Artificial Intelligence
Lecture 1
Introduction
What is Artificial Intelligence ?
• Human are wise because of their intelligence.
• Human have tried to understand how they:
• Think
• Perceive
• Understand
• Predict
• Manipulate
Large and complicated world
The field of AI is an attempts not just to understand
human intelligence but also build intelligent entities
What is Artificial Intelligence ?
• AI is one of the relatively new fields in science.
• Work on AI started after the Word War II
• The term AI was coined in 1956
• AI cover a huge variety of subfields:
• Play chess
• Proving mathematical theorems
• Writing poetry
• Driving a car
• Diagnosis disease
AI is truly a universal field
What is Artificial Intelligence ?
What is Artificial Intelligence ?
• The definitions on top are concerned with
thought process and reasoning.
• The one in the bottom address behavior.
• The definitions of the left measure success in
terms of fidelity (similarity) to human
performance.
• The one in the right measure success against an
ideal performance (rationality)
What is Artificial Intelligence ?
• AI definitions are laid out along
different dimension
• 1. process and reasoning (thinking)
What is Artificial Intelligence ?
• AI definitions are laid out along
different dimension
• 2. Behavior
What is Artificial Intelligence ?
• AI definitions are laid out
along different dimension
• 3. fidelity to human
performance
What is Artificial Intelligence ?
• AI definitions are laid out
along different dimension
• 4. Ideal performance
(Rationality)
A system is rational if it does the
“right thing” given what it knows
What is Artificial Intelligence ?
1. Acting Humanly: the Turing Test
• Proposed by Alan Turing (1950)
A computer passes the test if a human
interrogator, after posing some written
questions, cannot tell whether the
written response come from a person or
from a computer.
Ex : Which one is bigger a small
mountain or a big cat
What is Artificial Intelligence ?
1. Acting Humanly: the Turing Test
To pass the Turing test the computer need to posses the following
capabilities:
1. Natural language processing
2. Knowledge representation to store what it knows or hears
3. Automated reasoning
4. Machine learning to adapt to new circumstances
What is Artificial Intelligence ?
1. Acting Humanly: the Turing Test
• Turing Test avoided direct physical interaction between the
interrogator and the computer.
• However, the so called Total Turing Test includes:
• Video Signal for perceptual abilities.
• Ability to pass physical objects.
Hence Total Turing Test will need
5. Computer vision to perceive objects
6. Robotics to manipulate objects and move around.
What is Artificial Intelligence ?
2. Thinking humanly: The cognitive
modeling approach
• Program think like a human
• How human thinks
• Actual working of human mind
Represent human mind as a
computer program
What is Artificial Intelligence ?
2. Thinking humanly: The cognitive
modeling approach
• Program behavior matches
corresponding human behavior.
• Example:
General Problem Solver “GPS”
Compared and trace its reasoning
steps to traces of human subject
What is Artificial Intelligence ?
3. Thinking rationally: The “laws of
though” approach
• Right Thinking
• Irrefutable (indisputable) reasoning
process
Socrates is a man, all men are mortal,
therefore, Socrates is mortal
What is Artificial Intelligence ?
3. Thinking rationally: The “laws of
though” approach
• Represent object in the word and
the relation between them in form
of logical annotation
• Obstacle of this approach:
1. Knowledge representation with
uncertainty.
2. Computational resources
What is Artificial Intelligence ?
4. Acting rationally: The rational agent
approach
• Agent is something that acts
• Computer agent are expected:
• Operate autonomously
• Perceive their environment
• Persist over time
• Adapt to change
• Create and pursue goals
Rational Agent is one that acts to achieve
best outcome
In AI rational mean make the correct
inference
The foundation of Artificial Intelligence
1. Philosophy:
• How can form a rules to be used to draw a valid conclusions?
• How does the mind arise from a physical brain?
• Where dose knowledge come from?
• How does knowledge lead to action?
2. Mathematics
• What are the formal rules to draw valid conclusions?
• What can be computed?
• How do we reason with uncertain information?
The foundation of Artificial Intelligence
3. Economics
• How should we make decisions so as to maximize payoff?
• How should we do this when others may not
• How should we do this when the payoff may be far in the future?
4. Neuroscience
• How do brains process information?
5. Psychology
• How do humans and animals think and act?
6. Computer engineering
• How can we build an efficient computer
7. Control theory and cybernetics
• How can artifacts operate under their own control
8. Linguistics
• How does language related to thought
The History of Artificial Intelligence
The gestation of AI (1943-1955) Warren (1943) : constructed artificial neurons characterized as being “on” or
“off” in response to neighboring neurons. neurons are connected using
logical connectives (and, or , not , etc )
Donald (1949) updated the previous work by adding connection strengths.
Marvin (1950) build the first neural network computer (SNARC) to simulate
a B-24 automatic pilot which consists of 40 neurons
The birth of AI (1956) Tow months work shop held on Dartmouth college in Hanover in the summer
of 1956
Early enthusiasm (1952-1969) General Problem Solver (GPS): Thinking humanly, Physical symbol system
hypothesis which has sufficient means for general intelligent action, IBM
geometry theorem prover which was able to prove theorems that many
students of mathematics would find quite difficult.
