TSX:AAB
This presentation contains "forward looking information" within the meaning of applicable Canadian securities legislation. Forward
looking information includes, without limitation, statements regarding progress in development of mineral properties, future
production and sales volumes, capital and mine production costs, demand and market outlook for metals, future metal prices and
treatment and refining charges, the future financial or operating performance of the Company, the prospective mineralization of the
investee properties, planned exploration programs, anticipated production schedule and terms and the availability and likelihood of
future acquisitions. Generally, forward looking information can be identified by the use of forward-looking terminology such as "plans",
"expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not
anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could",
"would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks,
uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to
be materially different from those expressed or implied by such forward-looking information including, but not limited to: general
business, economic, competitive, geopolitical and social uncertainties; investment concentration; acquisition risks; environmental
conservation regulations, dependence of technology on specific mineral resources, a limited number of consumers in the
marketplace, other risks of the mining industry which are set out in the company’s Annual Information Form. Although the Company
has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking
information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance
that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in
such statements. Accordingly, readers should not place undue reliance on forward looking information. The Company does not
undertake to update any forward-looking information, except in accordance with applicable securities laws.
The Preliminary Economic Assessment (PEA) disclosed in this presentation is preliminary in nature and includes inferred mineral
resources that are considered too speculative geologically to have the economic considerations applied to them that would be
categorized as mineral reserves and there is no certainty the PEA will be realized. For more details, please see Technical Report dated
22 December 2011, filed on the Rodinia Lithium SEDAR profile at www.sedar.com.
2
Cautionary Statement
TSX:AAB 3
Principal Investment
Growth
Aberdeen has streamlined its holdings
and now provides shareholders with
access to investments in two
exclusive, premium assets—both with
environmental applications.
African Thunder Platinum:
A producing PGM company in South
Africa
Diablillos Lithium:
A Lithium brine development project in
South America
Portfolio Management
and Advisory
Aberdeen is a leader in mining
investing and is using this expertise
to provide portfolio advice and
service to Landmark Partners with
favourable terms.
Asset Management
Advisory Services
A Plan For Success
TSX:AAB
Building for the Future
4
The creation of Ore Acquisition Partners with Landmark Partners to
transfer historical holdings worth ~ $14 million and becoming Asset
Manager and Advisor
The closing of the $28 million acquisition of a South African based
platinum group metals producer with Pala investments to create African
Thunder Platinum
Signed a definitive agreement with Rodinia Lithium for the acquisition of
the Diablillos Lithium Project for $5 million
In 2015, Aberdeen announced three important transactions:
TSX:AAB
Aberdeen has two exclusive mining projects
African Thunder Platinum and Diablillos Lithium.
5
Principal Investments
Investment in these exclusive projects has allowed
Aberdeen to:
 Enter projects on the ground level or to
inexpensively invest in assets with significant
turnaround potential
 Take on an active role in management,
influencing company outcomes and leveraging a
skilled network of experts
TSX:AAB
Mining for a Green Future
6
$0
$500
$1,000
$1,500
$2,000
2012 2013 2014 2015 2016E 2017E
PGM Pricing
Platinum Palladium
$6.00
$6.50
$7.00
$7.50
$8.00
2012 2013 2014 2015 2016E 2017E
Lithium Pricing
LiCO 99.5%
Platinum Group Metals Lithium
Platinum and Palladium are critical in
their use as autocatalyst in both diesel
and gasoline engines to reduce carbon
based emissions.
Lithium Ion batteries have become the
industry standard for the rechargeable
cells used in hybrid and electric cars as
well as in most portable electronics.
Platinum Group Metals and Lithium are both important strategic
metals with compelling environmental benefits
Estimated Estimated
TSX:AAB 7
Platinum is a silvery white metal and is the most
scarce mineral of the PGM group but it is the most
widely used. This is the reason Platinum is
considered the most precious of metals. Platinum
is used as a powerful catalyzing agent and is
considered a premium jewellery metal.
Autocatalysts
44%
Jewellery
34%
Industrial
22%
2015 Worldwide Platinum Usage
Platinum Group Metals
Source: World Platinum Investment Council
Autocatalysts
76%
Jewellery
3%
Industrial
21%
2015 Worldwide Palladium Usage
Palladium is also a silvery white metal and is
generally more abundant than Platinum, though
they are usually found together. Palladium has
excellent catalytic properties, chemical stability
and excellent electrical conductivity. It
dominates the gasoline-engine catalyst markets.
TSX:AAB 8
Demand
 Slowed in short-term due to slow down
in global growth, but with the VW
scandal we expect more focus on
emissions standards
Supply
 Rebounding slightly from lost production
in 2014 due to strikes, yet expect
Western Limb mines to struggle in
2015-2016
Outlook
Poised to rebound strongly as emerging
market growth accelerates in the coming
years, and reducing emissions takes priority
over metals thrifting
Platinum/Palladium Demand
(2,000)
-
2,000
4,000
6,000
8,000
000oz
Platinum Forecast Supply and Demand
Surplus/Defecit Total Supply Net Demand
(2,000)
0
2,000
4,000
6,000
8,000
10,000
000oz
Palladium Forecast Supply and Demand
Surplus/Defecit Total Supply Net Demand
Source: World Platinum Investment Council, BMO Nesbit
Burns Commodities Canvas
TSX:AAB 9
A Platinum Group Metals (PGM) Producer
in South Africa
African Thunder Platinum or ATP is a
private company that Aberdeen founded
with partner Pala Investments in late
2014 – each hold 47%. ATP holds two
strategic low-cost PGM assets:
 The Smokey Hills PGM Mine in the
Eastern Limb (in production).
 50% of the potentially low-cost, open-
pittable, Kalplats PGM Project in the
Kraaipan Greenstone Belt, 330 km
west of Johannesburg.
Location:
South Africa
(Bushveld Complex –
Eastern Limb)
Commodity:
Platinum,
Palladium,
Rhodium
Estimated Value:
~ C$80M entity
value*
Current Status:
Production Restart-
First Concentrate
shipped April ‘15
CEO: George Faught
African Thunder Platinum
*based on similar, publicly comparable companies
TSX:AAB 10
ATP 2015 Milestones:
 Underground mining ramp-up continues at
Smokey Hills PGM Mine after first
concentrate shipped in April 2015
 60,000 tpm UG2 ore mill commissioned in
March 2015 (excess capacity for growth)
 Plans in place to update the Feasibility
Study on the Kalpats open pit deposit
 Advanced discussions on other nearby
PGM properties in the area as possible mill
feed
African Thunder Platinum
TSX:AAB
PGM Cost Curve – Well Positioned
11
Spot PGM basket (Oct 13 2105)
Smokey Hills (Estimated 60,000 oz/yr, $725/oz)
Kalplats (Estimated 100,000 oz/yr, $600/oz)
TSX:AAB
Lithium
Lithium is the lightest of all solid elements
and the first element in the alkali metals
group.
Properties:
 Silvery white, soft and reacts
immediately with air and water.
 Considered a rare element because of
its highly dispersed occurrence in the
earth’s crust
 Economic concentrations occur in salts
from surface and substance brines and
in the minerals petalite, spodumene,
amblygonite-montebrasite and lepidolite
in giant pegmatite deposits.
12
Source: Stormcrow Lithium Market Initiation Report 2015
Aluminium
Production
2%
Other
6%
Metalurgical
Powders
10%
Chemical and
Pharmaceutic
als
17%
Lubricants
11%
Batteries
22%
Glass and
Ceramics
32%
Worldwide Lithium Usage
TSX:AAB
Between 2003 and 2007 the battery
industry doubled its consumption of
lithium carbonate due to the increase
in mobile phones, laptops and
assorted electronic devices.
With electric and hybrid cars
becoming an increasingly popular
green option, the Lithium-ion battery
has become the green battery of
choice putting pressure on the Lithium
supply.
13
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
2002 2007 2012 2017
LiCoTonnage
Li-ion Battery Demand
50,000 tonnes
estimated for the
for the EV car
market alone
Demand Driven By Technology
Source: FoxDavies Lithium Market Report 2013
TSX:AAB 14
Location:
Salar de Diablillos,
Argentina, South
America
Commodity: Lithium, Potash
Estimated Value:
~ C$5M Purchase
Price + 2% NSR
Current Status:
Planning for
Feasibility Study
completion
A near-term lithium project in South
America.
 A Lithium brine project situated in
mining friendly Salta Province
 The Diablillos Project currently owns
>90% of the Salar and controls 100%
of the prospective producing area
 Current land position enables a fast
track to production
 Access to required infrastructure
including, trucking routes, water and
labour
 Sufficient acreage for evaporation
pond construction
Diablillos Lithium Project
TSX:AAB 15
 Historic 2.8 Mt lithium carbonate
equivalent from an in-situ inferred brine
resource of 4.9 Mt lithium carbonate
equivalent
 Favorable Historical Preliminary
Economics:
