The economics of cold ironing
Mark Sisson, PE, Lead Analyst & Krystle McBride, Analyst, AECOM, Los Angeles, CA, USA


In this age of globalisation, ports – and the goods flowing through
them – have become a mainstay of the U.S. economy. Although
containerisation is a highly successful component of the evolving
international trade, it has created its own backlash; the burgeoning
volume of containerised cargo has generated an increased level of
concern about the environmental effects of ever-expanding port
operations.
  The ports of Los Angeles and Long Beach have led the
movement to require cleaner performance from cargo operations.
“Cold ironing” – providing ships with shoreside power so vessels
can turn off their engines while hotelling in port – is one of
the key elements of the clean air action plan (CAAP) recently
adopted by the two ports. As explained in a CAAP fact sheet,
the plan envisions that “all major container cargo and cruise
ship terminals at the ports would be equipped with shoreside
electricity within five to ten years so that vessels can shut down
                                                                          Figure 1. Electrical cable reel on ship.
their diesel-powered engines while at berth.”
  The requirement for cold ironing is expected to spread beyond
Southern California to other environmentally sensitive areas. In
the past, the capital costs of cold ironing have often made it seem
unattractive, but the overall life-cycle costs (compared to the cost
of using shipboard fuels) have not been rigorously evaluated. The
following analysis examines the financial and environmental issues
surrounding cold ironing.

Cold ironing infrastructure
In order to allow for cold ironing, marine terminals must be
equipped with extra electrical capacity, conduits, and the “plug”
infrastructure that will accept power cables from a vessel. A large
container ship typically requires approximately 1,600 kilowatts
(kW) of power while at berth, but the power requirements can
differ substantially, depending on the size of the vessel and the
number of refrigerated containers on board.
   Although cold ironing for container ships in Los Angeles
initially entailed the use of a barge to deliver the power, the future
standard relies on permanent shoreside power. Figures 1 through
3 show key elements of the cold ironing infrastructure (photos
courtesy of Cavotec).
   Designing and constructing a terminal that is equipped for
cold ironing will cost more than a conventional terminal that
does not have the capability to deliver shoreside power. The
                                                                          Figure 2. Plugs being deployed from ship.
cost of constructing the shoreside infrastructure, and the cost of
retrofitting the vessels calling at the berth, must both be included.
These extra costs will obviously differ considerably by location;
this analysis uses US$1.5 million per berth for the shoreside
infrastructure, based on recent documented costs for a cruise
ship installation in Seattle. Assuming a 30-year design life and
applying a six per cent interest rate, this translates to a shoreside
construction cost equivalent to US$110,000 per year per berth.
   The vessels calling at the berth will also need to be equipped
with the required electrical infrastructure to take advantage of
shore power while hotelling. Based on recent published estimates,
this analysis assumes five vessels are required to provide a weekly
trans-Pacific service, at a cost of US$400,000 per vessel, or US$2
million for the fleet of five. With a 20-year vessel design life and
six per cent interest, this equates to an annual cost of US$170,000
for vessel modifications to a fleet of five vessels. Adding this to the
shoreside infrastructure cost yields a total annual construction cost
                                                                          Figure 3. Shoreside electrical plugs.
per berth of US$280,000.

                                                                                                 PORT TECHNOLOGY INTERNATIONAL   1
CONTAINER
HANDLING

                                                                                                                                                    PT40-24_1




       Figure 4. Recent escalation in fuel prices (January 2006-September 2008).

