ABDUL RASOOL SHAIK
Email: 83abdulshaik@gmail.com
SUMMARY OF QUALIFICATIONS
• 10+ years’ experience in designing and developing large scale enterprise applications which runs on both Web and
mobile devices using Core Java, J2EE Pega PRPC 7.1, 6.3 & 6.2, PAL, PLA, Tracer, SMA, PEGA Pulse, PEGA IAC, Pega
Mobile, Mashup SDK, Web services, XML, JMS, Spring, Hibernate, JBoss, WebSphere (6.x, 7.x), tomcat, Agents,
EXT JS, HTML5, JavaScript, Oracle, SQL, JUnit, Log4j, Eclipse, Mercury Quality Center (9.0)/ALM and Soap UI.
• 6 years’ experience in PEGA PRPC and have work on versions 6.x and 7.x.
• Proficient in designing and implementing Enterprise class structure in PEGA PRPC and Data modelling.
• Proficient in designing process using case designer and new case management features like Stages and Steps.
• Proficient in designing and implementing PEGA connectors and services including WS Security feature.
• Proficient in designing and implementing processing of Bulk work objects using Agents.
• Conducted DCO sessions and capture use cases in Application Profiler, Implement POC as model for each sprint.
• Proficient in designing and implementing Declare Pages, Data Pages, Agents, activities, Utility, data transform,
Declarative rules, Trigger, Audit, correspondence, System Settings, DSS, functions, libraries, Direct Web Access, SLA,
Ticket, Services (REST, SOAP), Integration connectors like Connect-Http, Connect-Rest and Connect SOAP.
• Successfully migrated application from PEGA PRPC 6.x to PEGA PRPC 7.1.x. We did tolerance upgrade.
• Proficient in upgrading existing work objects in Production, troubleshooting production issues etc.
• Created and integrated PEGA IAC gadgets in external portal application, dynamically render data based on
parameters. We have enabled SSO authentication.
• Proficient in designing and implementing harness, sections, layouts, portals and writing customs control.
• Proficient in import and export feature of PEGA including data instances, Application, roles and access group etc
• Good experience in integrating Pega-Pulse component. Proficient in implementing Roles and Privileges.
• Proficient in using PEGA performance and debugging tools like PAL, Log-Usage, Tracer, PLA and Clipboard.
• Design and develop functional, sequential, use case, Low level design documents and periodically update this
document to incorporate new changes/enhancements.
• Proficient in software development lifecycle stages from Dev, QA, SYS Test, INT, UAT and PROD.
• Strengths include self-motivation, creativity and ability to adapt to new technologies and applications.
• Domain experience is Investment banking, Wealth Management, Insurance and Health care.
SOFTWARE TECHNOLOGY SKILLS
Language : Java, J2EE, Webservices, Design patterns and JavaScript
Software Methodology : Agile and Scrum
BPM Tool : PEGA PRPC (7.1, 6.2v2, 6.3Sp1), IAC, PEGA Pulse, Pega Mobile etc.
Pega Tools : SMA, PLA, PAL, Tracer, Pega Differ Clipboard etc.
Java &J2EE : Core Java, JDBC, J2EE, Web services and Design patterns
Scripting language : JavaScript, EXT JS and JSON.
RDBMS : Oracle (SQL, PL/SQL) and MySQL
Test Framework : JUnit, Selenium and Soap UI.
Application Server : WebSphere 6.x,7.x and JBoss4.0.x
Build Tools : ANT and Hudson
ABDUL RASOOL SHAIK
EDUCATION AND CERTIFICATION
Masters
 A master degree in Computer Applications (MCA) from Osmania University, Hyderabad, India.
Degree
 A bachelor degree in Computer Science (B.Sc.) from Osmania University, Hyderabad, India.
Certifications
 Sun Certified Java Programmer.
 Certified System Architect Pega 6.2 V2.
 Certified Senior System Architect Pega 7.1
 Certified Lead System Architect Pega 7.1 Part 1
PROFESSIONAL WORK HISTORY
Employer Name’s Client Name Work Location Role Start – End dates
(MM/DD/YYYY)
Cap Gemini Financial
Services, Inc
Morgan Stanley, Inc
(Investment Bank)
New York, NY,
USA
Pega Lead Architect 09/10/2012 – Till Date
Cognizant Technology
Solutions
UBS (Swiss Bank)
Financial Services
Weehawken, NJ,
USA
Module Lead / Pega
Developer
06/13/2011 – 09/07/2012
Syntel, Inc State Farm Insurance Jacksonville, FL,
USA
Senior Developer 10/05/2009 – 06/10/2011
Metasense, Inc Express Scripts, Inc St Louis, Missouri,
USA
Programmer
Analysts
03/10/2009 – 10/01/2009
Cyber think, Inc
Lesto Technologies WellPoint Net Rx, Inc Hyderabad, India Software Engineer 08/04/2007 – 02/20/2009
Daisy Systems Ltd Stratus Tech Inc Hyderabad, India Software Engineer 06/01/2006 – 07/31/2007
Employer Name: Cap Gemini Financial Services, Inc. Client Name: Morgan Stanley Inc (Investment Bank) – New York
Role: Pega Lead Architect Duration: 09/10/2012 – Till Date Team Size: 12
Technology: Java, J2EE, Spring, Web services, Pega PRPC (6.3 & 7.1), Pega IAC, PAL, PLA, Pega differ, AES, Agents, Pega
Mobile, Google API, Html5, WebSphere, Mashup SDK, REST Webservices, Oracle PL/SQL, Unix and ALM.
