Rapidly Developing North American Gold Resources at Low Cost and Low Risk
                                                            Summer 2012




                                                                    1
Forward Looking Information                                                             TSX:MOZ

 CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
 Except for statements of historical fact relating to the Company, certain information contained herein
 constitutes "forward-looking statements". Forward-looking statements include statements that are predictive
 in nature, depend upon or refer to future events or conditions, or include words such as “expects”,
 “anticipates”, “plans”, “believes”, “considers”, “intends”, “targets”, or negative versions thereof and other
 similar expressions, or future or conditional verbs such as “may”, “will”, “should”, “would” and “could”. We
 provide forward-looking statements for the purpose of conveying information about our current expectations
 and plans relating to the future and readers are cautioned that such statements may not be appropriate for
 other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be
 general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections
 or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives,
 strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to
 those identified and reported in Marathon Gold Corporation’s public filings, which may be accessed at
 www.sedar.com .

 Other than as specifically required by law, we undertake no obligation to update any forward-looking
 statement to reflect events or circumstances after the date on which such statement is made, or to reflect the
 occurrence of unanticipated events, whether as a result of new information, future events, results or
 otherwise.




                                                                                                                 2
Proven Management                                                                                   TSX:MOZ


                   Management                                                   Board of Directors
Phillip Walford, P.Geo. | President , CEO & Director               Phillip Walford, P.Geo. | See Management
•   40 years in the mining industry, primarily in mining geology
•   Has held senior management roles at a number of companies      George Faught, CA | Non-Executive Chairman
    throughout the Americas, including Anaconda Gold,              •   30+ years in the financial management and resources
    Geomaque Exploration, LAC Minerals, Pamour Porcupine
    Mines, and Hudson Bay Exploration and Development                  industries
                                                                   •   Former CFO of North American Palladium
Sherry Dunsworth, P.Geo. | VP of Exploration
•   25+ years in the mining industry                               Joe Spiteri, P.Geo. | Director
•   Has held positions with Anaconda Gold and Marathon PGM         •   30+ years in the mining industry
•   Former member of the Mineral Rights Adjudication Board of      •   Former senior Manager and Officer with Placer Dome,
    Newfoundland and Labrador                                          Northgate Explorations, Lac Minerals and Campbell
•   Former Geoscience Councilor for the Association of                 Resources
    Professional Engineers and Geoscientists of Newfoundland
    and Labrador                                                   Page Chilcott | Director
                                                                   •   Former President of the Vancouver Stock Exchange
Jim Kirke, CA | CFO
•   15+ years involvement in the mining industry
•   Former CFO of BacTech Mining and Golden Odyssey Mining
                                                                   David Poynton | Director
                                                                   • 30+ years of legal and business experience
                                                                   • President and CEO of Daycon Minerals
                                                                   • Former Senior VP, General Counsel and Corporate Secretary for
                                                                     Iberian Minerals and Cadillac Ventures




                                                                                                                                3
Capital Structure                                  TSX:MOZ


                      Capitalization           Share Price

      Share Price (07-11-12)   $0.89
      Shares Outstanding       50,181,514
      Warrants                 3,850,650
      Options (at $1.61)       1,740,000
      Fully diluted            56,667,164
      Market Cap               ~C$45 million




 Analysts
 • Fraser Mackenzie
 • Octagon Capital Corp.




                                                             4
Focused on North American Gold Resources
                                                                                   TSX:MOZ

         Marathon Gold takes a 3-Prong approach to de-risking your investment



                                         Marathon Gold


              Focused on developing
                                             Projects have solid       Projects have
                gold Resources in
                                           infrastructure and are    >1,000,000 oz Au
              Canada and USA only-
                                              located in mining-     potential of good
              current Resources are
                                            friendly jurisdictions    grade potential
                   expanding!




