Voisey's Bay is a low-cost, long-life nickel mine located in Canada that also produces cobalt and copper as byproducts. Wheaton Precious Metals plans to acquire a stream on cobalt production from Voisey's Bay, which will add a new long-life asset to its portfolio and provide exposure to growing cobalt demand, especially from batteries. The upfront payment of $390 million will be paid from Wheaton's credit facility and the stream is expected to provide over $75 million in annual operating cash flow on average for the first 10 years. The transaction will be accretive to Wheaton's production, cash flow, and earnings on a per share basis.
VMS Ventures has discovered high grade copper deposits in Manitoba, Canada through its joint venture with Hudbay Minerals. Key points include:
- The Reed Copper Deposit has an indicated resource of over 2.5 million tonnes grading 7.86% zinc and 4.52% copper.
- A preliminary economic assessment estimates average annual production of 17,000 tonnes of copper concentrate over a 5 year mine life.
- Additional discoveries in 2011 include the Reed North zone with drill intercepts up to 9.31% copper over 3.95 meters.
- The company has a large land position in the prolific Flin Flon-Snow Lake volcanic massive sulfide belt, considered
VMS Ventures Inc. is a junior mining exploration company focused on discovering high grade copper deposits in Manitoba, Canada. It has a joint venture with Hudbay Minerals on the Reed Copper Deposit, which had a preliminary economic assessment completed in 2011, and four option agreements. VMS also owns 100% of several other exploration properties in the prolific Flin Flon-Snow Lake Greenstone Belt. In 2011, highlights included expanding resources at Reed Lake and making new discoveries. Plans for 2012 include additional drilling on joint venture and option properties as well as VMS's 100% owned lands.
VMS Ventures Inc. is exploring for copper deposits in Manitoba, Canada. It has discovered the Reed Copper Deposit through a joint venture with Hudbay Minerals. A preliminary economic assessment estimates the deposit contains over 2.5 million tonnes of 4.52% copper. VMS also holds additional exploration targets in the region through option agreements with Hudbay. The Flin Flon-Snow Lake belt where VMS is exploring is a prolific volcanogenic massive sulfide mining camp that has produced over 180 million tonnes of base and precious metals from various mines over the past 80 years.
This document provides an investor presentation for Cobre del Mayo, a Mexican mining company that operates the Piedras Verdes open-pit copper mine. It summarizes Cobre del Mayo's operations, financial performance, cost reduction strategies, mineral reserves, and an outlook for future copper prices. Declining copper prices since 2014 have significantly impacted Cobre del Mayo's sales, though cost reductions have lowered cash costs. An updated resource report estimates reserves sufficient for a 14-year mine life. Analysis of future copper demand and the incentive price needed for new production suggests prices will rise to incentivize supply.
The document discusses oil and gas prospects in Lebanon. It notes that seismic surveys have indicated high probabilities of considerable hydrocarbon reserves in Lebanon's offshore areas. Estimates suggest reserves of 25-96 trillion cubic feet of natural gas and 675 million-865 million barrels of oil. However, Lebanon has yet to launch its first offshore licensing bid round due to the government failing to approve crucial decrees related to territorial waters delimitation and provisions for exploration agreements. The document outlines Lebanon's legal framework and the role of the Petroleum Administration but notes delayed progress in the country's planned timeline for offshore exploration.
Cobre del Mayo operates the Piedras Verdes open-pit copper mine in Sonora, Mexico. It produces copper cathode through heap leaching and sells ore to Kupari Metals' flotation plant for processing into copper concentrate. Falling copper prices in recent years have significantly impacted Cobre del Mayo's sales. Despite cost cutting measures, its C1 cash costs have risen slightly due to higher processing costs. An updated 43-101 report estimates reserves of 846 thousand tonnes of contained copper over a 14 year mine life by optimizing production of both copper cathode and concentrate.
The annual report summarizes Bank Vozrozhdenie's performance in 2008. Despite difficult economic conditions, the bank increased assets by 27%, maintained a high quality loan portfolio, strengthened liquidity, and grew performance indicators. The bank increased return on equity to 23.3% and return on assets to 2.5%, while reducing costs. Looking ahead, the bank plans to increase loan loss provisions and remain profitable in 2009 by relying on its traditional client base of small and medium businesses and retail customers.
The investor presentation summarizes Sandridge Energy's assets and operational priorities. Sandridge has a Mid-Continent focus area with 462,000 net acres and over 300 drilling locations. It also has a North Park Niobrara oil project with 129,000 net acres and over 1,300 drilling locations. Sandridge's priorities include high-grading its Mid-Continent position through extended laterals and evaluating adjacent plays, and initiating its Niobrara oil program in North Park Basin through extended laterals and optimized completions to reduce costs.
VMS Ventures has discovered high grade copper deposits in Manitoba, Canada through its joint venture with Hudbay Minerals. Key points include:
- The Reed Copper Deposit has an indicated resource of over 2.5 million tonnes grading 7.86% zinc and 4.52% copper.
- A preliminary economic assessment estimates average annual production of 17,000 tonnes of copper concentrate over a 5 year mine life.
- Additional discoveries in 2011 include the Reed North zone with drill intercepts up to 9.31% copper over 3.95 meters.
- The company has a large land position in the prolific Flin Flon-Snow Lake volcanic massive sulfide belt, considered
VMS Ventures Inc. is a junior mining exploration company focused on discovering high grade copper deposits in Manitoba, Canada. It has a joint venture with Hudbay Minerals on the Reed Copper Deposit, which had a preliminary economic assessment completed in 2011, and four option agreements. VMS also owns 100% of several other exploration properties in the prolific Flin Flon-Snow Lake Greenstone Belt. In 2011, highlights included expanding resources at Reed Lake and making new discoveries. Plans for 2012 include additional drilling on joint venture and option properties as well as VMS's 100% owned lands.
VMS Ventures Inc. is exploring for copper deposits in Manitoba, Canada. It has discovered the Reed Copper Deposit through a joint venture with Hudbay Minerals. A preliminary economic assessment estimates the deposit contains over 2.5 million tonnes of 4.52% copper. VMS also holds additional exploration targets in the region through option agreements with Hudbay. The Flin Flon-Snow Lake belt where VMS is exploring is a prolific volcanogenic massive sulfide mining camp that has produced over 180 million tonnes of base and precious metals from various mines over the past 80 years.
This document provides an investor presentation for Cobre del Mayo, a Mexican mining company that operates the Piedras Verdes open-pit copper mine. It summarizes Cobre del Mayo's operations, financial performance, cost reduction strategies, mineral reserves, and an outlook for future copper prices. Declining copper prices since 2014 have significantly impacted Cobre del Mayo's sales, though cost reductions have lowered cash costs. An updated resource report estimates reserves sufficient for a 14-year mine life. Analysis of future copper demand and the incentive price needed for new production suggests prices will rise to incentivize supply.
The document discusses oil and gas prospects in Lebanon. It notes that seismic surveys have indicated high probabilities of considerable hydrocarbon reserves in Lebanon's offshore areas. Estimates suggest reserves of 25-96 trillion cubic feet of natural gas and 675 million-865 million barrels of oil. However, Lebanon has yet to launch its first offshore licensing bid round due to the government failing to approve crucial decrees related to territorial waters delimitation and provisions for exploration agreements. The document outlines Lebanon's legal framework and the role of the Petroleum Administration but notes delayed progress in the country's planned timeline for offshore exploration.
Cobre del Mayo operates the Piedras Verdes open-pit copper mine in Sonora, Mexico. It produces copper cathode through heap leaching and sells ore to Kupari Metals' flotation plant for processing into copper concentrate. Falling copper prices in recent years have significantly impacted Cobre del Mayo's sales. Despite cost cutting measures, its C1 cash costs have risen slightly due to higher processing costs. An updated 43-101 report estimates reserves of 846 thousand tonnes of contained copper over a 14 year mine life by optimizing production of both copper cathode and concentrate.
The annual report summarizes Bank Vozrozhdenie's performance in 2008. Despite difficult economic conditions, the bank increased assets by 27%, maintained a high quality loan portfolio, strengthened liquidity, and grew performance indicators. The bank increased return on equity to 23.3% and return on assets to 2.5%, while reducing costs. Looking ahead, the bank plans to increase loan loss provisions and remain profitable in 2009 by relying on its traditional client base of small and medium businesses and retail customers.
The investor presentation summarizes Sandridge Energy's assets and operational priorities. Sandridge has a Mid-Continent focus area with 462,000 net acres and over 300 drilling locations. It also has a North Park Niobrara oil project with 129,000 net acres and over 1,300 drilling locations. Sandridge's priorities include high-grading its Mid-Continent position through extended laterals and evaluating adjacent plays, and initiating its Niobrara oil program in North Park Basin through extended laterals and optimized completions to reduce costs.
KYC Harbour Redevelopment - Town Hall No 1 Presentationkingstonyc
This document outlines plans for a proposed harbour redevelopment at the Kingston Yacht Club. A phased plan over 10 years includes expanding the harbour with finger docks to accommodate more boats. A straw poll gauges member support. Financial details include funding the $1.6 million project through a loan and new harbour fees. A simplified fee structure and refundable dock deposits are proposed. Entrance fees would help fill slips and retain members. Feedback from members is requested to help finalize plans discussed at the next town hall meeting.
The document summarizes the slow but ongoing progress towards banking and fiscal union in the EU. Key points:
- EU finance ministers agreed to give the ECB oversight of large banks, but delayed fiscal union decisions until June 2013.
- The ECB will directly supervise over 200 large banks from 2014, leaving oversight of smaller banks to nations.
- A banking union aims to boost stability but was scaled back and implementation was pushed to 2014, leaving gaps.
- Fiscal and banking reforms need to go together with budget coordination to support financial stability long-term.
Sky Petroleum has exploration blocks in Albania and is planning drilling operations in 2012. Engineering studies have been completed for the first three prospects - Palokastra, Kanina, and Dumre. At Palokastra, a previous well from 2003 encountered oil shows but was plugged and abandoned. Kanina also had a prior well that encountered fractures with oil shows but testing was incomplete. The Dumre well requires deepening as the prior operator ran out of casing. Sky Petroleum will perform sidetracks and detailed testing at these locations in 2012 to evaluate the oil potential. Additional prospects are also being evaluated for future drilling.
This presentation by BWR Exploration Inc. summarizes their business plan and exploration projects. BWR recently acquired the Little Stull Lake Gold Project in Manitoba, which hosts 5 known gold zones, and plans to raise $1.9 million to conduct exploration including drilling and geophysics. BWR also owns projects in Quebec, Ontario, and Manitoba, but will focus initial efforts on advancing Little Stull Lake with the goal of outlining compliant resource estimates. Management owns 30.5% of shares and has outlined a strategy to create value through exploration and strategic partnerships.
This presentation was made by the BBMP during the first multi-stakeholder workshop conducted for Strategic Action Planning for Revival of Bangalore Lakes
This presentation discusses Consolidated Water's business providing desalination plants and water distribution systems. It highlights the company's operations in several countries including the Cayman Islands and Bahamas. The presentation also outlines Consolidated Water's growth strategy of expanding into new markets like Bali, Indonesia and Rosarito, Mexico through projects to develop desalination plants. It discusses the Rosarito project proposal and tender process as well as provides an overview of Consolidated Water's financial performance and growth opportunities.