Project Name: Derivative and Cash Client on boarding
The main objective of this project is to reduce firm risk and by creating a centralized workflow tool to be efficiently manage
the front to back process while enforcing proper business rules to insure data quality. Generated accounts will support
Banking/Clearing/Exchange, Firm (non BAAC). It’s fully compliant with IRS regulatory process like FATCA, Dodd Frank, Anti
Money laundering etc.
Role & Responsibilities:
• As the Pega Lead Architect I am involve in every phase of software development life cycle like requirement gathering,
analysis, design, development, integration, testing, deployment and update client project manager.
• As the LSA on the project, I am responsible for setting the direction for the architecture and design of the application.
Design and develop functional, sequential, use case, Low level design documents and also develop training and
production run book documents.
• I am an integral part of the Core business process reengineering team responsible for realigning different business
streams and systems as per client guidelines and strategic technical vision.
• Played a critical role in definition and execution of risk mitigation strategy during migration of client reference data
related processes.
ABDUL RASOOL SHAIK
• Lead the development teams to ensure on-time delivery and robust application development.
• Design and created Enterprise Class Structure and integrated MS proprietary COE Framework.
• Design entitlement model to handle global clients which needs region specific functionality.
• Define rule set hierarchy to achieve maximum reusability and componentize the various integration layers that will be
crated as a part of the solution.
• Design and develop centralize process orchestrator for creating regulatory cases based on response from forecaster,
Dodd Frank and AML compliance services.
• Design and implemented Bulk uploader tool which takes inputs from xls file and created work objects.
• Design and implemented service API which will allow external application to initiate request in PEGA.
• Design and implemented Change detection service to update work object whenever documents needs for
• Involve and played critical role in upgrading Pega PRPC version from 6.3 to 7.1.
Employer Name: Cognizant Technology Solutions, Inc. Client Name: UBS (Swiss Bank) Inc (Wealth Management) – NJ
Role: Module Lead/Pega Developer Duration: 06/13/2011 – 09/07/2012 Team Size: 10
Technology: Pega PRPC (6.3 & 7.1), Pega IAC, PAL, PLA, Pega differ, AES, Pega Mobile, Agents, Java, J2EE, Spring, Web
services, WebSphere, Mashup SDK, REST Webservices, Oracle PL/SQL, Unix and ALM.
Project Name: Client Portfolio Management
This project will create a holistic view of a client or relationship to financial advisors to quickly answer a client question “How
am i doing”? It will provide financial advisors with the flexibility to analyse a client portfolio using custom grouping of
accounts. They can add remove accounts/account group from relationship and set preferences for each gadget on client 360
portal pages. It also available on mobile. Secure Mailbox & Splash page for Online services client facing portal application
which will be used by more than one million user to access their account, fund transfer, trading etc. Splash page will allow
user to enrol in e-delivery, auto updates and performance status.
Role & Responsibilities:
• As a module lead on this project participate in Client Status Meetings, Release Planning, Requirements Grooming
Sessions, Daily Scrum sessions, Sprint Planning and Retrospective sessions in the sprint.
• Involve in designing and implementing work processes using case management.
• Design and implemented message event notify whenever we commit specific cases.
• Design and Implement PRPC Services (REST, SOAP) for down streams and PRPC Connectors like REST, HTTP and Soap
with exception handling, customize connection flow problem for upstream.
• Design and implemented data model like classes, properties and data model rules.
• Design and implemented standard and automatic agents as per business requirement.
• Customize OOTB harness rules (Perform, confirm and Review) as per requirement. Develop user interface using flow
actions, sections, layout, Smart Info, Paragraph and Dynamic UI controls.
• Design and implement business logic using Declare expressions, data transform, Decision rules, Activities, declarative
rules and validation rules. Implement security using roles, privileges and access groups.
• Design and implement process to upgrade existing/In flight work objects, resolve sub cases etc.
