A joint venture was awarded a contract to construct a 35 km section of a new 89 km railway line between Nuremberg and Ingolstadt in Germany. The project includes six major railway bridges totaling 932 m in length, 26 minor railway bridges, 11 road bridges, and two tunnels. One of the tunnels is the 1,340m long Offenbau Tunnel, which is being constructed using a sophisticated "lid-cover" method under compressed air due to the presence of underground water that prevented traditional cut-and-cover excavation. 70,000m of bored piles were installed to form the tunnel walls, which support a 1.3m thick concrete roof. Excavation beneath the roof is performed under