        Operators interviewed in Los Angeles do not believe that extra             the harbour area. MDO burns cleaner than bunker fuel, but it
      longshore labour will be required to plug and unplug vessels. They           is approximately twice as expensive. Furthermore, the cost of
      expect to use ILWU mechanics or other labourers already present              MDO has undergone a dramatic recent price increase, as shown
      at the terminal to perform these functions. Nevertheless, this               in Figure 4. From June 2007 to June 2008, the cost of a metric
      analysis addresses two cases: one with no additional labour and one          tonne of MDO in the United States rose from approximately
      with one additional person-shift at typical ILWU labour rates at             US$600 to US$1,200. For the purposes of this paper, we have
      each end of the vessel call (one to plug in and one to unplug the            used two different MDO costs in our calculations: a “worst” case
      vessel). A labour cost of US$500 per person-shift is assumed.                of US$1,200/MT and a “best” case of US$800 per MT.
                                                                                       Large diesel engines typically burn fuel at a rate of 200 grams
      Energy cost                                                                  per kilowatt hour (g/kW-hr). A vessel at berth for 24 hours and
                                                                                   requiring 1,600 kW of power will burn 7,700 kg of fuel (7.7
      The relative cost of on-board fuel versus electricity will be
                                                                                   metric tonnes). At the prices prevailing in June 2008, the fuel bill
      a key driver in the cost comparison between cold ironing and
                                                                                   for one day’s call would come to over US$9,000.
      conventional operations. Although some vessels have burned
                                                                                      In contrast to the price of fuel, which is fairly consistent
      bunker fuel while in port, the current tendency is for vessels to
                                                                                   worldwide, the price of electricity varies greatly depending on
      switch to marine distillate (MDO) while in port. In fact, local
                                                                                   local circumstances. Rates for cold ironing applications may need
      regulations in many places require MDO to be used while in
                                                                                   to be negotiated on a case-by-case basis, but the magnitude of
                                                                                   power use will likely result in rates similar to those charged to




       Figure 5. Electricity prices in selected U.S. maritime areas.               Figure 6. Cost of emissions from on-board fuel vs. grid power.



       2 PORT TECHNOLOGY INTERNATIONAL                                                                                        www.porttechnology.org
CONTAINER
                                                                                                                                            HANDLING

PT40-24_1
                                                      TABLE 1: SUMMARY OF ANALYSIS CASES
                                  Fuel cost per metric ton   Electricity cost   Extra labour cost per call vs. conventional Cost of extra emissions
  Conventional worst case US$1,200                           NA                 NA                                           Per Figure 6
  Conventional best case          US$800                     NA                 NA                                           US$0
  Cold ironing worst case         NA                         Commercial rate US$1,000                                        NA
  Cold ironing best case          NA                         Industrial rate    US$0                                         NA


commercial or industrial users. Figure 5 charts the electricity rates
for various maritime areas in the United States.
  If a vessel calling in California is charged the commercial rate
of US$0.11 per kW-hr, the bill for a 24-hour call drawing 1,600
kW will be US$4,200 – less than half the price of burning MDO
on board.

Emission “costs”
Although vessel operators at U.S. ports do not pay an explicit
penalty for emitting pollution while at berth, port authorities
are spending a great deal of money on programmes designed
to reduce local pollution caused by discharges such as nitrogen
oxide (NOX). The clean truck programme in Southern California,
which requires replacing or retrofitting 16,000 harbour trucks
over a period of five years, is one good example of this. And
within the United States, the notion of taxing the discharge of
greenhouse gases such as carbon dioxide (CO2) appears to be
gathering momentum.
  Incorporating these trends with direct fuel costs allows the
calculation of the virtual cost of using conventional on-board
fuel for hotelling versus plugging in to the local electric grid.
Figure 6, using emission factors from the U.S. Environmental                      Figure 7. Cost comparison in California.
Protection Agency, shows this virtual cost for major port areas
in the United States. The indicated “costs” for NOX and CO2                      hydroelectric, and other renewable sources that emit little or no
of US$600/tonne and US$37.50/tonne, respectively, represent                      greenhouse gases. In contrast, Texas and Hawaii generate most of
typical costs for retrofitting or replacing equipment to reduce                  their power with fossil fuels. Plugging in a ship in Hawaii will
production of the pollutants.                                                    actually increase the CO2 emissions per call versus using MDO
  Virtually any source of electricity will emit much less NOX                    on board ship.
than shipboard engines, but the savings in CO2 emissions vary                      Texas and Hawaii both have climates that make solar and wind
greatly by region. California and the Pacific Northwest states                   power very attractive. Port authorities in states such as these
generate a large percentage of their electric power from nuclear,                could generate a substantial fraction of their power through zero-




Figure 8. U.S. vessel hotelling costs.



