The document outlines a training strategy for a signals intelligence platoon over the first quarter of fiscal year 2015. It describes a three phase training plan focusing first on fundamental warrior tasks, then intelligence functions. Phase 1 emphasizes driver's training and discipline over weeks 1-6. Phase 2 adds marksmanship and a battalion situational training exercise to evaluate reconnaissance skills in weeks 7-11. Phase 3 prepares for equipment inventories with military occupational specialty training in weeks 12-14. The physical readiness training program progresses from fundamental form to building strength and endurance.
A short history of the Non Commissioned Officer Corps of the United States Army. This presentation was the basis of a professional development program for Soldiers in my platoon with the idea I could hand it to anyone else to present. Many of the slides fail to comply with text limitations and font size established by any reasonable presentation development program, however I knew the groups would be small and the screen large.
A short history of the Non Commissioned Officer Corps of the United States Army. This presentation was the basis of a professional development program for Soldiers in my platoon with the idea I could hand it to anyone else to present. Many of the slides fail to comply with text limitations and font size established by any reasonable presentation development program, however I knew the groups would be small and the screen large.
Planned excavation for NDRC pit in areas where live services may be present including:
• Electrical;
• Water;
• Sewerage;
• Gas;
• Telecoms;
PRIOR TO WORKS
Use of Excavator for excavating NDRC Pit and backfilling
Excavation open in site area
Confined space working – deep excavation for NDRC
NDRC – Thrust boring operation
Pipe electric welding inside pit
HDPE Welding inside pit
Maintenance of NDRC Excavation
Worker exposure to direct sun
(as applicable)
Planned excavation for NDRC pit in areas where live services may be present including:
• Electrical;
• Water;
• Sewerage;
• Gas;
• Telecoms;
PRIOR TO WORKS
Use of Excavator for excavating NDRC Pit and backfilling
Excavation open in site area
Confined space working – deep excavation for NDRC
NDRC – Thrust boring operation
Pipe electric welding inside pit
HDPE Welding inside pit
Maintenance of NDRC Excavation
Worker exposure to direct sun
(as applicable)
1QTR FY14 SIGINT Quarterly Training Brief (20140924)
1. UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
QTR 1 ENDSTATE:
SIGINT PLT PROFICIENT AND
TRAINED ON FUNDAMENTAL
WARRIOR TASKS AND DRILLS
FIRST, AND THE INTELLIGENCE
WARFIGHTING FUNCTION SECOND
QTR 1 FY 15 TRAINING STRATEGY
3 PHASES
• PHASE 1: Driver’s TRN, PLT MOS : WEEKS
1-6:
Driver’s Training, 8 Step Training Model
Planning, Counselings, PRT, Discipline, Alert
Rehearsals
• PHASE 2: Marksmanship, BN STX: WEEKS
7-11:
Training to Army Standards: Alert Rehearsals,
PMI, CO Range Week, Battle Roster Updates /
BN STX EVENT – Evaluate SIGINT PLT will be
evaluated on ability to conduct reconnaissance
and surveillance intelligence operations
• PHASE 3: AOM, Inventories: WEEKS 12-14:
MOS Focus Training, Preparation for JAN15
100% Inventories
SIGINT/A CO/1BSTB 1st QTR FY 15 GLIDE PATH
Driver’s Training
Driver’s Training / BDE ACL RETRIEVAL
Range Week AOM, 350-1 Training, Alert Rehearsal
BN STX EVENT
BN STX EVENT AOM
PLT MOS Focus Week
Range AOM
PLT MOS Focus
Week, 100%
Inventory Prep
PLT MOS Focus Week
ACL Retrieval AOM
Driver’s Training / PLT MOS Focus Week
PMI, Alert Rehearsal
RANGE WEEK (M4/M16, M249/M240B, M9)
QTR 1 PRT Focus
• Stage 1: Focusing on the fundamentals of form and
execution.
• Stage 2: PRT will focus on strength and endurance. Goal
is to increase number of correctly executed repetitions.
• Stage 3: This stage will be used to evaluate progress and
adjust training program to the individual Soldier.