This document provides an earnings presentation by Teekay Tankers for their fourth quarter and fiscal year 2011 results. It highlights recent market fundamentals including oversupply of tankers and volatility in charter rates. It also summarizes the company's financial results for Q4 2011, dividend payments, fleet employment strategies of balancing spot and time-chartered vessels, and outlook for fleet growth and tanker market recovery in 2012-2013 as fleet growth slows. The presentation provides context on the company's capital structure and ability to pay dividends through weak tanker markets.
The annual report summarizes Tangiers Petroleum Limited's operations for the 2012 fiscal year. It includes an operations report detailing the completion of a 677 square kilometer 3D seismic survey in the Assaka block that revealed prospects like Trident, TMA, and Assaka with best estimated oil volumes of over 3 billion barrels. The report also lists the company's corporate information and provides the chairman's report, directors' report, financial statements, and additional ASX information.
Consolidated Water Investor PresentationJeremy Keyser
This presentation discusses Consolidated Water's business providing desalinated water and water treatment services globally. It highlights the company's operating segments and locations, competitive advantages including use of best technology and long term customer contracts, and growth strategy pursuing new markets and complementary services like its recent acquisition of Aerex Industries. Key projects discussed are a proposed 100MGD desalination plant in Rosarito, Mexico and an existing plant expansion in Bali, Indonesia.
Virginia established a nutrient trading program and watershed permit in 2005 to help meet Chesapeake Bay nutrient reduction goals cost effectively. The program allows point sources to purchase credits from other point sources or nonpoint nutrient reduction projects. A 2012 law expanded the program by establishing a framework for certifying and using credits from additional nonpoint source practices. Key aspects include establishing baselines, only allowing use of certified credits listed in a public registry, and requiring local water quality protections are not contravened. The program aims to facilitate cost-effective reductions while maintaining regulatory oversight and permanent water quality benefits.
The speakers on the panel will provide different perspectives on how ballast water regulation and technology has created the current state of invasive species in the Great Lakes. This workshop will also enable participants to understand the regulatory challenges facing ballast water today while fully appreciating the current state of technology that is rising to the challenge of invaders. This presentation was given by Craig Middlebrook, Deputy Administrator, U.S. Saint Lawrence Seaway Development Corporation.
This presentation discusses Consolidated Water's business providing desalination plants and water distribution systems. It highlights the global need for water and Consolidated Water's competitive advantages in using best available technology. The presentation provides an overview of Consolidated Water's financial performance, existing operations, and growth strategy pursuing new projects in Mexico and Indonesia to expand into new markets.
Whiting Petroleum Corporation reported on several drilling operations in the Bakken and Permian basins. A well in the Sanish field in North Dakota had an initial flow rate of 2,594 BOE. Another well in the same field had an IP of 3,293 BOE/D. The company's first horizontal well in the Big Tex prospect in Texas was producing 788 BOE per day. The presentation provided an overview of the company, its operations map, recent well results, and prospect areas in the Bakken and Three Forks formations.
VMS Ventures discovered the high grade Reed Lake copper deposit in Manitoba, Canada in 2007. The company has a joint venture with Hudbay Minerals to develop Reed Lake, with Hudbay funding ongoing exploration and development as the project operator. VMS also holds other exploration properties in the region prospective for copper, zinc and gold deposits. An aggressive drill program is underway to test targets on VMS's properties and expand resources at Reed Lake.
Wheaton Precious Metals will acquire a precious metals stream from Sibanye-Stillwater's Stillwater mining operations in Montana. Under the stream, Wheaton will receive 100% of gold production and varying amounts of palladium production for the life of the Stillwater and East Boulder mines. The mines have over 24 years of reserves and significant exploration potential. The stream provides Wheaton with long-term production of over 30,000 gold equivalent ounces annually and diversifies its portfolio into palladium and the United States.
17 08-29 wpm september presentation final (for web & print)silverwheaton2016
- The document is a presentation by Wheaton Precious Metals describing the company.
- Wheaton Precious Metals is a streaming company that provides upfront payments to mining companies in exchange for the right to purchase precious metals from their mines at a low cost.
- This benefits both Wheaton, through a diversified portfolio of high-quality, long-life mining assets, and its mining partners through non-dilutive funding that improves project returns.
17 10-23 october presentation final (for web & print)silverwheaton2016
- The document is a presentation by Wheaton Precious Metals describing their business model of precious metals streaming.
- Wheaton provides upfront capital to mining companies in exchange for the right to purchase silver or gold produced at low fixed costs per ounce. This provides mining companies with significant funding that is non-dilutive to shareholders.
- Wheaton has a high-quality, long-life portfolio of streaming agreements that provides low-cost, diversified exposure to gold and silver production and exploration upside over the next several decades.
17 11-08 november presentation final (for web & print)silverwheaton2016
This document discusses Wheaton Precious Metals, a precious metals streaming company. It notes that Wheaton provides significant upfront capital to mining companies in a non-dilutive manner while retaining operational control. Wheaton has a diversified portfolio of long-life, high-quality streaming assets that provide low-cost, predictable production over 25 years on average. The document cautions readers about forward-looking statements and notes various risks and uncertainties involved.
Strategic Resources is presenting on their corporate projects in March 2024. The presentation outlines their phased approach to developing the BlackRock iron ore project in Quebec, beginning with a merchant iron pellet plant using third party feed (Phase 1), followed by direct reduction and hot briquetted iron production (Phase 2), and ultimately the construction of the BlackRock mine and metallurgical facility (Phase 3). Strategic also discusses their leased site at the deep water Port of Saguenay that will be critical infrastructure for shipping iron ore pellets and products internationally. The presentation provides an overview of the economics for the Phase 1 merchant pellet plant and Strategic's capital structure.
This corporate presentation provides an overview of Strategic Resources' plans to develop a high-purity pig iron production facility in Quebec, Canada. It outlines a three-phase approach, beginning with the construction of an iron pelletizing plant using third-party feed, then expanding to produce direct reduced iron and hot briquetted iron, and ultimately developing the BlackRock mine and production facilities to produce high-purity pig iron and other products. The presentation notes that Strategic's products will be high-value steelmaking inputs and that the BlackRock project is well-positioned near infrastructure to access markets. It argues the company is well-positioned to help enable the transition to lower-carbon electric arc furnace steel
- Strategic Resources is developing the BlackRock high purity pig iron project in Quebec and plans to build a 4Mtpa iron pellet plant (Phase 1) to produce direct reduction grade pellets using third party feed.
- The pellets would be sold at a premium to iron concentrate prices. Future phases could include production of DRI/HBI and high purity pig iron from the BlackRock project.
- The BlackRock project would produce high purity pig iron and critical metals like vanadium and titanium, supporting the green transition of the steel industry to electric arc furnaces.
KYC Harbour Redevelopment - Town Hall No 1 Presentationkingstonyc
This document outlines plans for a proposed harbour redevelopment at the Kingston Yacht Club. A phased plan over 10 years includes expanding the harbour with finger docks to accommodate more boats. A straw poll gauges member support. Financial details include funding the $1.6 million project through a loan and new harbour fees. A simplified fee structure and refundable dock deposits are proposed. Entrance fees would help fill slips and retain members. Feedback from members is requested to help finalize plans discussed at the next town hall meeting.
The document summarizes the slow but ongoing progress towards banking and fiscal union in the EU. Key points:
- EU finance ministers agreed to give the ECB oversight of large banks, but delayed fiscal union decisions until June 2013.
- The ECB will directly supervise over 200 large banks from 2014, leaving oversight of smaller banks to nations.
- A banking union aims to boost stability but was scaled back and implementation was pushed to 2014, leaving gaps.
- Fiscal and banking reforms need to go together with budget coordination to support financial stability long-term.
Sky Petroleum has exploration blocks in Albania and is planning drilling operations in 2012. Engineering studies have been completed for the first three prospects - Palokastra, Kanina, and Dumre. At Palokastra, a previous well from 2003 encountered oil shows but was plugged and abandoned. Kanina also had a prior well that encountered fractures with oil shows but testing was incomplete. The Dumre well requires deepening as the prior operator ran out of casing. Sky Petroleum will perform sidetracks and detailed testing at these locations in 2012 to evaluate the oil potential. Additional prospects are also being evaluated for future drilling.
This presentation by BWR Exploration Inc. summarizes their business plan and exploration projects. BWR recently acquired the Little Stull Lake Gold Project in Manitoba, which hosts 5 known gold zones, and plans to raise $1.9 million to conduct exploration including drilling and geophysics. BWR also owns projects in Quebec, Ontario, and Manitoba, but will focus initial efforts on advancing Little Stull Lake with the goal of outlining compliant resource estimates. Management owns 30.5% of shares and has outlined a strategy to create value through exploration and strategic partnerships.
This presentation was made by the BBMP during the first multi-stakeholder workshop conducted for Strategic Action Planning for Revival of Bangalore Lakes
This presentation discusses Consolidated Water's business providing desalination plants and water distribution systems. It highlights the company's operations in several countries including the Cayman Islands and Bahamas. The presentation also outlines Consolidated Water's growth strategy of expanding into new markets like Bali, Indonesia and Rosarito, Mexico through projects to develop desalination plants. It discusses the Rosarito project proposal and tender process as well as provides an overview of Consolidated Water's financial performance and growth opportunities.
This document provides an earnings presentation by Teekay Tankers for their fourth quarter and fiscal year 2011 results. It highlights recent market fundamentals including oversupply of tankers and volatility in charter rates. It also summarizes the company's financial results for Q4 2011, dividend payments, fleet employment strategies of balancing spot and time-chartered vessels, and outlook for fleet growth and tanker market recovery in 2012-2013 as fleet growth slows. The presentation provides context on the company's capital structure and ability to pay dividends through weak tanker markets.
The annual report summarizes Tangiers Petroleum Limited's operations for the 2012 fiscal year. It includes an operations report detailing the completion of a 677 square kilometer 3D seismic survey in the Assaka block that revealed prospects like Trident, TMA, and Assaka with best estimated oil volumes of over 3 billion barrels. The report also lists the company's corporate information and provides the chairman's report, directors' report, financial statements, and additional ASX information.
Consolidated Water Investor PresentationJeremy Keyser
This presentation discusses Consolidated Water's business providing desalinated water and water treatment services globally. It highlights the company's operating segments and locations, competitive advantages including use of best technology and long term customer contracts, and growth strategy pursuing new markets and complementary services like its recent acquisition of Aerex Industries. Key projects discussed are a proposed 100MGD desalination plant in Rosarito, Mexico and an existing plant expansion in Bali, Indonesia.
Virginia established a nutrient trading program and watershed permit in 2005 to help meet Chesapeake Bay nutrient reduction goals cost effectively. The program allows point sources to purchase credits from other point sources or nonpoint nutrient reduction projects. A 2012 law expanded the program by establishing a framework for certifying and using credits from additional nonpoint source practices. Key aspects include establishing baselines, only allowing use of certified credits listed in a public registry, and requiring local water quality protections are not contravened. The program aims to facilitate cost-effective reductions while maintaining regulatory oversight and permanent water quality benefits.
The speakers on the panel will provide different perspectives on how ballast water regulation and technology has created the current state of invasive species in the Great Lakes. This workshop will also enable participants to understand the regulatory challenges facing ballast water today while fully appreciating the current state of technology that is rising to the challenge of invaders. This presentation was given by Craig Middlebrook, Deputy Administrator, U.S. Saint Lawrence Seaway Development Corporation.
