Day 2 was a very general approach to setting up a basic Facebook page, generating "likes", and using the @tag feature, pictures etc. The page setup is of course the easy part, the preparation to market your page and the content strategy was a different story and discussed in depth.
Day 2 was a very general approach to setting up a basic Facebook page, generating "likes", and using the @tag feature, pictures etc. The page setup is of course the easy part, the preparation to market your page and the content strategy was a different story and discussed in depth.
This presentation was a workshop for the IREM GA group. It was a hands on workshop teaching students the fundamentals of Facebook and how it applies to best business practices.
Hot to make someone a Facebook admin in a few quick and easy steps. This is particularly helpful when turning your Facebook account over to a marketing company who will be handling your digital presence.
JTELSS14 TEL around the world incl wrap upTanja Kohn
This document summarizes a workshop on technology-enhanced learning (TEL) around the world. The workshop organizer, Tanja Kohn, is a PhD student interested in education, TEL, and ICT4D. The workshop provided an opportunity for an international community to discuss different TEL projects from around the world and how learning from other projects can inform one's own work. Workshop activities included discussing TEL integration and projects in different countries, reflecting on TEL acceptance across education levels and generations, and mapping TEL projects worldwide. The discussion concluded by considering how technology is naturally used for learning by youth and questions around integrating technology into teaching practices.
62. 丰田生产方式的4P模型
• 批量生产
Process
Process Process
C
A B
10 minutes 10 minutes
10 minutes
Lead Time: 30+ minutes for total order
21+ minutes for first piece
• 一个流
Process Process Process
A B C
12 min. for total order
3 min. for first part
122. 丰田生产方式的4P模型
原则四:使工作负荷水准稳定(生产均衡化)
实施单分钟换模—现状
22-Stow Change Parts
21-Change Coders
20-Change Height Setting
19-Change Belt Width
18-Change Lane Divider
g
17-Change Accumalation Lanes
16-Fit New Tynes Frame
15-Remove Tynes Frame
14-Head to in position
13-Remove B d
13 R Board
12-Connect Head to Machine
11-Bring Lifting Arm into Position
10-Lift Head onto Board
9-Bring Head to Machine
8-Insert Lanes and Bottle Stop
7-Stow Lane Sections
6-Remove Lane Sections
5-Reposition Lifting Arm
4-Remove
4 Remove Head
3-Disconnect Head
2-Lifting Arm into Position
0 20 40 60 80 100 120 140 160
1-Board to Machine
146. 丰田生产方式的4P模型
原则五:建立立即暂停以解决问题、从一开始就重视品质管理的
文化。
Errors
为了在生产工序中生产
出100%的合格品,通过
对工装、夹具的改善,
防止产生不良品于未然
的措施。 Can be
made by:
1. a person
2. a machine
差错预防(防错技术) 3. a process
172. 丰田生产方式的4P模型
原则七:运用视觉管理使问题无处隐藏
可视化控制—库存控制
AC 53
STORE STORE STORE
Part #__________________________ Part #__________________________ Part #__________________________
Description_____________________
Description Description_____________________
Description Description_____________________
Description
Std. Pack_______________________ Std. Pack_______________________ Std. Pack_______________________
Min____________ Max____________ Min____________ Max____________ Min____________ Max____________
Store Loc_______ Use Loc________ Store Loc_______ Use Loc________ Store Loc_______ Use Loc________
Supplier________________________ Supplier________________________ Supplier________________________
Delivery Date ‐ M ‐ T ‐ W ‐ T ‐ F ‐ S Delivery Date ‐ M ‐ T ‐ W ‐ T ‐ F ‐ S Delivery Date ‐ M ‐ T ‐ W ‐ T ‐ F ‐ S
Time___________________________ Time___________________________ Time___________________________
1 2