PKSPL – S2 KEPELABUHANAN
JAKARTA 5 MARET 2015
PRESENTED BY Capt. NASDION AGOES
PORT MANAGEMENT LEGAL BASE
DASAR HUKUM:
1. Undang Undang no 17 th 2008 ttg Pelayaran
2. Peraturan Pemerintah no 61 thn 2009 ttg Kepelabuhanan
3. Permenhub no 51 ,th 2011 ttg Tersus dan Tuks
4. Permenhub no 52, th 2011 ttg Pengerukan dan Reklamasi
5. Permenhub no 53, th 2011 ttg Pemanduan
6. Permenhub no 36 , th 2012 ttg Organisasi dan Tata Kerja
Kantor Kesyahbandaran dan Otoritas Pelabuhan
7. Permenhub no 414 th 2013 ttg Rencana Induk Pelabuhan
Nasional
8. SK Dirjen Hub La ono : UM 002/38/18/DJPL-11 ttg Standard
Kinerja Pelayanan Operasional Pelabuhan dll
2
Source : Lloyd’s Practical Shipping Guide’s, 2009. Port Operation’s, Planning and
Logistics. Khalid Bichou 2/18
INTRODUCTION ON PORT SYSTEM
9/18
Source : UNCTAD
PORT SYSTEM
POLICY
STRATEGY
MANAGEMENT
LOGISTICS
OPERATIONS
PLANNING
Port follow the Trade
Trade follow the port 3/18
PORT INSTITUTIONAL MODELS
DESCRIPTION STRENGHTS WEAKNESSES
Public
service
port
• Own, develops and maintains,
both infrastructure and
superstructure
• Own and operates handling
equipment
• Operate and performs on its
own all service
• Labour for allport service
provides by public sector
• Huge investment required
• No redundancy (in theory)
• Unity of command and
management
• Handling operations
not compatible with
administrative duties
of public entity
• Private sector out of
the port business
•Strong power from
labour unions
Landlord
port
•Owns, develops and maintains
the infrastructure, but
leases/rents it to the private
sector
•Handling services performed by
private sector. Labour for
handling service provided by
private sector
•Marine and nautical service may
be performed by either the public
sector, the private sector, or a
combination of both
• No investment required in
equipment and superstructure
facilities
• Private sector efficiency and
accountability
•Investment by the private sector
ensures strong market
leadership, long-term
relationship
•Competitive market dynamics
•Better management of port
labour
• Possibible conflict
between private sector
objectives and general
public interest
• Risk of footloose
10/18
Source : Port Operation Planning & Logistic, K. Bichou
PORT INSTITUTIONAL MODELS
DESCRIPTION STRENGHTD WEAKNESSES
Tool port • Own, develops and maintains,
the infrastructure
• Own superstructure which is
operated by the private sector
• Labour for handling service
provides by public sector
• Marine and nautical services
may be performed by either the
public sector, the private sector,
or a combination of both
• Huge investment
required
• No redundancy (in
theory)
• Double entity (public and
private) undertaking handling
operations and management
• Possibility of conflict
regarding equipment
assignment and operational
efficiency
• No control over gang and
labour efficiency from the part
of the private sector
Private
service
• Private sector owns, develops,
and operates infrastructure,
superstructure, and all other port
service
•Private sector provides labour for
all port service
•Regulatory and statutory
fuctions may be performed by the
public authority
• Port operations and
management
performance not
influenced by political
decisions
• Higher efficiency in
asset and human
resources management
(in theory)
• Prisk of market failure, eg
monopolistic behaviour
•Difficulty in planning and
implementing public port
policy
• Possible deviation from core
port business (eg handling) to
more profitable activities (eg
real estate development)
11/18
Source : Port Operation Planning & Logistic, K. Bichou
8
Suprastructure
 Belonging to the suprastructure are
• sheds
• terminal buildings
• warehouses
• tanks
cranes vehicles
hauling gear
sheds
storage areas
Suprastructure
equipment like:
gantry cranes
transtainers
other cranes etc….
9
Infrastructure
 The main infrastructure facilities required
 by ships and land carriers are
• channels
• aids to navigation
• turning areas
• locks
• docks
quay walls
roads
railway tracks
water area
inside the port
territory
quays
land areas
rail / road
Infrastructure
PORT and TERMINAL
MANAGEMENT
Market &
Service
Port /
Terminal
Impact
Operations
Agent
4/18
MASTER PLAN OBJECTIVES
• Cargo type bulk / container
• Hinterland to cover
• Type of ships to handle