This presentation discusses Consolidated Water's business providing desalination plants and water distribution systems. It highlights the global need for water and Consolidated Water's competitive advantages in using best available technology. The presentation provides an overview of Consolidated Water's financial performance, existing operations, and growth strategy pursuing new projects in Mexico and Indonesia to expand into new markets.
Whiting Petroleum Corporation reported on several drilling operations in the Bakken and Permian basins. A well in the Sanish field in North Dakota had an initial flow rate of 2,594 BOE. Another well in the same field had an IP of 3,293 BOE/D. The company's first horizontal well in the Big Tex prospect in Texas was producing 788 BOE per day. The presentation provided an overview of the company, its operations map, recent well results, and prospect areas in the Bakken and Three Forks formations.
VMS Ventures discovered the high grade Reed Lake copper deposit in Manitoba, Canada in 2007. The company has a joint venture with Hudbay Minerals to develop Reed Lake, with Hudbay funding ongoing exploration and development as the project operator. VMS also holds other exploration properties in the region prospective for copper, zinc and gold deposits. An aggressive drill program is underway to test targets on VMS's properties and expand resources at Reed Lake.
Wheaton Precious Metals will acquire a precious metals stream from Sibanye-Stillwater's Stillwater mining operations in Montana. Under the stream, Wheaton will receive 100% of gold production and varying amounts of palladium production for the life of the Stillwater and East Boulder mines. The mines have over 24 years of reserves and significant exploration potential. The stream provides Wheaton with long-term production of over 30,000 gold equivalent ounces annually and diversifies its portfolio into palladium and the United States.
17 08-29 wpm september presentation final (for web & print)silverwheaton2016
- The document is a presentation by Wheaton Precious Metals describing the company.
- Wheaton Precious Metals is a streaming company that provides upfront payments to mining companies in exchange for the right to purchase precious metals from their mines at a low cost.
- This benefits both Wheaton, through a diversified portfolio of high-quality, long-life mining assets, and its mining partners through non-dilutive funding that improves project returns.
17 10-23 october presentation final (for web & print)silverwheaton2016
- The document is a presentation by Wheaton Precious Metals describing their business model of precious metals streaming.
- Wheaton provides upfront capital to mining companies in exchange for the right to purchase silver or gold produced at low fixed costs per ounce. This provides mining companies with significant funding that is non-dilutive to shareholders.
- Wheaton has a high-quality, long-life portfolio of streaming agreements that provides low-cost, diversified exposure to gold and silver production and exploration upside over the next several decades.
17 11-08 november presentation final (for web & print)silverwheaton2016
This document discusses Wheaton Precious Metals, a precious metals streaming company. It notes that Wheaton provides significant upfront capital to mining companies in a non-dilutive manner while retaining operational control. Wheaton has a diversified portfolio of long-life, high-quality streaming assets that provide low-cost, predictable production over 25 years on average. The document cautions readers about forward-looking statements and notes various risks and uncertainties involved.
Strategic Resources is presenting on their corporate projects in March 2024. The presentation outlines their phased approach to developing the BlackRock iron ore project in Quebec, beginning with a merchant iron pellet plant using third party feed (Phase 1), followed by direct reduction and hot briquetted iron production (Phase 2), and ultimately the construction of the BlackRock mine and metallurgical facility (Phase 3). Strategic also discusses their leased site at the deep water Port of Saguenay that will be critical infrastructure for shipping iron ore pellets and products internationally. The presentation provides an overview of the economics for the Phase 1 merchant pellet plant and Strategic's capital structure.
This corporate presentation provides an overview of Strategic Resources' plans to develop a high-purity pig iron production facility in Quebec, Canada. It outlines a three-phase approach, beginning with the construction of an iron pelletizing plant using third-party feed, then expanding to produce direct reduced iron and hot briquetted iron, and ultimately developing the BlackRock mine and production facilities to produce high-purity pig iron and other products. The presentation notes that Strategic's products will be high-value steelmaking inputs and that the BlackRock project is well-positioned near infrastructure to access markets. It argues the company is well-positioned to help enable the transition to lower-carbon electric arc furnace steel
- Strategic Resources is developing the BlackRock high purity pig iron project in Quebec and plans to build a 4Mtpa iron pellet plant (Phase 1) to produce direct reduction grade pellets using third party feed.
- The pellets would be sold at a premium to iron concentrate prices. Future phases could include production of DRI/HBI and high purity pig iron from the BlackRock project.
- The BlackRock project would produce high purity pig iron and critical metals like vanadium and titanium, supporting the green transition of the steel industry to electric arc furnaces.
The document discusses Wheaton Precious Metals, a streaming company that provides upfront capital to mining companies in exchange for silver and gold production at a low fixed cost per ounce. It has a diversified portfolio of high-quality, long-life assets producing over 370,000 gold equivalent ounces annually with over 30 years of mine life remaining. Wheaton has a strong balance sheet, low production costs, and significant optionality from development projects. It also faces a C$399 million tax dispute with the CRA from 2005-2010.
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
Strategic Resources presented on their corporate projects in March 2024. They outlined a three phase plan to build an iron pelletizing facility using third party feed as Phase 1. This would produce direct reduction grade pellets for sale at a premium to iron concentrate prices. Phase 2 would involve building a direct reduction plant to convert pellets to DRI or HBI. Phase 3 is the construction of Strategic's BlackRock mine and metallurgical facility in Quebec to produce high purity pig iron, titanium slag, and vanadium slag. The presentation highlighted Strategic's products as high value steel inputs that support the green transition to electric arc furnace steelmaking.
The document provides an overview of Strategic Resources' corporate presentation from March 2024. It discusses a three phase plan to develop an iron pelletizing facility and eventually the fully permitted BlackRock mine in Quebec. Phase 1 would produce direct reduction grade iron ore pellets using third party feedstock. Phase 2 could produce direct reduced iron or hot briquetted iron. Phase 3 involves building the BlackRock mine and facilities to produce high purity pig iron, vanadium, and titanium products. The presentation outlines the project's economics, location advantages, and potential to support the green transition in steelmaking.
This document provides a summary of Royal Gold's presentation at the CIBC 18th Annual Whistler Institutional Investor Conference in January 2015. Royal Gold highlights its solid portfolio and future growth opportunities. It discusses the ramp-up of production at its key asset, Mt. Milligan mine. It also outlines construction progress at the Phoenix gold project. Royal Gold emphasizes the quality of its portfolio, with over 90% of reserves from investment-grade countries. It has over $900 million in capital to invest in new royalty and streaming deals.
The corporate presentation summarizes a proposed reverse takeover transaction where Strategic Resources will acquire BlackRock Metals to create a leading critical minerals producer. Key highlights include BlackRock's construction-ready vanadium project in Quebec being the only permitted vanadium mine in North America, with potential production for 40 years. The transaction offers shareholders ownership in a near-term vanadium producer and combines management teams. A concurrent financing of $14 million will help fund the project's construction.
18 02-19 march presentation final (for web & print)silverwheaton2016
- The document discusses Wheaton Precious Metals, a company that purchases silver and gold from mining companies through streaming agreements. It provides upfront capital to mining companies in exchange for silver and gold at a discounted price in the future.
- Wheaton has a diversified portfolio of 20 operating mines and 9 development projects located around the world. It has over 25 years of mine life based on reserves and 99% of its production comes from low-cost, long-life assets.
- The company has a strong balance sheet with ample capacity for growth through acquisitions and development of existing streams. It also has a track record of production and reserve growth through exploration by its mining partners.
Cobar Consolidated Resources is developing the Wonawinta Silver Project in New South Wales, Australia. Construction is 65% complete, with commissioning expected in March 2012. The project involves open pit mining and processing of a 51 million ounce silver resource. Updated resources estimates show 65% of the 33.5 million tonne resource is now indicated. Permitting and exploration upside were also discussed.
- Royal Gold reported solid financial results for the first quarter of 2015, with net income up 23% and adjusted EBITDA of $0.86 per share, despite a 3% decline in the gold price.
- Production at Mt. Milligan continues to ramp up, reaching over 135,000 ounces of gold produced year-to-date. Throughput is expected to reach design capacity by year-end.
- Construction at the Phoenix gold project remains on schedule for a mid-2015 start-up. Over half of the project has been completed and mill assembly is underway.
18 03-26 april presentation final (for web & print)silverwheaton2016
The document discusses Wheaton Precious Metals, a streaming company that provides upfront capital to mining companies in exchange for silver and gold production. It notes the benefits of streaming to mining companies, including being non-dilutive, improving project returns, and allowing mining companies to retain operational control. The document also discusses Wheaton's high-quality asset portfolio, low costs, production growth outlook, and initiatives to support communities near partner mines through its CSR program.
The corporate presentation provides an overview of Strategic Resources' plan to acquire BlackRock Metals through a reverse takeover. This will create a leading critical minerals producer of vanadium, titanium, and high purity iron. BlackRock's flagship project is a construction ready multi-metallic mine and processing facility located in Quebec with all required permits. The presentation highlights the project's world-class infrastructure access, supportive stakeholders, and potential to become a long-term North American supplier of critical and specialty metals.
This document provides an overview of The High Margin Precious Metals Company and cautions readers about forward-looking statements. It notes that actual results could differ materially from expectations and strongly cautions readers to carefully review cautionary notes regarding forward-looking statements and mineral reserve and resource estimates. The document also outlines various risks and uncertainties that could affect the company's projections and statements.
This document provides an overview of The High Margin Precious Metals Company and cautions readers about forward-looking statements. It notes that actual results could differ materially from expectations and strongly cautions readers to carefully review cautionary notes regarding forward-looking statements and mineral reserve and resource estimates. The document also outlines various risks and uncertainties that could affect the company's projections and statements.
Similar to 18 06-11 voisey's bay acquisition final (20)
The document is a presentation by Wheaton Precious Metals outlining their business model. It describes Wheaton as a streaming company that provides upfront capital to mining companies in exchange for the right to purchase precious metals at discounted prices in the future. The presentation highlights the benefits of streaming for both mining companies and communities, including improving project returns, retaining operational control, and supporting CSR initiatives in local communities. It also outlines Wheaton's high-quality asset portfolio, production growth outlook, and unique dividend policy.
- The document is a presentation from Wheaton Precious Metals discussing their business model of precious metals streaming.
- They have a diversified portfolio of streaming agreements with operating mines and development projects around the world. This provides low-cost, long-life production of gold and silver.
- Key assets include Salobo, Peñasquito, Antamina, and Constancia, which collectively account for the majority of their forecasted production over the next 5 years. They also have additional optionality from development assets.
- The document discusses Wheaton Precious Metals, a streaming company that provides upfront payments to mining companies in exchange for the rights to future silver and gold production at a set price.
- Wheaton has a diversified portfolio of high-quality, long-life assets producing silver and gold with low costs and substantial optionality from development projects.
- The company offers investors exposure to precious metals with more upside potential and downside protection compared to ETFs and bullion due to exploration upside, expansion opportunities, and the ability to make accretive acquisitions.
- The document is a presentation from Wheaton Precious Metals discussing their business model of precious metals streaming.
- They have a diversified portfolio of streaming agreements with major mining companies. This provides low-cost, long-life production of silver and gold with significant optionality from development assets.
