ANIL KUMAR K
AK.ABINITIO@GMIAL.COM
Mobile: +91-9742131889
Professional Experience:
• Around 4 Years of Experience in Data warehousing using Abinitio, ACE as the ETL tool.
• Strong expertise in MDWP (ACE and BRE) and Ab Initio.
• Building/enhancing templates in application configuration environment.
• Very good understanding of data warehouse environments and data models.
• Created and maintained Ab Initio Graphs using various components like Join, Rollup,
Reformat, Filter by Expression, Joiner, Scan, Lookup, Partition components.
• Proficient in understanding Business processes/requirements and translating them into
technical requirements.
• Database experience using Oracle and Teradata.
• Good working experience with all the components in the GDE in Ab initio. Creating,
Executing, Testing and maintaining the graphs in Ab initio.
• Good experience on AbInitio AIR and M commands.
• Good understanding about Fact and Dimension tables.
• Created Graphs using the transformations such as Aggregator, Filter, Sequence
generator, Lookup and Reformat.
• Well versed with various Ab Initio Parallelism techniques and implemented Ab Initio
Graphs using Data Parallelism.
• Writing the Unix Shell scripting for automating the things
Experience:
• Currently working at IBM India Pvt Ltd as Software Engineer from June 2012 to till
date.
Education
• Graduate from Jawaharlal Nehru Technological University Kakinada
Software Skills:
ETL Technologies : Abinitio, MDWP & ACE
Scripting Language : UNIX Shell Scripting.
Databases : Teradata, Oracle,SQL.
Operating system : Windows-NT/XP, Linux
Project Summary:
Project 1:
Project : SFoBI-VFDE
Client : VODAFONE GERMANY
Role : MDWP Developer
Duration : Oct 2014 to till date
Project Description:
The existing Data Warehouse of Vodafone Germany is split into a mobile and a fixed
network part and proliferated with a lot of user databases. SFoBI is a BI transformation
program of Vodafone Germany, which aims at building the Data Warehouse with
completely new architecture that is supported by reusable frameworks. And these reusable
frameworks can be leveraged in other markets of Vodafone. SFoBI is built using reusable
framework (MDWP) created by Ab Initio. This project is following Agile methodology.
The activities of the project can be categorized in following ways:
a) Development and Enhancement activities using Ab Initio, MDWP, Unix scripts, Teradata,
Oracle 10g, ODI
b) Adhoc activities.
The application runs on UNIX environment using variety of software like Ab Initio, MDWP,
Unix script along with databases Teradata, Oracle that essentially requires in-depth
knowledge on them.
In this project the Source data is processed first and loaded to staging area using the ACE
configurations. Then the Load ready files are being created using the feed mapping process
(referring the Mapping specifications and data model, by running the synch mapping
process)
MDWP DB Load process loads the data to the Teradata tables, which acts as the source for
the SFoBI Semantic Layer Load process.
The Core layer is built on CLDM and the semantic layer on TDW telecom model.
SFoBI Releases
The overall project objective of SFoBI is limited to the creation/modification of MDWP
Configurations necessary to receive and stage the different source data into Source staging
area.
Responsibilities:
• Developed and enhanced templates in application configuration environment. Executed
sync-mapping for generation of Feed mapping template.
• Build the Graphs for analyzing the data.
• Prepared UTR and LLD’s
• Developing various graphs as per the business requirements.
• Understanding the Functional Requirement documents
• Code changes of Transformations in ACE Template.
• Performed lookups, joins and various filter criteria’s in data extraction process
based on metadata report or details sheet.
• Checking whether all the functionalities are met or not as per the requirement.
• Writing the Unix Shell scripting for automating the things.
• Developing Graphs using various components such as partition, Departition,
validate, reformat, rollup, lookup, join, sort, database components etc.
• Involved in the design document and capture the design issues and tracking through
excel sheet.
• Involved in daily meeting for discussing about defect fixes.
• Worked as a part of technical team, actively participated in burn down chart
creation, daily scrum call.
• Technical discussion with Client, Sprint review sessions, retrospective session etc.