• Transport access
Market Study
• Optimalization plan
• Areal of development and extention
• Environment issue
Development
Plan
• HRD
• Bench marketing
• SOP
• Safety and Security
• Maintenance
• Marketing
Management
Plan
17/18
Source : Port Operation Planning & Logistic, K. Bichou
MARKETS AND SERVICES
• Container, bulk, etc
Port / terminal
type
• Quay, yard, gate, etc
• Hinterland, foreland, etc
Spatial Coverage
• Service to ship
• Service to cargo
• Value added logistics
Service Type
• Trade lanes
• Shipping service
• Inland system
• Logistics networks
• Supply chain systems
Network Type
6/18
PROCESS AND ELEMENTS OF STRATEGIC PORT PLANNING
13/18
Source : Port Operation Planning & Logistic, K. Bichou
CONCESSION ARRANGEMENT
Under a BOT concession, the government provides an exclusive grant to the
private sector to built and operate a port facility for a specified period of time.
After the expire of this period, the grantor can lease out the facilities or, if the
facilities have to be completely rehabilitated, he can grant a similar or different
concessional arrangement. A BOT agreement implies that the concessionaire has
rights similar to holding a title which allow him to use the port facility as a
corollary to loans during the period of concession.
BFOT (Build, Finance, Operate, Transfer), BTO (Build, Transfer, Operate) and
WBTO (Wraparound BOT) are special variations of BOT concession used where
the private sector is also in charge of project financing, where legislation forbids
private ownership of public infrastructure, and where the private sector is in
charge of expanding a public – owned port facility, respectively. Other variations
include the Design, Build, Finance, Operate (DBFO). Both models provide a high
degree of private sector control with little or no demand risk
15/18
Source : Port Operation Planning & Logistic, K. Bichou
CONCESSION ARRANGEMENT
In the Build-Operate-Own (BOO) contract, the assumption is that there will be full
and permanent privatization of the facilities built or operated at the end of the
concession period of the concession agreement. The terms of a BOO concession
should explicitly grant ownership of the facilities that will be built
Under the build-Operate-Own-Transfer (BOOT) agreement, the ownership title over
port assets and infrastructure conveys to the concessionaire during the concession.
This arrangement facilitates to the Government at the end of the concession. This
arrangement facilities the granting of loans by financial institutions to private
terminal operators. However, subject to project economics, the concessionaire takes
at least some demand risk in BOOT structure.
Under the Equip – Operate – Transfer (EOT) scheme, port infrastructure already
exists, but superstructure is supplied and operated by the private sector for an agreed
period of time, after which it is transferred to the public sector
16/18
Source : Port Operation Planning & Logistic, K. Bichou
UNCTAD’S PORT GENERATIONS MODEL
2000+
3rd generation port: dynamic mode in
global supply chains
Quality supply chains, competition on
added value to the end customer
1970 - 2000
2nd generation port: gateway node in inter
–modal transport networks
Competition on location, port charges,
efficiency, service level, reliability, VAS
1950 -1970
1st generation port: port as business Competition on cost and port charges
12/18
Type of Terminal
PORT INEFFCIENCY
KINERJA OPERASIONAL PELABUHAN
 Standar Kinerja pelayanan operasional pelabuhan
dan utilisasinya memperhatikan tingkat kualitas
pelayanan kapal,pelayanan barang,utilisasi
fasilitas, kesiapan peralatan pelabuhan, dan
disesuaikan dengan karakteristik masing masing
lokasi terminal di pelabuhan. (Pasal 7)
 Standar Kinerja pelayanan operasinal pelabuhan
tsb ditetapkan oleh SK Dirjen
21
KINERJA OPERASIONAL PELABUHAN
 Operator Terminal menyampaikan laporan ke Otoritas
Pelabuhan setiap bulan, dan akan diteruskan secara
berkala ke Direktur Jendral, yg akan di evaluasi oleh
Dirjen paling sedikit satu kali dalam periode enam
bulan . ( Bab V. Ketentuan lain-lain)
 Laporan dan evaluasi adalah sebagai dasar
pengambilan keputusan untuk Perencanaan
Pengembangan kebutuhan (Port Demand) pelabuhan
di masa depan
22
TERIMA KASIH
SELAMAT BEKERJA
SELAMAT BERISTIRAHAT