- Key highlights of their portfolio include the long-life Salobo mine, the high-grade Peñasquito mine, and potential expansion opportunities across several assets.
- The document is a presentation by Wheaton Precious Metals describing their business model of precious metals streaming.
- They have a diversified portfolio of streaming agreements with operating mines and development projects around the world. This provides low-cost, long-life production of gold and silver.
- Key assets include Salobo, Peñasquito, Antamina, and Constancia, which account for the majority of their forecasted production over the next 5 years. They also discuss recent developments and exploration potential at several of these key mines.
- The document discusses forward-looking statements and risks associated with Wheaton Precious Metals' business, including commodity price fluctuations and tax disputes.
- Readers are strongly cautioned to review risk factors described in the document and in Wheaton's regulatory filings.
- The document contains Wheaton's cautionary statements regarding forward-looking projections and mineral reserve estimates.
The document is a presentation by The High Margin Precious Metals Company summarizing Silver Wheaton's business model and assets. It notes that forward-looking statements are subject to risks and uncertainties. It provides an overview of how streaming works, why it creates value for partners, and highlights Silver Wheaton's high-quality, long-life, low-cost asset portfolio which includes operating mines and development projects. Key updates are provided on several of Silver Wheaton's largest assets. The presentation also discusses Silver Wheaton's community support programs, the ongoing tax dispute with CRA, and why Silver Wheaton is an attractive investment compared to traditional miners and other streaming companies.
This document provides an overview of the Antamina mining operation in Peru as follows:
1) Antamina is a large copper mine located in Peru that began operations in 2001. It is one of the largest and lowest cost copper mines globally.
2) The mine produces copper, zinc, silver and other metals. Production has increased over time with expansions. In 2016 it produced 431kt of copper.
3) The mine is owned by major mining companies and has extensive infrastructure including a pipeline and port facilities to transport its concentrates.
This document is a presentation by The High Margin Precious Metals Company from March 2017. It cautions readers that forward-looking statements are subject to risks and uncertainties, and directs readers to review cautionary statements. It then provides an overview of Silver Wheaton's business model, high-quality asset base including cornerstone assets, growth strategy, partnerships, Canadian tax dispute, advantages over traditional miners and other streamers, and upside compared to ETFs/bullion.
17 01-10 slw presentation final (for web & print)silverwheaton2016
This document provides cautionary statements regarding the use of forward-looking statements in the presentation. It notes that actual results could differ materially from what is presented. It strongly cautions readers to carefully review the cautionary notes in the presentation, particularly those regarding forward-looking statements, material assumptions, risk factors, and mineral reserve and resource estimates. The document aims to ensure readers are aware of the risks and uncertainties inherent in the information presented.
This document is a presentation by The High Margin Precious Metals Company from December 2016. It contains cautionary statements regarding the use of forward-looking statements and notes the risks associated with relying on such statements. Readers are strongly cautioned to carefully review the risk factors contained in the presentation and in other Silver Wheaton regulatory filings.
16 11-08 slw presentation final (for web & print)silverwheaton2016
This document provides an overview and summary of The High Margin Precious Metals Company. It cautions readers that forward-looking statements are subject to risks and uncertainties. It also cautions readers to carefully review cautionary notes regarding forward-looking statements and mineral reserve and resource estimates. The document then provides information on Silver Wheaton's business model, asset base, production growth forecast, partnerships, Canadian tax dispute, advantages over traditional miners and other streamers, and potential as silver supply declines in coming years.
16 09-14 slw presentation final (for web and print)silverwheaton2016
This document provides an overview and summary of The High Margin Precious Metals Company. It begins with cautionary statements regarding the use of forward-looking statements. It then provides a high-level summary of Silver Wheaton's business model of streaming precious metals, why streaming works, and who Silver Wheaton is as a company. Key points include that Silver Wheaton has a well-diversified, high-quality portfolio of streaming agreements with long-life, low-cost assets. It also discusses Silver Wheaton's largest current assets, growth profile, tax dispute with CRA, and advantages of investing in Silver Wheaton over traditional mining companies.
16 09-13 slw presentation final (for web and print)silverwheaton2016
This document is a presentation by The High Margin Precious Metals Company from September 2016. It contains cautionary statements regarding the use of forward-looking statements and notes the risks associated with mineral reserve and resource estimates. Silver Wheaton provides concise 3-sentence summaries.
The document is a presentation by The High Margin Precious Metals Company summarizing Silver Wheaton. It notes that Silver Wheaton has a diversified, high-quality portfolio of streaming agreements, with production expected to grow 45% in gold and 55% in silver over the next five years. However, it cautions readers that forward-looking statements are subject to risks and uncertainties, and to carefully review the risk factors outlined in the presentation.
This document provides an overview of Salobo, a gold mine owned by Vale S.A. in Brazil. It summarizes the key terms of an agreement where Silver Wheaton will acquire an additional 25% of the life-of-mine gold from Salobo, increasing its total entitlement to 75%. Some key details include that Silver Wheaton will pay $800 million upfront for the increased stream and also potential expansion payments to Vale if throughput is increased. The acquisition is expected to be accretive and significantly increase Silver Wheaton's gold reserves and production.
The E-Way Bill revolutionizes logistics by digitizing the documentation of goods transport, ensuring transparency, tax compliance, and streamlined processes. This mandatory, electronic system reduces delays, enhances accountability, and combats tax evasion, benefiting businesses and authorities alike. Embrace the E-Way Bill for efficient, reliable transportation operations.
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESWilliamRodrigues148
Mutual funds are investment vehicles that pool money from multiple investors to purchase a diversified portfolio of stocks, bonds, or other securities. They are managed by professional portfolio managers or investment companies who make investment decisions on behalf of the fund's investors.
Methanex is the world's largest producer and supplier of methanol. We create value through our leadership in the global production, marketing and delivery of methanol to customers. View our latest Investor Presentation for more details.
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfSOFTTECHHUB
The world of blockchain and decentralized technologies is about to witness a groundbreaking event. ZKsync, the pioneering Ethereum Layer 2 network, has announced the highly anticipated airdrop of its native token, ZK. This move marks a significant milestone in the protocol's journey, empowering the community to take the reins and shape the future of this revolutionary ecosystem.
Cleades Robinson, a respected leader in Philadelphia's police force, is known for his diplomatic and tactful approach, fostering a strong community rapport.
World economy charts case study presented by a Big 4
World economy charts case study presented by a Big 4
World economy charts case
World economy charts case study presented by a Big 4
World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4
World economy charts case study presented by a Big 4
World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4World economy charts case study presented by a Big 4study presented by a Big 4
2. 2
CAUTIONARY STATEMENTS
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
The information contained in this Presentation contains “forward-looking statements” within the meaning of the United States
Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of Canadian securities
legislation. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such statements.
Readers are strongly cautioned to carefully review the cautionary notes to this Presentation starting on page 32 and in
particular:
Note 1 at the end of this Presentation contains our cautionary note regarding forward-looking statements and sets out the
material assumptions and risk factors that could cause actual results to differ, including, but not limited to, the satisfaction of each
party’s obligations in accordance with the Vale cobalt stream, fluctuations in the price of commodities, the outcome of the
challenge by the CRA of Wheaton Precious Metal’s tax filings, the absence of control over mining operations from which
Wheaton Precious Metal purchases silver or gold, and risks related to such mining operations and continued operation of
Wheaton Precious Metal’s Counterparties. Readers should also consider the section entitled “Description of the Business – Risk
Factors” in Wheaton Precious Metal’s Annual Information Form and the risks identified under “Risks and Uncertainties” in
Management's Discussion and Analysis for the period ended December 31, 2017, both available on SEDAR and in Wheaton
Precious Metals' Form 40-F and Wheaton Precious Metals' Form 6-K filed March 29, 2018, both on file with the U.S. Securities
and Exchange Commission. Where applicable, readers should also consider any updates to such “Risks and Uncertainties” that
may be provided by Wheaton Precious Metals in its quarterly Management’s Discussion and Analysis.
Note 2 at the end of this Presentation contains our cautionary note regarding the presentation of mineral reserve and mineral
resource estimates.
4. 4
VOISEY’S BAY
ADDING CASH FLOW FROM A LOW-COST & LONG-LIFE MINE
▪ Adds to Wheaton’s existing high-quality portfolio
• Effective January 1, 2021, Wheaton will be entitled to an amount of finished cobalt equal to 42.4% of cobalt
production from Voisey’s Bay until delivery of 31 million pounds, dropping to 21.2% thereafter for the life of
mine
• Voisey’s Bay is a low-cost, high-margin nickel mine, ranking in the lowest half of the nickel cost curve
▪ Enhances growth profile and cash flow
• Production to start accruing to Wheaton starting in 2021, coincident with the anticipated ramp up in
underground production from Voisey’s Bay
• Attributable cobalt production is forecast to average 2.6 million pounds per year for the first 10 years, or
approximately 80 thousand gold equivalent ounces per year3
• Operating cash flow to Wheaton at the current cobalt Metal Bulletin market price (“cobalt spot price”) is
forecast to average over US$75 million per year for the first 10 years3
▪ Diversifies Wheaton’s portfolio with an integral metal for clean energy
• Cobalt is primarily used in battery technology, especially in the rapidly expanding electric vehicle market
• Cobalt supply comes predominantly from risky jurisdictions, making Canadian production very attractive
▪ Upfront Payment to be paid using funds available under existing revolving credit facility
Voisey’s Bay Stream
5. 5
VOISEY’S BAY
TRANSACTION OVERVIEW
Voisey’s Bay
Stream
• Stream agreement with a subsidiary of Vale S.A. (“Vale”), Vale
Newfoundland & Labrador Ltd. (“Project Owner”), Vale S.A. and Wheaton
Precious Metals Corp. (“Wheaton”)
• Effective January 2021, an amount of finished cobalt equal to 42.4% of
cobalt produced at Voisey’s Bay, reduced after 31 million pounds delivered
to 21.2% of cobalt production for the life of mine
• Closing expected to occur shortly following announcement and is subject
to the completion of certain corporate matters and customary conditions
• In conjunction with Wheaton’s stream, Vale entered into a separate
streaming agreement with Cobalt 27
Consideration
• Wheaton will pay a cash payment of US$390 million on closing
• Wheaton will utilize existing revolving credit facility for upfront payment
Production
Payments
• 18% of the Metal Bulletin cobalt spot price per pound delivered until the
value of the upfront cash consideration is reduced to zero, then 22%
Voisey’s Bay Stream
6. 6
VOISEY’S BAY
TRANSACTION OVERVIEW (CON.)
Stream
Structure
• Wheaton to take physical delivery of high quality finished metal by way of
warehouse certificates
• Payable rates for cobalt in concentrate have generally been fixed at 93.3%
• Wheaton anticipates having offtake agreements in place prior to the initial
delivery of cobalt
• Completion test related to the ramp up of underground operations measured
by throughput rate
• The upfront payment to be considered an advanced payment against the
purchase price for the sale of cobalt to Wheaton
• Wheaton will be responsible for Canadian tax on the sale of finished cobalt to
a third party / offtaker
Guarantors • Guaranteed by Project Owner and financial guarantee by Vale S.A.
