NO SAT VOLUME
HARGA SATUAN BAHAN
DAN UPAH
(Rp.)
TOTAL HARGA
(Rp.)
a c d e f
22 Grounding / Pentanahan SKUTR (GTR) Unit 1
MDU
1 Stainless Steel Strap Mtr 3,60 453.000,00 1.630.800,00
2 Stoping Buckle (Yoke for stainless steel strip) Bh 5,00 110.000,00 550.000,00
3 Link Bh 3,00 75.000,00 225.000,00
4 Pipa Galvanis 3/4" 3 meter Btg 1,00 124.694,00 124.694,00
5 Tap Connector AL/CU 35-50/25-35 mm2 Bh 1,00 150.000,00 150.000,00
6 Grounding Rod 3/4-1,5 u/TR lengkap Clamp Bh 1,00 950.000,00 950.000,00
7 Copper Conductor 35 mm2 Mtr 14,00 45.000,00 630.000,00
Jasa Konstruksi
1 Kepala Tukang Listrik / Mandor HO 0,17 220.000,00 37.400,00
2 Tukang Listrik HO 0,17 200.000,00 34.000,00
3 Pekerja HO 0,17 200.000,00 34.000,00
Angkutan
1 Angkutan Darat Ls 1,00 55.000,00 55.000,00
2 Angkutan Laut Ls 1,00 182.000,00 182.000,00
JUMLAH 4.602.894,00
NO SAT VOLUME
HARGA SATUAN BAHAN
DAN UPAH
(Rp.)
TOTAL HARGA
(Rp.)
a c d e f
23 Down Guy / Treckschoor komplit T. Besi (E-1)
1 Band Pole Brace 3-4" Set 2,00 105.000,00 210.000,00
2 Turn Bucle / Spanscroef 5/8 Bh 2,00 93.000,00 186.000,00
3 Wire Clip Bh 6,00 27.500,00 165.000,00
4 Bolt & Nut M16x300 + Washer Galvanis Bh 1,00 83.129,33 83.129,33
5 Guy Insulator TR Bh 1,00 300.000,00 300.000,00
6 Guy Wire 35 mm2 Mtr 14,00 276.000,00 3.864.000,00
7 Anchor rod 5/8"x2400 mm Tahanan Track Schoor TR Set 1,00 1.500.000,00 1.500.000,00
8 Beton Blok u/ E1 TR Set 1,00 410.000,00 410.000,00
9 Kaos Baja / Guy Wire Thimble Set 1,00 275.000,00 275.000,00
Jasa Konstruksi
1 Kepala Tukang Listrik / Mandor HO 0,13 220.000,00 28.600,00
2 Tukang Listrik HO 0,50 200.000,00 100.000,00
3 Pekerja HO 0,50 200.000,00 100.000,00
Angkutan
1 Angkutan Darat Ls 1,00 55.000,00 55.000,00
2 Angkutan Laut Ls 1,00 182.000,00 182.000,00
JUMLAH 7.458.729,33
NO SAT VOLUME
HARGA SATUAN BAHAN
DAN UPAH
(Rp.)
TOTAL HARGA
(Rp.)
a c d e f
24 Span Guy / Kontramast komplit T. Besi (E-2) Unit 1
1 Band Pole Brace 3-4" Set 2,00 105.000,00 210.000,00
2 Turn Bucle / Spanscroef 5/8 Bh 2,00 93.000,00 186.000,00
3 Wire Clip Bh 8,00 27.500,00 220.000,00
4 Bolt & Nut M16x300 + Washer Galvanis Bh 1,00 83.129,33 83.129,33
5 Guy Insulator TR Bh 1,00 300.000,00 300.000,00
6 Guy Wire 35 mm2 Mtr 32,00 276.000,00 8.832.000,00
7 Anchor rod 5/8"x2400 mm Tahanan Track Schoor TR Set 1,00 1.500.000,00 1.500.000,00
8 Beton Blok u/ E1 TR Set 1,00 410.000,00 410.000,00
9 Kaos Baja / Guy Wire Thimble Set 2,00 275.000,00 550.000,00
Jasa Konstruksi
1 Kepala Tukang Listrik / Mandor HO 0,17 220.000,00 37.400,00
2 Tukang Listrik HO 0,57 200.000,00 114.000,00
3 Pekerja HO 0,57 200.000,00 114.000,00
Angkutan
1 Angkutan Darat Ls 1,00 55.000,00 55.000,00
2 Angkutan Laut Ls 1,00 182.000,00 182.000,00
JUMLAH 12.793.529,33
URAIAN PEKERJAAN
b
URAIAN PEKERJAAN
b
URAIAN PEKERJAAN
b