• Design and develop lazy loading for secure mailbox inbox grid and cash flow, performance gadgets in 360 to increase
application performance. Design and implemented business reports.
• Involved in code review analysis adhering to client side coding standards before promoting the code.
• Develop logging facilities using J2EE, spring and Log4j.
• Develop JUnit and integration test cases for application and generate reports for code coverage.
ABDUL RASOOL SHAIK
Employer Name: Syntel, Inc. Client Name: State Farm Insurance - Florida
Role: Senior Developer Duration: 10/05/2009 – 06/10/2011 Team Size: 8
Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, Html5, WebSphere, REST Webservices, Oracle, Windows,
Spring AOP, Spring MVC, J2EE Design patterns, IBM Content Management, Enterprise service bus.
Project Name: Claims Processing Engine (Uniform Forms Master)
Role & Responsibilities:
• As a Senior Develop I am responsible for develop highly critical business components and reports.
• Design and develop claims processing engine using Java, J2EE, spring and Web Services.
• Design and integrate external third party applications using Webservices.
• Design and develop user interface using JSP, JavaScript, and AJAX and HTML 5 components.
• Interact with others team to integrate their services or shared our services and make necessary changes as required
actively resolve any issues /defects reported by other teams.
• Mentor and co-ordinate with offshore team in understanding business requirement and solve their technical issues
also keep track on their work progress through daily status call.
• Interact with IBM Content management service API to upload the customer claims and policy documents.
• Develop reports using Jasper reports with customize data source.
• Hibernate to develop persistency layer and wrote complex queries using HSQL.
• Develop password security measures using AES, SHA-256 encryption, hashing algorithms using per user salt and
updating the password using previous salt.
• Develop build system along with code coverage and integrated with Hudson server.
• Develop test cases for Business, persistency and controller layers using Junit and JMockit.
• Develop the logging facilities using the Log4j. Building and deploying application using ANT and Hudson.
Employer Name: Metasense & Cyberthink, Inc. Client Name: Express Scripts, Inc
Role: Programmer Analysts Duration: 03/10/2009 – 10/01/2009 Team Size: 10
Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, Html5, WebSphere, REST Webservices, Oracle, Windows,
Spring AOP, Spring MVC, Web flow, J2EE Design patterns, IBM Content Management, Enterprise service bus, Siteminder
Project Name: Compass
Web based Portal that provides access to claim adjudication and call tracking information to call centre executives primarily. It
is a secured http site that provides details of patient information, benefits and rejected claim information. Compass allows you
to Access a specific member's information, based on the client. Add or update a member's credit card information for mail
orders. It is a tool used by Express Scripts Employees and Call Centres executives to assist callers’ questions, regarding their
Home Delivery service and Pharmacy Benefit information.
Role & Responsibilities:
• As a Programmer I am involve analysing business requirements with client and involve in project planning
Using scrum methodology for short term iteration planning and create project status report based on sprints.
• Create Low level design documents, use case and service documents for client.
• Work closely with other scrum teams and resolve road block to complete the use stories for this iteration.
• Design and develop business functionality layer using Java, J2EE, spring and Webservices.
• Develop user/manager portal dashboard using JavaScript, Ajax with services develop on Web services.
• Responsible for Integrating Spring MVC with Web Flow (2.0) and other modules of spring.
• Design and integrate enterprise service bus in application to consume all there web services.
• Design and develop customize modal dialog box to display alerts, session timeout and error messages.
ABDUL RASOOL SHAIK
• Applied J2EE core design patterns to develop the controller, business and persistency layers.
• Interact with IBM Content management service API to upload the patient prescription.
• Design and develop persistency layer and wrote complex SQL’s using Joins, Cursors and triggers
• Resolved bugs found during QA, SYSTEST, INT and UAT environments and update the work progress daily
in Rally as part of Scrum practise and Quality Center.
• Develop the logging facilities using Java, J2EE and Log4j.
Employer Name: Lesto Technologies, Inc. Client Name: Well Point Net Rx, Inc
Role: Software Engineer Duration: 08/04/2007 – 02/20/2009 Team Size: 14
Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, WebSphere, Oracle, Windows, Spring AOP, Spring MVC, J2EE
Design patterns, IBM Web Flow services, Enterprise service bus, Siteminder
Project Name: Member Portal
Web-based portal application that has been designed to offer quick access to the most commonly used features for WellPoint
clients and members. The major features offered are: Order Refills and Renewals, Price a Drug, Save on My Prescriptions,
Prescription History, Single Sign On, Access to Drug and Health Guides and many more. This portal offers custom content areas
for special alerts. It helps clients and members save money by helping them to make cost saving decisions regarding their
Pharmacy Benefits. Any WellPoint member/client who intends to manage his/her prescription plan can make use of the
Member Portal.
