A joint venture under the techni-
cal management of Bilfinger
Berger AG was awarded the
contract for the construction of a
35 km long section of the 89 km
long new railway line between
Nuremberg and Ingolstadt. The
works include six major railway
bridges with a total length of 932
m, 26 minor railway bridges, 11
road bridges and two tunnels.
One of the tunnels is the 1,340
m long Offenbau Tunnel with a
cross-section of 12.3 m x 7.5 m.
It is situated 45 km south of
Nuremberg and has to be built
to protect the nearby village of
Offenbau against noise from the
new high-speed railway line.
Originally, the tunnel was to be
built using the cut-and-cover
method, but it turned out that
artesian water in the ground did
not permit the required excava-
tion down to nearly 20 m. In-
stead, the more sophisticated
lid-cover method under com-
pressed air is now being applied
for the construction of the tunnel.
The two tunnel walls consist of
overlapping bored piles. They
carry a 1.3 m thick concrete
cover which is to form the tunnel
roof. The soil which was previ-
ously excavated to enable the
construction of the concrete
cover, was backfilled on top of
the concrete cover, forming a 2-
6 m thick layer. The pile walls
consist of piles with a diameter
of 1.2 m installed at distances of
1.04 m. 70,000 m of borings
were made using 12 drilling rigs.
Soil excavation beneath the
tunnel roof is performed under
excess pressure of 1.0 bar.
Three separate locks were in-
stalled at the southern portal for
persons, material and large
equipment. Excavation is made
using electrically-powered
equipment and the material is
transported by means of electri-
cally driven trains.
The bottom of the excavation is
secured by a 0.3 m thick shot-
crete layer, vaulted downwards
and anchored to the bored pile
wall. After completion of the
works under compressed air
and prior to the installation of the
bottom slab, it will protect the
bottom of the excavation against
uplift. The bottom slab and the
inner lining of the tunnel will be
concreted under atmospheric
pressure.
Offenbau Tunnel
High-Speed Railway
Line Nuremberg-
Ingolstadt,
Germany
Contract Value:
USD (m) 160.9
Construction Period:
04/2002 – 09/2006
Client:
Deutsche Bahn AG
Services:
Construction of a 1,340 m
long tunnel under
compressed air
Reg.41-bb-000-28.1.712-00

More Related Content

Viewers also liked

Competitive Analysis
Competitive AnalysisCompetitive Analysis
Competitive Analysis
Anumita Steinberg
 
Requirement and system analysis
Requirement and system analysisRequirement and system analysis
Requirement and system analysis
Alqalam University Katsina, Nigeria
 
Programa municipal definitivo PSOE 2015
Programa municipal definitivo PSOE 2015Programa municipal definitivo PSOE 2015
Programa municipal definitivo PSOE 2015
Antonio M Ruiz Giménez
 
Electrochemical Deposition Research
Electrochemical Deposition ResearchElectrochemical Deposition Research
Electrochemical Deposition Research
Nicholas Sullivan
 
Digital marketing plan
Digital marketing plan Digital marketing plan
Digital marketing plan
Vanessa Baires
 
Rotational motion
Rotational motionRotational motion
Rotational motion
Cody Mims
 

Viewers also liked (6)

Competitive Analysis
Competitive AnalysisCompetitive Analysis
Competitive Analysis
 
Requirement and system analysis
Requirement and system analysisRequirement and system analysis
Requirement and system analysis
 
Programa municipal definitivo PSOE 2015
Programa municipal definitivo PSOE 2015Programa municipal definitivo PSOE 2015
Programa municipal definitivo PSOE 2015
 
Electrochemical Deposition Research
Electrochemical Deposition ResearchElectrochemical Deposition Research
Electrochemical Deposition Research
 
Digital marketing plan
Digital marketing plan Digital marketing plan
Digital marketing plan
 
Rotational motion
Rotational motionRotational motion
Rotational motion
 

Similar to 28-1-712-00

On the road
On the roadOn the road
On the road
Elias Chatzimpalis
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
Saurabh Samant
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
arravindsai
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
Abhay Ocean India ltd.
 