                                      Current Resources (at 100%)
  Valentine Lake Project: M&I 424,000 oz Au @ 2.05 g/t Au, Inferred 305,000 oz Au @ 1.65 g/t Au
   Golden Chest Mine: M&I 147,000 oz Au @ 1.47 g/t Au, Inferred 233,300 oz Au @ 1.46 g/t Au


                                                                                                  5
Our Projects   TSX:MOZ




                         Legend
                   Advanced Stage
                  1. Valentine Lake
                       – Leprechaun Deposit
                  2. Golden Chest
                         Early Stage

                  1.     Bonanza
                  2.     Baie Verte
                  3.     Finger Pond


                                              6
Summary of Global Resources                                                                                                                             TSX:MOZ

                                           M and I Resources                                                                           Inferred Resources
       Deposit                         Tonnes                    Au Grade                          Gold                     Tonnes                  Au Grade                 Gold (oz)
                                                                    g/t                            (oz)                                                g/t
   100%-Owned
  Valentine Lake
     Project1,2                       6,450,000                       2.05                       424,000                   5.740,000                     1.65                     305,000
  Global Updated
 Resource Estimate

                                           M and I Resources                                                                              Inferred Resources
         Deposit                         Tonnes                    Au Grade                         Gold                      Tonnes                 Au Grade                     Gold (oz)
                                                                      g/t                           (oz)                                                g/t
  Golden Chest Mine
     Global Initial
                                        3,107,000                       1.47                      147,000                    4,978,000                    1.46                     233,300
  Resource Estimate 3


    TOTAL M&I and
    TOTAL Inferred
     Valentine Lake                     9,557,000                       1.86                      571,000                   10,718,000                    1.56                     538,300
  Project and Golden
      Chest Mine
 1.   Source: Technical Report on the Mineral Resource Estimate for the Leprechaun Gold deposit Valentine Lake Gold Project Central Newfoundland, Canada, dated March 29, 2012.
 2.   Assuming completion of the Mountain Lake Resources acquisition
 3.   The Golden Chest Mine is a 50/50 Joint Venture with New Jersey Mining Company, therefore Marathon Gold Reserves and Resource account for half


                                                                                                                                                                                              7
Corporate Strategy Going Forward                                                     TSX:MOZ



  “We Add Value by Adding Quality Ounces”
                                    Marathon Gold’s
                                      2012/2013
                                       Strategy

                                         UPDATING                    CONSERVING
             GROWTH
                                         RESOURCES                     CAPITAL


        - Progressing the            - 22,000 m of drilling to
        Valentine Lake Project       be added to the
        and Golden Chest Mine        Valentine Lake Project      - 1 drill turning
        towards the million          Resource                    - Prospecting, trenching
        ounce mark                                               and geological mapping
                                     -7,000 m of drilling to
        - Longevity in a volatile    be added to the Golden
        market                       Chest Mine Resource

                                                                                               8
Our Projects   TSX:MOZ




                         Legend
                   Advanced Stage
                  1. Valentine Lake
                       – Leprechaun Deposit
                  2. Golden Chest
                         Early Stage

                  1.     Bonanza
                  2.     Baie Verte
                  3.     Finger Pond


                                              9
Valentine Lake Project, Newfoundland
(100%)Leprechaun Gold Deposit: Updated NI 43-101
                                                                                                 TSX:MOZ
Resource Estimate
 GLOBAL
                    Tonnes       Cut Au (g/t)          Au oz
RESOURCE
ESTIMATE
Total Resource
Above 0.50 g/t
   cut off1
                                                                                                            Elevation
    Measured       1,378,000         1.90             84,000                                               - 400m

    Indicated      5,068,000         2.09             340,000
                                                                                                           - 300m
      M+I          6,446,000         2.05            424,000

                                                     305,000                                               - 200m
    Inferred       5,742,000         1.65
                                                                              Open to
                                                                              Depth                        - 100m
    Updated NI 43-101 compliant Resource Estimate; M&I
     Increase of 54%

    Total 58,500m drilling (2010-2012), of which
     22,300 (2012) drilling not in current Resource

    Leprechaun Gold Deposit has been extended along
     strike and down-dip

    Hanging-wall zones are open in all directions
                                                                3 Dimensional Model of the Leprechaun Gold Deposit,
    Coarse and free gold have excellent metallurgical          Main Zone Alteration and Surface Resource Boundary
     recoveries with ~50% by gravity, total >90%

                                                                                                                        10
Selected 2012 Drill Results                                                     TSX:MOZ

•   Marathon expects a steady stream of drill results from its 2012 drilling program
•   The deposit remains open down-dip and along strike to the northeast and southwest