More Related Content

Similar to 13682996.ppt

Port Partnership Seminar - Jakarta
Port Partnership Seminar - JakartaPort Partnership Seminar - Jakarta
Port Partnership Seminar - Jakarta
Fitri Indra Wardhono
 
Transnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic DirectionTransnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic Direction
Tristan Wiggill
 
1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...
BARITEMEL
 
PPP in Ports
PPP in Ports PPP in Ports
PPP in Ports
Mukul Saini
 
The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...
The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...
The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...
Dr. Amarjeet Singh
 
CONCESSIONING IN SEAPORTS: CHANGING PRACTICES, CHANGING MARKET POWER?
CONCESSIONING IN SEAPORTS:  CHANGING PRACTICES, CHANGING  MARKET POWER?CONCESSIONING IN SEAPORTS:  CHANGING PRACTICES, CHANGING  MARKET POWER?
CONCESSIONING IN SEAPORTS: CHANGING PRACTICES, CHANGING MARKET POWER?
Cláudio Carneiro
 
Presentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdfPresentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdf
XolaniRadebeRadebe
 
BCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdfBCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdf
ssuser455a701
 
Oecd
OecdOecd
Oecd-sea transportation
Oecd-sea transportationOecd-sea transportation
Oecd-sea transportation
Universiti Utara Malaysia
 
Multimodal Transport in an Indian Perspective
Multimodal Transport in an Indian PerspectiveMultimodal Transport in an Indian Perspective
Multimodal Transport in an Indian Perspective
Farhan Khan
 
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
P3s for Puerto Rico  - 17 May 2023 - Updated.pptxP3s for Puerto Rico  - 17 May 2023 - Updated.pptx
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
Marc Joffe
 
Ports in Global Supply Chains
Ports in Global Supply Chains Ports in Global Supply Chains
Ports in Global Supply Chains
Rob Zuidwijk
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
OECDGlobalRelations
 
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's RoleCarlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
ProColombia
 
Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit
ravindransandhya
 
FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...
FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...
FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...
AHRP Law Firm
 
Role of transport as an element in logistics
Role of transport as an element in logisticsRole of transport as an element in logistics
Role of transport as an element in logistics
Ebo Hammond
 
Debt assumption commitments in Turkish PPPs - Hulya Pasaogullari, Turkey
Debt assumption commitments in Turkish PPPs - Hulya Pasaogullari, TurkeyDebt assumption commitments in Turkish PPPs - Hulya Pasaogullari, Turkey
Debt assumption commitments in Turkish PPPs - Hulya Pasaogullari, Turkey
OECD Governance
 
Caribbean Port Efficiency: Challenges and Opportunities
Caribbean Port Efficiency: Challenges and OpportunitiesCaribbean Port Efficiency: Challenges and Opportunities
Caribbean Port Efficiency: Challenges and Opportunities
Caribbean Development Bank
 

Similar to 13682996.ppt (20)

Port Partnership Seminar - Jakarta
Port Partnership Seminar - JakartaPort Partnership Seminar - Jakarta
Port Partnership Seminar - Jakarta
 
Transnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic DirectionTransnet National Ports Authority Strategic Direction
Transnet National Ports Authority Strategic Direction
 
1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...
 