Role & Responsibilities:
• As Software engineer I was involve in requirement gathering, business clarifications and development.
• Design and implement Java, J2EE core design patterns to develop reusable business controller, business and
persistency layers.
• Develop user interface using JSP, HTML, CSS, JavaScript and Ajax.
• Design and develop using Java, J2EE, Web services, and spring, like Command objects, Handler mappings, View
Resolvers, Exception handler and AOP classes.
• Design and develop Aspect oriented model to develop generic level of logging, transaction management and
exception handling in the business layer using J2EE and spring.
• Develop customize modal dialog box to display alerts, session timeout and error messages.
• Develop Custom Exception handling to display business rule error and alert messages on screens.
• Develop Webservices using Axis2 both on Server side and creating clients using spring and also create a test client to
test the Webservices and jms (queues and topics).
• Responsible for integration of DOJO into the web layer.
• Develop business reports using Jasper Reporting tool for patients claims, prescriptions etc.
• Design and develop SAX and DOM Parsers for parsing XML files and also XPath for searching specific node value.
• Involved in code review analysis compliance with company standards.
• Develop test cases using JUnit and Soap UI for testing Webservices request and response.
• Solved defects occurred in application DEV, SYSTEST, INT, and UAT and in production environments.
• Develop the logging facilities using Java,J2EE and Log4j
Employer Name: Daisy Systems, Inc. Client Name: Stratus Technologies, Inc
Role: Software Engineer Duration: 06/01/2006 – 07/30/2007 Team Size: 9
Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, WebSphere, Oracle, Windows, Spring AOP, Spring MVC, J2EE
Design patterns, IBM Web Flow services, Enterprise service bus, Siteminder
Project Name: Continuous Availability Lifecycle Management (CALM)
ABDUL RASOOL SHAIK
Continuous Availability Lifecycle Management (CALM) portfolio encompasses a range of technology enabled services,
including comprehensive support for end-to-end, multi-vendor IT infrastructures. From routine change management
procedures to virtualization solutions to SLA’s guaranteed for exceptional Performance our singular focus is on helping you
achieve and sustain the highest levels of availability.
Role & Responsibilities:
• Utilize agile methodology for short term iteration planning of different tasks in application.
• Utilize J2EE Core Design patterns to design the application web, controller, business and persistence layers
• Develop business application Portlets using Liferay provided API, Service Builder and other Liferay tools.
• Integrate Liferay Ajax library tool to send and receive asynchronous request and response to the server through
business Portlets.
• Customization of built-in Liferay Portlets based on the business requirements. Interacting with Liferay built-in CMS
Portlets, User management (Admin Portlets) ETC.
• Provide application level validations through Struts provided Validators framework.
• Develop Custom Exception handling to display business rule error and alert messages on screens.
• Develop custom message dialog boxes use JSF messages tag to display alerts and error messages.
• Develop Business Portlets controllers to interact with business layers through spring.
• Utilize spring modules and Liferay provided tools to build business, persistency and service layers for the application.
• Utilize Liferay Hibernate built-in configuration to develop database session configuration and also develop Joins,
Criteria queries, Named Queries, HSQL, and Pojo mapping HBM Files.
• Solved defects occurred in application DEV, SYSTEST, INT, and UAT and in PROD environments and updating the status
in Quality Center.
• Develop Test cases for business layer using JUnit.
ABDUL RASOOL SHAIK
Continuous Availability Lifecycle Management (CALM) portfolio encompasses a range of technology enabled services,
including comprehensive support for end-to-end, multi-vendor IT infrastructures. From routine change management
procedures to virtualization solutions to SLA’s guaranteed for exceptional Performance our singular focus is on helping you
achieve and sustain the highest levels of availability.
Role & Responsibilities:
• Utilize agile methodology for short term iteration planning of different tasks in application.
• Utilize J2EE Core Design patterns to design the application web, controller, business and persistence layers
• Develop business application Portlets using Liferay provided API, Service Builder and other Liferay tools.
• Integrate Liferay Ajax library tool to send and receive asynchronous request and response to the server through
business Portlets.
• Customization of built-in Liferay Portlets based on the business requirements. Interacting with Liferay built-in CMS
Portlets, User management (Admin Portlets) ETC.
• Provide application level validations through Struts provided Validators framework.
• Develop Custom Exception handling to display business rule error and alert messages on screens.
• Develop custom message dialog boxes use JSF messages tag to display alerts and error messages.
• Develop Business Portlets controllers to interact with business layers through spring.
• Utilize spring modules and Liferay provided tools to build business, persistency and service layers for the application.
• Utilize Liferay Hibernate built-in configuration to develop database session configuration and also develop Joins,
Criteria queries, Named Queries, HSQL, and Pojo mapping HBM Files.