             Zone          Hole ID    From (m)   To (m)   Length*(m)   Gold (g/t)

              LGD        VL-12-393      115        130      13.5         4.31
                         VL-12-395      252        261       7.7        11.28
                         VL-12-402      277        301      21.6         4.05
                         VL-12-403      210        232      20.9         7.23
                         VL-12-407      289        304      13.5         9.19
                         VL-12-408      153        172      18.1        13.81
                         VL-12-410      277        289      11.4         8.06
                         VL-12-437      228        240      10.2         6.10
                         VL-12-440      369        396      21.6         3.81
              FZ         VL-12-431       92        157      61.75        0.64

                   * True Thickness


                                                                                          11
Newfoundland, Valentine Lake Project
100% Owned: Flagship Project           TSX:MOZ




                                                 12
Newfoundland, Valentine Lake Project
100% Owned - Deposit Expansion         TSX:MOZ




                                                 13
Newfoundland, Valentine Lake Project
100% Owned : Leprechaun Deposit        TSX:MOZ




                                                 14
Newfoundland, Valentine Lake Project
100% Owned : Leprechaun Deposit        TSX:MOZ




                                                 15
Newfoundland, Valentine Lake Project
100% Owned : Frank Zone                TSX:MOZ




                                                 16
Leprechaun Gold Deposit:
Coarse and Free Gold                               TSX:MOZ

                       Visible gold in outcrop – Leprechaun Deposit




                                                                      17
Idaho - Golden Chest Mine
Prolific Coeur d’Alene Mining District   TSX:MOZ




      Idaho Hill




                                                   View West
                                                           18
Idaho, Golden Chest Mine: NI 43-101
Resource Estimate, Near Surface Open-Pit TSX:MOZ
                                                              GLOBAL
                                                                              Tonnes     g/t Au     Au oz
                                                             RESOURCE
                                                             ESTIMATE
       Katie -                                               Total Cut-off
       Dora                                                    0.40 g/t

                                                                 M+I         3,107,000   1.47     147,000
                                                               Inferred      4,978,000   1.46     233,300

                                                            IN OPEN PIT
                                                             Total Cut-off    Tonnes     g/t Au     Au oz
                                                               0.40g/t


                     “H” Vein                                    M+I         2,788,000   1.35      121,100

                                                               Inferred      3,847,500   1.45      179,000

 Initial Resource Estimate based on 10,000 m of drilling in 2011

 18,034 m drilled to date (2011-2012)

 Past produced 8,500 t of ore with an average grade of 6.90 g/t and an average recovery of ~94%

 Fully permitted surface and timber rights with an existing reserve and exploration potential
                                                                                                            19
Idaho, Golden Chest Mine
Open-Pit & Underground Potential          TSX:MOZ


                                   Open pit potential and
                                   significant opportunity
                                   for reserve growth with
                                   underground drilling




  2011 Drilling – 102 DDH’s –
  11,456m

  2012 Drilling – 50 DDH’s -
  total 6,578m to date
                                                             20
Oregon         TSX:MOZ




BONANZA MINE
Circa 1904

                         21
Oregon, Bonanza Mine (100%):
Historical High-Grade Producer                  TSX:MOZ


 100% Owned

 Historical Producer
    • 128,500 tons grading 1.2 oz/ton and
       99,900 oz Au was produced with an
       average recovery of 65%
    • Historic mining cut off grade of 0.60
       oz/ton (17 grams)

 Three main veins are important for mining
    • South Vein
    • Bonanza Vein; can be followed on
       surface from more than 2,500 ft
    • North Vein

 The veins vary from a foot to 6 ft wide and
  locally can be up to 30 ft wide, dipping
  steeply to the southwest



                                                          22
Bonanza Mine: Property Boundary                                                        TSX:MOZ




                               Basalt



                                                           Volcanic

         Basalt
                  Bonanza Vein
                                                     North Vein
                                                                      Volcaniclastic
                       Slate




                                        South Vein
                                                                             Slate