Stream area of
interest
• Stream applies to Voisey's Bay mining lease plus a 2 kilometre surrounding
area so long as any such cobalt is extracted using the same underground
infrastructure as the planned Reid Brook and Eastern Deeps deposits
Voisey’s Bay Stream
7. 7Voisey’s Bay Stream
VOISEY’S BAY
ASSET OVERVIEW
Mine Type
Deposit Type
Open Pit / Underground
Magmatic Sulphide
Location Canada
Startup
Open pit 2005,
Underground in 2021
Estimated Avg. Annual Stream3
10 year avg starting in 2021
Life of Mine
2.6 Mlb Cobalt
2.4 Mlb Cobalt
Cobalt Payable Rates Fixed at 93.3%
Attributable P&P Reserves4 32.6 Mlb Cobalt
Attributable M&I Resources4 2.0 Mlb Cobalt
Attributable Inferred Resources4 8.6 Mlb Cobalt
Nickel By-product Cash Cost5 2nd Quartile
Location
Global By-product Nickel Cost Curve5
Q1 Q2 Q3 Q4
8. 8Voisey’s Bay Stream
VOISEY’S BAY
ASSET OVERVIEW
▪ Primary Metals
• Primarily nickel with byproduct cobalt and copper
▪ Overview
• Originally discovered in 1993 in Newfoundland & Labrador,
approximately 1,200 km north of St. John’s
• Open-pit mine & concentrator became operational in 2005
• First full year of production from underground mine forecasted
in 2021
• Underground development focused on two deposits: Reid
Brook and Eastern Deeps
• Development Agreement with the Government of
Newfoundland and Labrador on construction of Voisey’s Bay
▪ Infrastructure
• The Long Harbour Processing Plant became operational in
2014 and currently processes all nickel concentrate
• Cobalt circuit started up in Q1 2017 & is undergoing ramp-up:
hydrometallurgical refining results in increased cobalt recovery
10. 10Voisey’s Bay Stream
VOISEY’S BAY
ASSET OVERVIEW – EXISTING MINERAL RESERVES AND RESOURCES
Proven Mineral Reserves
Probable Mineral Reserves
Indicated Mineral Resources
Inferred Mineral Resources
Exploration Target
Proposed Mine Workings
11. 11Voisey’s Bay Stream
VOISEY’S BAY
ASSET OVERVIEW – POSSIBLE EXPLORATION UPSIDE6
Proven Mineral Reserves
Probable Mineral Reserves
Indicated Mineral Resources
Inferred Mineral Resources
Mined
Exploration Target
Exploration Prospect
Proposed Mine Workings
Mineral Intercept
Assay Results of Intercept:
%Ni, %Cu, %Co
m
1.3, 0.6, 0.04
29.5m
2.3, 1.9, 0.15
1.8m
2.0, 0.7, 0.15
4.2m
2.1, 0.8, 0.15
33.4m
1.8, 0.9, 0.12
50.2m
2.6, 0.9, 0.16
9.6m
1.4, 0.7, 0.10
4.0m
1.4, 0.9, 0.06
37.0m
12. 12Voisey’s Bay Stream
VOISEY’S BAY
ASSET OVERVIEW – LONG HARBOUR FACILITY
Long Harbour Cobalt Circuit
started up in Q1 2017
Cobalt
rounds
13. 13
$0
$1,000
$2,000
$3,000
Revolving
Credit
Facility
Cash Additional
Debt for
Voisey's Bay
Remaining
Capacity
Est. Op.
Cash Flow
(2018-2022)
Voisey’s Bay Stream
VOISEY’S BAY
AMPLE CAPACITY TO FINANCE THE TRANSACTION
Debt Service Capacity1,8
Strong cash flow readily services debt and provides capacity for additional growth
Undrawn
Drawn
▪ To fund the upfront cash payment of US$390
million, Wheaton intends to use proceeds
borrowed under its revolving credit facility
▪ At March 31, 2018, the Company had net
debt of approx. $547 million7
▪ Debt readily serviceable:
• Attractive interest rate: LIBOR plus 120bp
to 220bp
• Trailing 4-quarter operating cash flow was
just under $550 million to March 31, 2018
• Flexible nature of the covenants under the
revolving credit facility
14. 14.4
-
5.0
10.0
15.0
20.0
25.0
Ratio
0.23
-
0.20
0.40
0.60
0.80
1.00
Ratio
14
▪ The Company’s revolving credit facility has two financial covenants:
• Maximum Net Debt to Tangible Net Worth Ratio of less than or equal to 0.75:1.00; and
• Minimum Interest Coverage Ratio of greater than or equal to 3.00:1.00
▪ The Company can comfortably comply with these two covenants with the additional
debt for the Voisey’s Bay Stream
Maximum Net Debt to
Tangible Net Worth1,9
Minimum Interest
Coverage1,9
Wheaton can comfortably comply with financial covenants
Covenant
of ≤ 0.75
Covenant
of ≥ 3.00
FINANCIAL COVENANTS
Voisey’s Bay Stream
VOISEY’S BAY
15. 15Voisey’s Bay Stream
VOISEY’S BAY
ADDING CASH FLOW AND EARNINGS ON A PER SHARE BASIS
Voisey’s Bay significantly increases production, cashflow, and reserves and resources
Estimated Accretion to Wheaton Precious Metals1,10
Voisey’s Bay upfront
payment of $390M
represents 3.7% of
Wheaton’s pro-forma
enterprise value
10.0% 9.7%
10.4% 10.2% 10.2% 10.1%
5.5%
0%
2%
4%
6%
8%
10%
12%
10 Yr
Production Oz /
Share
20 Yr
Production Oz /
Share
10 Yr Payable
Oz / Share
20 Yr Payable
Oz / Share
10 Yr
Cash Flow /
Share
20 Yr
Cash Flow /
Share
P&P Reserves /
Share
17. 17Voisey’s Bay Stream
VOISEY’S BAY
COBALT OVERVIEW
▪ Two thirds of world cobalt mining supply comes from just three countries, with
the Democratic Republic of Congo being the dominant supplier11
▪ Cobalt supply is inelastic due to its by-product nature. Cobalt demand alone is
unlikely to justify starting new copper and nickel mines
• Timing of supply growth of copper and nickel versus timing of demand
growth for cobalt may result in continued cobalt deficits that could lead to
persistent high prices
▪ Cobalt demand for non-battery related end use is expected to grow1,12
▪ Growth in demand for battery related end use is anticipated to be significant1,12
• Cobalt significantly improves stability and life-span of rechargeable batteries
• Anticipated demand for cobalt battery related end-use is expected to more
than double between 2018 – 20251,12
▪ Cobalt’s nominal USD price may appear high but in more stable units of
measure, such as gold, it appears fairly priced13
Cobalt is an integral metal for clean energy storage
Batteries in electric
vehicles is a key demand
driver for cobalt14
18. 18Voisey’s Bay Stream
VOISEY’S BAY
LITHIUM-ION ANTICIPATED BATTERY DEMAND OVERVIEW
Battery segment cobalt demand to grow +140% from 2018 - 2025
0
20
40
60
80
100
120
140
160
2017 2018 2019 2020 2021 2022 2023 2024 2025
CobaltDemand
(thousandmetrictons)
Other Electrical Device Smart Phone Mobile Phone E-Scooter E-Motorbike Personal Computing EVs (small) E-Bike EVs (large)
These four categories are forecast to drive growth
Cobalt Demand from Lithium-Ion Batteries1,12
19. 19Voisey’s Bay Stream
VOISEY’S BAY
COBALT SUPPLY OVERVIEW
Cobalt supply is inelastic and is reliant on no interruptions from the DRC
55%
6%
5%
5%
29%
DRCongo China Russia Canada Others
65%
33%
2%
Copper Nickel Primary Cobalt
Cobalt Production by Country11
66%
Cobalt Production by Primary Metal11
21. 21Voisey’s Bay Stream
VOISEY’S BAY
DIVERSIFIED PORTFOLIO OF HIGH QUALITY ASSETS
Well-diversified with low political risk
Operating Mines (17) Development Projects (10) Partners:
Vale
Glencore
Goldcorp
Barrick
Lundin
Eldorado
Hudbay
Pan American
First Majestic
Capstone
Alexco
Sandspring
Panoro
Leagold
Kutcho CopperCorporate Offices (2)
22. 22
0
10
20
30
40
50
60
70
0
200
400
600
800
1,000
2012 2013 2014 2015 2016 2017 2018E 2019E 2020E 2021E 2022E
SilverEquivalentProduction(SEO)(Moz)
GoldEquivalentProduction(GEO)(Koz)
Other San Dimas Peñasquito Constancia Sudbury Salobo Antamina
Voisey’s Bay Stream
VOISEY’S BAY
FIVE YEAR PRODUCTION FORECAST
Production Profile1,15
Peñasquito
Other
San Dimas
Constancia
Sudbury
Salobo
Antamina
Voisey’s Bay
Additional
2.6 Mlbs of Co
per year on
average for
first 10 years
Voisey’s Bay adds to Wheaton’s five-year production growth profile
370koz Gold
25Moz Silver
Avg 5-year
production:
23. 23Voisey’s Bay Stream
VOISEY’S BAY
SUMMARY
WHEATON BELIEVES THAT
THE NEW VOISEY’S BAY STREAM:
Adds to Wheaton’s existing high quality
portfolio of low-cost long life mines
Increases Wheaton’s growth profile
Exploration upside
Accretive to earnings and cash flow
Diversifies production profile
Provides exposure to clean, conflict-free cobalt
While Wheaton is focused on precious metals, the Voisey’s Bay stream checks all the boxes
✓
✓
✓
✓
✓
✓
24. 24
INVESTOR RELATIONS
Tel: 604-684-9648
Toll Free: 1-844-288-9878
Email: info@wheatonpm.com
TRANSFER AGENT
AST Trust Company
Toll Free: 1-800-387-0825
International: 1-416-682-3860
Email: inquiries@canstockta.com
NYSE: WPM TSX: WPM
www.wheatonpm.com
@Wheaton_PM
@WheatonPM
@Wheaton Precious Metals Corp.
