JOB ON TRAINING INDUSTRY
  AT ADIKARYA SELOGIRI
    WONOGIRI IN 2011
      AMBAR MARIJAN
          XII TP
MY ACTIVITIES
• Cutting the plate iron with length 100 cm
• Make thread of a screw with diameter 14 cm
• Drill the plate iron with diameter 19 cm,7 cm,13
  cm and 22 cm
• Lathe the iron with diameter 19 cm become
  diameter 14 cm
• Welding two the plate iron with length 15 cm
• Milling the plate iron agree with size
Cutting the plate iron with length
               100 cm
• 2 people
• A half hour
• Size long less
Make thread of a screw with
         diameter 14 cm
• 4 people
• Two days
• The
Drill the plate iron with diameter 19
     cm,7 cm,13 cm and 22 cm
• 3 people
• One day
• The result is good and right size
Lathe the iron with diameter 19 cm
     become diameter 14 cm
• 5 people
• Two days
• Turning pretty good result
Welding two the plate iron with
           length 15 cm
• 4 people
• Two days
• Unsatisfactory welding result
Milling the plate iron agree with size
• 4 people
• Three days
• Size less than maximum
conclusion
After I job on training industry at Adikarya
  selogiri wonogiri in 2011 here,I get a lot of
  skill on iron lathe,drill steel plate,cut some
  metal and of course here I also received a
  lot of work experience machining
  techniques.
GOOD BYE

2012.xii.tp.ambar maridjan

  • 1.
    JOB ON TRAININGINDUSTRY AT ADIKARYA SELOGIRI WONOGIRI IN 2011 AMBAR MARIJAN XII TP
  • 2.
    MY ACTIVITIES • Cuttingthe plate iron with length 100 cm • Make thread of a screw with diameter 14 cm • Drill the plate iron with diameter 19 cm,7 cm,13 cm and 22 cm • Lathe the iron with diameter 19 cm become diameter 14 cm • Welding two the plate iron with length 15 cm • Milling the plate iron agree with size
  • 3.
    Cutting the plateiron with length 100 cm • 2 people • A half hour • Size long less
  • 4.
    Make thread ofa screw with diameter 14 cm • 4 people • Two days • The
  • 5.
    Drill the plateiron with diameter 19 cm,7 cm,13 cm and 22 cm • 3 people • One day • The result is good and right size
  • 6.
    Lathe the ironwith diameter 19 cm become diameter 14 cm • 5 people • Two days • Turning pretty good result
  • 7.
    Welding two theplate iron with length 15 cm • 4 people • Two days • Unsatisfactory welding result
  • 8.
    Milling the plateiron agree with size • 4 people • Three days • Size less than maximum
  • 9.
    conclusion After I jobon training industry at Adikarya selogiri wonogiri in 2011 here,I get a lot of skill on iron lathe,drill steel plate,cut some metal and of course here I also received a lot of work experience machining techniques.
  • 10.