• Solved defects occurred in application DEV, SYSTEST, INT, and UAT and in PROD environments and updating the status
in Quality Center.
• Develop Test cases for business layer using JUnit.

AbdulRasoolShaik_Pega_LSA

  • 1.
    ABDUL RASOOL SHAIK Email:83abdulshaik@gmail.com SUMMARY OF QUALIFICATIONS • 10+ years’ experience in designing and developing large scale enterprise applications which runs on both Web and mobile devices using Core Java, J2EE Pega PRPC 7.1, 6.3 & 6.2, PAL, PLA, Tracer, SMA, PEGA Pulse, PEGA IAC, Pega Mobile, Mashup SDK, Web services, XML, JMS, Spring, Hibernate, JBoss, WebSphere (6.x, 7.x), tomcat, Agents, EXT JS, HTML5, JavaScript, Oracle, SQL, JUnit, Log4j, Eclipse, Mercury Quality Center (9.0)/ALM and Soap UI. • 6 years’ experience in PEGA PRPC and have work on versions 6.x and 7.x. • Proficient in designing and implementing Enterprise class structure in PEGA PRPC and Data modelling. • Proficient in designing process using case designer and new case management features like Stages and Steps. • Proficient in designing and implementing PEGA connectors and services including WS Security feature. • Proficient in designing and implementing processing of Bulk work objects using Agents. • Conducted DCO sessions and capture use cases in Application Profiler, Implement POC as model for each sprint. • Proficient in designing and implementing Declare Pages, Data Pages, Agents, activities, Utility, data transform, Declarative rules, Trigger, Audit, correspondence, System Settings, DSS, functions, libraries, Direct Web Access, SLA, Ticket, Services (REST, SOAP), Integration connectors like Connect-Http, Connect-Rest and Connect SOAP. • Successfully migrated application from PEGA PRPC 6.x to PEGA PRPC 7.1.x. We did tolerance upgrade. • Proficient in upgrading existing work objects in Production, troubleshooting production issues etc. • Created and integrated PEGA IAC gadgets in external portal application, dynamically render data based on parameters. We have enabled SSO authentication. • Proficient in designing and implementing harness, sections, layouts, portals and writing customs control. • Proficient in import and export feature of PEGA including data instances, Application, roles and access group etc • Good experience in integrating Pega-Pulse component. Proficient in implementing Roles and Privileges. • Proficient in using PEGA performance and debugging tools like PAL, Log-Usage, Tracer, PLA and Clipboard. • Design and develop functional, sequential, use case, Low level design documents and periodically update this document to incorporate new changes/enhancements. • Proficient in software development lifecycle stages from Dev, QA, SYS Test, INT, UAT and PROD. • Strengths include self-motivation, creativity and ability to adapt to new technologies and applications. • Domain experience is Investment banking, Wealth Management, Insurance and Health care. SOFTWARE TECHNOLOGY SKILLS Language : Java, J2EE, Webservices, Design patterns and JavaScript Software Methodology : Agile and Scrum BPM Tool : PEGA PRPC (7.1, 6.2v2, 6.3Sp1), IAC, PEGA Pulse, Pega Mobile etc. Pega Tools : SMA, PLA, PAL, Tracer, Pega Differ Clipboard etc. Java &J2EE : Core Java, JDBC, J2EE, Web services and Design patterns Scripting language : JavaScript, EXT JS and JSON. RDBMS : Oracle (SQL, PL/SQL) and MySQL Test Framework : JUnit, Selenium and Soap UI. Application Server : WebSphere 6.x,7.x and JBoss4.0.x Build Tools : ANT and Hudson
  • 2.