 Production of 15,000 tonnes lithium
carbonate per year and approximately
51,000 tonnes of potash per year
 Pre-Tax Internal Rate of Return of
34%
 Pre-Tax Net Present Value of US$561
million at an 8% discount rate
 Opportunity to scale production to right-
size the project.
Diablillos Lithium Project
Full disclosure details on the Historic Mineral Resource can be found on page 25. Full disclosure
details on the Historic PEA are found on slides 26 and 27.
TSX:AAB 16
Lithium Cost Curve
Source: Roskill Estimates 2014
Canada Lithium no longer in production. Galaxy operations no longer include mining and purchase concentrates
Estimated Diablillos Cash Cost
TSX:AAB
Aberdeen has been selected by Landmark Partners, a
U.S. based investment manager, to advise on and
manage the Ore Acquisition Partners LP.
As part of this arrangement Aberdeen will be receiving:
 Received approximately $8.1 million in cash +
proceeds of the sale of 325,000 shares of Tahoe
Resources (currently estimated to be $3+ million)
 Advisory fees for a minimum of 3 years and up to 5
years
 Potential for an additional $2 million earn in payment,
and net profits interest from sale of portfolio assets
17
Portfolio Management
TSX:AAB 18
Management
David Stein, CFA, MSc.
President & CEO, Director
Ryan Ptolemy, CGA, CFA
Chief Financial Officer
Scott Roberts, CFA
Investment Strategy and Compliance
Rob Hopkins
Investor Relations
Aberdeen has built its company with strong management who have a depth
of experience in the resource sector and a proven track record at building
companies from the seed level through to highly successful exits.
Board of Directors
Stan Bharti, P.Eng.
Executive Chairman
George Faught, CA
(Vice Chairman)
Independents:
Bernard Wilson, CA
John Begeman, P.Eng.
Maurice Colson
A Team with Experience
TSX:AAB
A Proven Track Record in Creating Value
19
Belo Sun
Allana Potash
Crocodile Gold
Sulliden Gold
Avion Gold
Premier Royalties
Investment Return
$11.20 mm $56.0 mm
$6.25 mm $17.50 mm
$13.61 mm $25.0 mm
$6.97 mm $16.0 mm
$1.81 mm $8.50 mm
$2.81 mm $9.0 mm
2009
2014
5.0x
2.8x
1.9x
2.3x
4.7x
3.2x
Return
TSX:AAB 20
Private Equity Investments
 Unlock Value at African Thunder Platinum and Diablillos Lithium
 Use both companies as a platform for mid-tier low-cost production in
their sectors
 Go-public event within 12-24 months
Corporate Growth
 Deliver value to shareholders with lower net overhead costs
 Continue to build deal flow through management’s network
 Follow through with Normal Course Issuer Bid
 Current NCIB in place to purchase and cancel 10% of the public float of
AAB – up to 7,796,525 shares can be bought back in the open market
this year.
What’s Next?
TSX:AAB 21
TSX: AAB
Shares Issued &
Outstanding
96.7 million
Options 3.46 million
Warrants ($0.30) 10.0 million
Fully Diluted 110.16 million
Share Price
(Jan 2016)
$0.145
Market
Capitalization
$14.02M
52 week High/Low $0.17/$0.11
Major Shareholders
• Management & Insiders 24%
• Canadian High Net Worth
Investors 16%
• Lloyd Miller (Family Office) 10%
• Sulliden Mining 5%
• Investment Partners Asset
Management 4%
Corporate Structure
David Stein
President & CEO
416-861-5812
dstein@aberdeeninternational.ca
Rob Hopkins
Manager, Investor Relations
416-861-5899
info@aberdeeninternational.ca
Follow us:
www.aberdeeninternational.ca
TSX:AAB OTCPS:AABVF
TSX:AAB
Appendix 1: Historic Mineral Resource Details
Table 1 - Brine Resource Estimate, Diablillos Lithium-Potash Project, Salta, Argentina as of March 29, 201l
Aquifer Recoverable
Brine
Volume
Specific
Yield
S. G. Concentration Recoverable
Tonnage
Recoverable
LCE
Recoverable
PE
Recoverable
BAE
(1000m3) (%) Li
(mg/l)
K
(mg/l)
B
(mg/l)
Li (Mt)
(1000)
K (Mt)
(1000)
B (Mt)
(1000)
Li2CO3 Mt
eq. (1000)
KCl Mt
eq. (1000)
Boric Acid
Mt eq.
(1000)
I 41,470 15.00% 1.10 592 6,298 647 25 261 27 131 498 153
II 270,825 18.50% 1.07 471 5,269 540 128 1,427 146 679 2,721 836
III 640,258 18.50% 1.10 589 6,595 691 377 4,223 442 2,007 8,051 2,530
TOTAL 952,553 18.31% 1.09 556 6,206 646 530 5,911 615 2,817 11,270 3,519
This mineral resource is consider a historical estimate and as such, cannot be relied upon. This historical estimate also uses terms such as
"in-situ inferred resource" and "recoverable inferred resource" that are not recognized terms under the 2014 CIM Definition Standards on
Mineral Resources and Mineral Reserves. A qualified person has not done sufficient work to classify this historical estimate as current
mineral resources and the Company is not treating the historical estimate as a current mineral resource for the Diablillos Lithium Project.
Aberdeen will be completing an up-to-date mineral resource estimate and technical report done in accordance with current NI 43-101 and
CIM standards within the prescribed timelines.
Inferred recoverable brine resource estimate for the Salar de Diablillos. Equivalent tonnages are reported as recoverable in metric tonnes
("Mt") and were calculated using standard conversion rates as determined by the chemical composition of the final product, and are
independent of price and mining processes. A 230 mg/l Li cut off was used for all resource estimations.
Notes:
1. Recoverable resources are determined by the specific yield which is the unit volume of fluid that will drain under gravity. The specific
yield values may change when further data from the Diablillos deposit are collected. These resources do not include allowance for
losses in extraction of Li, K and B from brines in a treatment plant.
2. The economic cut-off applied was based on analogous deposits.
3. Assumptions regarding thicknesses of Aquifer ll and lll may change with more detailed drilling and geophysical data.
4. The effective date of the estimate is March 1, 2011.
25
TSX:AAB
Appendix 2: Preliminary Economic Assessment
*Averaged using years of full production, discounting ramp up period. *Assumes average sale price of US$5,500/t LC; US$620/t KCl; and
US$1,150/t boric acid.
Production Case: 15,000 tpa LC 25,000 tpa LC
NPV at 8% discount rate $561 million $964 million
IRR 34% 36%
Total Initial Capital Costs $144 million $220 million
Operating Costs per tonne LC* $1,519 $1,486
Operating Costs per tonne LC with potash and
boric acid credits
($703) ($762)
Operating Costs per tonne KCl* $170 $160
Average annual free cash flow* $89 million $150 million
Mine life 20+ 20+
Annual production rate of potash* 51,000 85,000
Annual production rate of boric acid* 18,000 31,000
Years to payback 1.6 years 1.5 years
The PEA and technical report were completed by SRK Consulting and filed on the Rodinia Lithium SEDAR profile at www.sedar.com on December 22,
2011. The PEA is not compliant with current NI 43-101 standards and as such, the disclosed project economic details are considered historical in
nature and should not be relied upon. The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative
geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no
certainty that the PEA will be realized. Aberdeen will be completing an up-to-date technical report done in accordance with current NI 43-101
standards within the prescribed timelines. A Preliminary Economic Assessment (PEA) is preliminary in nature and includes inferred mineral resources
that are considered too speculative geologically to have the economic considerations applied to them that would be categorized as mineral reserves
and there is no certainty the PEA will be realized.
26
TSX:AAB
Appendix 2: Preliminary Economic Assessment
The Company notes that this does not include an analysis of after tax economics. Generally speaking, applicable taxes for mining in the
Puna region of Salta, Argentina are subject to a federal income tax rate of 35% and export duties, or retentions, of 5% on industrialized
products that are exported from the country. However, as per certain resolutions passed by the Argentine Federal Ministry of Economy,
lithium, lithium oxide, lithium hydroxide, lithium carbonate and lithium chloride are subject to a special benefit which provides a 5%
reimbursement of value of exports of such products extracted from the Puna Region. In addition, the Company would be subject to
royalties in the amount of 3% payable to the Province of Salta. Generally speaking, Law Nº 24,196, known as the Federal Mining
Investments Promotion Law in Argentina grants several privileges to mining companies registered with the Federal Mining Secretariat.
As the Company’s wholly-owned subsidiary which holds the property is registered pursuant to Law Nº 24,196 with the Federal Mining
Secretariat, the Company has the benefit of a tax stability regime which provides that for thirty (30) years from the date a feasibility is
filed a company will only be subject to the federal, provincial and municipal taxes in effect at the time of filing and that any increase in tax
rates or new taxes will not apply to a company so registered. In addition, by virtue of being registered with the Federal Mining
Secretariat: (i) sums invested in prospecting, exploration and in any other expenses necessary to determine the feasibility of the project
incurred before the filing of the feasibility study enjoy double deductibility; (ii) accelerated depreciation regime is applicable to new
mining projects and to the enlargement of the existing ones, as well as all the capital investments made during exploitation; (iii) profits
that its shareholders may gain from the contribution of mines or mining rights as capital are exempt from income tax; and (iv) investors
may capitalize up to fifty percent (50%) of the assessment of economically exploitable mining reserves certified by an authorized
professional.
27