PPP in Ports
PPP in Ports PPP in Ports
PPP in Ports
 
The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...
The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...
The Role of Private Off Dock Terminals on Port Efficiency (A Study of Sifax O...
 
CONCESSIONING IN SEAPORTS: CHANGING PRACTICES, CHANGING MARKET POWER?
CONCESSIONING IN SEAPORTS:  CHANGING PRACTICES, CHANGING  MARKET POWER?CONCESSIONING IN SEAPORTS:  CHANGING PRACTICES, CHANGING  MARKET POWER?
CONCESSIONING IN SEAPORTS: CHANGING PRACTICES, CHANGING MARKET POWER?
 
Presentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdfPresentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdf
 
BCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdfBCG - Port of Los Angeles.pdf
BCG - Port of Los Angeles.pdf
 
Oecd
OecdOecd
Oecd
 
Oecd-sea transportation
Oecd-sea transportationOecd-sea transportation
Oecd-sea transportation
 
Multimodal Transport in an Indian Perspective
Multimodal Transport in an Indian PerspectiveMultimodal Transport in an Indian Perspective
Multimodal Transport in an Indian Perspective
 
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
P3s for Puerto Rico  - 17 May 2023 - Updated.pptxP3s for Puerto Rico  - 17 May 2023 - Updated.pptx
P3s for Puerto Rico - 17 May 2023 - Updated.pptx
 
Ports in Global Supply Chains
Ports in Global Supply Chains Ports in Global Supply Chains
Ports in Global Supply Chains
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
 
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's RoleCarlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
Carlos Alberto Sandoval - Infraestructure Opportunities and FDN's Role
 
Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit Functional planning of vizhinjam port and design of transit
Functional planning of vizhinjam port and design of transit
 
FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...
FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...
FSRU procurement for Oil and Gas Upstream Business (clauses and legal concern...
 
Role of transport as an element in logistics
Role of transport as an element in logisticsRole of transport as an element in logistics
Role of transport as an element in logistics
 
Debt assumption commitments in Turkish PPPs - Hulya Pasaogullari, Turkey
Debt assumption commitments in Turkish PPPs - Hulya Pasaogullari, TurkeyDebt assumption commitments in Turkish PPPs - Hulya Pasaogullari, Turkey
Debt assumption commitments in Turkish PPPs - Hulya Pasaogullari, Turkey
 
Caribbean Port Efficiency: Challenges and Opportunities
Caribbean Port Efficiency: Challenges and OpportunitiesCaribbean Port Efficiency: Challenges and Opportunities
Caribbean Port Efficiency: Challenges and Opportunities
 

Recently uploaded

Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
obriengroupinc04
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
BBPMedia1
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
ZevinAttisha
 
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka ResultsKalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Satta Matka Dpboss Kalyan Matka Results
 
Kalyan chart 6366249026 India satta Matta Matka 143 jodi fix
Kalyan chart 6366249026 India satta Matta Matka 143 jodi fixKalyan chart 6366249026 India satta Matta Matka 143 jodi fix
Kalyan chart 6366249026 India satta Matta Matka 143 jodi fix
satta Matta matka 143 Kalyan chart jodi 6366249026
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
Arijit Dutta
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
dazzjoker
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Niswey
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Herman Kienhuis
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
➑➌➋➑➒➎➑➑➊➍
 

Recently uploaded (20)

Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
 
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka ResultsKalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
 
Kalyan chart 6366249026 India satta Matta Matka 143 jodi fix
Kalyan chart 6366249026 India satta Matta Matka 143 jodi fixKalyan chart 6366249026 India satta Matta Matka 143 jodi fix
Kalyan chart 6366249026 India satta Matta Matka 143 jodi fix
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
 