More Related Content

What's hot

Format iup operasi produksi
Format iup operasi produksiFormat iup operasi produksi
Format iup operasi produksiarioadhi0902
 
Sni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai Panas
Sni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai PanasSni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai Panas
Sni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai PanasArief Rachman
 
Tlic jilid-1-bab-lampiran-simbol-listrik
Tlic jilid-1-bab-lampiran-simbol-listrikTlic jilid-1-bab-lampiran-simbol-listrik
Tlic jilid-1-bab-lampiran-simbol-listrikDeas Saputra
 
Metode pelaksanaan pasang rangka atap baja ringan
Metode pelaksanaan pasang rangka atap baja ringanMetode pelaksanaan pasang rangka atap baja ringan
Metode pelaksanaan pasang rangka atap baja ringanHandry J
 
Batang Tarik Baja.pptx
Batang Tarik Baja.pptxBatang Tarik Baja.pptx
Batang Tarik Baja.pptxnugrahafillah1
 
AHS pekerjaan beton SNI 7394-2008
AHS pekerjaan beton SNI 7394-2008AHS pekerjaan beton SNI 7394-2008
AHS pekerjaan beton SNI 7394-2008Vanny Wayongkere
 
Metoda pelaksanaan Trotoar Kota Pariaman
Metoda pelaksanaan Trotoar Kota PariamanMetoda pelaksanaan Trotoar Kota Pariaman
Metoda pelaksanaan Trotoar Kota PariamanIMRA MORALDY
 
Pp evaluasi analisa retaining wall (dinding penahan tebing
Pp evaluasi analisa retaining wall (dinding penahan tebingPp evaluasi analisa retaining wall (dinding penahan tebing
Pp evaluasi analisa retaining wall (dinding penahan tebingriky irawan
 
Perhitungan sambungan lentur dan geser balok baja
Perhitungan sambungan lentur dan geser balok bajaPerhitungan sambungan lentur dan geser balok baja
Perhitungan sambungan lentur dan geser balok bajaAfret Nobel
 
Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014WSKT
 
Perencanaan sambungan-profil-baja
Perencanaan sambungan-profil-bajaPerencanaan sambungan-profil-baja
Perencanaan sambungan-profil-bajaFajar Istu
 
SNI Tata Cara Perencanaan Struktur Baja.ppt
SNI Tata Cara Perencanaan Struktur Baja.pptSNI Tata Cara Perencanaan Struktur Baja.ppt
SNI Tata Cara Perencanaan Struktur Baja.pptdarmadi ir,mm
 
3.mekanika tanah dan teknik pondasi
3.mekanika tanah dan teknik pondasi3.mekanika tanah dan teknik pondasi
3.mekanika tanah dan teknik pondasiYuniarni Cfs
 

What's hot (20)

Format iup operasi produksi
Format iup operasi produksiFormat iup operasi produksi
Format iup operasi produksi
 
GARDU DISTRIBUSI TENAGA LISTRIK
GARDU DISTRIBUSI TENAGA LISTRIK GARDU DISTRIBUSI TENAGA LISTRIK
GARDU DISTRIBUSI TENAGA LISTRIK
 
Sni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai Panas
Sni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai PanasSni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai Panas
Sni 07 2054 2006 Baja Profil Siku Sama Kaki Proses Canai Panas
 