More Related Content

What's hot

Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)PetroMagdalena
 
PVA BMO Investor Presentation 2013
PVA BMO Investor Presentation 2013PVA BMO Investor Presentation 2013
PVA BMO Investor Presentation 2013PennVirginiaCorp
 
International Lithium Presentation December 2017.
International Lithium Presentation December 2017.International Lithium Presentation December 2017.
International Lithium Presentation December 2017.Kirill Klip
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012PetroMagdalena
 
Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017
Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017
Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017Kirill Klip
 
TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017
TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017
TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017Kirill Klip
 
Seabridge Corporate Presentation - February 2014
Seabridge Corporate Presentation - February 2014Seabridge Corporate Presentation - February 2014
Seabridge Corporate Presentation - February 2014Company Spotlight
 
Seabridge Corporate Presentation Jan 2014
Seabridge Corporate Presentation Jan 2014Seabridge Corporate Presentation Jan 2014
Seabridge Corporate Presentation Jan 2014Company Spotlight
 
Seabridge Gold Corporate presentation
Seabridge Gold Corporate presentationSeabridge Gold Corporate presentation
Seabridge Gold Corporate presentationCompany Spotlight
 
Pmd -investor_presentation__jan_2012__final
Pmd  -investor_presentation__jan_2012__finalPmd  -investor_presentation__jan_2012__final
Pmd -investor_presentation__jan_2012__finalPetroMagdalena
 