A dose of reality (1966-1973) Early successes made a prediction that within 10 years would do many
intelligence actions. The prediction come true within 40 years due to two
main difficulty: absence of background knowledge and the need for faster
hardware and memory
The History of Artificial Intelligence
Knowledge-based system
(1969-1979)
Early stages of AI trying to string together elementary reasoning steps to
find complete solutions (Weak Methods).
Alternatively , using more powerful (domain specific knowledge ) allows
larger reasoning steps (expert system)
AI becomes an industry (1980-
present)
The first successful commercial AI (expert system) R1 began operation the
digital equipment corporation.
By 1988, the corporation used 40 expert systems
The return of neural networks
(1986-present)
In the mid of 1980s for different research group reinvented the back-
propagation learning algorithm firs found in 1969.
AI adopts the scientific method
(1987-present)
Revolution in both the content and methodology of work in AI. It is more
common to build on existing theories than to propose brand-new one.
The History of Artificial Intelligence
The emergence of intelligent
Agent (1995-present)
Internet is one of the most important factor to create agent. It is so common
in web-base application that the “-bot” , recommender system , search
engines.
The availability of very large
data sets (2001-present)
In AI recent work has been suggests that it make more sense to concentrate
on the data. This is true because of the increasing availability of very large
data sources.
The State of the Art
What can AI do today ?
1. Robotic vehicles
2. Speech recognition
3. Autonomous planning and scheduling
4. Game playing
5. Spam fighting
6. Logistics planning
7. Robotics
8. Machine Translation
Summary
Important Points
1. Different people approach AI with different
goals in mind (Thinking Or Behavior).
2. Intelligence is concerned mainly with rational
action (intelligent agent).
3. Philosophers (400 B.C.) consider mind like
machine, mind operates on knowledge encoded
in some internal language, and that thought can
be used to choose what actions to take.
4. Mathematicians provided the tools to
manipulate statements of logical certainty as
well as uncertain (probabilistic) and reasoning
Summary
Important Points
5. Economists formalized the problem of making
decisions.
6. Neuroscientist discovered some facts about how
brain works
7. Psychologists adopted the idea that human can
be considered as information processing
machine
8. Computer engineers provided the ever-more-
powerful machine that make AI applications
possible

#1 Lecture .pptx

  • 1.
  • 2.
    What is ArtificialIntelligence ? • Human are wise because of their intelligence. • Human have tried to understand how they: • Think • Perceive • Understand • Predict • Manipulate Large and complicated world The field of AI is an attempts not just to understand human intelligence but also build intelligent entities
  • 3.
    What is ArtificialIntelligence ? • AI is one of the relatively new fields in science. • Work on AI started after the Word War II • The term AI was coined in 1956 • AI cover a huge variety of subfields: • Play chess • Proving mathematical theorems • Writing poetry • Driving a car • Diagnosis disease AI is truly a universal field
  • 4.
    What is ArtificialIntelligence ?
  • 5.
    What is ArtificialIntelligence ? • The definitions on top are concerned with thought process and reasoning. • The one in the bottom address behavior. • The definitions of the left measure success in terms of fidelity (similarity) to human performance. • The one in the right measure success against an ideal performance (rationality)
  • 6.
    What is ArtificialIntelligence ? • AI definitions are laid out along different dimension • 1. process and reasoning (thinking)
  • 7.
    What is ArtificialIntelligence ? • AI definitions are laid out along different dimension • 2. Behavior
  • 8.
    What is ArtificialIntelligence ? • AI definitions are laid out along different dimension • 3. fidelity to human performance
  • 9.
    What is ArtificialIntelligence ? • AI definitions are laid out along different dimension • 4. Ideal performance (Rationality) A system is rational if it does the “right thing” given what it knows
  • 10.
    What is ArtificialIntelligence ? 1. Acting Humanly: the Turing Test • Proposed by Alan Turing (1950) A computer passes the test if a human interrogator, after posing some written questions, cannot tell whether the written response come from a person or from a computer. Ex : Which one is bigger a small mountain or a big cat
  • 11.
    What is ArtificialIntelligence ? 1. Acting Humanly: the Turing Test To pass the Turing test the computer need to posses the following capabilities: 1. Natural language processing 2. Knowledge representation to store what it knows or hears 3. Automated reasoning 4. Machine learning to adapt to new circumstances
  • 12.
    What is ArtificialIntelligence ? 1. Acting Humanly: the Turing Test • Turing Test avoided direct physical interaction between the interrogator and the computer. • However, the so called Total Turing Test includes: • Video Signal for perceptual abilities. • Ability to pass physical objects. Hence Total Turing Test will need 5. Computer vision to perceive objects 6. Robotics to manipulate objects and move around.
  • 13.