    ABDUL RASOOL SHAIK EDUCATIONAND CERTIFICATION Masters  A master degree in Computer Applications (MCA) from Osmania University, Hyderabad, India. Degree  A bachelor degree in Computer Science (B.Sc.) from Osmania University, Hyderabad, India. Certifications  Sun Certified Java Programmer.  Certified System Architect Pega 6.2 V2.  Certified Senior System Architect Pega 7.1  Certified Lead System Architect Pega 7.1 Part 1 PROFESSIONAL WORK HISTORY Employer Name’s Client Name Work Location Role Start – End dates (MM/DD/YYYY) Cap Gemini Financial Services, Inc Morgan Stanley, Inc (Investment Bank) New York, NY, USA Pega Lead Architect 09/10/2012 – Till Date Cognizant Technology Solutions UBS (Swiss Bank) Financial Services Weehawken, NJ, USA Module Lead / Pega Developer 06/13/2011 – 09/07/2012 Syntel, Inc State Farm Insurance Jacksonville, FL, USA Senior Developer 10/05/2009 – 06/10/2011 Metasense, Inc Express Scripts, Inc St Louis, Missouri, USA Programmer Analysts 03/10/2009 – 10/01/2009 Cyber think, Inc Lesto Technologies WellPoint Net Rx, Inc Hyderabad, India Software Engineer 08/04/2007 – 02/20/2009 Daisy Systems Ltd Stratus Tech Inc Hyderabad, India Software Engineer 06/01/2006 – 07/31/2007 Employer Name: Cap Gemini Financial Services, Inc. Client Name: Morgan Stanley Inc (Investment Bank) – New York Role: Pega Lead Architect Duration: 09/10/2012 – Till Date Team Size: 12 Technology: Java, J2EE, Spring, Web services, Pega PRPC (6.3 & 7.1), Pega IAC, PAL, PLA, Pega differ, AES, Agents, Pega Mobile, Google API, Html5, WebSphere, Mashup SDK, REST Webservices, Oracle PL/SQL, Unix and ALM. Project Name: Derivative and Cash Client on boarding The main objective of this project is to reduce firm risk and by creating a centralized workflow tool to be efficiently manage the front to back process while enforcing proper business rules to insure data quality. Generated accounts will support Banking/Clearing/Exchange, Firm (non BAAC). It’s fully compliant with IRS regulatory process like FATCA, Dodd Frank, Anti Money laundering etc. Role & Responsibilities: • As the Pega Lead Architect I am involve in every phase of software development life cycle like requirement gathering, analysis, design, development, integration, testing, deployment and update client project manager. • As the LSA on the project, I am responsible for setting the direction for the architecture and design of the application. Design and develop functional, sequential, use case, Low level design documents and also develop training and production run book documents. • I am an integral part of the Core business process reengineering team responsible for realigning different business streams and systems as per client guidelines and strategic technical vision. • Played a critical role in definition and execution of risk mitigation strategy during migration of client reference data related processes.
  • 3.
    ABDUL RASOOL SHAIK •Lead the development teams to ensure on-time delivery and robust application development. • Design and created Enterprise Class Structure and integrated MS proprietary COE Framework. • Design entitlement model to handle global clients which needs region specific functionality. • Define rule set hierarchy to achieve maximum reusability and componentize the various integration layers that will be crated as a part of the solution. • Design and develop centralize process orchestrator for creating regulatory cases based on response from forecaster, Dodd Frank and AML compliance services. • Design and implemented Bulk uploader tool which takes inputs from xls file and created work objects. • Design and implemented service API which will allow external application to initiate request in PEGA. • Design and implemented Change detection service to update work object whenever documents needs for • Involve and played critical role in upgrading Pega PRPC version from 6.3 to 7.1. Employer Name: Cognizant Technology Solutions, Inc. Client Name: UBS (Swiss Bank) Inc (Wealth Management) – NJ Role: Module Lead/Pega Developer Duration: 06/13/2011 – 09/07/2012 Team Size: 10 Technology: Pega PRPC (6.3 & 7.1), Pega IAC, PAL, PLA, Pega differ, AES, Pega Mobile, Agents, Java, J2EE, Spring, Web services, WebSphere, Mashup SDK, REST Webservices, Oracle PL/SQL, Unix and ALM. Project Name: Client Portfolio Management This project will create a holistic view of a client or relationship to financial advisors to quickly answer a client question “How am i doing”? It will provide financial advisors with the flexibility to analyse a client portfolio using custom grouping of accounts. They can add remove accounts/account group from relationship and set preferences for each gadget on client 360 portal pages. It also available on mobile. Secure Mailbox & Splash page for Online services client facing portal application which will be used by more than one million user to access their account, fund transfer, trading etc. Splash page will allow user to enrol in e-delivery, auto updates and performance status. Role & Responsibilities: • As a module lead on this project participate in Client Status Meetings, Release Planning, Requirements Grooming Sessions, Daily Scrum sessions, Sprint Planning and Retrospective sessions in the sprint. • Involve in designing and implementing work processes using case management. • Design and implemented message event notify whenever we commit specific cases. • Design and Implement PRPC Services (REST, SOAP) for down streams and PRPC Connectors like REST, HTTP and Soap with exception handling, customize connection flow problem for upstream. • Design and implemented data model like classes, properties and data model rules. • Design and implemented standard and automatic agents as per business requirement. • Customize OOTB harness rules (Perform, confirm and Review) as per requirement. Develop user interface using flow actions, sections, layout, Smart Info, Paragraph and Dynamic UI controls. • Design and implement business logic using Declare expressions, data transform, Decision rules, Activities, declarative rules and validation rules. Implement security using roles, privileges and access groups. • Design and implement process to upgrade existing/In flight work objects, resolve sub cases etc. • Design and develop lazy loading for secure mailbox inbox grid and cash flow, performance gadgets in 360 to increase application performance. Design and implemented business reports. • Involved in code review analysis adhering to client side coding standards before promoting the code. • Develop logging facilities using J2EE, spring and Log4j. • Develop JUnit and integration test cases for application and generate reports for code coverage.