International Lithium: Royalty And Strategic Investments Company Presentation...
International Lithium: Royalty And Strategic Investments Company Presentation...International Lithium: Royalty And Strategic Investments Company Presentation...
International Lithium: Royalty And Strategic Investments Company Presentation...Kirill Klip
 
Royal Dutch Shell plc second quarter 2016 results webcast presentation
Royal Dutch Shell plc second quarter 2016 results webcast presentationRoyal Dutch Shell plc second quarter 2016 results webcast presentation
Royal Dutch Shell plc second quarter 2016 results webcast presentationShell plc
 
International Lithium Presentation January 2018.
International Lithium Presentation January 2018.International Lithium Presentation January 2018.
International Lithium Presentation January 2018.Kirill Klip
 
International Lithium Presentation May 2017
International Lithium Presentation May 2017International Lithium Presentation May 2017
International Lithium Presentation May 2017Kirill Klip
 

What's hot (20)

Investor Presentation - October 2013
Investor Presentation - October 2013Investor Presentation - October 2013
Investor Presentation - October 2013
 
September Investor Presentation
September Investor PresentationSeptember Investor Presentation
September Investor Presentation
 
Hecla apr13invpres
Hecla apr13invpresHecla apr13invpres
Hecla apr13invpres
 
Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)Investor Presentation - September 2011 (English)
Investor Presentation - September 2011 (English)
 
PVA BMO Investor Presentation 2013
PVA BMO Investor Presentation 2013PVA BMO Investor Presentation 2013
PVA BMO Investor Presentation 2013
 
PMD February
PMD FebruaryPMD February
PMD February
 
International Lithium Presentation December 2017.
International Lithium Presentation December 2017.International Lithium Presentation December 2017.
International Lithium Presentation December 2017.
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012
 
Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017
Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017
Green Energy Metals Royalty Co.: TNR Gold Investor Presentation June 2017
 
TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017
TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017
TNR Gold: Shotgun Gold Project, Alaska. Presentation June 2017
 
Seabridge Corporate Presentation - February 2014
Seabridge Corporate Presentation - February 2014Seabridge Corporate Presentation - February 2014
Seabridge Corporate Presentation - February 2014
 
Seabridge Corporate Presentation Jan 2014
Seabridge Corporate Presentation Jan 2014Seabridge Corporate Presentation Jan 2014
Seabridge Corporate Presentation Jan 2014
 
Seabridge Gold Corporate presentation
Seabridge Gold Corporate presentationSeabridge Gold Corporate presentation
Seabridge Gold Corporate presentation
 
Cypress Development Corporate Presentation
Cypress Development Corporate Presentation Cypress Development Corporate Presentation
Cypress Development Corporate Presentation
 
Pmd -investor_presentation__jan_2012__final
Pmd  -investor_presentation__jan_2012__finalPmd  -investor_presentation__jan_2012__final
Pmd -investor_presentation__jan_2012__final
 
International Lithium: Royalty And Strategic Investments Company Presentation...
International Lithium: Royalty And Strategic Investments Company Presentation...International Lithium: Royalty And Strategic Investments Company Presentation...
International Lithium: Royalty And Strategic Investments Company Presentation...
 
Royal Dutch Shell plc second quarter 2016 results webcast presentation
Royal Dutch Shell plc second quarter 2016 results webcast presentationRoyal Dutch Shell plc second quarter 2016 results webcast presentation
Royal Dutch Shell plc second quarter 2016 results webcast presentation
 
International Lithium Presentation January 2018.
International Lithium Presentation January 2018.International Lithium Presentation January 2018.
International Lithium Presentation January 2018.
 
International Lithium Presentation May 2017
International Lithium Presentation May 2017International Lithium Presentation May 2017
International Lithium Presentation May 2017
 
Seabridge may13pres
Seabridge may13presSeabridge may13pres
Seabridge may13pres
 

Viewers also liked

20120518 advanced jsrendertemplatingfeatures
20120518 advanced jsrendertemplatingfeatures20120518 advanced jsrendertemplatingfeatures
20120518 advanced jsrendertemplatingfeaturesLearningTech
 
تنصيب Oracl 9I
تنصيب Oracl 9Iتنصيب Oracl 9I
تنصيب Oracl 9Iguest481a1f
 
Oracle Database 11g Release 2 Installation
Oracle Database 11g Release 2 InstallationOracle Database 11g Release 2 Installation
Oracle Database 11g Release 2 InstallationKuwait10
 
Oracle Database 10g Release 2 Installation
Oracle Database 10g Release 2 InstallationOracle Database 10g Release 2 Installation
Oracle Database 10g Release 2 InstallationKuwait10
 
AAA & RADIUS Protocols
AAA & RADIUS ProtocolsAAA & RADIUS Protocols
AAA & RADIUS ProtocolsPeter R. Egli
 
WTF - Why the Future Is Up to Us - pptx version
WTF - Why the Future Is Up to Us - pptx versionWTF - Why the Future Is Up to Us - pptx version
WTF - Why the Future Is Up to Us - pptx versionTim O'Reilly
 
The Future of Everything
The Future of EverythingThe Future of Everything
The Future of EverythingCharbel Zeaiter
 
Can We Assess Creativity?
Can We Assess Creativity?Can We Assess Creativity?
Can We Assess Creativity?John Spencer
 
Mobile-First SEO - The Marketers Edition #3XEDigital
Mobile-First SEO - The Marketers Edition #3XEDigitalMobile-First SEO - The Marketers Edition #3XEDigital
Mobile-First SEO - The Marketers Edition #3XEDigitalAleyda Solís
 
Guided Reading: Making the Most of It
Guided Reading: Making the Most of ItGuided Reading: Making the Most of It
Guided Reading: Making the Most of ItJennifer Jones
 

Viewers also liked (14)

AAD with MVC App
AAD with MVC AppAAD with MVC App
AAD with MVC App
 
Prevision mercredi 09 septembre 2015
Prevision mercredi 09 septembre 2015Prevision mercredi 09 septembre 2015
Prevision mercredi 09 septembre 2015
 
Plaidoyer du Collectif pour l'éradication du travail des "petites bonnes" - V...
Plaidoyer du Collectif pour l'éradication du travail des "petites bonnes" - V...Plaidoyer du Collectif pour l'éradication du travail des "petites bonnes" - V...
Plaidoyer du Collectif pour l'éradication du travail des "petites bonnes" - V...
 