                                                                                                       PORT TECHNOLOGY INTERNATIONAL                  3
CONTAINER
HANDLING

                                                                                                                                                 PT40-24_1
       emission renewables if they so chose. Solar and wind power are                       Figure 8 shows overall costs for six major port areas in the
       especially attractive in Hawaii due to the very high cost of grid                   United States.
       power, which is largely generated from fuel oil.
                                                                                           U.S. vessel hotelling costs
       Overall cost summary                                                                Figures 7 and 8 make a compelling financial case for cold
       For the sake of analysis, best- and worst-case values were                          ironing, except in Hawaii. In New York, cold ironing may
       developed for both conventional operations and cold ironing, as                     be economically justifiable, depending on how closely actual
       summarised in Table 1. The conventional best-case scenario is                       costs track against the stated assumptions in this article. In the
       based on the mean of fuel prices in June 2007 and June 2008.                        Pacific Northwest and Virginia, even the worst-case cold ironing
         Figure 7 shows the cost comparison for California ports. These                    scenario is cheaper than the best-case conventional scenario,
       calculations assume one berth at 50 per cent utilisation with a                     while in California and Texas cold-ironing is likely to be more
       mean vessel call duration of 24 hours, resulting in 180 calls per                   affordable given prevailing MDO prices.
       berth per year.                                                                        Both environmental and economic implications affect the
         Figure 7 shows that the energy cost for fuel or electricity is                    decision to equip ports and vessels for cold ironing. Given the
       the primary driver for overall cost. Over the life of the asset, the                seriousness of the environmental concerns, however, the decision
       capital costs to convert vessels and berths to utilise cold ironing                 may be made by political mandate. This analysis shows that, in
       constitute a small fraction of the costs. Even the addition of                      many cases, such a requirement will ultimately be financially
       two ILWU labour shifts per vessel call would not add a massive                      beneficial to port operators and shippers.
       amount of cost to the bottom line.

        ABOUT THE AUTHORS                                                                  ENQUIRIES
      Mark Sisson, P.E., leads AECOM Transportation’s marine analysis group. He is         555 South Flower Street, Suite 3700
                                                                                           Los Angeles
      responsible for business development, project execution, and oversight of research
                                                                                           California 90071-2300
      and development of AECOM Transportation’s simulation models. Mr. Sisson has
                                                                                           USA
      13 years of experience managing and executing a wide range of marine terminal
      planning, simulation, and analysis projects.
                                                                                           Tel: +1 213 593 8000
      Krystle McBride is an analyst in AECOM Transportation’s marine analysis group.
                                                                                           Email: info@aecom.com
      Among the projects Ms. McBride has worked on are Union Pacific’s Intermodal
                                                                                           Web: www.aecom.com
      Container Transfer Facility (ICTF) and the Port of Sacramento.




       4 PORT TECHNOLOGY INTERNATIONAL                                                                                           www.porttechnology.org

More Related Content

Similar to Cold Ironing Economics

COLD IRONING Ships - Alternative Maritime Power
COLD IRONING Ships - Alternative Maritime PowerCOLD IRONING Ships - Alternative Maritime Power
COLD IRONING Ships - Alternative Maritime PowerPawanexh Kohli
 
LNG Controversy
LNG ControversyLNG Controversy
LNG Controversymimariner
 
The Future Of Clean Power Generation
The Future Of Clean Power GenerationThe Future Of Clean Power Generation
The Future Of Clean Power GenerationGlenn Klith Andersen
 
The Economics and Finance of Offshore Wind
The Economics and Finance of Offshore WindThe Economics and Finance of Offshore Wind
The Economics and Finance of Offshore WindEamon Keane
 
Proposal of a 550MW electrical power Station
Proposal of a 550MW electrical power StationProposal of a 550MW electrical power Station
Proposal of a 550MW electrical power StationHaim R. Branisteanu
 
BarberANSNukeH2InvitedPanelNov05
BarberANSNukeH2InvitedPanelNov05BarberANSNukeH2InvitedPanelNov05
BarberANSNukeH2InvitedPanelNov05David Barber
 
Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)GuidoBacker1
 
Cal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationCal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationFingerPointer
 
Wind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic ProposalWind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic ProposalCarlos Rymer
 
Interstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement ProjectInterstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement ProjectMargaret Puckette
 
Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Michael P Totten
 
Economics Of Nuclear Power
Economics Of Nuclear PowerEconomics Of Nuclear Power
Economics Of Nuclear Powernitin3000
 
U.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid ProjectU.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid ProjectFuelCellEnergy
 
Lazard finds the cost of wind power dropped 50%
Lazard finds the cost of wind power dropped 50%Lazard finds the cost of wind power dropped 50%
Lazard finds the cost of wind power dropped 50%Starwatch20
 
