The document describes the drillers method for killing a gas well influx. It involves making multiple circulations of the well while carefully monitoring and controlling drillpipe and casing pressures to maintain bottomhole pressure and circulate the gas out of the well. The first circulation involves increasing drillpipe pressure as casing pressure rises to expand the gas bubble. The second circulation then displaces the drillstring with kill-weight mud while holding casing pressure constant to displace the gas from the annulus. After confirming no remaining gas influx, the well is shut in.
Configure a Diaphragm Pump with Confidence - Configuration (Part 2)Graco
When configuring a diaphragm pump there are a lot of influences to take into consideration. In this presentation you find the basics about positioning, cycle rates, pressure drops and tools you can use to make the right choice.
How does a diaphragm pump work?
https://www.youtube.com/watch?v=-gy9UqLXvo4
Chemical compatibility guide
http://www.graco.com/us/en/products/ad/chemical-compatibility.html
Pump selector tool
http://www.graco.com/gb/en/products/ad/husky-pumps/husky-selector-tool.html
For more information about our diaphragm pump range:
www.graco.com/husky
Could urban re-industrialisation be seen as a method of increasing business effectiveness in the context of a politically stimulated 'green economy'? Could it be seen as a nostalgic mutation of a creative-class concept, focused on 3D printing, 'boutique manufacturing' and crafts? These two notions place urban re-industrialisation within the context of the current neoliberal economic regime and urban development based on property and land speculation. Is could urban re-industrialisation be imagined as a progressive socio-political and economical project, aiming to create an inclusive and democratic society based on cooperation and symbiosis that goes way beyond the current model of a neoliberal city?
Configure a Diaphragm Pump with Confidence - Configuration (Part 2)Graco
When configuring a diaphragm pump there are a lot of influences to take into consideration. In this presentation you find the basics about positioning, cycle rates, pressure drops and tools you can use to make the right choice.
How does a diaphragm pump work?
https://www.youtube.com/watch?v=-gy9UqLXvo4
Chemical compatibility guide
http://www.graco.com/us/en/products/ad/chemical-compatibility.html
Pump selector tool
http://www.graco.com/gb/en/products/ad/husky-pumps/husky-selector-tool.html
For more information about our diaphragm pump range:
www.graco.com/husky
Could urban re-industrialisation be seen as a method of increasing business effectiveness in the context of a politically stimulated 'green economy'? Could it be seen as a nostalgic mutation of a creative-class concept, focused on 3D printing, 'boutique manufacturing' and crafts? These two notions place urban re-industrialisation within the context of the current neoliberal economic regime and urban development based on property and land speculation. Is could urban re-industrialisation be imagined as a progressive socio-political and economical project, aiming to create an inclusive and democratic society based on cooperation and symbiosis that goes way beyond the current model of a neoliberal city?
In deze presentatie (thesis) wordt onderzoek gevoerd naar oplossingsmethodes voor een online afspraken systeem. Eigen aan dit afsprakensysteem is dat de zaak tot bij de klant reist. De zoekmethodes worden ontwikkeld en getest. Met als bedoeling deze na afloop te implementeren in het afsprakensysteem dat Cornelis ICT ontwikkeld heeft.
Presentation was given at the Montenegrin Academy of Science and Arts in Podgorica, as well as at the Information Technology conference IT2016 in Žabljak, Montenegro.
about 70 % of the existing reservoirs are impossible to reach with conventional drilling . MPD or managed pressure drilling is the best solution for HPHT and very deep reservoirs .
In deze presentatie (thesis) wordt onderzoek gevoerd naar oplossingsmethodes voor een online afspraken systeem. Eigen aan dit afsprakensysteem is dat de zaak tot bij de klant reist. De zoekmethodes worden ontwikkeld en getest. Met als bedoeling deze na afloop te implementeren in het afsprakensysteem dat Cornelis ICT ontwikkeld heeft.
Presentation was given at the Montenegrin Academy of Science and Arts in Podgorica, as well as at the Information Technology conference IT2016 in Žabljak, Montenegro.
about 70 % of the existing reservoirs are impossible to reach with conventional drilling . MPD or managed pressure drilling is the best solution for HPHT and very deep reservoirs .
The slide-pack covers a large variety of artificial lift methods. Explanations are supported by breakdown of pros and cons, calculations and questions. Questions will shed light of roughly how to decide which method(s) to use in a specific case.
1. CLOSE OPEN
300
500 Well is shut in and pressures allowed to stabilize.
Shut-in Drillpipe pressure + Hydrostatic = Bottom Hole Pressure.
Kill the well using the Drillers Method.
Mud weight = 10ppg
TVD = 10,000 ft.