13682996.ppt

  • 1. PKSPL – S2 KEPELABUHANAN JAKARTA 5 MARET 2015 PRESENTED BY Capt. NASDION AGOES
  • 2. PORT MANAGEMENT LEGAL BASE DASAR HUKUM: 1. Undang Undang no 17 th 2008 ttg Pelayaran 2. Peraturan Pemerintah no 61 thn 2009 ttg Kepelabuhanan 3. Permenhub no 51 ,th 2011 ttg Tersus dan Tuks 4. Permenhub no 52, th 2011 ttg Pengerukan dan Reklamasi 5. Permenhub no 53, th 2011 ttg Pemanduan 6. Permenhub no 36 , th 2012 ttg Organisasi dan Tata Kerja Kantor Kesyahbandaran dan Otoritas Pelabuhan 7. Permenhub no 414 th 2013 ttg Rencana Induk Pelabuhan Nasional 8. SK Dirjen Hub La ono : UM 002/38/18/DJPL-11 ttg Standard Kinerja Pelayanan Operasional Pelabuhan dll 2
  • 3. Source : Lloyd’s Practical Shipping Guide’s, 2009. Port Operation’s, Planning and Logistics. Khalid Bichou 2/18 INTRODUCTION ON PORT SYSTEM
  • 6. PORT INSTITUTIONAL MODELS DESCRIPTION STRENGHTS WEAKNESSES Public service port • Own, develops and maintains, both infrastructure and superstructure • Own and operates handling equipment • Operate and performs on its own all service • Labour for allport service provides by public sector • Huge investment required • No redundancy (in theory) • Unity of command and management • Handling operations not compatible with administrative duties of public entity • Private sector out of the port business •Strong power from labour unions Landlord port •Owns, develops and maintains the infrastructure, but leases/rents it to the private sector •Handling services performed by private sector. Labour for handling service provided by private sector •Marine and nautical service may be performed by either the public sector, the private sector, or a combination of both • No investment required in equipment and superstructure facilities • Private sector efficiency and accountability •Investment by the private sector ensures strong market leadership, long-term relationship •Competitive market dynamics •Better management of port labour • Possibible conflict between private sector objectives and general public interest • Risk of footloose 10/18 Source : Port Operation Planning & Logistic, K. Bichou
  • 7. PORT INSTITUTIONAL MODELS DESCRIPTION STRENGHTD WEAKNESSES Tool port • Own, develops and maintains, the infrastructure • Own superstructure which is operated by the private sector • Labour for handling service provides by public sector • Marine and nautical services may be performed by either the public sector, the private sector, or a combination of both • Huge investment required • No redundancy (in theory) • Double entity (public and private) undertaking handling operations and management • Possibility of conflict regarding equipment assignment and operational efficiency • No control over gang and labour efficiency from the part of the private sector Private service • Private sector owns, develops, and operates infrastructure, superstructure, and all other port service •Private sector provides labour for all port service •Regulatory and statutory fuctions may be performed by the public authority • Port operations and management performance not influenced by political decisions • Higher efficiency in asset and human resources management (in theory) • Prisk of market failure, eg monopolistic behaviour •Difficulty in planning and implementing public port policy • Possible deviation from core port business (eg handling) to more profitable activities (eg real estate development) 11/18 Source : Port Operation Planning & Logistic, K. Bichou
  • 8. 8 Suprastructure  Belonging to the suprastructure are • sheds • terminal buildings • warehouses • tanks cranes vehicles hauling gear sheds storage areas Suprastructure equipment like: gantry cranes transtainers other cranes etc….
  • 9. 9 Infrastructure  The main infrastructure facilities required  by ships and land carriers are • channels • aids to navigation • turning areas • locks • docks quay walls roads railway tracks water area inside the port territory quays land areas rail / road Infrastructure
  • 10. PORT and TERMINAL MANAGEMENT Market & Service Port / Terminal Impact Operations Agent 4/18