                                                                                                 23
Bonanza Mine: Property Boundary   TSX:MOZ




                                            24
Reasons to Invest                                                                  TSX:MOZ



                                                                                    SIGNIFICANT
                                                    RESOURCE
 LOCATION                MANAGEMENT                                                 EXPLORATION
                                                  DEVELOPMENT
                                                                                     POTENTIAL
  Mining-friendly          Over 80 years of         Valentine Lake Project:           Classic lode gold
  jurisdictions:           proven management                                          deposits at Valentine
  Newfoundland, Idaho                               - NI 43-101 compliant
                           experience in mining                                       Lake and Golden
  and Oregon                                        Updated Resource
                           exploration,                                               Chest have significant
                                                    Estimate with M&I
                           development and                                            exploration potential
                                                    increase of 53%
 Established               production
 infrastructure; road                               -22,000 m of drilling to be
 access, water, fully                               added to the Resource             Mineralization covering
 equipped on-site camp                                                                only a fraction of
                                                                                      Valentine’s total 30 km
                                                    Golden Chest Mine:                strike has been
                                                                                      delineated
  Socio-economic and                                -NI 43-101 compliant Initial
  political stability                               Resource Estimate
                                                    -7,000 m of drilling to be
                                                    added to the Resource


                                                                                                         25
TSX:MOZ




 www.marathon-gold.com
                 416-987-0714
Phillip Walford              Jennie Guay
President and CEO            Investor Relations Manager
pwalford@marathon-gold.com   jguay@marathon-gold.com