IRJET- Applications of Alternative Fuels in Maritime Industry
IRJET- Applications of Alternative Fuels in Maritime IndustryIRJET- Applications of Alternative Fuels in Maritime Industry
IRJET- Applications of Alternative Fuels in Maritime IndustryIRJET Journal
 
Thermally_modulated_lithium_iron_phosphate_batteris.pdf
Thermally_modulated_lithium_iron_phosphate_batteris.pdfThermally_modulated_lithium_iron_phosphate_batteris.pdf
Thermally_modulated_lithium_iron_phosphate_batteris.pdfahmed66731
 

Similar to Cold Ironing Economics (20)

COLD IRONING Ships - Alternative Maritime Power
COLD IRONING Ships - Alternative Maritime PowerCOLD IRONING Ships - Alternative Maritime Power
COLD IRONING Ships - Alternative Maritime Power
 
LNG Controversy
LNG ControversyLNG Controversy
LNG Controversy
 
The Future Of Clean Power Generation
The Future Of Clean Power GenerationThe Future Of Clean Power Generation
The Future Of Clean Power Generation
 
The Economics and Finance of Offshore Wind
The Economics and Finance of Offshore WindThe Economics and Finance of Offshore Wind
The Economics and Finance of Offshore Wind
 
Proposal of a 550MW electrical power Station
Proposal of a 550MW electrical power StationProposal of a 550MW electrical power Station
Proposal of a 550MW electrical power Station
 
Two difficulties
Two difficultiesTwo difficulties
Two difficulties
 
oceanocean
oceanoceanoceanocean
oceanocean
 
BarberANSNukeH2InvitedPanelNov05
BarberANSNukeH2InvitedPanelNov05BarberANSNukeH2InvitedPanelNov05
BarberANSNukeH2InvitedPanelNov05
 
Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)
 
Cal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationCal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentation
 
Wind power3
Wind power3Wind power3
Wind power3
 
Wind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic ProposalWind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic Proposal
 
Interstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement ProjectInterstate Grid Electrification Improvement Project
Interstate Grid Electrification Improvement Project
 
Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07
 
Economics Of Nuclear Power
Economics Of Nuclear PowerEconomics Of Nuclear Power
Economics Of Nuclear Power
 
U.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid ProjectU.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid Project
 
Lazard finds the cost of wind power dropped 50%
Lazard finds the cost of wind power dropped 50%Lazard finds the cost of wind power dropped 50%
Lazard finds the cost of wind power dropped 50%
 
Phillips Ch10 Ppt 1
Phillips Ch10 Ppt 1Phillips Ch10 Ppt 1
Phillips Ch10 Ppt 1
 
IRJET- Applications of Alternative Fuels in Maritime Industry
IRJET- Applications of Alternative Fuels in Maritime IndustryIRJET- Applications of Alternative Fuels in Maritime Industry
IRJET- Applications of Alternative Fuels in Maritime Industry
 
Thermally_modulated_lithium_iron_phosphate_batteris.pdf
Thermally_modulated_lithium_iron_phosphate_batteris.pdfThermally_modulated_lithium_iron_phosphate_batteris.pdf
Thermally_modulated_lithium_iron_phosphate_batteris.pdf
 

Recently uploaded

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 

Recently uploaded (20)

