Workshop
Scheme Design for 20 mph scheme
Graham Hanson
Reduced time and cost of scheme
delivery
20mph zones
• Sign illumination can be relaxed throughout a 20mph
limit/zone – subject to risk analysis
• Remove the requirement for terminal signs to be placed
on both sides of the road
• Repeater signs can be used as a physical feature
• Remove the requirement for a speed roundel to be
accompanied by an upright sign
• Provided new signs for 20mph part-time limits
Maximum speed limit
Requirements of directions
Traffic management costs
• Average speed hump = £2000
• Illuminated traffic sign =£600
• Energy costs and maintenance = £100 pa
• Cost to place an unilluminated sign = £200
• Cost to place pair of unilluminated signs (back to
back) = £300
• Cost to mark a parking bay = £500
Scheme costs
Total cost = £36,200
• 8 x speed hump = £2000 x 8 = £16000
• Illuminated traffic sign = £600 x 16 = £9600
• Energy costs and maintenance = £100 pa =
£1600 x 5 = £8000
• 4 back-to-back signs for zone = £4 x £300 =
£1200
• 2 x unilluminated parking signs = 2 x £200 =
£400
• Mark 2 x parking bay = £500 x 2 = £1000
Questions

More Related Content

Similar to TSRGD Roadshow 2 00pm graham hanson [compatibility mode]

EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)
EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)
EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)
The European GNSS Agency (GSA)
 
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECTLAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
Step Interreg Ivc
 
Scot LaytonEmail [email protected]Fleet Managementmai.docx
Scot LaytonEmail [email protected]Fleet Managementmai.docxScot LaytonEmail [email protected]Fleet Managementmai.docx
Scot LaytonEmail [email protected]Fleet Managementmai.docx
kenjordan97598
 
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Farming Futures
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing
Shreyansh Kejriwal
 
Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Lecture: Introduction to Linear Programming for Natural Resource Economists a...Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Daniel Sandars
 
B p of low c, transports 500 mn$
B p of low c,  transports  500 mn$B p of low c,  transports  500 mn$
B p of low c, transports 500 mn$
andyappan1
 
Bp no carbon bus business 500 mn$
Bp  no  carbon  bus  business 500 mn$Bp  no  carbon  bus  business 500 mn$
Bp no carbon bus business 500 mn$
andyappan1
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
iQHub
 
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP_scotland
 
Operating costing
Operating costingOperating costing
Operating costing
daminigyanchandani
 
Circular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptxCircular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptx
Mircea Gingu
 
WI Natural Gas for Transportation Roundtable - Cummins NPower Presentation
WI Natural Gas for Transportation Roundtable - Cummins NPower PresentationWI Natural Gas for Transportation Roundtable - Cummins NPower Presentation
WI Natural Gas for Transportation Roundtable - Cummins NPower Presentation
Wisconsin Clean Cities
 
Gowipes18 new trends in modern shopfloor
Gowipes18   new trends in modern shopfloorGowipes18   new trends in modern shopfloor
Gowipes18 new trends in modern shopfloor
Guido Conio
 
HOMES CONFERENCE
HOMES CONFERENCEHOMES CONFERENCE
HOMES CONFERENCE
John Harrison
 
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of SavillsBlake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Morgan
 
Bombardier Eco4
Bombardier Eco4Bombardier Eco4
Bombardier Eco4
Railways and Harbours
 
e-cycle garbage collector.pptx
e-cycle garbage collector.pptxe-cycle garbage collector.pptx
e-cycle garbage collector.pptx
dhyan1082
 
Customer Presentation - FEP-Snipptec (April 2015)
Customer Presentation - FEP-Snipptec (April 2015) Customer Presentation - FEP-Snipptec (April 2015)
Customer Presentation - FEP-Snipptec (April 2015)
Anja Bernier ( Bange )
 
Emex Conference
Emex ConferenceEmex Conference
Emex Conference
John Harrison
 

Similar to TSRGD Roadshow 2 00pm graham hanson [compatibility mode] (20)

EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)
EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)
EGNSS and the GIS way forward - (Bernhard Richter, Leica Geosystems)
 
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECTLAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
 
Scot LaytonEmail [email protected]Fleet Managementmai.docx
Scot LaytonEmail [email protected]Fleet Managementmai.docxScot LaytonEmail [email protected]Fleet Managementmai.docx
Scot LaytonEmail [email protected]Fleet Managementmai.docx
 
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
Wind turbines in farm locations: opportunities, barriers and solutions - Davi...
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing
 
Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Lecture: Introduction to Linear Programming for Natural Resource Economists a...Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Lecture: Introduction to Linear Programming for Natural Resource Economists a...
 
B p of low c, transports 500 mn$
B p of low c,  transports  500 mn$B p of low c,  transports  500 mn$
B p of low c, transports 500 mn$
 
Bp no carbon bus business 500 mn$
Bp  no  carbon  bus  business 500 mn$Bp  no  carbon  bus  business 500 mn$
Bp no carbon bus business 500 mn$
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
 
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
STEP on the Bus - Session 2.1 - Lothian Buses' Journey to Zero Emissions_Emma...
 
Operating costing
Operating costingOperating costing
Operating costing
 
Circular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptxCircular Economy in Transformer Service.pptx
Circular Economy in Transformer Service.pptx
 
WI Natural Gas for Transportation Roundtable - Cummins NPower Presentation
WI Natural Gas for Transportation Roundtable - Cummins NPower PresentationWI Natural Gas for Transportation Roundtable - Cummins NPower Presentation
WI Natural Gas for Transportation Roundtable - Cummins NPower Presentation
 
Gowipes18 new trends in modern shopfloor
Gowipes18   new trends in modern shopfloorGowipes18   new trends in modern shopfloor
Gowipes18 new trends in modern shopfloor
 
HOMES CONFERENCE
HOMES CONFERENCEHOMES CONFERENCE
HOMES CONFERENCE
 
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of SavillsBlake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
 
Bombardier Eco4
Bombardier Eco4Bombardier Eco4
Bombardier Eco4
 
e-cycle garbage collector.pptx
e-cycle garbage collector.pptxe-cycle garbage collector.pptx
e-cycle garbage collector.pptx
 
Customer Presentation - FEP-Snipptec (April 2015)
Customer Presentation - FEP-Snipptec (April 2015) Customer Presentation - FEP-Snipptec (April 2015)
Customer Presentation - FEP-Snipptec (April 2015)
 
Emex Conference
Emex ConferenceEmex Conference
Emex Conference
 

Recently uploaded

原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 

Recently uploaded (20)

原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 

TSRGD Roadshow 2 00pm graham hanson [compatibility mode]

  • 1. Workshop Scheme Design for 20 mph scheme Graham Hanson
  • 2. Reduced time and cost of scheme delivery 20mph zones • Sign illumination can be relaxed throughout a 20mph limit/zone – subject to risk analysis • Remove the requirement for terminal signs to be placed on both sides of the road • Repeater signs can be used as a physical feature • Remove the requirement for a speed roundel to be accompanied by an upright sign • Provided new signs for 20mph part-time limits
  • 3.
  • 5.
  • 6.
  • 8.
  • 9.
  • 10. Traffic management costs • Average speed hump = £2000 • Illuminated traffic sign =£600 • Energy costs and maintenance = £100 pa • Cost to place an unilluminated sign = £200 • Cost to place pair of unilluminated signs (back to back) = £300 • Cost to mark a parking bay = £500
  • 11. Scheme costs Total cost = £36,200 • 8 x speed hump = £2000 x 8 = £16000 • Illuminated traffic sign = £600 x 16 = £9600 • Energy costs and maintenance = £100 pa = £1600 x 5 = £8000 • 4 back-to-back signs for zone = £4 x £300 = £1200 • 2 x unilluminated parking signs = 2 x £200 = £400 • Mark 2 x parking bay = £500 x 2 = £1000