                                                          26

07 18-12-august presentation

  • 1.
    Rapidly Developing NorthAmerican Gold Resources at Low Cost and Low Risk Summer 2012 1
  • 2.
    Forward Looking Information TSX:MOZ CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION Except for statements of historical fact relating to the Company, certain information contained herein constitutes "forward-looking statements". Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as “expects”, “anticipates”, “plans”, “believes”, “considers”, “intends”, “targets”, or negative versions thereof and other similar expressions, or future or conditional verbs such as “may”, “will”, “should”, “would” and “could”. We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to those identified and reported in Marathon Gold Corporation’s public filings, which may be accessed at www.sedar.com . Other than as specifically required by law, we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events, results or otherwise. 2
  • 3.
    Proven Management TSX:MOZ Management Board of Directors Phillip Walford, P.Geo. | President , CEO & Director Phillip Walford, P.Geo. | See Management • 40 years in the mining industry, primarily in mining geology • Has held senior management roles at a number of companies George Faught, CA | Non-Executive Chairman throughout the Americas, including Anaconda Gold, • 30+ years in the financial management and resources Geomaque Exploration, LAC Minerals, Pamour Porcupine Mines, and Hudson Bay Exploration and Development industries • Former CFO of North American Palladium Sherry Dunsworth, P.Geo. | VP of Exploration • 25+ years in the mining industry Joe Spiteri, P.Geo. | Director • Has held positions with Anaconda Gold and Marathon PGM • 30+ years in the mining industry • Former member of the Mineral Rights Adjudication Board of • Former senior Manager and Officer with Placer Dome, Newfoundland and Labrador Northgate Explorations, Lac Minerals and Campbell • Former Geoscience Councilor for the Association of Resources Professional Engineers and Geoscientists of Newfoundland and Labrador Page Chilcott | Director • Former President of the Vancouver Stock Exchange Jim Kirke, CA | CFO • 15+ years involvement in the mining industry • Former CFO of BacTech Mining and Golden Odyssey Mining David Poynton | Director • 30+ years of legal and business experience • President and CEO of Daycon Minerals • Former Senior VP, General Counsel and Corporate Secretary for Iberian Minerals and Cadillac Ventures 3
  • 4.
    Capital Structure TSX:MOZ Capitalization Share Price Share Price (07-11-12) $0.89 Shares Outstanding 50,181,514 Warrants 3,850,650 Options (at $1.61) 1,740,000 Fully diluted 56,667,164 Market Cap ~C$45 million Analysts • Fraser Mackenzie • Octagon Capital Corp. 4
  • 5.
    Focused on NorthAmerican Gold Resources TSX:MOZ Marathon Gold takes a 3-Prong approach to de-risking your investment Marathon Gold Focused on developing Projects have solid Projects have gold Resources in infrastructure and are >1,000,000 oz Au Canada and USA only- located in mining- potential of good current Resources are friendly jurisdictions grade potential expanding! Current Resources (at 100%) Valentine Lake Project: M&I 424,000 oz Au @ 2.05 g/t Au, Inferred 305,000 oz Au @ 1.65 g/t Au Golden Chest Mine: M&I 147,000 oz Au @ 1.47 g/t Au, Inferred 233,300 oz Au @ 1.46 g/t Au 5
  • 6.
    Our Projects TSX:MOZ Legend Advanced Stage 1. Valentine Lake – Leprechaun Deposit 2. Golden Chest Early Stage 1. Bonanza 2. Baie Verte 3. Finger Pond 6
  • 7.
    Summary of GlobalResources TSX:MOZ M and I Resources Inferred Resources Deposit Tonnes Au Grade Gold Tonnes Au Grade Gold (oz) g/t (oz) g/t 100%-Owned Valentine Lake Project1,2 6,450,000 2.05 424,000 5.740,000 1.65 305,000 Global Updated Resource Estimate M and I Resources Inferred Resources Deposit Tonnes Au Grade Gold Tonnes Au Grade Gold (oz) g/t (oz) g/t Golden Chest Mine Global Initial 3,107,000 1.47 147,000 4,978,000 1.46 233,300 Resource Estimate 3 TOTAL M&I and TOTAL Inferred Valentine Lake 9,557,000 1.86 571,000 10,718,000 1.56 538,300 Project and Golden Chest Mine 1. Source: Technical Report on the Mineral Resource Estimate for the Leprechaun Gold deposit Valentine Lake Gold Project Central Newfoundland, Canada, dated March 29, 2012. 2. Assuming completion of the Mountain Lake Resources acquisition 3. The Golden Chest Mine is a 50/50 Joint Venture with New Jersey Mining Company, therefore Marathon Gold Reserves and Resource account for half 7
  • 8.
    Corporate Strategy GoingForward TSX:MOZ “We Add Value by Adding Quality Ounces” Marathon Gold’s 2012/2013 Strategy UPDATING CONSERVING GROWTH RESOURCES CAPITAL - Progressing the - 22,000 m of drilling to Valentine Lake Project be added to the and Golden Chest Mine Valentine Lake Project - 1 drill turning towards the million Resource - Prospecting, trenching ounce mark and geological mapping -7,000 m of drilling to - Longevity in a volatile be added to the Golden market Chest Mine Resource 8