  • 4.
    ABDUL RASOOL SHAIK EmployerName: Syntel, Inc. Client Name: State Farm Insurance - Florida Role: Senior Developer Duration: 10/05/2009 – 06/10/2011 Team Size: 8 Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, Html5, WebSphere, REST Webservices, Oracle, Windows, Spring AOP, Spring MVC, J2EE Design patterns, IBM Content Management, Enterprise service bus. Project Name: Claims Processing Engine (Uniform Forms Master) Role & Responsibilities: • As a Senior Develop I am responsible for develop highly critical business components and reports. • Design and develop claims processing engine using Java, J2EE, spring and Web Services. • Design and integrate external third party applications using Webservices. • Design and develop user interface using JSP, JavaScript, and AJAX and HTML 5 components. • Interact with others team to integrate their services or shared our services and make necessary changes as required actively resolve any issues /defects reported by other teams. • Mentor and co-ordinate with offshore team in understanding business requirement and solve their technical issues also keep track on their work progress through daily status call. • Interact with IBM Content management service API to upload the customer claims and policy documents. • Develop reports using Jasper reports with customize data source. • Hibernate to develop persistency layer and wrote complex queries using HSQL. • Develop password security measures using AES, SHA-256 encryption, hashing algorithms using per user salt and updating the password using previous salt. • Develop build system along with code coverage and integrated with Hudson server. • Develop test cases for Business, persistency and controller layers using Junit and JMockit. • Develop the logging facilities using the Log4j. Building and deploying application using ANT and Hudson. Employer Name: Metasense & Cyberthink, Inc. Client Name: Express Scripts, Inc Role: Programmer Analysts Duration: 03/10/2009 – 10/01/2009 Team Size: 10 Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, Html5, WebSphere, REST Webservices, Oracle, Windows, Spring AOP, Spring MVC, Web flow, J2EE Design patterns, IBM Content Management, Enterprise service bus, Siteminder Project Name: Compass Web based Portal that provides access to claim adjudication and call tracking information to call centre executives primarily. It is a secured http site that provides details of patient information, benefits and rejected claim information. Compass allows you to Access a specific member's information, based on the client. Add or update a member's credit card information for mail orders. It is a tool used by Express Scripts Employees and Call Centres executives to assist callers’ questions, regarding their Home Delivery service and Pharmacy Benefit information. Role & Responsibilities: • As a Programmer I am involve analysing business requirements with client and involve in project planning Using scrum methodology for short term iteration planning and create project status report based on sprints. • Create Low level design documents, use case and service documents for client. • Work closely with other scrum teams and resolve road block to complete the use stories for this iteration. • Design and develop business functionality layer using Java, J2EE, spring and Webservices. • Develop user/manager portal dashboard using JavaScript, Ajax with services develop on Web services. • Responsible for Integrating Spring MVC with Web Flow (2.0) and other modules of spring. • Design and integrate enterprise service bus in application to consume all there web services. • Design and develop customize modal dialog box to display alerts, session timeout and error messages.
  • 5.
    ABDUL RASOOL SHAIK •Applied J2EE core design patterns to develop the controller, business and persistency layers. • Interact with IBM Content management service API to upload the patient prescription. • Design and develop persistency layer and wrote complex SQL’s using Joins, Cursors and triggers • Resolved bugs found during QA, SYSTEST, INT and UAT environments and update the work progress daily in Rally as part of Scrum practise and Quality Center. • Develop the logging facilities using Java, J2EE and Log4j. Employer Name: Lesto Technologies, Inc. Client Name: Well Point Net Rx, Inc Role: Software Engineer Duration: 08/04/2007 – 02/20/2009 Team Size: 14 Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, WebSphere, Oracle, Windows, Spring AOP, Spring MVC, J2EE Design patterns, IBM Web Flow services, Enterprise service bus, Siteminder Project Name: Member Portal Web-based portal application that has been designed to offer quick access to the most commonly used features for WellPoint clients and members. The major features offered are: Order Refills and Renewals, Price a Drug, Save on My Prescriptions, Prescription History, Single Sign On, Access to Drug and Health Guides and many more. This portal offers custom content areas for special alerts. It helps clients and members save money by helping them to make cost saving decisions regarding their Pharmacy Benefits. Any WellPoint member/client who intends to manage his/her prescription plan can make use of the Member Portal. Role & Responsibilities: • As Software engineer I was involve in requirement gathering, business clarifications and development. • Design and implement Java, J2EE core design patterns to develop reusable business controller, business and persistency layers. • Develop user interface using JSP, HTML, CSS, JavaScript and