8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 

Cold Ironing Economics

  • 1. CONTAINER HANDLING PT40-24_1 The economics of cold ironing Mark Sisson, PE, Lead Analyst & Krystle McBride, Analyst, AECOM, Los Angeles, CA, USA In this age of globalisation, ports – and the goods flowing through them – have become a mainstay of the U.S. economy. Although containerisation is a highly successful component of the evolving international trade, it has created its own backlash; the burgeoning volume of containerised cargo has generated an increased level of concern about the environmental effects of ever-expanding port operations. The ports of Los Angeles and Long Beach have led the movement to require cleaner performance from cargo operations. “Cold ironing” – providing ships with shoreside power so vessels can turn off their engines while hotelling in port – is one of the key elements of the clean air action plan (CAAP) recently adopted by the two ports. As explained in a CAAP fact sheet, the plan envisions that “all major container cargo and cruise ship terminals at the ports would be equipped with shoreside electricity within five to ten years so that vessels can shut down Figure 1. Electrical cable reel on ship. their diesel-powered engines while at berth.” The requirement for cold ironing is expected to spread beyond Southern California to other environmentally sensitive areas. In the past, the capital costs of cold ironing have often made it seem unattractive, but the overall life-cycle costs (compared to the cost of using shipboard fuels) have not been rigorously evaluated. The following analysis examines the financial and environmental issues surrounding cold ironing. Cold ironing infrastructure In order to allow for cold ironing, marine terminals must be equipped with extra electrical capacity, conduits, and the “plug” infrastructure that will accept power cables from a vessel. A large container ship typically requires approximately 1,600 kilowatts (kW) of power while at berth, but the power requirements can differ substantially, depending on the size of the vessel and the number of refrigerated containers on board. Although cold ironing for container ships in Los Angeles initially entailed the use of a barge to deliver the power, the future standard relies on permanent shoreside power. Figures 1 through 3 show key elements of the cold ironing infrastructure (photos courtesy of Cavotec). Designing and constructing a terminal that is equipped for cold ironing will cost more than a conventional terminal that does not have the capability to deliver shoreside power. The Figure 2. Plugs being deployed from ship. cost of constructing the shoreside infrastructure, and the cost of retrofitting the vessels calling at the berth, must both be included. These extra costs will obviously differ considerably by location; this analysis uses US$1.5 million per berth for the shoreside infrastructure, based on recent documented costs for a cruise ship installation in Seattle. Assuming a 30-year design life and applying a six per cent interest rate, this translates to a shoreside construction cost equivalent to US$110,000 per year per berth. The vessels calling at the berth will also need to be equipped with the required electrical infrastructure to take advantage of shore power while hotelling. Based on recent published estimates, this analysis assumes five vessels are required to provide a weekly trans-Pacific service, at a cost of US$400,000 per vessel, or US$2 million for the fleet of five. With a 20-year vessel design life and six per cent interest, this equates to an annual cost of US$170,000 for vessel modifications to a fleet of five vessels. Adding this to the shoreside infrastructure cost yields a total annual construction cost Figure 3. Shoreside electrical plugs. per berth of US$280,000. PORT TECHNOLOGY INTERNATIONAL 1
  • 2. CONTAINER HANDLING PT40-24_1 Figure 4. Recent escalation in fuel prices (January 2006-September 2008). Operators interviewed in Los Angeles do not believe that extra the harbour area. MDO burns cleaner than bunker fuel, but it longshore labour will be required to plug and unplug vessels. They is approximately twice as expensive. Furthermore, the cost of expect to use ILWU mechanics or other labourers already present MDO has undergone a dramatic recent price increase, as shown at the terminal to perform these functions. Nevertheless, this in Figure 4. From June 2007 to June 2008, the cost of a metric analysis addresses two cases: one with no additional labour and one tonne of MDO in the United States rose from approximately with one additional person-shift at typical ILWU labour rates at US$600 to US$1,200. For the purposes of this paper, we have each end of the vessel call (one to plug in and one to unplug the used two different MDO costs in our calculations: a “worst” case vessel). A labour cost of US$500 per person-shift is assumed. of US$1,200/MT and a “best” case of US$800 per MT. Large diesel engines typically burn fuel at a rate of 200 grams Energy cost per kilowatt hour (g/kW-hr). A vessel at berth for 24 hours and requiring 1,600 kW of power will burn 7,700 kg of fuel (7.7 The relative cost of on-board fuel versus electricity will be metric tonnes). At the prices prevailing in June 2008, the fuel bill a key driver in the cost comparison between cold ironing and for one day’s call would come to over US$9,000. conventional operations. Although some vessels have burned In contrast to the price of fuel, which is fairly consistent bunker fuel while in port, the current tendency is for vessels to worldwide, the price of electricity varies greatly depending on switch to marine distillate (MDO) while in port. In fact, local local circumstances. Rates for cold ironing applications may need regulations in many places require MDO to be used while in to be negotiated on a case-by-case basis, but the magnitude of power use will likely result in rates similar to those charged to Figure 5. Electricity prices in selected U.S. maritime areas. Figure 6. Cost of emissions from on-board fuel vs. grid power. 2 PORT TECHNOLOGY INTERNATIONAL www.porttechnology.org