  • 9.
    Our Projects TSX:MOZ Legend Advanced Stage 1. Valentine Lake – Leprechaun Deposit 2. Golden Chest Early Stage 1. Bonanza 2. Baie Verte 3. Finger Pond 9
  • 10.
    Valentine Lake Project,Newfoundland (100%)Leprechaun Gold Deposit: Updated NI 43-101 TSX:MOZ Resource Estimate GLOBAL Tonnes Cut Au (g/t) Au oz RESOURCE ESTIMATE Total Resource Above 0.50 g/t cut off1 Elevation Measured 1,378,000 1.90 84,000 - 400m Indicated 5,068,000 2.09 340,000 - 300m M+I 6,446,000 2.05 424,000 305,000 - 200m Inferred 5,742,000 1.65 Open to Depth - 100m  Updated NI 43-101 compliant Resource Estimate; M&I Increase of 54%  Total 58,500m drilling (2010-2012), of which 22,300 (2012) drilling not in current Resource  Leprechaun Gold Deposit has been extended along strike and down-dip  Hanging-wall zones are open in all directions 3 Dimensional Model of the Leprechaun Gold Deposit,  Coarse and free gold have excellent metallurgical Main Zone Alteration and Surface Resource Boundary recoveries with ~50% by gravity, total >90% 10
  • 11.
    Selected 2012 DrillResults TSX:MOZ • Marathon expects a steady stream of drill results from its 2012 drilling program • The deposit remains open down-dip and along strike to the northeast and southwest Zone Hole ID From (m) To (m) Length*(m) Gold (g/t) LGD VL-12-393 115 130 13.5 4.31 VL-12-395 252 261 7.7 11.28 VL-12-402 277 301 21.6 4.05 VL-12-403 210 232 20.9 7.23 VL-12-407 289 304 13.5 9.19 VL-12-408 153 172 18.1 13.81 VL-12-410 277 289 11.4 8.06 VL-12-437 228 240 10.2 6.10 VL-12-440 369 396 21.6 3.81 FZ VL-12-431 92 157 61.75 0.64 * True Thickness 11
  • 12.
    Newfoundland, Valentine LakeProject 100% Owned: Flagship Project TSX:MOZ 12
  • 13.
    Newfoundland, Valentine LakeProject 100% Owned - Deposit Expansion TSX:MOZ 13
  • 14.
    Newfoundland, Valentine LakeProject 100% Owned : Leprechaun Deposit TSX:MOZ 14
  • 15.
    Newfoundland, Valentine LakeProject 100% Owned : Leprechaun Deposit TSX:MOZ 15
  • 16.
    Newfoundland, Valentine LakeProject 100% Owned : Frank Zone TSX:MOZ 16
  • 17.
    Leprechaun Gold Deposit: Coarseand Free Gold TSX:MOZ Visible gold in outcrop – Leprechaun Deposit 17
  • 18.
    Idaho - GoldenChest Mine Prolific Coeur d’Alene Mining District TSX:MOZ Idaho Hill View West 18
  • 19.
    Idaho, Golden ChestMine: NI 43-101 Resource Estimate, Near Surface Open-Pit TSX:MOZ GLOBAL Tonnes g/t Au Au oz RESOURCE ESTIMATE Katie - Total Cut-off Dora 0.40 g/t M+I 3,107,000 1.47 147,000 Inferred 4,978,000 1.46 233,300 IN OPEN PIT Total Cut-off Tonnes g/t Au Au oz 0.40g/t “H” Vein M+I 2,788,000 1.35 121,100 Inferred 3,847,500 1.45 179,000  Initial Resource Estimate based on 10,000 m of drilling in 2011  18,034 m drilled to date (2011-2012)  Past produced 8,500 t of ore with an average grade of 6.90 g/t and an average recovery of ~94%  Fully permitted surface and timber rights with an existing reserve and exploration potential 19
  • 20.
    Idaho, Golden ChestMine Open-Pit & Underground Potential TSX:MOZ Open pit potential and significant opportunity for reserve growth with underground drilling 2011 Drilling – 102 DDH’s – 11,456m 2012 Drilling – 50 DDH’s - total 6,578m to date 20
  • 21.
    Oregon TSX:MOZ BONANZA MINE Circa 1904 21
  • 22.
    Oregon, Bonanza Mine(100%): Historical High-Grade Producer TSX:MOZ  100% Owned  Historical Producer • 128,500 tons grading 1.2 oz/ton and 99,900 oz Au was produced with an average recovery of 65% • Historic mining cut off grade of 0.60 oz/ton (17 grams)  Three main veins are important for mining • South Vein • Bonanza Vein; can be followed on surface from more than 2,500 ft • North Vein  The veins vary from a foot to 6 ft wide and locally can be up to 30 ft wide, dipping steeply to the southwest 22
  • 23.
    Bonanza Mine: PropertyBoundary TSX:MOZ Basalt Volcanic Basalt Bonanza Vein North Vein Volcaniclastic Slate South Vein Slate 23
  • 24.
    Bonanza Mine: PropertyBoundary TSX:MOZ 24
  • 25.
    Reasons to Invest TSX:MOZ SIGNIFICANT RESOURCE LOCATION MANAGEMENT EXPLORATION DEVELOPMENT POTENTIAL Mining-friendly Over 80 years of Valentine Lake Project: Classic lode gold jurisdictions: proven management deposits at Valentine Newfoundland, Idaho - NI 43-101 compliant experience in mining Lake and Golden and Oregon Updated Resource exploration, Chest have significant Estimate with M&I development and exploration potential increase of 53% Established production infrastructure; road -22,000 m of drilling to be access, water, fully added to the Resource Mineralization covering equipped on-site camp only a fraction of Valentine’s total 30 km Golden Chest Mine: strike has been delineated Socio-economic and -NI 43-101 compliant Initial political stability Resource Estimate -7,000 m of drilling to be added to the Resource 25
  • 26.
    TSX:MOZ www.marathon-gold.com 416-987-0714 Phillip Walford Jennie Guay President and CEO Investor Relations Manager pwalford@marathon-gold.com jguay@marathon-gold.com 26