  • 11. MASTER PLAN OBJECTIVES • Cargo type bulk / container • Hinterland to cover • Type of ships to handle • Transport access Market Study • Optimalization plan • Areal of development and extention • Environment issue Development Plan • HRD • Bench marketing • SOP • Safety and Security • Maintenance • Marketing Management Plan 17/18 Source : Port Operation Planning & Logistic, K. Bichou
  • 12. MARKETS AND SERVICES • Container, bulk, etc Port / terminal type • Quay, yard, gate, etc • Hinterland, foreland, etc Spatial Coverage • Service to ship • Service to cargo • Value added logistics Service Type • Trade lanes • Shipping service • Inland system • Logistics networks • Supply chain systems Network Type 6/18
  • 13. PROCESS AND ELEMENTS OF STRATEGIC PORT PLANNING 13/18 Source : Port Operation Planning & Logistic, K. Bichou
  • 14. CONCESSION ARRANGEMENT Under a BOT concession, the government provides an exclusive grant to the private sector to built and operate a port facility for a specified period of time. After the expire of this period, the grantor can lease out the facilities or, if the facilities have to be completely rehabilitated, he can grant a similar or different concessional arrangement. A BOT agreement implies that the concessionaire has rights similar to holding a title which allow him to use the port facility as a corollary to loans during the period of concession. BFOT (Build, Finance, Operate, Transfer), BTO (Build, Transfer, Operate) and WBTO (Wraparound BOT) are special variations of BOT concession used where the private sector is also in charge of project financing, where legislation forbids private ownership of public infrastructure, and where the private sector is in charge of expanding a public – owned port facility, respectively. Other variations include the Design, Build, Finance, Operate (DBFO). Both models provide a high degree of private sector control with little or no demand risk 15/18 Source : Port Operation Planning & Logistic, K. Bichou
  • 15. CONCESSION ARRANGEMENT In the Build-Operate-Own (BOO) contract, the assumption is that there will be full and permanent privatization of the facilities built or operated at the end of the concession period of the concession agreement. The terms of a BOO concession should explicitly grant ownership of the facilities that will be built Under the build-Operate-Own-Transfer (BOOT) agreement, the ownership title over port assets and infrastructure conveys to the concessionaire during the concession. This arrangement facilitates to the Government at the end of the concession. This arrangement facilities the granting of loans by financial institutions to private terminal operators. However, subject to project economics, the concessionaire takes at least some demand risk in BOOT structure. Under the Equip – Operate – Transfer (EOT) scheme, port infrastructure already exists, but superstructure is supplied and operated by the private sector for an agreed period of time, after which it is transferred to the public sector 16/18 Source : Port Operation Planning & Logistic, K. Bichou
  • 16. UNCTAD’S PORT GENERATIONS MODEL 2000+ 3rd generation port: dynamic mode in global supply chains Quality supply chains, competition on added value to the end customer 1970 - 2000 2nd generation port: gateway node in inter –modal transport networks Competition on location, port charges, efficiency, service level, reliability, VAS 1950 -1970 1st generation port: port as business Competition on cost and port charges 12/18
  • 18.
  • 19.
  • 21. KINERJA OPERASIONAL PELABUHAN  Standar Kinerja pelayanan operasional pelabuhan dan utilisasinya memperhatikan tingkat kualitas pelayanan kapal,pelayanan barang,utilisasi fasilitas, kesiapan peralatan pelabuhan, dan disesuaikan dengan karakteristik masing masing lokasi terminal di pelabuhan. (Pasal 7)  Standar Kinerja pelayanan operasinal pelabuhan tsb ditetapkan oleh SK Dirjen 21
  • 22. KINERJA OPERASIONAL PELABUHAN  Operator Terminal menyampaikan laporan ke Otoritas Pelabuhan setiap bulan, dan akan diteruskan secara berkala ke Direktur Jendral, yg akan di evaluasi oleh Dirjen paling sedikit satu kali dalam periode enam bulan . ( Bab V. Ketentuan lain-lain)  Laporan dan evaluasi adalah sebagai dasar pengambilan keputusan untuk Perencanaan Pengembangan kebutuhan (Port Demand) pelabuhan di masa depan 22