  • 3. CONTAINER HANDLING PT40-24_1 TABLE 1: SUMMARY OF ANALYSIS CASES Fuel cost per metric ton Electricity cost Extra labour cost per call vs. conventional Cost of extra emissions Conventional worst case US$1,200 NA NA Per Figure 6 Conventional best case US$800 NA NA US$0 Cold ironing worst case NA Commercial rate US$1,000 NA Cold ironing best case NA Industrial rate US$0 NA commercial or industrial users. Figure 5 charts the electricity rates for various maritime areas in the United States. If a vessel calling in California is charged the commercial rate of US$0.11 per kW-hr, the bill for a 24-hour call drawing 1,600 kW will be US$4,200 – less than half the price of burning MDO on board. Emission “costs” Although vessel operators at U.S. ports do not pay an explicit penalty for emitting pollution while at berth, port authorities are spending a great deal of money on programmes designed to reduce local pollution caused by discharges such as nitrogen oxide (NOX). The clean truck programme in Southern California, which requires replacing or retrofitting 16,000 harbour trucks over a period of five years, is one good example of this. And within the United States, the notion of taxing the discharge of greenhouse gases such as carbon dioxide (CO2) appears to be gathering momentum. Incorporating these trends with direct fuel costs allows the calculation of the virtual cost of using conventional on-board fuel for hotelling versus plugging in to the local electric grid. Figure 6, using emission factors from the U.S. Environmental Figure 7. Cost comparison in California. Protection Agency, shows this virtual cost for major port areas in the United States. The indicated “costs” for NOX and CO2 hydroelectric, and other renewable sources that emit little or no of US$600/tonne and US$37.50/tonne, respectively, represent greenhouse gases. In contrast, Texas and Hawaii generate most of typical costs for retrofitting or replacing equipment to reduce their power with fossil fuels. Plugging in a ship in Hawaii will production of the pollutants. actually increase the CO2 emissions per call versus using MDO Virtually any source of electricity will emit much less NOX on board ship. than shipboard engines, but the savings in CO2 emissions vary Texas and Hawaii both have climates that make solar and wind greatly by region. California and the Pacific Northwest states power very attractive. Port authorities in states such as these generate a large percentage of their electric power from nuclear, could generate a substantial fraction of their power through zero- Figure 8. U.S. vessel hotelling costs. PORT TECHNOLOGY INTERNATIONAL 3
  • 4. CONTAINER HANDLING PT40-24_1 emission renewables if they so chose. Solar and wind power are Figure 8 shows overall costs for six major port areas in the especially attractive in Hawaii due to the very high cost of grid United States. power, which is largely generated from fuel oil. U.S. vessel hotelling costs Overall cost summary Figures 7 and 8 make a compelling financial case for cold For the sake of analysis, best- and worst-case values were ironing, except in Hawaii. In New York, cold ironing may developed for both conventional operations and cold ironing, as be economically justifiable, depending on how closely actual summarised in Table 1. The conventional best-case scenario is costs track against the stated assumptions in this article. In the based on the mean of fuel prices in June 2007 and June 2008. Pacific Northwest and Virginia, even the worst-case cold ironing Figure 7 shows the cost comparison for California ports. These scenario is cheaper than the best-case conventional scenario, calculations assume one berth at 50 per cent utilisation with a while in California and Texas cold-ironing is likely to be more mean vessel call duration of 24 hours, resulting in 180 calls per affordable given prevailing MDO prices. berth per year. Both environmental and economic implications affect the Figure 7 shows that the energy cost for fuel or electricity is decision to equip ports and vessels for cold ironing. Given the the primary driver for overall cost. Over the life of the asset, the seriousness of the environmental concerns, however, the decision capital costs to convert vessels and berths to utilise cold ironing may be made by political mandate. This analysis shows that, in constitute a small fraction of the costs. Even the addition of many cases, such a requirement will ultimately be financially two ILWU labour shifts per vessel call would not add a massive beneficial to port operators and shippers. amount of cost to the bottom line. ABOUT THE AUTHORS ENQUIRIES Mark Sisson, P.E., leads AECOM Transportation’s marine analysis group. He is 555 South Flower Street, Suite 3700 Los Angeles responsible for business development, project execution, and oversight of research California 90071-2300 and development of AECOM Transportation’s simulation models. Mr. Sisson has USA 13 years of experience managing and executing a wide range of marine terminal planning, simulation, and analysis projects. Tel: +1 213 593 8000 Krystle McBride is an analyst in AECOM Transportation’s marine analysis group. Email: info@aecom.com Among the projects Ms. McBride has worked on are Union Pacific’s Intermodal Web: www.aecom.com Container Transfer Facility (ICTF) and the Port of Sacramento. 4 PORT TECHNOLOGY INTERNATIONAL www.porttechnology.org