39. boq
39. boq39. boq
39. boq
 
Tlic jilid-1-bab-lampiran-simbol-listrik
Tlic jilid-1-bab-lampiran-simbol-listrikTlic jilid-1-bab-lampiran-simbol-listrik
Tlic jilid-1-bab-lampiran-simbol-listrik
 
Documents.tips brosur peri-pd-8
Documents.tips brosur peri-pd-8Documents.tips brosur peri-pd-8
Documents.tips brosur peri-pd-8
 
JARINGAN TEGANGAN MENENGAH 20 KV
JARINGAN TEGANGAN MENENGAH 20 KVJARINGAN TEGANGAN MENENGAH 20 KV
JARINGAN TEGANGAN MENENGAH 20 KV
 
Metode pelaksanaan pasang rangka atap baja ringan
Metode pelaksanaan pasang rangka atap baja ringanMetode pelaksanaan pasang rangka atap baja ringan
Metode pelaksanaan pasang rangka atap baja ringan
 
GARDU DISTRIBUSI
GARDU DISTRIBUSI GARDU DISTRIBUSI
GARDU DISTRIBUSI
 
Batang Tarik Baja.pptx
Batang Tarik Baja.pptxBatang Tarik Baja.pptx
Batang Tarik Baja.pptx
 
Kegagalan konstruksi
Kegagalan konstruksiKegagalan konstruksi
Kegagalan konstruksi
 
AHS pekerjaan beton SNI 7394-2008
AHS pekerjaan beton SNI 7394-2008AHS pekerjaan beton SNI 7394-2008
AHS pekerjaan beton SNI 7394-2008
 
Metoda pelaksanaan Trotoar Kota Pariaman
Metoda pelaksanaan Trotoar Kota PariamanMetoda pelaksanaan Trotoar Kota Pariaman
Metoda pelaksanaan Trotoar Kota Pariaman
 
Pp evaluasi analisa retaining wall (dinding penahan tebing
Pp evaluasi analisa retaining wall (dinding penahan tebingPp evaluasi analisa retaining wall (dinding penahan tebing
Pp evaluasi analisa retaining wall (dinding penahan tebing
 
Perhitungan sambungan lentur dan geser balok baja
Perhitungan sambungan lentur dan geser balok bajaPerhitungan sambungan lentur dan geser balok baja
Perhitungan sambungan lentur dan geser balok baja
 
JTR ( JARINGAN TEGANGAN RENDAH)
JTR ( JARINGAN TEGANGAN RENDAH)JTR ( JARINGAN TEGANGAN RENDAH)
JTR ( JARINGAN TEGANGAN RENDAH)
 
Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014
 
Perencanaan sambungan-profil-baja
Perencanaan sambungan-profil-bajaPerencanaan sambungan-profil-baja
Perencanaan sambungan-profil-baja
 
SNI Tata Cara Perencanaan Struktur Baja.ppt
SNI Tata Cara Perencanaan Struktur Baja.pptSNI Tata Cara Perencanaan Struktur Baja.ppt
SNI Tata Cara Perencanaan Struktur Baja.ppt
 
3.mekanika tanah dan teknik pondasi
3.mekanika tanah dan teknik pondasi3.mekanika tanah dan teknik pondasi
3.mekanika tanah dan teknik pondasi
 

