SPORTS
The Ocean Star
FRIDAY, APRIL 3, 2015 PAGE 35
LACROSSE 36
BASEBALL 37
TENNIS 39
COLLEGE NOTEBOOK 40
BY DOMINICK POLLIO
THE OCEAN STAR
ASBURY PARK — The Garnet
Gulls baseball team opened
up the spring season on the
road against Asbury Park on
Wednesday.
With the mercy rule in
play, Point Beach walked
away with a 17-3 victory in
five innings of play.
“It’s a good opening game,”
said Beach coach Angelo
Fiore. “You come out here
and you play a team like As-
bury and it’s rough because
you don’t know what you’re
going to get.”
According to Fiore, a cou-
ple of years ago the Gulls
faced Asbury Park and did
not fare as well as they
thought they would.
“A couple years ago we
played these guys and we
came out with a lazy attitude
and they threw up 10 runs on
us in the first inning,” Fiore
said. “The whole time we had
to play catch up and we
weren’t able to pull that one
out.”
The story was different
this time with Point Beach
going up early, batting in 8
runs in the first inning.
“We got off to a hot start,
batted around the first in-
ning,” said senior Mike
Frauenheim. “From there, we
just never looked back.”
On the mound for the
Gulls in the bottom of the
first was John VanSchoick, a
reliable pitcher.
“The pitching was solid.
John VanSchoick came out,
threw the first inning and he
was good,” said Fiore. “He is
about as dependable as you
can get.”
VanSchoick finished with
one strikeout and then the
POINT BEACH 17 BASEBALL ASBURY PARK 3
Beach baseball cruises
to season-opening win
Mike Frauenheim
finished with a
single, a double
& two RBIs
STEVE WEXLER THE OCEAN STAR
Kevin Donnelly throws a pitch against Asbury Park on Wednesday. Donnelly finished with seven strike-
outs through three innings in the season-opening win.
BY DOMINICK POLLIO
THE OCEAN STAR
ASBURY PARK — The presea-
son has been a rough one as
the weather dictated the time
Point Beach softball was able
to dedicate to on-field prac-
tice. Most of the time, the
Gulls found themselves prac-
ticing in a gym — nothing
close to real game action.
Despite these less-than-
ideal circumstances, Point
Beach opened up its season
with ease on Wednesday.
The Gulls traveled to face
Asbury Park High School,
where the Garnet Gulls bat-
ted their way to a 33-1 victory
in only four innings of play.
Alexa Russell opened the
first inning with a double to
center field. Teammate
Kellyann Ohlinger hit a
ground ball for another dou-
ble, and Russell booked it
home for the first score of the
game. The Gulls then batted
their way through the order
and put up six more runs
POINT BEACH 33 SOFTBALL ASBURY PARK 1
Garnet Gulls soar high
in their season opener
Freshman pitcher
Kylee Kells threw
11 strikeouts
STEVE WEXLER THE OCEAN STAR
ALEXA RUSSELL
STEVE WEXLER THE OCEAN STAR
Freshman pitcher Kylee Kells had 11 stikeouts in Point Beach’s sea-
son opener against Asbury Park.
BY DOMINICK POLLIO
THE OCEAN STAR
POINT PLEASANT BOROUGH —
The Point Pleasant Borough
varsity softball team has
been back on its grind and
is ready for the 2015 season.
The Panther squad com-
petes in the B South divi-
sion and is coming off of a 5-
15 overall 2014 season.
The team lost around six
seniors from last year, so
coach Steve Ferullo will be
relying a lot on the younger
players and the two return-
ing seniors, Amanda Caputo
and Alli Blisnuk.
“Basically, we didn’t have
a lot of wins last year. We’re
looking to improve on that,”
said Ferullo. “The kids have
been working hard so far. I
have a very, very young
team — I only have two sen-
iors on the team. A couple
freshmen start and a bunch
of sophomores. It’s just go-
ing to take the kids getting
used to playing on a varsity
level to work out for us.”
Caputo, along with Blis-
nuk, are prepared to shoul-
der the burden of being the
only seniors on the team
and hope their leadership
can have a lasting effect on
the younger girls.
“We did have more sen-
iors last year so there was
more leadership,” explained
Caputo. “We’re a younger
team so we have to kind of
lead them to be a stronger
team.”
Blisnuk agreed with her
teammate and also wants to
impress upon the rest of the
team that the key is to have
fun, saying, “It’s not worth it
if you’re not having fun. You
have to make the most out
of it. There are days where
you don’t want to be here —
you just have to push
through it. There will be
days where it’s worth it.”
Blisnuk was referring in
particular to a game last
season where the Panthers
found themselves down 9-2
in the seventh inning.
Through the rain and the
odds the team pulled out
the win, a testament to what
hard work can translate to
during the season.
Junior catcher Melissa Al-
fonso, who has been on the
varsity team since freshman
year, notices the positive
change of the past few sea-
sons. She remains hopeful
POINT PLEASANT BOROUGH SOFTBALL PREVIEW
Panthers start season
with a loss on the road
STEVE WEXLER THE OCEAN STAR
Point Boro returns the same infield as last season, a plus for their defense. According to the play-
ers, offense is not their strongest suit so they have been working on hitting during the preseason.
Point Boro drops
season opener to
Manchester Township
SEE GULLS PAGE 39
SEE BEACH PAGE 38
SEE BORO PAGE 38
WWW.STARNEWSGROUP.COMPAGE 36 THE OCEAN STAR FRIDAY, APRIL 3, 2015 SPORTS
POINT PLEASANT BOROUGH GIRLS LACROSSE NOTEBOOK
Panthers fall to Manasquan in season opening game
BY DOMINICK POLLIO
THE OCEAN STAR
MANASQUAN — The Point
Boro girls lacrosse team
opened up their season on
the road Monday against the
Manasquan Warriors, where
they lost by a score of 15-1.