20120518 advanced jsrendertemplatingfeatures
20120518 advanced jsrendertemplatingfeatures20120518 advanced jsrendertemplatingfeatures
20120518 advanced jsrendertemplatingfeatures
 
تنصيب Oracl 9I
تنصيب Oracl 9Iتنصيب Oracl 9I
تنصيب Oracl 9I
 
Oracle Database 11g Release 2 Installation
Oracle Database 11g Release 2 InstallationOracle Database 11g Release 2 Installation
Oracle Database 11g Release 2 Installation
 
Oracle Database 10g Release 2 Installation
Oracle Database 10g Release 2 InstallationOracle Database 10g Release 2 Installation
Oracle Database 10g Release 2 Installation
 
AAA & RADIUS Protocols
AAA & RADIUS ProtocolsAAA & RADIUS Protocols
AAA & RADIUS Protocols
 
WTF - Why the Future Is Up to Us - pptx version
WTF - Why the Future Is Up to Us - pptx versionWTF - Why the Future Is Up to Us - pptx version
WTF - Why the Future Is Up to Us - pptx version
 
The Future of Everything
The Future of EverythingThe Future of Everything
The Future of Everything
 
Can We Assess Creativity?
Can We Assess Creativity?Can We Assess Creativity?
Can We Assess Creativity?
 
Mobile-First SEO - The Marketers Edition #3XEDigital
Mobile-First SEO - The Marketers Edition #3XEDigitalMobile-First SEO - The Marketers Edition #3XEDigital
Mobile-First SEO - The Marketers Edition #3XEDigital
 
Guided Reading: Making the Most of It
Guided Reading: Making the Most of ItGuided Reading: Making the Most of It
Guided Reading: Making the Most of It
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Similar to AAB Corporate Presentation January 2016

Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen_AAB
 
Fortune investor presentation2014
Fortune investor presentation2014Fortune investor presentation2014
Fortune investor presentation2014Company Spotlight
 
Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014Company Spotlight
 
Hong-Kong-2012-REE-Presentation-FINAL.pdf
Hong-Kong-2012-REE-Presentation-FINAL.pdfHong-Kong-2012-REE-Presentation-FINAL.pdf
Hong-Kong-2012-REE-Presentation-FINAL.pdfTAPASH13
 
Corporate Presentation June 2018
Corporate Presentation June 2018Corporate Presentation June 2018
Corporate Presentation June 2018Western Areas Ltd
 
Corporate Presentation May 2018
Corporate Presentation May 2018Corporate Presentation May 2018
Corporate Presentation May 2018Western Areas Ltd
 
Breakaway session final, mining finance, jan 22, 2014
Breakaway session   final, mining finance, jan 22, 2014Breakaway session   final, mining finance, jan 22, 2014
Breakaway session final, mining finance, jan 22, 2014RoyalGold
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceDetourGold
 
SAC September 2011 Corporate Presentation
SAC September 2011 Corporate PresentationSAC September 2011 Corporate Presentation
SAC September 2011 Corporate Presentationsoamsilver
 
Investor Intel Presentation
Investor Intel Presentation Investor Intel Presentation
Investor Intel Presentation Alkane Resources
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDetourGold
 
Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019
Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019
Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019RedChip Companies, Inc.
 
SAC August 2011 Corporate Presentation
SAC August 2011 Corporate PresentationSAC August 2011 Corporate Presentation
SAC August 2011 Corporate Presentationsoamsilver
 
SAC September 2011 Corporate Presentation
SAC September 2011 Corporate PresentationSAC September 2011 Corporate Presentation
SAC September 2011 Corporate Presentationsoamsilver
 
Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019RedChip Companies, Inc.
 
Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)RoyalGold
 
Orbite presentation april 2013 final 930
Orbite presentation april 2013 final   930Orbite presentation april 2013 final   930
Orbite presentation april 2013 final 930proedge2013
 

Similar to AAB Corporate Presentation January 2016 (20)

Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016
 
Fortune investor presentation2014
Fortune investor presentation2014Fortune investor presentation2014
Fortune investor presentation2014
 
Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014
 
Hong-Kong-2012-REE-Presentation-FINAL.pdf
Hong-Kong-2012-REE-Presentation-FINAL.pdfHong-Kong-2012-REE-Presentation-FINAL.pdf
Hong-Kong-2012-REE-Presentation-FINAL.pdf
 
Corporate Presentation June 2018
Corporate Presentation June 2018Corporate Presentation June 2018
Corporate Presentation June 2018
 
Corporate Presentation May 2018
Corporate Presentation May 2018Corporate Presentation May 2018
Corporate Presentation May 2018
 
Breakaway session final, mining finance, jan 22, 2014
Breakaway session   final, mining finance, jan 22, 2014Breakaway session   final, mining finance, jan 22, 2014
Breakaway session final, mining finance, jan 22, 2014
 
RBC Global Mining and Materials Conference
RBC Global Mining and Materials ConferenceRBC Global Mining and Materials Conference
RBC Global Mining and Materials Conference
 
Nap investor presentation_may_2012
Nap investor presentation_may_2012Nap investor presentation_may_2012
Nap investor presentation_may_2012
 
SAC September 2011 Corporate Presentation
SAC September 2011 Corporate PresentationSAC September 2011 Corporate Presentation
SAC September 2011 Corporate Presentation
 
Investor Intel Presentation
Investor Intel Presentation Investor Intel Presentation
Investor Intel Presentation
 
Dgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conferenceDgc 13 05_14-16_bo_aml conference
Dgc 13 05_14-16_bo_aml conference
 
Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019
Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019
Piedmont Lithium (NASDAQ: PLL) Corporate Presentation September 2019
 
Nap investor presentation august 2012
Nap investor presentation august 2012Nap investor presentation august 2012
Nap investor presentation august 2012
 
SAC August 2011 Corporate Presentation
SAC August 2011 Corporate PresentationSAC August 2011 Corporate Presentation
SAC August 2011 Corporate Presentation
 
19 kgi-big eventgaladinner-26may15
19 kgi-big eventgaladinner-26may1519 kgi-big eventgaladinner-26may15
19 kgi-big eventgaladinner-26may15
 
SAC September 2011 Corporate Presentation
SAC September 2011 Corporate PresentationSAC September 2011 Corporate Presentation
SAC September 2011 Corporate Presentation
 
Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019
 
Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)
 
Orbite presentation april 2013 final 930
Orbite presentation april 2013 final   930Orbite presentation april 2013 final   930
Orbite presentation april 2013 final 930
 

More from Aberdeen International

Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International
 
Abderdeen International Corporate Presentation
Abderdeen International Corporate PresentationAbderdeen International Corporate Presentation
Abderdeen International Corporate PresentationAberdeen International
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International
 
Aberdeen International Corp Pres July 15
Aberdeen International Corp Pres July 15Aberdeen International Corp Pres July 15
Aberdeen International Corp Pres July 15Aberdeen International
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International
 
Aberdeen Corporate Presentation April 22 2011
Aberdeen Corporate Presentation   April 22 2011Aberdeen Corporate Presentation   April 22 2011
Aberdeen Corporate Presentation April 22 2011Aberdeen International
 
