alexandria Construction Company (Talaat Mustafa) From Jan.2007 to December2007
surveyor
Waste Water Treatment Plant ( Amriya ) 400 m $
Duties and Responsibilities:
Preparation and review all surveying work such as
 Download, edit and process of data using SOKIA software for as built drawing.
Processing and plotting of data using AUTOCAD Establishment of horizontal
andvertical control points for fixed reference using total station and automatic levels
Profile and cross sectioning of areas covered by sit construction area to
determinepotion to be cut for excavation.
Lay-out and setting out of vertical and horizontal alignment of concrete
column,footing, slabs, other concrete structure, mechanical layout.
As-built all structure facilities based on design
planCo-ordination of all site activities.
 Discussing and resolving interference problems.
Alexandria Construction Company (Talaat Mustafa)
From Nov.2006 to Jan.2007
surveyor
Mustafa Kamel hotel of the armed forces high rise buildings
Duties and Responsibilities:
Preparation and review all surveying work such as
 Download, edit and process of data using SOKIA software for as built drawing.
Processing and plotting of data using AUTOCAD Establishment of horizontal
andvertical control points for fixed reference using total station and automatic levels
Profile and cross sectioning of areas covered by sit construction area to
determinepotion to be cut for excavation.
Lay-out and setting out of vertical and horizontal alignment of concrete
column,footing, slabs, other concrete structure, mechanical layout.
As-built all structure facilities based on design
planCo-ordination of all site activities.
 Discussing and resolving interference problems.
Thank you, for your kind attention,
Ahmed Mohamed Mustafa Makled

Ahmed CV

  • 1.
    Ahmed Mohamed MoustafaMakled Over 11 years in Survey field of hands-on well diversified experience in the field of construction of major international projects with world-class construction firms. Completed several major traditional and design-build projects including wastewater treatments plants, water systems, Egypt Oil &gas and high rise buildings. Excellent communication skills and high ability to operate ina multi- national environment Ahmedmoustafa4syrvey@yahoo.com
  • 2.
    Curriculum Vitae Ahmed MohamedMoustafaMakled ahmedmoustafa4survey@yahoo.com Mobile: +20 1003697349 +201277423247 Background: Over 10 years of hands-on well diversified experience in the field of construction of major international projects with world-class construction firms. Completed several major traditional and design-build projects including wastewater treatments plants, water systems, Egypt Oil & gas and high rise buildings. Excellent communication skills and high ability to operate in a multi-national environment Personal Data: Age: 31 Nationality: Egyptian Address: 10 Al Imam Al Shafeist. Al Mahrossa Al Gededa , Alexandria Languages: English, Arabic Civil Status: Married (with two kids) Mobile: +20 103697349 - +20 01277423247 Email: ahmedmoustafa4survey@yahoo.com Computer Skills Windows – Microsoft Office – Internet AutoCAD -LAND DESK-SOFTDESK –Surfer – Transfer Data-Arc map-Arc view Micro station Educational Attainment: Licens of arts – geography branch surveying and maps and Gis.Alexandria University 2006 Diploma in geographic information systems that is contain (arc view 3.2 & arc map 9 & auto desk map) Career Objectives Improve my personality as a professional, and enhance my knowledge and capabilities, Relevant to any field in more challenging and growth oriented environment to gain further exposure and to take new challenges. Training Courses& Skills Handling computerized surveying instrument works and functions Total station: (Sokkia: all versions) (Topcon: all versions) (Trimble: all versions) Levels : (Sokkia- Topcon- Trimble- Lica)
  • 3.
    Skills Acquired -Excellence aspilt and traverse and point lowering with total stations. -Make Drawing on auto cad, and limiting amount of cutting and filling up to Land. - Enduring skills in customer service -Handling different kinds of People. - Good communication. - Fast learner and hardworking with patience, responsible on the duties and able to work under pressure with minimum supervision. Professional Experience Current job: ACE Consulting Engineers (MOHARRAM.BAKHOUM) From Oct.2015 till now Consulting Survey Marassi (Sidi Abdel Rahman Resort Community, Mediterranean-North Coast, EGYPT) Duties and Responsibilities: As-built all structure facilities based on design plan Approved all survey activities on sit Approved all survey project submittals and drawings. Profile and cross sectioning of areas covered by sit construction area to determine potion to be cut for excavation. Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout. As-built all structure facilities based on design plan Uhde THYSSENKRUPP OF TECHNOLOGEIS (German company) From Jan. 2014 to Oct. 2015 Chief surveyor with additional duties as a draftsman National Vegetables Oils Company “NVOC” located at Borg El-Arab, Alexandria, Egypt Duties and Responsibilities: As-built all structure facilities based on design plan Coordinates with Project Manager and Construction Manager on preparation of all project submittals and drawings. Download, edit and process of data using SOKIA software for as built drawing. Profile and cross sectioning of areas covered by sit construction area to determine potion to be cut for excavation. Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout. As-built all structure facilities based on design plan
  • 4.