7 analisa harga jar listrik 1

  • 1. NO SAT VOLUME HARGA SATUAN BAHAN DAN UPAH (Rp.) TOTAL HARGA (Rp.) a c d e f 22 Grounding / Pentanahan SKUTR (GTR) Unit 1 MDU 1 Stainless Steel Strap Mtr 3,60 453.000,00 1.630.800,00 2 Stoping Buckle (Yoke for stainless steel strip) Bh 5,00 110.000,00 550.000,00 3 Link Bh 3,00 75.000,00 225.000,00 4 Pipa Galvanis 3/4" 3 meter Btg 1,00 124.694,00 124.694,00 5 Tap Connector AL/CU 35-50/25-35 mm2 Bh 1,00 150.000,00 150.000,00 6 Grounding Rod 3/4-1,5 u/TR lengkap Clamp Bh 1,00 950.000,00 950.000,00 7 Copper Conductor 35 mm2 Mtr 14,00 45.000,00 630.000,00 Jasa Konstruksi 1 Kepala Tukang Listrik / Mandor HO 0,17 220.000,00 37.400,00 2 Tukang Listrik HO 0,17 200.000,00 34.000,00 3 Pekerja HO 0,17 200.000,00 34.000,00 Angkutan 1 Angkutan Darat Ls 1,00 55.000,00 55.000,00 2 Angkutan Laut Ls 1,00 182.000,00 182.000,00 JUMLAH 4.602.894,00 NO SAT VOLUME HARGA SATUAN BAHAN DAN UPAH (Rp.) TOTAL HARGA (Rp.) a c d e f 23 Down Guy / Treckschoor komplit T. Besi (E-1) 1 Band Pole Brace 3-4" Set 2,00 105.000,00 210.000,00 2 Turn Bucle / Spanscroef 5/8 Bh 2,00 93.000,00 186.000,00 3 Wire Clip Bh 6,00 27.500,00 165.000,00 4 Bolt & Nut M16x300 + Washer Galvanis Bh 1,00 83.129,33 83.129,33 5 Guy Insulator TR Bh 1,00 300.000,00 300.000,00 6 Guy Wire 35 mm2 Mtr 14,00 276.000,00 3.864.000,00 7 Anchor rod 5/8"x2400 mm Tahanan Track Schoor TR Set 1,00 1.500.000,00 1.500.000,00 8 Beton Blok u/ E1 TR Set 1,00 410.000,00 410.000,00 9 Kaos Baja / Guy Wire Thimble Set 1,00 275.000,00 275.000,00 Jasa Konstruksi 1 Kepala Tukang Listrik / Mandor HO 0,13 220.000,00 28.600,00 2 Tukang Listrik HO 0,50 200.000,00 100.000,00 3 Pekerja HO 0,50 200.000,00 100.000,00 Angkutan 1 Angkutan Darat Ls 1,00 55.000,00 55.000,00 2 Angkutan Laut Ls 1,00 182.000,00 182.000,00 JUMLAH 7.458.729,33 NO SAT VOLUME HARGA SATUAN BAHAN DAN UPAH (Rp.) TOTAL HARGA (Rp.) a c d e f 24 Span Guy / Kontramast komplit T. Besi (E-2) Unit 1 1 Band Pole Brace 3-4" Set 2,00 105.000,00 210.000,00 2 Turn Bucle / Spanscroef 5/8 Bh 2,00 93.000,00 186.000,00 3 Wire Clip Bh 8,00 27.500,00 220.000,00 4 Bolt & Nut M16x300 + Washer Galvanis Bh 1,00 83.129,33 83.129,33 5 Guy Insulator TR Bh 1,00 300.000,00 300.000,00 6 Guy Wire 35 mm2 Mtr 32,00 276.000,00 8.832.000,00 7 Anchor rod 5/8"x2400 mm Tahanan Track Schoor TR Set 1,00 1.500.000,00 1.500.000,00 8 Beton Blok u/ E1 TR Set 1,00 410.000,00 410.000,00 9 Kaos Baja / Guy Wire Thimble Set 2,00 275.000,00 550.000,00 Jasa Konstruksi 1 Kepala Tukang Listrik / Mandor HO 0,17 220.000,00 37.400,00 2 Tukang Listrik HO 0,57 200.000,00 114.000,00 3 Pekerja HO 0,57 200.000,00 114.000,00 Angkutan 1 Angkutan Darat Ls 1,00 55.000,00 55.000,00 2 Angkutan Laut Ls 1,00 182.000,00 182.000,00 JUMLAH 12.793.529,33 URAIAN PEKERJAAN b URAIAN PEKERJAAN b URAIAN PEKERJAAN b