DP CP
BHP
300 500
10,000 X 10 X .052 = 5,200 psi
5,200 + 300 = 5,500 psi
Drillers Method – first circulation
500
CLOSE OPEN
1300
DP CP
BHP
1300 500
5,500
KRP @40 spm = 1,000psi
ICP = 1000 + 300 = 1,300 psi on DP
Casing Pressure is held constant as pumps are brought up to speed
by opening the choke.
If the Casing Pressure is held constant when starting then BHP is
held constant.
Once pumps are up to speed the Drillpipe Pressure should be held
constant to keep BHP constant.
Drillers Method – first circulation
CLOSE OPEN
1300
DP CP
BHP
1300 520
5,500
Till the gas influx gets farther up the hole there is little expansion and
the Casing pressure will rise slowly as mud (hydrostatic) is pushed out
of the hole.
520
Drillers Method – first circulation
2. CLOSE OPEN
1300
DP CP
BHP
1300 650
5,500
650
As the bubble begins to expand it pushes mud out of the hole causing a
loss of hydrostatic.
To keep BHP constant, Drillpipe pressure must be kept constant.
Drillers Method – first circulation
CLOSE OPEN
1300
DP CP
BHP
1300 800
5,500
800
Drillers Method – first circulation
CLOSE OPEN
1300
DP CP
BHP
1300 1000
5,500
1000
Drillers Method – first circulation
3. DP CP
BHP
1300 1100
5,500
CLOSE OPEN
1300
1100
Drillers Method – first circulation
1300
1250
DP CP
BHP
1300 1250
5,500
CLOSE OPEN
Drillers Method – first circulation
1300
1400
DP CP
BHP
1300 1400
5,500
CLOSE OPEN
Drillers Method – first circulation
4. 1300
1600
DP CP
BHP
1300 1600
5,500
CLOSE OPEN
Drillers Method – first circulation
1300
1750
DP CP
BHP
1300 1750
5,500
CLOSE OPEN
Drillers Method – first circulation
1300
1000
DP CP
BHP
1300 1000
5,500
CLOSE OPEN
Drillers Method – first circulation
5. 1300
400
DP CP
BHP
1300 400
5,500
CLOSE OPEN
Drillers Method – first circulation
300
300
DP CP
BHP
300 300
5,500
CLOSE OPEN
Once the influx is circulated out, the well should be shut-in.
Compare the Drillpipe and Casing pressure gauges and confirm
that they are equal. If Casing pressure is greater than Drillpipe
pressure then you may not have all the influx out of the well.
Once you are confident that the annulus is clean line up the pumps
on Kill Weight Fluid.
Drillers Method – half way home
300
DP CP
BHP
1300 300
5,500
CLOSE OPEN
1300 Hold Casing pressure constant as you bring the pumps up to 40 spm.
Continue to hold Casing pressure constant as you displace the drillstring.
Drillpipe pressure should drop as hydrostatic in the drillpipe increases.
KRP @40 spm = 1,000psi
ICP = 1000 + 300 = 1,300 psi on DP
Drillers Method – second circulation
6. 300
DP CP
BHP
1250 300
5,500
CLOSE OPEN
1250
Drillers Method – second circulation
300
DP CP
BHP
1200 300
5,500
CLOSE OPEN
1200
Drillers Method – second circulation
300
DP CP
BHP
1150 300
5,500
CLOSE OPEN
1150
Drillers Method – second circulation
7. 300
DP CP
BHP
1100 300
5,500
CLOSE OPEN
1100
Drillers Method – second circulation
300
DP CP
BHP
1060 300
5,500
CLOSE OPEN
1060 Once the Drillpipe is full of Kill Weight Fluid the hydrostatic will
remain constant.
Continue circulating holding Drillpipe pressure constant at FCP.
Casing pressure should drop as Kill Weight Fluid displaces the
annulus.
Drillers Method – second circulation
300
DP CP
BHP
300
5,500
CLOSE OPEN
1060
1060
Drillers Method – second circulation
8. 250
DP CP
BHP
250
5,500
CLOSE OPEN
1060
1060
Drillers Method – second circulation
200
DP CP
BHP
200
5,500
CLOSE OPEN
1060
1060
Drillers Method – second circulation
150
DP CP
BHP
150
5,500
CLOSE OPEN
1060
1060
Drillers Method – second circulation
9. 100
DP CP
BHP
100
5,500
CLOSE OPEN
1060
1060
Drillers Method – second circulation
50
DP CP
BHP
50
5,500
CLOSE OPEN
1060
1060
Drillers Method – second circulation
0
DP CP
BHP
0 0
5,500
CLOSE OPEN
0
After confirming that Kill Weight Fluid is back to surface, shut the well in.
Drillpipe and Casing pressure should read 0 psi.
Open the choke and check for flow. When opening the Annular beware of
gas trapped under the element.
Drillers Method – END