CONNECT WITH US
26. 26
Shares Outstanding 442.8 million
Diluted Shares Outstanding16 443.4 million
3 Month Average Daily Trading Volume:
TSX: 0.8 million shares
NYSE: 2.1 million shares
LIQUID STOCK
CAPITAL STRUCTURE AS OF MAR 31, 2018
Appendix
27. 27
Precious Metal Interest Mine Owner
Location of
Mine
Upfront
Consideration
Attributable Production
Silver Gold
Production Payment
as of March 31, 20171
Silver Gold
Term of
Agreement
Date of
Original
Contract
1 San Dimas First Majestic Mexico $ 25% paid in gold 25% $600 Life of Mine 15-Oct-04
2 Los Filos Leagold Mexico $ 4,463 100% 0% $4.29 n/a 25 years 15-Oct-04
3 Zinkgruvan Lundin Sweden $ 77,866 100% 0% $4.29 n/a Life of Mine 8-Dec-04
4 Yauliyacu Glencore Peru $ 285,000
100% up to 1.5Moz,
then 50%
0% variable2
n/a Life of Mine 23-Mar-06
5 Stratoni Eldorado Gold Greece $ 57,500 100% 0% variable3
n/a Life of Mine 23-Apr-07
6 Peñasquito Goldcorp Mexico $ 485,000 25% 0% $4.13 n/a Life of Mine 24-Jul-07
7 Keno Hill Alexco Canada $ 50,000 25% 0% variable4
n/a Life of Mine 2-Oct-08
8-12 Silverstone Resources 21-May-09
8 Minto Capstone Canada $ 54,805 100%
100% up to 30koz,
then 50%
$4.14 $318 Life of Mine 20-Nov-08
9 Neves-Corvo Lundin Portugal $ 35,350 100% 0% $4.18 n/a 50 years 5-Jun-07
10 Aljustrel I'M SGPS Portugal $ 2,451 100%5
0% $4.06 n/a 50 years 5-Jun-07
11 Navidad (Loma de La Plata) Pan American Argentina $ 43,289 6
12.5% 0% $4.00 n/a Life of Mine n/a7
Barrick $ 625,000
12 Pascua-Lama Barrick Chile/Argentina 25% 0% $3.90 n/a Life of Mine 8-Sep-09
The Barrick transaction also included streams on Lagunas Norte, Pierina, Veladero which expired on March 31, 2018
13 Rosemont Hudbay United States $ 230,0009
100% 100% $3.90 $450 Life of Mine 10-Feb-10
2004 2005 2006 2007 2008 2009 2010 2011
4) Yauliyacu 7) Keno Hill 8-11) Silverstone
12) Barrick
1) San Dimas
2) Los Filos
3) Zinkgruvan
Silver Wheaton (SLW)
Begins Trading
5) Stratoni
6) Peñasquito
13) Rosemont
Silver Stream Gold & Silver Stream Gold Stream
Timeline Since Inception17
COMPANY ACQUISITION HISTORY
Appendix
28. 2012 2013 2014 2015 2016 2017 2018 2019
28
Precious Metal
Interest Mine Owner
Location of
Mine
Upfront
Consideration
Attributable Production
Silver Gold Other
Production Payment
As of March 31, 20171
Silver Gold Other
Term of
Agreement
Date of
Original
Contract
14 Constancia10,11 Hudbay Peru $ 429,900 100% 50% $5.90 $400 Life of Mine 8-Aug-12
Constancia Silver $ 294,900 100% $5.90 8-Aug-12
Constancia Gold $ 135,000 50% $400 4-Nov-13
15 77711 Hudbay Canada $ 455,100 100% 50% $6.02 $408 Life of Mine 8-Aug-12
16 Salobo12 Vale Brazil $ 3,059,360 0% 75% n/a $400 Life of Mine 28-Feb-13
Salobo I $ 1,330,000 0% 25% 28-Feb-13
Salobo III $ 900,000 0% 25% 2-Mar-15
Salobo III13 $ 829,360 0% 25% 2-Aug-16
17 Sudbury14 Vale Canada $ 623,572 0% 70% n/a $400 20 years 28-Feb-13
Coleman, Copper Cliff, Garson, Stobie, Creighton, Totten and Victor gold interests
18 Toroparu15 Sandspring Guyana $ 153,500 50% 10% $3.90 $400 Life of Mine 11-Nov-13
19 Antamina16,17 Glencore Peru $ 900,000 33.75% 0% 20% of Spot n/a Life of Mine 3-Nov-15
20 Cotabambas18,19 Panoro Peru $ 140,000 100% 25% $5.90 $450 Life of Mine 21-Mar-16
21 Kutcho20,21 Kutcho Copper Canada $ 65,000 100% 100% 20% of Spot 20% of Spot Life of Mine 15-Dec-17
22 Voisey’s Bay Cobalt22 Vale Canada $ 390,000 42.4% 18% of Spot Life of Mine Jun-18
Timeline Since Inception17
14) Constancia
Silver
15) 777
16) Salobo I
17) Sudbury
14) Constancia
Gold
18) Toroparu
16) Salobo II
19) Antamina
20) Cotabambas
16) Salobo III
Silver Stream Gold & Silver Stream Gold Stream Other Stream
Silver Wheaton Becomes
Wheaton Precious Metals (WPM)
21) Kutcho
COMPANY ACQUISITION HISTORY
Appendix
22) Voisey’s Bay
29. 29
1. Subject to an annual inflationary adjustment with the exception of Loma de La Plata and Sudbury.
2. Should the prevailing market price for silver or gold be lower than this amount, the per ounce cash payment will be reduced to the prevailing market price, with the exception of Yauliyacu where the per ounce cash payment will not be reduced below
$4.24 per ounce, subject to an annual inflationary factor.
3. In October 2015, in order to incentivize additional exploration and potentially extend the limited remaining mine life of Stratoni, Wheaton Precious Metals and Eldorado Gold agreed to modify the Stratoni silver purchase agreement. The primary
modification is to increase the production price per ounce of silver delivered to Wheaton Precious Metals over the current fixed price by one of the following amounts: (i) $2.50 per ounce of silver delivered if 10,000 meters of drilling is completed outside
of the existing ore body and within Wheaton Precious Metals' defined area of interest (“Expansion Drilling”); (ii) $5.00 per ounce of silver delivered if 20,000 meters of Expansion Drilling is completed; and (iii) $7.00 per ounce of silver delivered if 30,000
meters of Expansion Drilling is completed. Drilling in all three cases must be completed by December 31, 2020, in order for the agreed upon increase in production price to be initiated.
4. In March 2017, the Company amended its silver purchase agreement with Alexco Resource Corp. (“Alexco”) to make the production payment a function of the silver head grade and silver spot price in the month in which the silver is produced. In
addition, the area of interest was expanded to include properties currently owned by Alexco and properties acquired by Alexco in the future which fall within a one kilometer radius of existing Alexco holdings in the Keno Hill Silver District. As
consideration of the amendments, Alexco issued 3,000,000 shares to Wheaton Precious Metals.
5. Wheaton Precious Metals only has the rights to silver contained in concentrate containing less than 15% copper at the Aljustrel mine.
6. Comprised of $11 million allocated to the silver interest upon the Company’s acquisition of Silverstone Resources Corp. in addition to a contingent liability of $32 million, payable upon the satisfaction of certain conditions, including Pan American
receiving all necessary permits to proceed with the mine construction.
7. Definitive terms of the agreement to be finalized.
8. Wheaton Precious Metals' attributable silver production is subject to a maximum of 8% of the silver contained in the ore processed at Veladero during the period.
9. The upfront consideration is currently reflected as a contingent obligation, payable on an installment basis to partially fund construction of the Rosemont mine once certain milestones are achieved, including the receipt of key permits and securing the
necessary financing to complete construction of the mine.
10.Gold recoveries will be set at 55% for the Constancia deposit and 70% for the Pampacancha deposit until 265,000 ounces of gold have been delivered to the Company. Should there be a delay in achieving completion or mining the Pampacancha
deposit beyond the end of 2018, Wheaton Precious Metals would be entitled to additional compensation in respect of the gold stream.
11.Subject to an increase to $9.90 per ounce of silver and $550 per ounce of gold after the initial 40 year term.
12.Vale has completed the expansion of the mill throughput capacity at the Salobo mine to 24 million tonnes per annum (“Mtpa”) from its previous 12 Mtpa. If actual throughput is expanded above 28 Mtpa within a predetermined period, and depending on
the grade of material processed, Wheaton Precious Metals will be required to make an additional payment to Vale based on a set fee schedule ranging from $113 million if throughput is expanded beyond 28 Mtpa by January 1, 2036, up to $953 million
if throughput is expanded beyond 40 Mtpa by January 1, 2021.
13.Upfront payment consisted of $800 million cash & the amendment of the 10mil Wheaton Precious Metals common share purchase warrants previously issued to Vale in connection with the Sudbury precious metal purchase agreement which expire on
Feb. 28, 2023 to reduce the strike price from $65 to $43.75 per common share. The amendment to these warrants was valued at $29 million using a Black-Scholes option pricing model.
14.Includes Coleman, Copper Cliff, Garson, Stobie, Creighton, Totten & Victor gold interests. Upfront payment consisted of $570 million cash plus 10 million Wheaton Precious Metals common share purchase warrants with a $65 strike and 10 year term.
15.Comprised of $16 million paid to date and $138 million to be payable on an installment basis to partially fund construction of the mine. Following the delivery of certain feasibility documentation or after December 31, 2017 if the feasibility documentation
has not been delivered to Wheaton Precious Metals by such date, Wheaton Precious Metals may elect not to proceed with the agreement or not pay the balance of the upfront consideration and reduce the gold stream percentage from 10% to 0.909%
and the silver stream percentage from 50% to nil. If Wheaton Precious Metals elects to terminate, Wheaton Precious Metals will be entitled to a return of the amounts advanced less $2 million which is non-refundable on the occurrence of certain
events. If Wheaton Precious Metals elects to reduce the streams, Sandspring Resources Ltd. may return the amount of the deposit already advanced less $2 million to Wheaton Precious Metals and terminate the agreement.
16.Glencore owns 33.75% of the Antamina mine through a joint venture. Wheaton Precious Metals is entitled to Gelncore’s portion of the silver production.
17.Once the Company has received 140 million ounces of silver under the Antamina agreement, the Company’s attributable silver production to be purchased will be reduced to 22.5%.
18.Comprised of $4.75 million paid to date, $9.25 million which is payable on an installment basis spread out over a period of up to eight years and $126 million payable on an installment basis to partially fund construction of the mine once certain
conditions have been satisfied.
19.Once 90 million silver equivalent ounces attributable to Wheaton Precious Metals have been produced, the attributable production to be purchased will decrease to 66.67% of silver & 16.67% of gold production for the life of mine.
20.Comprised of $7 million as an early deposit, payable in 2018. The balance of the $65 million would be payable in instalments during construction of the Kutcho Project.
21.Once 5.6 million ounces of silver and 51,000 ounces of gold have been delivered, the stream will decrease to 66.67% of the silver and gold production for the life of the mine.
22.Stream is effective January 1, 2021. Once 31 million pounds of cobalt are delivered, the stream drops to 21.2% of cobalt for the life of mine. Production payment is set at 18% of the cobalt spot price until the value of the upfront cash consideration is
reduced to zero, then the production payment is 22% of the cobalt spot price.
COMPANY ACQUISITION HISTORY
Appendix
NOTES TO TIMELINE
31. 31
ATTRIBUTABLE RESERVES AND RESOURCES
VOISEY’S BAY
Appendix
Deposit Category
Tonnage Grade Contained
Mt Co % Co Mlbs
Main & Mini Ovoid Proven 0.3 0.18 1.3
SE Extension Proven 0.8 0.04 0.7
Reid Brook
Proven 1.7 0.15 5.6
Probable 0.9 0.13 2.6
Eastern Deeps
Proven 1.8 0.16 6.3
Probable 5.6 0.13 16.2
Total Reserves
Proven 4.6 0.14 13.9
Probable 6.5 0.13 18.7
P&P 11.1 0.13 32.6
Discovery Hill
Indicated 1.4 0.05 1.5
Inferred 1.4 0.05 1.6
SE Extension Indicated 0.8 0.03 0.5
Reid Brook Inferred 2.5 0.13 7.0
Total Resources
Measured - - -
Indicated 2.2 0.04 2.0
M&I 2.2 0.04 2.0
Inferred 3.9 0.10 8.6
Mineral Reserves & Resources2 Notes on Mineral Reserves & Mineral Resources2
• All Mineral Reserves and Mineral Resources have been estimated in accordance with the 2014 Canadian Institute of
Mining, Metallurgy and Petroleum (CIM) Standards for Mineral Resources and Mineral Reserves and National
Instrument 43-101 – Standards for Disclosure for Mineral Projects (“NI 43-101”), or the 2012 Australasian Joint Ore
Reserves Committee (JORC) Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
• Mineral Reserves and Mineral Resources are reported above in millions of metric tonnes ("Mt"), percent ("%") and
millions of pounds ("Mlbs").