Aberdeen Corporate Presentation Feb 2011
Aberdeen Corporate Presentation  Feb 2011Aberdeen Corporate Presentation  Feb 2011
Aberdeen Corporate Presentation Feb 2011Aberdeen International
 
Aberdeen International Corp Pres - Jan 2011
Aberdeen International Corp Pres - Jan 2011Aberdeen International Corp Pres - Jan 2011
Aberdeen International Corp Pres - Jan 2011Aberdeen International
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International
 

More from Aberdeen International (19)

Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate Presentation
 
Aberdeen Corporate Presesentation
Aberdeen Corporate PresesentationAberdeen Corporate Presesentation
Aberdeen Corporate Presesentation
 
Abderdeen International Corporate Presentation
Abderdeen International Corporate PresentationAbderdeen International Corporate Presentation
Abderdeen International Corporate Presentation
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate Presesentation
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate Presesentation
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate Presesentation
 
Aberdeen International Corporate Presesentation
Aberdeen International Corporate PresesentationAberdeen International Corporate Presesentation
Aberdeen International Corporate Presesentation
 
Aberdeen International Corp Pres July 15
Aberdeen International Corp Pres July 15Aberdeen International Corp Pres July 15
Aberdeen International Corp Pres July 15
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate Presentation
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate Presentation
 
Aberdeen Corporate Presentation April 22 2011
Aberdeen Corporate Presentation   April 22 2011Aberdeen Corporate Presentation   April 22 2011
Aberdeen Corporate Presentation April 22 2011
 
Aberdeen International Corporate Pres
Aberdeen International Corporate PresAberdeen International Corporate Pres
Aberdeen International Corporate Pres
 
Aberdeen Corporate Presentation Feb 2011
Aberdeen Corporate Presentation  Feb 2011Aberdeen Corporate Presentation  Feb 2011
Aberdeen Corporate Presentation Feb 2011
 
Aberdeen International Corp Pres - Jan 2011
Aberdeen International Corp Pres - Jan 2011Aberdeen International Corp Pres - Jan 2011
Aberdeen International Corp Pres - Jan 2011
 
Aberdeen Corporate Presentation
Aberdeen Corporate PresentationAberdeen Corporate Presentation
Aberdeen Corporate Presentation
 
Aberdeen Corp Pres October 2010
Aberdeen Corp Pres October 2010Aberdeen Corp Pres October 2010
Aberdeen Corp Pres October 2010
 
AAB Corporate Presentation
AAB Corporate PresentationAAB Corporate Presentation
AAB Corporate Presentation
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate Presentation
 
Aberdeen International Corporate Presentation
Aberdeen International Corporate PresentationAberdeen International Corporate Presentation
Aberdeen International Corporate Presentation
 

Recently uploaded

High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 

Recently uploaded (20)

Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 

AAB Corporate Presentation January 2016

  • 2. TSX:AAB This presentation contains "forward looking information" within the meaning of applicable Canadian securities legislation. Forward looking information includes, without limitation, statements regarding progress in development of mineral properties, future production and sales volumes, capital and mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the future financial or operating performance of the Company, the prospective mineralization of the investee properties, planned exploration programs, anticipated production schedule and terms and the availability and likelihood of future acquisitions. Generally, forward looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information including, but not limited to: general business, economic, competitive, geopolitical and social uncertainties; investment concentration; acquisition risks; environmental conservation regulations, dependence of technology on specific mineral resources, a limited number of consumers in the marketplace, other risks of the mining industry which are set out in the company’s Annual Information Form. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws. The Preliminary Economic Assessment (PEA) disclosed in this presentation is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would be categorized as mineral reserves and there is no certainty the PEA will be realized. For more details, please see Technical Report dated 22 December 2011, filed on the Rodinia Lithium SEDAR profile at www.sedar.com. 2 Cautionary Statement
  • 3. TSX:AAB 3 Principal Investment Growth Aberdeen has streamlined its holdings and now provides shareholders with access to investments in two exclusive, premium assets—both with environmental applications. African Thunder Platinum: A producing PGM company in South Africa Diablillos Lithium: A Lithium brine development project in South America Portfolio Management and Advisory Aberdeen is a leader in mining investing and is using this expertise to provide portfolio advice and service to Landmark Partners with favourable terms. Asset Management Advisory Services A Plan For Success
  • 4. TSX:AAB Building for the Future 4 The creation of Ore Acquisition Partners with Landmark Partners to transfer historical holdings worth ~ $14 million and becoming Asset Manager and Advisor The closing of the $28 million acquisition of a South African based platinum group metals producer with Pala investments to create African Thunder Platinum Signed a definitive agreement with Rodinia Lithium for the acquisition of the Diablillos Lithium Project for $5 million In 2015, Aberdeen announced three important transactions:
  • 5. TSX:AAB Aberdeen has two exclusive mining projects African Thunder Platinum and Diablillos Lithium. 5 Principal Investments Investment in these exclusive projects has allowed Aberdeen to:  Enter projects on the ground level or to inexpensively invest in assets with significant turnaround potential  Take on an active role in management, influencing company outcomes and leveraging a skilled network of experts
  • 6. TSX:AAB Mining for a Green Future 6 $0 $500 $1,000 $1,500 $2,000 2012 2013 2014 2015 2016E 2017E PGM Pricing Platinum Palladium $6.00 $6.50 $7.00 $7.50 $8.00 2012 2013 2014 2015 2016E 2017E Lithium Pricing LiCO 99.5% Platinum Group Metals Lithium Platinum and Palladium are critical in their use as autocatalyst in both diesel and gasoline engines to reduce carbon based emissions. Lithium Ion batteries have become the industry standard for the rechargeable cells used in hybrid and electric cars as well as in most portable electronics. Platinum Group Metals and Lithium are both important strategic metals with compelling environmental benefits Estimated Estimated
  • 7. TSX:AAB 7 Platinum is a silvery white metal and is the most scarce mineral of the PGM group but it is the most widely used. This is the reason Platinum is considered the most precious of metals. Platinum is used as a powerful catalyzing agent and is considered a premium jewellery metal. Autocatalysts 44% Jewellery 34% Industrial 22% 2015 Worldwide Platinum Usage Platinum Group Metals Source: World Platinum Investment Council Autocatalysts 76% Jewellery 3% Industrial 21% 2015 Worldwide Palladium Usage Palladium is also a silvery white metal and is generally more abundant than Platinum, though they are usually found together. Palladium has excellent catalytic properties, chemical stability and excellent electrical conductivity. It dominates the gasoline-engine catalyst markets.
  • 8. TSX:AAB 8 Demand  Slowed in short-term due to slow down in global growth, but with the VW scandal we expect more focus on emissions standards Supply  Rebounding slightly from lost production in 2014 due to strikes, yet expect Western Limb mines to struggle in 2015-2016 Outlook Poised to rebound strongly as emerging market growth accelerates in the coming years, and reducing emissions takes priority over metals thrifting Platinum/Palladium Demand (2,000) - 2,000 4,000 6,000 8,000 000oz Platinum Forecast Supply and Demand Surplus/Defecit Total Supply Net Demand (2,000) 0 2,000 4,000 6,000 8,000 10,000 000oz Palladium Forecast Supply and Demand Surplus/Defecit Total Supply Net Demand Source: World Platinum Investment Council, BMO Nesbit Burns Commodities Canvas
  • 9. TSX:AAB 9 A Platinum Group Metals (PGM) Producer in South Africa African Thunder Platinum or ATP is a private company that Aberdeen founded with partner Pala Investments in late 2014 – each hold 47%. ATP holds two strategic low-cost PGM assets:  The Smokey Hills PGM Mine in the Eastern Limb (in production).  50% of the potentially low-cost, open- pittable, Kalplats PGM Project in the Kraaipan Greenstone Belt, 330 km west of Johannesburg. Location: South Africa (Bushveld Complex – Eastern Limb) Commodity: Platinum, Palladium, Rhodium Estimated Value: ~ C$80M entity value* Current Status: Production Restart- First Concentrate shipped April ‘15 CEO: George Faught African Thunder Platinum *based on similar, publicly comparable companies
  • 10. TSX:AAB 10 ATP 2015 Milestones:  Underground mining ramp-up continues at Smokey Hills PGM Mine after first concentrate shipped in April 2015  60,000 tpm UG2 ore mill commissioned in March 2015 (excess capacity for growth)  Plans in place to update the Feasibility Study on the Kalpats open pit deposit  Advanced discussions on other nearby PGM properties in the area as possible mill feed African Thunder Platinum
  • 11. TSX:AAB PGM Cost Curve – Well Positioned 11 Spot PGM basket (Oct 13 2105) Smokey Hills (Estimated 60,000 oz/yr, $725/oz) Kalplats (Estimated 100,000 oz/yr, $600/oz)
  • 12. TSX:AAB Lithium Lithium is the lightest of all solid elements and the first element in the alkali metals group. Properties:  Silvery white, soft and reacts immediately with air and water.  Considered a rare element because of its highly dispersed occurrence in the earth’s crust  Economic concentrations occur in salts from surface and substance brines and in the minerals petalite, spodumene, amblygonite-montebrasite and lepidolite in giant pegmatite deposits. 12 Source: Stormcrow Lithium Market Initiation Report 2015 Aluminium Production 2% Other 6% Metalurgical Powders 10% Chemical and Pharmaceutic als 17% Lubricants 11% Batteries 22% Glass and Ceramics 32% Worldwide Lithium Usage
  • 13. TSX:AAB Between 2003 and 2007 the battery industry doubled its consumption of lithium carbonate due to the increase in mobile phones, laptops and assorted electronic devices. With electric and hybrid cars becoming an increasingly popular green option, the Lithium-ion battery has become the green battery of choice putting pressure on the Lithium supply. 13 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 2002 2007 2012 2017 LiCoTonnage Li-ion Battery Demand 50,000 tonnes estimated for the for the EV car market alone Demand Driven By Technology Source: FoxDavies Lithium Market Report 2013
  • 14. TSX:AAB 14 Location: Salar de Diablillos, Argentina, South America Commodity: Lithium, Potash Estimated Value: ~ C$5M Purchase Price + 2% NSR Current Status: Planning for Feasibility Study completion A near-term lithium project in South America.  A Lithium brine project situated in mining friendly Salta Province  The Diablillos Project currently owns >90% of the Salar and controls 100% of the prospective producing area  Current land position enables a fast track to production  Access to required infrastructure including, trucking routes, water and labour  Sufficient acreage for evaporation pond construction Diablillos Lithium Project
  • 15. TSX:AAB 15  Historic 2.8 Mt lithium carbonate equivalent from an in-situ inferred brine resource of 4.9 Mt lithium carbonate equivalent  Favorable Historical Preliminary Economics:  Production of 15,000 tonnes lithium carbonate per year and approximately 51,000 tonnes of potash per year  Pre-Tax Internal Rate of Return of 34%  Pre-Tax Net Present Value of US$561 million at an 8% discount rate  Opportunity to scale production to right- size the project. Diablillos Lithium Project Full disclosure details on the Historic Mineral Resource can be found on page 25. Full disclosure details on the Historic PEA are found on slides 26 and 27.