Ajax. • Design and develop using Java, J2EE, Web services, and spring, like Command objects, Handler mappings, View Resolvers, Exception handler and AOP classes. • Design and develop Aspect oriented model to develop generic level of logging, transaction management and exception handling in the business layer using J2EE and spring. • Develop customize modal dialog box to display alerts, session timeout and error messages. • Develop Custom Exception handling to display business rule error and alert messages on screens. • Develop Webservices using Axis2 both on Server side and creating clients using spring and also create a test client to test the Webservices and jms (queues and topics). • Responsible for integration of DOJO into the web layer. • Develop business reports using Jasper Reporting tool for patients claims, prescriptions etc. • Design and develop SAX and DOM Parsers for parsing XML files and also XPath for searching specific node value. • Involved in code review analysis compliance with company standards. • Develop test cases using JUnit and Soap UI for testing Webservices request and response. • Solved defects occurred in application DEV, SYSTEST, INT, and UAT and in production environments. • Develop the logging facilities using Java,J2EE and Log4j Employer Name: Daisy Systems, Inc. Client Name: Stratus Technologies, Inc Role: Software Engineer Duration: 06/01/2006 – 07/30/2007 Team Size: 9 Technology: Java, J2EE, Spring, Web services, JavaScript, AJAX, WebSphere, Oracle, Windows, Spring AOP, Spring MVC, J2EE Design patterns, IBM Web Flow services, Enterprise service bus, Siteminder Project Name: Continuous Availability Lifecycle Management (CALM)
  • 6.
    ABDUL RASOOL SHAIK ContinuousAvailability Lifecycle Management (CALM) portfolio encompasses a range of technology enabled services, including comprehensive support for end-to-end, multi-vendor IT infrastructures. From routine change management procedures to virtualization solutions to SLA’s guaranteed for exceptional Performance our singular focus is on helping you achieve and sustain the highest levels of availability. Role & Responsibilities: • Utilize agile methodology for short term iteration planning of different tasks in application. • Utilize J2EE Core Design patterns to design the application web, controller, business and persistence layers • Develop business application Portlets using Liferay provided API, Service Builder and other Liferay tools. • Integrate Liferay Ajax library tool to send and receive asynchronous request and response to the server through business Portlets. • Customization of built-in Liferay Portlets based on the business requirements. Interacting with Liferay built-in CMS Portlets, User management (Admin Portlets) ETC. • Provide application level validations through Struts provided Validators framework. • Develop Custom Exception handling to display business rule error and alert messages on screens. • Develop custom message dialog boxes use JSF messages tag to display alerts and error messages. • Develop Business Portlets controllers to interact with business layers through spring. • Utilize spring modules and Liferay provided tools to build business, persistency and service layers for the application. • Utilize Liferay Hibernate built-in configuration to develop database session configuration and also develop Joins, Criteria queries, Named Queries, HSQL, and Pojo mapping HBM Files. • Solved defects occurred in application DEV, SYSTEST, INT, and UAT and in PROD environments and updating the status in Quality Center. • Develop Test cases for business layer using JUnit.
  • 7.
    ABDUL RASOOL SHAIK ContinuousAvailability Lifecycle Management (CALM) portfolio encompasses a range of technology enabled services, including comprehensive support for end-to-end, multi-vendor IT infrastructures. From routine change management procedures to virtualization solutions to SLA’s guaranteed for exceptional Performance our singular focus is on helping you achieve and sustain the highest levels of availability. Role & Responsibilities: • Utilize agile methodology for short term iteration planning of different tasks in application. • Utilize J2EE Core Design patterns to design the application web, controller, business and persistence layers • Develop business application Portlets using Liferay provided API, Service Builder and other Liferay tools. • Integrate Liferay Ajax library tool to send and receive asynchronous request and response to the server through business Portlets. • Customization of built-in Liferay Portlets based on the business requirements. Interacting with Liferay built-in CMS Portlets, User management (Admin Portlets) ETC. • Provide application level validations through Struts provided Validators framework. • Develop Custom Exception handling to display business rule error and alert messages on screens. • Develop custom message dialog boxes use JSF messages tag to display alerts and error messages. • Develop Business Portlets controllers to interact with business layers through spring. • Utilize spring modules and Liferay provided tools to build business, persistency and service layers for the application. • Utilize Liferay Hibernate built-in configuration to develop database session configuration and also develop Joins, Criteria queries, Named Queries, HSQL, and Pojo mapping HBM Files. • Solved defects occurred in application DEV, SYSTEST, INT, and UAT and in PROD environments and updating the status in Quality Center. • Develop Test cases for business layer using JUnit.