SlideShare a Scribd company logo
Personal data
Name Mostafa Saad Morsy
Date of birth 2/8/1968
Education BSC of electrical power engineering, May1990, good grade, Helwan University
Tele. No. (+202) 01005268238
Military status Served
Marital status Married
Address 2 B st Dr Abd Elazeem Ramadan El Gawhara building Maruotya Harm Giza Egypt
E- Mail mostafa.saad@octoberpharma.com
Working History
Current job:
Date: from Jan 2001 till date
Company Name: Octoberpharma Pharmaceutical Co.
Job Title: Electrical Maintenance & control system Manager
Previous jobs:
Date: From Jan1994 to Jan 2001
Company Name: Service Engineering packaging Co (Espack).
Job Title: Design & Electrical Maintenance Section Head
Date: From July 1992 to Jan1994
Company Name: Golden Tex Co.
Job Title: Electrical Maintenance Engineer
Responsibility
1- Managing the New projects such as upgrade of a bitalctam Manufacturing Facility upgrade syrup, packaging Dept, New
Microbiology with regards to cGMP, installation new bus duct 2000A& new two chillers,
2- Ensuring that the new facility is complying with all relevant Quality, Safety and Engineering Standards
3- Outlines Engineering procedures for equipment and facility to ensure maximum service life and Utilization
4- Develop Project plan and ensure that the Project achieve the planned target with the planned cost in
The planned time
7-Management maintenance activity (Preventive and Predictive Maintenance plan) to reduce down time
8- Identify The Annual Budget.
9- Management Validation protocols (DQ, IQ,OQ ,PO)
10- Management OHASA 18001& HSE rules
11-Ensure effective Business Continuity Plan for key supply areas
12- Management &Development standard and emergency operating procedures and prepare work-scopes required.
Computer skills
Word, Excel, Microsoft Office Project & AutoCAD.
Language
Arabic excellent
English Very Good
TRAINING COURSES
Project management Professional pmp
cGMP regulation
Time management
Programming of plc Omron, Siemens
Office Project management
OHASA 18001&ISO14001
Management skill

More Related Content

Similar to (511066082) cv2015

Biggie's CV1
Biggie's CV1Biggie's CV1
Biggie's CV1
biggie charuza
 
Abdou fattouh cv
Abdou fattouh cvAbdou fattouh cv
Abdou fattouh cv
Abdou Fatouh
 
moataz cv
moataz cvmoataz cv
moataz cv
Moataz Elemam
 
resume new (2)
resume new (2)resume new (2)
resume new (2)
abu hanifah abu bakar
 
Ashraf - CV
Ashraf - CVAshraf - CV
Ashraf - CV
Ashraf Saber
 
cvee new
cvee newcvee new
cvee new
Yousef Ali
 
ENG.Mohamed CV
ENG.Mohamed CVENG.Mohamed CV
ENG.Mohamed CV
Mohamed Sharaf
 
Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)
Hakim Makram
 
Mahmoud-Gebril-CV
Mahmoud-Gebril-CVMahmoud-Gebril-CV
Mahmoud-Gebril-CV
Mahmoud Gebril
 
ahmed Abdelmoneim
ahmed Abdelmoneimahmed Abdelmoneim
ahmed Abdelmoneim
Ahmed Ibrahem
 
mohamed rabea CV
mohamed rabea CVmohamed rabea CV
mohamed rabea CV
Mohamed Rabea
 
Hamdy cv
Hamdy cvHamdy cv
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
Boytoy Domer
 
(429601081) adam engineer
(429601081) adam engineer(429601081) adam engineer
(429601081) adam engineer
adam aitta
 
ABDOERTF
ABDOERTFABDOERTF
CV_reahannan
CV_reahannanCV_reahannan
CV_reahannan
mohammed sallam
 
sureshbabu cv
sureshbabu cvsureshbabu cv
sureshbabu cv
Suresh Babu
 
CV Peter De Klerk
CV Peter De KlerkCV Peter De Klerk
CV Peter De Klerk
Peter De Klerk
 