  • 16. TSX:AAB 16 Lithium Cost Curve Source: Roskill Estimates 2014 Canada Lithium no longer in production. Galaxy operations no longer include mining and purchase concentrates Estimated Diablillos Cash Cost
  • 17. TSX:AAB Aberdeen has been selected by Landmark Partners, a U.S. based investment manager, to advise on and manage the Ore Acquisition Partners LP. As part of this arrangement Aberdeen will be receiving:  Received approximately $8.1 million in cash + proceeds of the sale of 325,000 shares of Tahoe Resources (currently estimated to be $3+ million)  Advisory fees for a minimum of 3 years and up to 5 years  Potential for an additional $2 million earn in payment, and net profits interest from sale of portfolio assets 17 Portfolio Management
  • 18. TSX:AAB 18 Management David Stein, CFA, MSc. President & CEO, Director Ryan Ptolemy, CGA, CFA Chief Financial Officer Scott Roberts, CFA Investment Strategy and Compliance Rob Hopkins Investor Relations Aberdeen has built its company with strong management who have a depth of experience in the resource sector and a proven track record at building companies from the seed level through to highly successful exits. Board of Directors Stan Bharti, P.Eng. Executive Chairman George Faught, CA (Vice Chairman) Independents: Bernard Wilson, CA John Begeman, P.Eng. Maurice Colson A Team with Experience
  • 19. TSX:AAB A Proven Track Record in Creating Value 19 Belo Sun Allana Potash Crocodile Gold Sulliden Gold Avion Gold Premier Royalties Investment Return $11.20 mm $56.0 mm $6.25 mm $17.50 mm $13.61 mm $25.0 mm $6.97 mm $16.0 mm $1.81 mm $8.50 mm $2.81 mm $9.0 mm 2009 2014 5.0x 2.8x 1.9x 2.3x 4.7x 3.2x Return
  • 20. TSX:AAB 20 Private Equity Investments  Unlock Value at African Thunder Platinum and Diablillos Lithium  Use both companies as a platform for mid-tier low-cost production in their sectors  Go-public event within 12-24 months Corporate Growth  Deliver value to shareholders with lower net overhead costs  Continue to build deal flow through management’s network  Follow through with Normal Course Issuer Bid  Current NCIB in place to purchase and cancel 10% of the public float of AAB – up to 7,796,525 shares can be bought back in the open market this year. What’s Next?
  • 21. TSX:AAB 21 TSX: AAB Shares Issued & Outstanding 96.7 million Options 3.46 million Warrants ($0.30) 10.0 million Fully Diluted 110.16 million Share Price (Jan 2016) $0.145 Market Capitalization $14.02M 52 week High/Low $0.17/$0.11 Major Shareholders • Management & Insiders 24% • Canadian High Net Worth Investors 16% • Lloyd Miller (Family Office) 10% • Sulliden Mining 5% • Investment Partners Asset Management 4% Corporate Structure
  • 22. David Stein President & CEO 416-861-5812 dstein@aberdeeninternational.ca Rob Hopkins Manager, Investor Relations 416-861-5899 info@aberdeeninternational.ca Follow us: www.aberdeeninternational.ca TSX:AAB OTCPS:AABVF
  • 23. TSX:AAB Appendix 1: Historic Mineral Resource Details Table 1 - Brine Resource Estimate, Diablillos Lithium-Potash Project, Salta, Argentina as of March 29, 201l Aquifer Recoverable Brine Volume Specific Yield S. G. Concentration Recoverable Tonnage Recoverable LCE Recoverable PE Recoverable BAE (1000m3) (%) Li (mg/l) K (mg/l) B (mg/l) Li (Mt) (1000) K (Mt) (1000) B (Mt) (1000) Li2CO3 Mt eq. (1000) KCl Mt eq. (1000) Boric Acid Mt eq. (1000) I 41,470 15.00% 1.10 592 6,298 647 25 261 27 131 498 153 II 270,825 18.50% 1.07 471 5,269 540 128 1,427 146 679 2,721 836 III 640,258 18.50% 1.10 589 6,595 691 377 4,223 442 2,007 8,051 2,530 TOTAL 952,553 18.31% 1.09 556 6,206 646 530 5,911 615 2,817 11,270 3,519 This mineral resource is consider a historical estimate and as such, cannot be relied upon. This historical estimate also uses terms such as "in-situ inferred resource" and "recoverable inferred resource" that are not recognized terms under the 2014 CIM Definition Standards on Mineral Resources and Mineral Reserves. A qualified person has not done sufficient work to classify this historical estimate as current mineral resources and the Company is not treating the historical estimate as a current mineral resource for the Diablillos Lithium Project. Aberdeen will be completing an up-to-date mineral resource estimate and technical report done in accordance with current NI 43-101 and CIM standards within the prescribed timelines. Inferred recoverable brine resource estimate for the Salar de Diablillos. Equivalent tonnages are reported as recoverable in metric tonnes ("Mt") and were calculated using standard conversion rates as determined by the chemical composition of the final product, and are independent of price and mining processes. A 230 mg/l Li cut off was used for all resource estimations. Notes: 1. Recoverable resources are determined by the specific yield which is the unit volume of fluid that will drain under gravity. The specific yield values may change when further data from the Diablillos deposit are collected. These resources do not include allowance for losses in extraction of Li, K and B from brines in a treatment plant. 2. The economic cut-off applied was based on analogous deposits. 3. Assumptions regarding thicknesses of Aquifer ll and lll may change with more detailed drilling and geophysical data. 4. The effective date of the estimate is March 1, 2011. 25
  • 24. TSX:AAB Appendix 2: Preliminary Economic Assessment *Averaged using years of full production, discounting ramp up period. *Assumes average sale price of US$5,500/t LC; US$620/t KCl; and US$1,150/t boric acid. Production Case: 15,000 tpa LC 25,000 tpa LC NPV at 8% discount rate $561 million $964 million IRR 34% 36% Total Initial Capital Costs $144 million $220 million Operating Costs per tonne LC* $1,519 $1,486 Operating Costs per tonne LC with potash and boric acid credits ($703) ($762) Operating Costs per tonne KCl* $170 $160 Average annual free cash flow* $89 million $150 million Mine life 20+ 20+ Annual production rate of potash* 51,000 85,000 Annual production rate of boric acid* 18,000 31,000 Years to payback 1.6 years 1.5 years The PEA and technical report were completed by SRK Consulting and filed on the Rodinia Lithium SEDAR profile at www.sedar.com on December 22, 2011. The PEA is not compliant with current NI 43-101 standards and as such, the disclosed project economic details are considered historical in nature and should not be relied upon. The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Aberdeen will be completing an up-to-date technical report done in accordance with current NI 43-101 standards within the prescribed timelines. A Preliminary Economic Assessment (PEA) is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would be categorized as mineral reserves and there is no certainty the PEA will be realized. 26
  • 25. TSX:AAB Appendix 2: Preliminary Economic Assessment The Company notes that this does not include an analysis of after tax economics. Generally speaking, applicable taxes for mining in the Puna region of Salta, Argentina are subject to a federal income tax rate of 35% and export duties, or retentions, of 5% on industrialized products that are exported from the country. However, as per certain resolutions passed by the Argentine Federal Ministry of Economy, lithium, lithium oxide, lithium hydroxide, lithium carbonate and lithium chloride are subject to a special benefit which provides a 5% reimbursement of value of exports of such products extracted from the Puna Region. In addition, the Company would be subject to royalties in the amount of 3% payable to the Province of Salta. Generally speaking, Law Nº 24,196, known as the Federal Mining Investments Promotion Law in Argentina grants several privileges to mining companies registered with the Federal Mining Secretariat. As the Company’s wholly-owned subsidiary which holds the property is registered pursuant to Law Nº 24,196 with the Federal Mining Secretariat, the Company has the benefit of a tax stability regime which provides that for thirty (30) years from the date a feasibility is filed a company will only be subject to the federal, provincial and municipal taxes in effect at the time of filing and that any increase in tax rates or new taxes will not apply to a company so registered. In addition, by virtue of being registered with the Federal Mining Secretariat: (i) sums invested in prospecting, exploration and in any other expenses necessary to determine the feasibility of the project incurred before the filing of the feasibility study enjoy double deductibility; (ii) accelerated depreciation regime is applicable to new mining projects and to the enlargement of the existing ones, as well as all the capital investments made during exploitation; (iii) profits that its shareholders may gain from the contribution of mines or mining rights as capital are exempt from income tax; and (iv) investors may capitalize up to fifty percent (50%) of the assessment of economically exploitable mining reserves certified by an authorized professional. 27