Design of multi-anchored_walls_for_deep (1)
Design of multi-anchored_walls_for_deep (1)Design of multi-anchored_walls_for_deep (1)
Design of multi-anchored_walls_for_deep (1)
Bulent U
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
Ujwal Ujwal
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
Vicky Matwan
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
Bimenpreet Kaur
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
Filipe Mello
 
Tunneling
Tunneling Tunneling
Tunneling
ila vamsi krishna
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
Mansimishra351962
 
Comacchio Drilling Equipment
Comacchio Drilling EquipmentComacchio Drilling Equipment
Comacchio Drilling Equipment
MECandPMV
 
Wien Sammelkanal
Wien SammelkanalWien Sammelkanal
Wien Sammelkanal
Georg Venhorst
 
Allianz_Arena_Stadium_Research.pptx
Allianz_Arena_Stadium_Research.pptxAllianz_Arena_Stadium_Research.pptx
Allianz_Arena_Stadium_Research.pptx
HeatherMDX
 
Underwater construction
Underwater constructionUnderwater construction
Underwater construction
HetviPatel58
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
ADARSH _
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
Bridge pgd sbornik 2017 web
Bridge pgd sbornik 2017 webBridge pgd sbornik 2017 web
Bridge pgd sbornik 2017 web
jose bonifacio de souza leite cuadros
 

Similar to 28-1-712-00 (20)

On the road
On the roadOn the road
On the road
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
Design of multi-anchored_walls_for_deep (1)
Design of multi-anchored_walls_for_deep (1)Design of multi-anchored_walls_for_deep (1)
Design of multi-anchored_walls_for_deep (1)
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Tunneling
Tunneling Tunneling
Tunneling
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
 
Comacchio Drilling Equipment
Comacchio Drilling EquipmentComacchio Drilling Equipment
Comacchio Drilling Equipment
 
Wien Sammelkanal
Wien SammelkanalWien Sammelkanal
Wien Sammelkanal
 
Allianz_Arena_Stadium_Research.pptx
Allianz_Arena_Stadium_Research.pptxAllianz_Arena_Stadium_Research.pptx
Allianz_Arena_Stadium_Research.pptx
 
Underwater construction
Underwater constructionUnderwater construction
Underwater construction
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Bridge pgd sbornik 2017 web
Bridge pgd sbornik 2017 webBridge pgd sbornik 2017 web
Bridge pgd sbornik 2017 web
 

28-1-712-00

  • 1. A joint venture under the techni- cal management of Bilfinger Berger AG was awarded the contract for the construction of a 35 km long section of the 89 km long new railway line between Nuremberg and Ingolstadt. The works include six major railway bridges with a total length of 932 m, 26 minor railway bridges, 11 road bridges and two tunnels. One of the tunnels is the 1,340 m long Offenbau Tunnel with a cross-section of 12.3 m x 7.5 m. It is situated 45 km south of Nuremberg and has to be built to protect the nearby village of Offenbau against noise from the new high-speed railway line. Originally, the tunnel was to be built using the cut-and-cover method, but it turned out that artesian water in the ground did not permit the required excava- tion down to nearly 20 m. In- stead, the more sophisticated lid-cover method under com- pressed air is now being applied for the construction of the tunnel. The two tunnel walls consist of overlapping bored piles. They carry a 1.3 m thick concrete cover which is to form the tunnel roof. The soil which was previ- ously excavated to enable the construction of the concrete cover, was backfilled on top of the concrete cover, forming a 2- 6 m thick layer. The pile walls consist of piles with a diameter of 1.2 m installed at distances of 1.04 m. 70,000 m of borings were made using 12 drilling rigs. Soil excavation beneath the tunnel roof is performed under excess pressure of 1.0 bar. Three separate locks were in- stalled at the southern portal for persons, material and large equipment. Excavation is made using electrically-powered equipment and the material is transported by means of electri- cally driven trains. The bottom of the excavation is secured by a 0.3 m thick shot- crete layer, vaulted downwards and anchored to the bored pile wall. After completion of the works under compressed air and prior to the installation of the bottom slab, it will protect the bottom of the excavation against uplift. The bottom slab and the inner lining of the tunnel will be concreted under atmospheric pressure. Offenbau Tunnel High-Speed Railway Line Nuremberg- Ingolstadt, Germany Contract Value: USD (m) 160.9 Construction Period: 04/2002 – 09/2006 Client: Deutsche Bahn AG Services: Construction of a 1,340 m long tunnel under compressed air Reg.41-bb-000-28.1.712-00