• Designed and Developed Solution Using AbInitio and MDWP
• Designed Test Scenarios for Unit and System Testing
• Participated in UAT, System Integration Testing
• Tuned Performance
Project 2:
Title : Single view of customer(SVoC)
Client : Royal Bank of Scotland
Role : ETL Developer
Duration : June 2012 to Oct 2014
Environment : Abinitio, oracle, Unix.
Project Description:
The RBS group is a large international banking and financial services company.
From its headquarters in Edinburgh, the Group serves over 30 million customers in the
United Kingdom, Europe, the Middle East, the Americas and Asia Now We are We are
implementing SVoC Single view of customer here we are integrating the various modules
data like CC(Credit Card) CASL ( Current, Savings and Loan Accounts ), SVoC is very useful
for the front end application level and Customer also can all products under One
application.
Responsibilities:
• Understanding existing sales system.
• Extracted Data from Oracle and Flat files using Abinitio.
• Used Lookups with Reformat component to fetch matching records based on for
the downstream process.
• Used Sort component to sort the tables, and used Dedup Sort to remove duplicate
values.
• Used Rollup component to populate monthly, quarterly and annual summary tables
• Used Data Parallelism, Pipeline Parallelism and Component Parallelism in
Graphs, where huge data files are partitioned into multi files, and each segment is
processed simultaneously.
• Worked in a sandbox environment while extensively interacting with EME to
maintain version control on objects. Sandbox features like check in and checkout
were used for this purpose.
• Worked with de-partition components Gather, Merge which will be used for add
the files which is done partition for fast process of data files.
Responsibilities:
• Understanding existing sales system.
• Extracted Data from Oracle and Flat files using Abinitio.
• Used Lookups with Reformat component to fetch matching records based on for
the downstream process.
• Used Sort component to sort the tables, and used Dedup Sort to remove duplicate
values.
• Used Rollup component to populate monthly, quarterly and annual summary tables
• Used Data Parallelism, Pipeline Parallelism and Component Parallelism in
Graphs, where huge data files are partitioned into multi files, and each segment is
processed simultaneously.
• Worked in a sandbox environment while extensively interacting with EME to
maintain version control on objects. Sandbox features like check in and checkout
were used for this purpose.
• Worked with de-partition components Gather, Merge which will be used for add
the files which is done partition for fast process of data files.

Abinitio Experienced resume-Anilkumar

  • 1.
    ANIL KUMAR K AK.ABINITIO@GMIAL.COM Mobile:+91-9742131889 Professional Experience: • Around 4 Years of Experience in Data warehousing using Abinitio, ACE as the ETL tool. • Strong expertise in MDWP (ACE and BRE) and Ab Initio. • Building/enhancing templates in application configuration environment. • Very good understanding of data warehouse environments and data models. • Created and maintained Ab Initio Graphs using various components like Join, Rollup, Reformat, Filter by Expression, Joiner, Scan, Lookup, Partition components. • Proficient in understanding Business processes/requirements and translating them into technical requirements. • Database experience using Oracle and Teradata. • Good working experience with all the components in the GDE in Ab initio. Creating, Executing, Testing and maintaining the graphs in Ab initio. • Good experience on AbInitio AIR and M commands. • Good understanding about Fact and Dimension tables. • Created Graphs using the transformations such as Aggregator, Filter, Sequence generator, Lookup and Reformat. • Well versed with various Ab Initio Parallelism techniques and implemented Ab Initio Graphs using Data Parallelism. • Writing the Unix Shell scripting for automating the things Experience: • Currently working at IBM India Pvt Ltd as Software Engineer from June 2012 to till date.
  • 2.
    Education • Graduate fromJawaharlal Nehru Technological University Kakinada Software Skills: ETL Technologies : Abinitio, MDWP & ACE Scripting Language : UNIX Shell Scripting. Databases : Teradata, Oracle,SQL. Operating system : Windows-NT/XP, Linux Project Summary: Project 1: Project : SFoBI-VFDE Client : VODAFONE GERMANY Role : MDWP Developer Duration : Oct 2014 to till date Project Description: The existing Data Warehouse of Vodafone Germany is split into a mobile and a fixed network part and proliferated with a lot of user databases. SFoBI is a BI transformation program of Vodafone Germany, which aims at building the Data Warehouse with completely new architecture that is supported by reusable frameworks. And these reusable frameworks can be leveraged in other markets of Vodafone. SFoBI is built using reusable framework (MDWP) created by Ab Initio. This project is following Agile methodology. The activities of the project can be categorized in following ways: a) Development and Enhancement activities using Ab Initio, MDWP, Unix scripts, Teradata, Oracle 10g, ODI
  • 3.