• Qualified persons (“QPs”), as defined by the NI 43-101, for the Mineral Reserve and Mineral Resource estimates are:
o Neil Burns, M.Sc., P.Geo. (Vice President, Technical Services); and
o Ryan Ulansky, M.A.Sc., P.Eng. (Senior Director, Engineering),
• The Mineral Resources reported in the above tables are exclusive of Mineral Reserves.
• Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.
• Mineral Reserves and Mineral Resources are reported as of December 31, 2017 based on information available to the
Company as of the date of this document, and therefore will not reflect updates, if any, after such date.
• Process recovery of cobalt to a nickel concentrate averages 84%.
• Mineral Reserves and Resources are estimated using appropriate process recovery rates and the following NSR cut-
offs and commodity prices:
o Ovoid, Mini Ovoid and SE Extension Mineral Reserves – Cdn $24.04 per tonne assuming $9.07 per pound
nickel, $2.86 per pound copper and $12.25 per pound cobalt;
o Reid Brook Mineral Reserves and Mineral Resources - $275.00 per tonne assuming $9.72 per pound nickel,
$3.40 per pound copper and $11.50 per pound cobalt;
o Eastern Deeps Mineral Reserves - $225.00 per tonne assuming $6.35 per pound nickel, $2.81 per pound
copper and $18.13 per pound cobalt;
o SE Extension Mineral Resources - $24.00 per tonne assuming $10.43 per pound nickel, $3.45 per pound
copper and $13.00 per pound cobalt; and
o Discovery Hill Mineral Resources - $24.81 per tonne assuming $9.53 per pound nickel, $3.13 per pound copper
and $12.50 per pound cobalt.
• The Company's attributable Resources and Reserves for Voisey’s Bay have been constrained to the production
expected from January 1, 2021 onwards.
• The Voisey’s Bay cobalt purchase and sale agreement provides that Vale will deliver an amount of finished cobalt
equal to 42.4% of the cobalt production until 31 million pounds are delivered and 21.2% of cobalt production thereafter,
for the life of the mine. Attributable reserves and resources have been calculated on the 42.4% / 21.2% basis.
• Cobalt is produced as a by-product metal; therefore, the economic cut-off applied to the reporting of cobalt Resources
and Reserves will be influenced by changes in the commodity prices of other metals at the time.
• Full Reserve and Resource tables are available on the Company's website, www.wheatonpm.com.
32. 32End Notes
END NOTES
1. The information contained herein contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information”
within the meaning of applicable Canadian securities legislation. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to,
statements with respect to:
the payment of the upfront cash consideration of US$390 million to Vale in connection with the Cobalt Stream; the construction timeline, including completion, of the mine expansion, including
the underground mines, at Voisey’s Bay by Vale; the commencement and timing of delivery of cobalt by Vale under the Cobalt Stream; the receipt of cobalt by Wheaton of cobalt production in
respect of Voisey’s Bay; Vale’s obligations under the development agreement with the Government of Newfoundland and Labrador and the impacts and benefits agreements with the Innu
Nation and the Nunatsiavut government; the demand, uses and supply of cobalt; the effect of the SAT legal claim on the business, financial condition, results of operations and cash flows for
2010-2014 and 2015-2019 in respect of the San Dimas mine; the proposed acquisition of the Minto mine; the repayment of the Kutcho convertible note; the ability of Barrick to advance the
Pascua-Lama project as an underground mine; future payments by the Company in accordance with precious metal purchase agreements, including any acceleration of payments, estimated
throughput and exploration potential; projected increases to Wheaton’s production and cash flow profile; the expansion and exploration potential at the Salobo and Peñasquito mines; projected
changes to Wheaton’s production mix; anticipated increases in total throughput; the estimated future production; the future price of commodities; the estimation of mineral reserves and mineral
resources; the realization of mineral reserve estimates; the timing and amount of estimated future production (including 2018 and average attributable annual production over the next five
years); the costs of future production; reserve determination; estimated reserve conversion rates and produced but not yet delivered ounces; any statements as to future dividends, the ability to
fund outstanding commitments and the ability to continue to acquire accretive precious metal stream interests; confidence in the Company’s business structure; the Company’s position relating
to any dispute with the CRA and the Company’s intention to defend reassessments issued by the CRA; the impact of potential taxes, penalties and interest payable to the CRA; possible audits
for taxation years subsequent to 2015; estimates as to amounts that may be reassessed by the CRA in respect of taxation years subsequent to 2010; amounts that may be payable in respect
of penalties and interest; the Company’s intention to file future tax returns in a manner consistent with previous filings; that the CRA will continue to accept the Company posting security for
amounts sought by the CRA under notices of reassessment for the 2005-2010 taxation years or will accept posting security for any other amounts that may be sought by the CRA under other
notices of reassessment; the length of time it would take to resolve any dispute with the CRA or an objection to a reassessment; and assessments of the impact and resolution of various tax
matters, including outstanding audits, proceedings with the CRA and proceedings before the courts; and assessments of the impact and resolution of various legal and tax matters, including
but not limited to outstanding class actions.
Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”,
“estimates”, “forecasts”, “projects”, “intends”, “anticipates” or “does not anticipate”, or “believes”, “potential”, or variations of such words and phrases or statements that certain actions, events or
results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may
cause the actual results, level of activity, performance or achievements of Wheaton to be materially different from those expressed or implied by such forward-looking statements, including but
not limited to:
that each party does not satisfy it’s obligations in accordance with the terms of the Cobalt Stream; Vale does not meet the construction timeline, including anticipated completion, of the mine
expansion, including the underground mines, at Voisey’s Bay; Vale is unable to commence, or the timing of delivery of cobalt by Vale is delayed or deferred under the Cobalt Stream or
Wheaton is unable to sell its cobalt production delivered under the Cobalt Stream at acceptable prices or at all; Vale does not meet its obligations under the development agreement with the
Government of Newfoundland and Labrador or the impacts and benefits agreements with the Innu Nation and the Nunatsiavut government; the decrease in demand for cobalt, the decrease in
uses for cobalt or the discovery of new supplies of cobalt, any or all of which could result in a decrease to the price of cobalt or a decrease in the ability to sell cobalt;
33. 33End Notes
END NOTES
1. (cont.) First Majestic not being able to defend the validity of the 2012 APA, is unable to pay taxes in Mexico based on realized silver prices or the SAT proceedings or actions otherwise having
an adverse impact on the business, financial condition or results of operation in respect of the San Dimas mine; Kutcho not being able to make payments under the Kutcho convertible note; the
acquisition of the Minto mine not being completed as proposed or at all; Barrick not being able to advance the Pascua-Lama project as an underground mine; risks related to the satisfaction of
each party's obligations in accordance with the terms of Wheaton’s precious metal purchase agreements, including any acceleration of payments, estimated throughput and exploration
potential; fluctuations in the price of commodities; risks related to the Mining Operations including risks related to fluctuations in the price of the primary commodities mined at such operations,
actual results of mining and exploration activities, environmental, economic and political risks of the jurisdictions in which the Mining Operations are located, and changes in project parameters
as plans continue to be refined; absence of control over the Mining Operations and having to rely on the accuracy of the public disclosure and other information Wheaton receives from the
owners and operators of the Mining Operations as the basis for its analyses, forecasts and assessments relating to its own business; differences in the interpretation or application of tax laws
and regulations or accounting policies and rules; Wheaton’s interpretation of, or compliance with, tax laws and regulations or accounting policies and rules, being found to be incorrect or the tax
impact to the Company’s business operations being materially different than currently contemplated; any challenge by the CRA of the Company’s tax filings being successful and the potential
negative impact to the Company’s previous and future tax filings; the Company’s business or ability to enter into precious metal purchase agreements being materially impacted as a result of
any CRA reassessment; any reassessment of the Company’s tax filings and the continuation or timing of any such process is outside the Company’s control; any requirement to pay reassessed
tax, and the amount of any tax, interest and penalties that may be payable changing due to currency fluctuations; the Company not being assessed taxes on its foreign subsidiary’s income on
the same basis that the Company pays taxes on its Canadian income, if taxable in Canada; interest and penalties associated with a CRA reassessment having an adverse impact on the
Company’s financial position; litigation risk associated with a challenge to the Company’s tax filings; credit and liquidity risks; indebtedness and guarantees risks; mine operator concentration
risks; hedging risk; competition in the mining industry; risks related to Wheaton’s acquisition strategy; risks related to the market price of the common shares of Wheaton; equity price risks
related to Wheaton’s holding of long term investments in other exploration and mining companies; risks related to interest rates; risks related to the declaration, timing and payment of dividends;
the ability of Wheaton and the Mining Operations to retain key management employees or procure the services of skilled and experienced personnel; litigation risk associated with outstanding
legal matters; risks related to claims and legal proceedings against Wheaton or the Mining Operations; risks relating to unknown defects and impairments; risks relating to security over
underlying assets; risks related to ensuring the security and safety of information systems, including cyber security risks; risks related to the adequacy of internal control over financial reporting;
risks related to governmental regulations; risks related to international operations of Wheaton and the Mining Operations; risks relating to exploration, development and operations at the Mining
Operations; risks related to the ability of the companies with which Wheaton has precious metal purchase agreements to perform their obligations under those precious metal purchase
agreements in the event of a material adverse effect on the results of operations, financial condition, cash flows or business of such companies; risks related to environmental regulations and
climate change; the ability of Wheaton and the Mining Operations to obtain and maintain necessary licenses, permits, approvals and rulings; the ability of Wheaton and the Mining Operations to
comply with applicable laws, regulations and permitting requirements; lack of suitable infrastructure and employees to support the Mining Operations; uncertainty in the accuracy of mineral
reserve and mineral resource estimates; inability to replace and expand mineral reserves; risks relating to production estimates from Mining Operations, including anticipated timing of the
commencement of production by certain Mining Operations; uncertainties related to title and indigenous rights with respect to the mineral properties of the Mining Operations; fluctuations in the
commodity prices other than silver or gold; the ability of Wheaton and the Mining Operations to obtain adequate financing; the ability of the Mining Operations to complete permitting,
construction, development and expansion; challenges related to global financial conditions; risks relating to future sales or the issuance of equity securities; and other risks discussed in the
section entitled “Description of the Business – Risk Factors” in Wheaton’s Annual Information Form available on SEDAR at www.sedar.com, and in Wheaton’s Form 40-F for the year ended
December 31, 2017 and Form 6-K filed March 21, 2018 both on file with the U.S. Securities and Exchange Commission in Washington, D.C. (the “Disclosure”).