GAVIN'S 2016 CV
GAVIN'S 2016 CVGAVIN'S 2016 CV
GAVIN'S 2016 CV
GAVIN CHIPANGO NDUMBA
 
My CV.DOC
My CV.DOCMy CV.DOC
My CV.DOC
Alaa Mekkawy
 

Similar to (511066082) cv2015 (20)

Biggie's CV1
Biggie's CV1Biggie's CV1
Biggie's CV1
 
Abdou fattouh cv
Abdou fattouh cvAbdou fattouh cv
Abdou fattouh cv
 
moataz cv
moataz cvmoataz cv
moataz cv
 
resume new (2)
resume new (2)resume new (2)
resume new (2)
 
Ashraf - CV
Ashraf - CVAshraf - CV
Ashraf - CV
 
cvee new
cvee newcvee new
cvee new
 
ENG.Mohamed CV
ENG.Mohamed CVENG.Mohamed CV
ENG.Mohamed CV
 
Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)
 
Mahmoud-Gebril-CV
Mahmoud-Gebril-CVMahmoud-Gebril-CV
Mahmoud-Gebril-CV
 
ahmed Abdelmoneim
ahmed Abdelmoneimahmed Abdelmoneim
ahmed Abdelmoneim
 
mohamed rabea CV
mohamed rabea CVmohamed rabea CV
mohamed rabea CV
 
Hamdy cv
Hamdy cvHamdy cv
Hamdy cv
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
(429601081) adam engineer
(429601081) adam engineer(429601081) adam engineer
(429601081) adam engineer
 
ABDOERTF
ABDOERTFABDOERTF
ABDOERTF
 
CV_reahannan
CV_reahannanCV_reahannan
CV_reahannan
 
sureshbabu cv
sureshbabu cvsureshbabu cv
sureshbabu cv
 
CV Peter De Klerk
CV Peter De KlerkCV Peter De Klerk
CV Peter De Klerk
 
GAVIN'S 2016 CV
GAVIN'S 2016 CVGAVIN'S 2016 CV
GAVIN'S 2016 CV
 
My CV.DOC
My CV.DOCMy CV.DOC
My CV.DOC
 

(511066082) cv2015

  • 1. Personal data Name Mostafa Saad Morsy Date of birth 2/8/1968 Education BSC of electrical power engineering, May1990, good grade, Helwan University Tele. No. (+202) 01005268238 Military status Served Marital status Married Address 2 B st Dr Abd Elazeem Ramadan El Gawhara building Maruotya Harm Giza Egypt E- Mail mostafa.saad@octoberpharma.com Working History Current job: Date: from Jan 2001 till date Company Name: Octoberpharma Pharmaceutical Co. Job Title: Electrical Maintenance & control system Manager Previous jobs: Date: From Jan1994 to Jan 2001 Company Name: Service Engineering packaging Co (Espack). Job Title: Design & Electrical Maintenance Section Head Date: From July 1992 to Jan1994 Company Name: Golden Tex Co. Job Title: Electrical Maintenance Engineer Responsibility 1- Managing the New projects such as upgrade of a bitalctam Manufacturing Facility upgrade syrup, packaging Dept, New Microbiology with regards to cGMP, installation new bus duct 2000A& new two chillers,
  • 2. 2- Ensuring that the new facility is complying with all relevant Quality, Safety and Engineering Standards 3- Outlines Engineering procedures for equipment and facility to ensure maximum service life and Utilization 4- Develop Project plan and ensure that the Project achieve the planned target with the planned cost in The planned time 7-Management maintenance activity (Preventive and Predictive Maintenance plan) to reduce down time 8- Identify The Annual Budget. 9- Management Validation protocols (DQ, IQ,OQ ,PO) 10- Management OHASA 18001& HSE rules 11-Ensure effective Business Continuity Plan for key supply areas 12- Management &Development standard and emergency operating procedures and prepare work-scopes required. Computer skills Word, Excel, Microsoft Office Project & AutoCAD. Language Arabic excellent English Very Good TRAINING COURSES Project management Professional pmp cGMP regulation Time management Programming of plc Omron, Siemens Office Project management OHASA 18001&ISO14001 Management skill