    b) Adhoc activities. Theapplication runs on UNIX environment using variety of software like Ab Initio, MDWP, Unix script along with databases Teradata, Oracle that essentially requires in-depth knowledge on them. In this project the Source data is processed first and loaded to staging area using the ACE configurations. Then the Load ready files are being created using the feed mapping process (referring the Mapping specifications and data model, by running the synch mapping process) MDWP DB Load process loads the data to the Teradata tables, which acts as the source for the SFoBI Semantic Layer Load process. The Core layer is built on CLDM and the semantic layer on TDW telecom model. SFoBI Releases The overall project objective of SFoBI is limited to the creation/modification of MDWP Configurations necessary to receive and stage the different source data into Source staging area. Responsibilities: • Developed and enhanced templates in application configuration environment. Executed sync-mapping for generation of Feed mapping template. • Build the Graphs for analyzing the data. • Prepared UTR and LLD’s • Developing various graphs as per the business requirements. • Understanding the Functional Requirement documents • Code changes of Transformations in ACE Template. • Performed lookups, joins and various filter criteria’s in data extraction process based on metadata report or details sheet.
  • 4.
    • Checking whetherall the functionalities are met or not as per the requirement. • Writing the Unix Shell scripting for automating the things. • Developing Graphs using various components such as partition, Departition, validate, reformat, rollup, lookup, join, sort, database components etc. • Involved in the design document and capture the design issues and tracking through excel sheet. • Involved in daily meeting for discussing about defect fixes. • Worked as a part of technical team, actively participated in burn down chart creation, daily scrum call. • Technical discussion with Client, Sprint review sessions, retrospective session etc. • Designed and Developed Solution Using AbInitio and MDWP • Designed Test Scenarios for Unit and System Testing • Participated in UAT, System Integration Testing • Tuned Performance Project 2: Title : Single view of customer(SVoC) Client : Royal Bank of Scotland Role : ETL Developer Duration : June 2012 to Oct 2014 Environment : Abinitio, oracle, Unix. Project Description: The RBS group is a large international banking and financial services company. From its headquarters in Edinburgh, the Group serves over 30 million customers in the United Kingdom, Europe, the Middle East, the Americas and Asia Now We are We are implementing SVoC Single view of customer here we are integrating the various modules data like CC(Credit Card) CASL ( Current, Savings and Loan Accounts ), SVoC is very useful for the front end application level and Customer also can all products under One application.
  • 5.
    Responsibilities: • Understanding existingsales system. • Extracted Data from Oracle and Flat files using Abinitio. • Used Lookups with Reformat component to fetch matching records based on for the downstream process. • Used Sort component to sort the tables, and used Dedup Sort to remove duplicate values. • Used Rollup component to populate monthly, quarterly and annual summary tables • Used Data Parallelism, Pipeline Parallelism and Component Parallelism in Graphs, where huge data files are partitioned into multi files, and each segment is processed simultaneously. • Worked in a sandbox environment while extensively interacting with EME to maintain version control on objects. Sandbox features like check in and checkout were used for this purpose. • Worked with de-partition components Gather, Merge which will be used for add the files which is done partition for fast process of data files.
  • 6.
    Responsibilities: • Understanding existingsales system. • Extracted Data from Oracle and Flat files using Abinitio. • Used Lookups with Reformat component to fetch matching records based on for the downstream process. • Used Sort component to sort the tables, and used Dedup Sort to remove duplicate values. • Used Rollup component to populate monthly, quarterly and annual summary tables • Used Data Parallelism, Pipeline Parallelism and Component Parallelism in Graphs, where huge data files are partitioned into multi files, and each segment is processed simultaneously. • Worked in a sandbox environment while extensively interacting with EME to maintain version control on objects. Sandbox features like check in and checkout were used for this purpose. • Worked with de-partition components Gather, Merge which will be used for add the files which is done partition for fast process of data files.