34. 34End Notes
END NOTES
1. (cont.) Forward-looking statements are based on assumptions management currently believes to be reasonable, including but not limited to:
the payment of US$390 million to Vale and the satisfaction of each party’s obligations in accordance with the terms of the Cobalt Stream; Vale is able to meet the construction timeline,
including anticipated completion, of the mine expansion, including the underground mines, at Voisey’s Bay; Vale is able to commence and meet its timing for delivery of cobalt under the Cobalt
Stream and Wheaton is able to sell cobalt production delivered under the Cobalt Stream at acceptable prices; Vale meets its obligations under the development agreement with the
Government of Newfoundland and Labrador and the impacts and benefits agreements with the Innu Nation and the Nunatsiavut government; the demand and uses for cobalt will not
significantly decrease and the supply of cobalt will not significantly increase; that Kutcho will make all required payments and not be in default under the Kutcho Convertible Note; that the
acquisition of the Minto mine will be completed as proposed; that Barrick will be able to advance the Pascua-Lama project as an underground mine or that Wheaton will be able to terminate the
Pascua-Lama precious metal purchase agreement in accordance with its terms; that each party will satisfy their obligations in accordance with the precious metal purchase agreements; that
there will be no material adverse change in the market price of commodities; that the Mining Operations will continue to operate and the mining projects will be completed in accordance with
public statements and achieve their stated production estimates; that Wheaton will continue to be able to fund or obtain funding for outstanding commitments; that Wheaton will be able to
source and obtain accretive precious metal stream interests; expectations regarding the resolution of legal and tax matters, including the ongoing class action litigation and CRA audit involving
the Company; that Wheaton will be successful in challenging any reassessment by the CRA; that Wheaton has properly considered the application of Canadian tax law to its structure and
operations; that Wheaton will continue to be permitted to post security for amounts sought by the CRA under notices of reassessment; that Wheaton has filed its tax returns and paid applicable
taxes in compliance with Canadian tax law; that Wheaton will not change its business as a result of any CRA reassessment; that Wheaton’s ability to enter into new precious metal purchase
agreements will not be impacted by any CRA reassessment; expectations and assumptions concerning prevailing tax laws and the potential amount that could be reassessed as additional tax,
penalties and interest by the CRA; that any foreign subsidiary income, if taxable in Canada, would be subject to the same or similar tax calculations as Wheaton’s Canadian income, including
the Company’s position, in respect of precious metal purchase agreements with upfront payments paid in the form of a deposit, that the estimates of income subject to tax is based on the cost
of precious metal acquired under such precious metal purchase agreements being equal to the market value of such precious metal while the deposit is outstanding, and the cash cost
thereafter; the estimate of the recoverable amount for any precious metal purchase agreement with an indicator of impairment; and such other assumptions and factors as set out in the
Disclosure.
Although Wheaton has attempted to identify important factors that could cause actual results, level of activity, performance or achievements to differ materially from those contained in forward-
looking statements, there may be other factors that cause results, level of activity, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that
forward-looking statements will prove to be accurate and even if events or results described in the forward-looking statements are realized or substantially realized, there can be no assurance
that they will have the expected consequences to, or effects on, Wheaton. Accordingly, readers should not place undue reliance on forward-looking statements and are cautioned that actual
outcomes may vary. The forward-looking statements included herein are for the purpose of providing investors with information to assist them in understanding Wheaton’s expected financial and
operational performance and may not be appropriate for other purposes. Any forward looking statement speaks only as of the date on which it is made. Wheaton does not undertake to update
any forward-looking statements that are included or incorporated by reference herein, except in accordance with applicable securities laws.
35. 35End Notes
END NOTES
2. CAUTIONARY NOTE TO UNITED STATES INVESTORS REGARDING PRESENTATION OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES: The information contained herein
has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. The terms “mineral
reserve”, “proven mineral reserve” and “probable mineral reserve” are Canadian mining terms defined in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for
Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by
the CIM Council, as amended (the “CIM Standards”). These definitions differ from the definitions in Industry Guide 7 (“SEC Industry Guide 7”) under the U.S. Securities Act of 1933, as amended
(the “U.S. Securities Act”). Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and
legally produced or extracted at the time the reserve determination is made. Also, under SEC Industry Guide 7 standards, a “final” or “bankable” feasibility study is required to report reserves,
the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the appropriate
governmental authority. In addition, the terms “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral resource” are defined in and required to be
disclosed by NI 43-101; however, these terms are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the
SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. “Inferred mineral resources” have a great amount
of uncertainty as to their existence and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher
category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to
assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Mineral resources that are not mineral reserves do not have demonstrated economic
viability. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does
not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures. Accordingly, information contained herein that describes the Company’s mineral
deposits may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the United States federal securities laws and the
rules and regulations thereunder. United States investors are urged to consider closely the disclosure in the Annual Information Form, a copy of which is available at www.sec.gov.
3. Production estimates are for pounds contained in concentrate and based on the mine plan provided by Vale. Gold equivalent production is based on approximate spot prices at the time of the
announcement of the transaction, specifically $1,300 per ounce of gold and $40 per pound of cobalt. Operating cash flow is based on cobalt spot prices of approximately $40 per pound of
cobalt, estimated 2.6 million pounds of cobalt produced annually, a payable cobalt rate of 93.3%, production payment of 18%, and an assumed cobalt marketing fee. Statements as to estimated
operating cash flow and EBITDA contain forward looking information and readers are cautioned that actual outcomes may vary. Please see Note 1 - “Cautionary Statements” for material risks,
assumptions, and important disclosure associated with this information.
4. Please refer to the Reserve and Resource tables in the appendix of this presentation for full disclosure of reserve and resource estimates.
5. Based on Wood Mackenzie est. of 2nd quarter of 2018 by-product cost curve for nickel mines.
6. Possible exploration upside refers to potential areas of exploration and does not indicate that any additional reserves or resources are contained at Voisey’s Bay.
36. 36End Notes
END NOTES
7. As of March 31, 2018, Wheaton had cash and cash equivalent of US$116 million and debt outstanding under its US$2 billion Revolving Credit Facility of US$663 million. The Revolving Credit
Facility of $2 billion with term to February 2023.
8. Estimated operating cash flow calculations assume for each year between 2018 and 2022 (i) production forecasted to average on an annual basis 25 million silver ounces, 370,000 gold ounces,
and for 2021 and 2022, 2.1 million cobalt pounds (ii) sales price of $1,350 per gold ounce, $17 per silver ounce, and $40 per cobalt pound (iii) production payments of between $4.17 and $4.87
per silver ounce, between $393 and $425 per gold ounce, and $8.00 per cobalt pound (inclusive of 18% production payment and assumed marketing cost) (iv) 90% payable rates, (v) indicated
silver and gold prices being in place throughout the periods, (vi) deduction of general & administrative expenses of approximately $30 million on an annual basis, (vii) calculation before
dividends, interest expense and taxes, and (viii) successful resolution of the CRA dispute. Cash flow estimates are made as of March 23, 2018, are presented to show impact of silver and gold
prices on cash flow and are not guaranteed. Excludes C$213 million letter of guarantee posted in connection with the CRA dispute. Revolving Credit Facility of $2 billion with term to February
2023. Cash balance of $116 million and $663 million drawn on the Revolving Credit Facility as of Mar 31, 2018. Please see also Note 1 for material risks, assumptions, and important disclosure
associated with this information, including, but not limited to, risks and assumptions associated with fluctuations in the price of commodities, the absence of control over mining operations from
which Wheaton Precious Metals purchases silver or gold, production estimates and the challenge by the CRA of Wheaton Precious Metals' tax filings.
9. For covenant tests, net debt is as of Mar 31, 2018, and inclusive of the additional $390 million payable for the Voisey’s Bay transaction. Interest expense based on net debt and interest rates
applicable to the Company’s revolving credit facility.
10. Estimated operating cash flow based on estimated cobalt price of $40 per pound, gold price of $1,300 per ounce, and silver price of $16.50 per ounce; production estimates based on mine plan
provided by Vale; resources are exclusive of reserves; and please refer to the Reserve and Resource tables in the appendix of this presentation for full disclosure of reserve and resource
estimates. Estimated cash flow is before dividends and based on criteria described in End Note 13 except silver and gold price as noted above. Enterprise value is based on NYSE closing price
as of May 31, 2018, net debt as of March 31, 2018, and the additional debt of $390 million for the upfront payment. Statements as to estimated operating cash flow and EBITDA contain forward
looking information and readers are cautioned that actual outcomes may vary. Please see Note 1 - “Cautionary Statements” for material risks, assumptions, and important disclosure associated
with this information.
11. Cobalt mine production based on research by Canaccord Genuity, Citi Research, Darton Consulting, SNL Mine Economics, United States Geological Survey, and Wheaton Precious Metals
International Ltd. (“WPMI”).
12. Cobalt demand based on research by Canaccord Genuity, Company Reports, and WPMI.
13. Based on Bloomberg, CRU Group, Global Financial Data, London Bullion Market Association, Metal Bulletin, The Golden Constant, World Bank, United States Geological Survey, WPMI.
14. From Vale “Electric Vehicle Revolution and Implications for New Energy Metals” Presentation, May 16, 2018
15. 2012-2017 Production based on Avg. realized gold & silver prices. 2018-2022E production forecasted to average on an annual basis 25 million silver ounces, 370,000 gold ounces and assumes
a Au:Ag ratio of 70:1 ; and 2021-2022 assumes Au:Co ratio based on $1,300 per ounce of gold and $40 per pound of cobalt. Production forecast includes the impact of the Barrick Other
streams finishing March 31, 2018. In conjunction with First Majestic’s acquisition of Primero, the Primero SPA was terminate and a new precious metals purchase agreement entered into at a
reduced level starting in the second quarter of 2018, representing a 25% stream on the silver produced at San Dimas, payable in gold, and a 25% stream on the gold produced at San Dimas.
16. Per the treasury method.
17. Upfront payment denoted in US$ millions; excludes closing costs and capitalized interest, where applicable. See notes specific to the Timeline on the page immediately following Timeline
graphs.
37. 37
Wheaton Precious Metals has included, throughout this document, certain non-IFRS performance measures, including (i) adjusted net
earnings and adjusted net earnings per share; (ii) operating cash flow per share (basic and diluted); (iii) average cash costs of silver and
gold on a per ounce basis and; (iv) cash operating margin.
Adjusted net earnings and adjusted net earnings per share are calculated by removing the effects of the non-cash impairment charges.
The Company believes that, in addition to conventional measures prepared in accordance with IFRS, management and certain investors
use this information to evaluate the Company’s performance.
i. Operating cash flow per share (basic and diluted) is calculated by dividing cash generated by operating activities by the weighted
average number of shares outstanding (basic and diluted). The Company presents operating cash flow per share as
management and certain investors use this information to evaluate the Company’s performance in comparison to other
companies in the precious metal mining industry who present results on a similar basis.
ii. Average cash cost of silver and gold on a per ounce basis is calculated by dividing the total cost of sales, less depletion, by the
ounces sold. In the precious metal mining industry, this is a common performance measure but does not have any standardized
meaning. In addition to conventional measures prepared in accordance with IFRS, management and certain investors use this
information to evaluate the Company’s performance and ability to generate cash flow.
iii. Cash operating margin is calculated by subtracting the average cash cost of silver and gold on a per ounce basis from the
average realized selling price of silver and gold on a per ounce basis. The Company presents cash operating margin as
management and certain investors use this information to evaluate the Company’s performance in comparison to other
companies in the precious metal mining industry who present results on a similar basis.
These non-IFRS measures do not have any standardized meaning prescribed by IFRS, and other companies may calculate these
measures differently. The presentation of these non-IFRS measures is intended to provide additional information and should not be
considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For more detailed information,
please refer to Wheaton Precious Metals' Management Discussion and Analysis available on the Company’s website at
www.wheatonpm.com and posted on SEDAR at www.sedar.com.
NON-IFRS MEASURES