    What is ArtificialIntelligence ? 2. Thinking humanly: The cognitive modeling approach • Program think like a human • How human thinks • Actual working of human mind Represent human mind as a computer program
  • 14.
    What is ArtificialIntelligence ? 2. Thinking humanly: The cognitive modeling approach • Program behavior matches corresponding human behavior. • Example: General Problem Solver “GPS” Compared and trace its reasoning steps to traces of human subject
  • 15.
    What is ArtificialIntelligence ? 3. Thinking rationally: The “laws of though” approach • Right Thinking • Irrefutable (indisputable) reasoning process Socrates is a man, all men are mortal, therefore, Socrates is mortal
  • 16.
    What is ArtificialIntelligence ? 3. Thinking rationally: The “laws of though” approach • Represent object in the word and the relation between them in form of logical annotation • Obstacle of this approach: 1. Knowledge representation with uncertainty. 2. Computational resources
  • 17.
    What is ArtificialIntelligence ? 4. Acting rationally: The rational agent approach • Agent is something that acts • Computer agent are expected: • Operate autonomously • Perceive their environment • Persist over time • Adapt to change • Create and pursue goals Rational Agent is one that acts to achieve best outcome In AI rational mean make the correct inference
  • 18.
    The foundation ofArtificial Intelligence 1. Philosophy: • How can form a rules to be used to draw a valid conclusions? • How does the mind arise from a physical brain? • Where dose knowledge come from? • How does knowledge lead to action? 2. Mathematics • What are the formal rules to draw valid conclusions? • What can be computed? • How do we reason with uncertain information?
  • 19.
    The foundation ofArtificial Intelligence 3. Economics • How should we make decisions so as to maximize payoff? • How should we do this when others may not • How should we do this when the payoff may be far in the future? 4. Neuroscience • How do brains process information? 5. Psychology • How do humans and animals think and act? 6. Computer engineering • How can we build an efficient computer 7. Control theory and cybernetics • How can artifacts operate under their own control 8. Linguistics • How does language related to thought
  • 20.
    The History ofArtificial Intelligence The gestation of AI (1943-1955) Warren (1943) : constructed artificial neurons characterized as being “on” or “off” in response to neighboring neurons. neurons are connected using logical connectives (and, or , not , etc ) Donald (1949) updated the previous work by adding connection strengths. Marvin (1950) build the first neural network computer (SNARC) to simulate a B-24 automatic pilot which consists of 40 neurons The birth of AI (1956) Tow months work shop held on Dartmouth college in Hanover in the summer of 1956 Early enthusiasm (1952-1969) General Problem Solver (GPS): Thinking humanly, Physical symbol system hypothesis which has sufficient means for general intelligent action, IBM geometry theorem prover which was able to prove theorems that many students of mathematics would find quite difficult. A dose of reality (1966-1973) Early successes made a prediction that within 10 years would do many intelligence actions. The prediction come true within 40 years due to two main difficulty: absence of background knowledge and the need for faster hardware and memory
  • 21.
    The History ofArtificial Intelligence Knowledge-based system (1969-1979) Early stages of AI trying to string together elementary reasoning steps to find complete solutions (Weak Methods). Alternatively , using more powerful (domain specific knowledge ) allows larger reasoning steps (expert system) AI becomes an industry (1980- present) The first successful commercial AI (expert system) R1 began operation the digital equipment corporation. By 1988, the corporation used 40 expert systems The return of neural networks (1986-present) In the mid of 1980s for different research group reinvented the back- propagation learning algorithm firs found in 1969. AI adopts the scientific method (1987-present) Revolution in both the content and methodology of work in AI. It is more common to build on existing theories than to propose brand-new one.
  • 22.
    The History ofArtificial Intelligence The emergence of intelligent Agent (1995-present) Internet is one of the most important factor to create agent. It is so common in web-base application that the “-bot” , recommender system , search engines. The availability of very large data sets (2001-present) In AI recent work has been suggests that it make more sense to concentrate on the data. This is true because of the increasing availability of very large data sources.
  • 23.
    The State ofthe Art What can AI do today ? 1. Robotic vehicles 2. Speech recognition 3. Autonomous planning and scheduling 4. Game playing 5. Spam fighting 6. Logistics planning 7. Robotics 8. Machine Translation
  • 24.
    Summary Important Points 1. Differentpeople approach AI with different goals in mind (Thinking Or Behavior). 2. Intelligence is concerned mainly with rational action (intelligent agent). 3. Philosophers (400 B.C.) consider mind like machine, mind operates on knowledge encoded in some internal language, and that thought can be used to choose what actions to take. 4. Mathematicians provided the tools to manipulate statements of logical certainty as well as uncertain (probabilistic) and reasoning
  • 25.
    Summary Important Points 5. Economistsformalized the problem of making decisions. 6. Neuroscientist discovered some facts about how brain works 7. Psychologists adopted the idea that human can be considered as information processing machine 8. Computer engineers provided the ever-more- powerful machine that make AI applications possible