    OFOK Properties From June2010 to Jan.2014 Chief surveyor with additional duties as a draftsman Rayos (350 acres) Duties and Responsibilities: As-built all structure facilities based on design plan Coordinates with Project Manager and Construction Manager on preparation of all project submittals and drawings. Download, edit and process of data using SOKIA software for as built drawing. Profile and cross sectioning of areas covered by sit construction area to determine potion to be cut for excavation. Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout. As-built all structure facilities based on design plan Barons Court Sports & Leisure From Jan.2010 to June 2010 Chief surveyor Alex West (600 acres) Duties and Responsibilities: As-built all structure facilities based on design plan Coordinates with Project Manager and Construction Manager on preparation of all project submittals and drawings. Download, edit and process of data using SOKIA software for as built drawing. Profile and cross sectioning of areas covered by sit construction area to determine potion to be cut for excavation. Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout. As-built all structure facilities based on design plan Hallcrow(England company) From July2008 jan.2010 Chief surveyor with additional duties as section engineer Alexandria International Container Terminal Plinth Remedial Works Duties and Responsibilities: Preparation and review all surveying work such as  Download, edit and process of data using SOKIA software for as built drawing.  Processing and plotting of data using AUTOCAD Establishment of horizontal andvertical control points for fixed reference using total station and automatic levels  Profile and cross sectioning of areas covered by sit construction area to determinepotion to be cut for excavation.  Lay-out and setting out of vertical and horizontal alignment of concrete column,footing, slabs, other concrete structure, mechanical layout.  As-built all structure facilities based on design planCo-ordination of all site activities.  Discussing and resolving interference problems.
  • 5.
    UHDE THYSSENKRUPP OFTECHNOLOGEIS (German company) From December2007 to July2008 Land surveyor (PDH/PP PROJECT) POLE PROPYLENE IN PORT SAID Duties and Responsibilities: Preparation and review all surveying work such as  Download, edit and process of data using SOKIA software for as built drawing.  Processing and plotting of data using AUTOCAD Establishment of horizontal andvertical control points for fixed reference using total station and automatic levels  Profile and cross sectioning of areas covered by sit construction area to determinepotion to be cut for excavation.  Lay-out and setting out of vertical and horizontal alignment of concrete column,footing, slabs, other concrete structure, mechanical layout.  As-built all structure facilities based on design planCo-ordination of all site activities.  Discussing and resolving interference problems. Alexandria Construction Company (Talaat Mustafa) From Jan.2007 to December2007 surveyor Waste Water Treatment Plant ( Amriya ) 400 m $ Duties and Responsibilities: Preparation and review all surveying work such as  Download, edit and process of data using SOKIA software for as built drawing. Processing and plotting of data using AUTOCAD Establishment of horizontal andvertical control points for fixed reference using total station and automatic levels Profile and cross sectioning of areas covered by sit construction area to determinepotion to be cut for excavation. Lay-out and setting out of vertical and horizontal alignment of concrete column,footing, slabs, other concrete structure, mechanical layout. As-built all structure facilities based on design planCo-ordination of all site activities.  Discussing and resolving interference problems. Alexandria Construction Company (Talaat Mustafa) From Nov.2006 to Jan.2007 surveyor Mustafa Kamel hotel of the armed forces high rise buildings Duties and Responsibilities: Preparation and review all surveying work such as  Download, edit and process of data using SOKIA software for as built drawing. Processing and plotting of data using AUTOCAD Establishment of horizontal andvertical control points for fixed reference using total station and automatic levels Profile and cross sectioning of areas covered by sit construction area to determinepotion to be cut for excavation. Lay-out and setting out of vertical and horizontal alignment of concrete column,footing, slabs, other concrete structure, mechanical layout. As-built all structure facilities based on design planCo-ordination of all site activities.  Discussing and resolving interference problems. Thank you, for your kind attention, Ahmed Mohamed Mustafa Makled