After the Panthers’ first
two games were canceled
due to weather, it was a tough
opening to their season, but
the girls never let up and put
forth a strong effort until the
final whistle.
“I’m just really proud of my
girls for never giving up,” said
Boro head coach Megan Fritz.
“They kept going no matter
the score — no matter what
was happening, they just nev-
er gave up.”
Fritz was also happy the
team tried to incorporate all
they have been working on in
practice, saying, “They were
willing to try new things.
Working on things that we’ve
been working on in practice.
That’s always a plus that
they’re putting in that effort.
“I saw good things from
each and every one of them.
I’m just really proud of them
for that,” she added.
The first half was sluggish
for the Panthers as Man-
asquan found the back of the
net 11 times. Point Boro had a
difficult time keeping up with
the Warrior offense and often
found themselves a step be-
hind a pass or cut.
“We have a completely
new defense really so we’re
just getting comfortable with
each other,” explained Fritz.
“We talked a lot about it at
halftime just how they should
be moving with their girl and
how they should be cutting
with her. I think taking that
and using it in the second
half really helped a lot.”
The Panther defense
stepped up in the second half,
adding pressure and moving
more aggressively on the
field.
Manasquan managed an-
other three goals before the
Panther offense had their mo-
ment.
Nicole Favato of Point
Boro took the ball through
the defense and laid it in past
the Warrior goalie to keep
their season opener from be-
ing a shut out.
Favato, an unselfish player,
saw the goal as a statement
for the team, saying, “It was
awesome, it showed us we
can do it.”
With “we” being the opera-
tive word, Fritz and the team
were proud of the lone goal.
“No one wants to walk
away from a game not having
scored at all,” said Fritz. “It’s
really nice when we can get
on the board like that. Nicole
is one of our strongest shoot-
ers so I was really happy that
she could get one in today.”
The Panthers did have oth-
er opportunities to score
throughout the game but
some shots just did not have
enough power behind them,
making easy saves for the
Warrior goalie.
“I keep telling them to be
confident in their shots and
just go from the core and re-
ally put power behind it,” ex-
plained Fritz. “Against a varsi-
ty goalie that’s the only way
you’re going to get it in the
net. What works on JV isn’t
going to work on varsity, so
we have to up the ante a bit.”
Manasquan found the net
one last time before the final
whistle, claiming the victory
15-1.
Despite the loss, the Pan-
thers remain upbeat about
their team and walk away
with things to improve. Fava-
to and Fritz both agree that
communication is a big as-
pect of the game they need to
work on.
“Our team will just play
better if we’re all talking,
knowing who is open, and
when to pass and when to
not,” stated Favato.
Fritz also noticed some
things to work on for the of-
fense and the defense, saying,
“On offense we’re continuing
to work on movement and
how we should be cutting
and how we should be clear-
ing the field and putting our-
selves in positions where we
can go in and score. On de-
fense — just really working
on that man-to-man and how
you cut with your girl and
how you defend that eight-
meter and also defend your
girl at the same time. Some-
times we pick one or the oth-
er and we need to realize we
need to do both.”
The Panther girls have
plenty of time to improve
their game and are anxious to
continue getting better as the
season moves on.
Point Boro went on to face
Jackson Liberty on the road
Wednesday.
The Panthers lost a close
game 8-7.
Jackson Liberty scored five
goals in the first half while
Point Boro only managed
three.
With the game close, the
Panthers won the second half
netting four goals. Unfortu-
nately Jackson Liberty scored
another three, just enough to
claim the one-goal victory.
The Panthers played yes-
terday against St. Rose in a
game occurring too late for
this week’s edition of The
Ocean Star. Be sure to read
next week’s edition for full
coverage.
Point Boro’s next game will
be at home against Shore Re-
gional on Tuesday April 7.
The game is scheduled to
start at 10 a.m.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
Nicole Favato netted
a goal for Point Boro
in Monday’s loss
STEVE WEXLER THE OCEAN STAR
According to Boro coach Megan Fritz, communication is an aspect of their game that needs to improve
for the team to see success as the season moves on.
STEVE WEXLER THE OCEAN STAR
While the Panthers struggled in the first half against Manasquan on
Monday, they came out strong in the second half and eventually
scored a goal.
POINT BOROUGH BOYS LACROSSE NOTEBOOK
Defense leads to offense in home opener
BY DOMINICK POLLIO
THE OCEAN STAR
POINT PLEASANT BOROUGH —
The Panthers played their
first home game on Saturday
morning at Stadium Field.
The boys lacrosse team faced
off against the Shore Region-
al Blue Devils, who walked
away with a 14-5 victory.
The Blue Devils came out
fast and aggressive to start
the first quarter. They netted
three quick goals within the
first three minutes. Two
goals came from Shore’s Jack
Britton and the opening goal
came off the stick of Chris
Johnsen.
Point Boro’s head coach
Guy Lassen called a timeout
following the third goal to
have a word with his team.
“The thing is in the begin-
ning of the game they feel the
stress, they feel the pressure
and the game is moving fast,”
said Lassen. “When the pres-
sure is off they start playing.
They have to understand, to
win the game, they have to
play a full game.”
For the following eight and
one-half minutes, the Pan-
thers stood strong on defense
before the Blue Devils man-
aged three more goals in the
final minute of the first quar-
ter.
In the second quarter Point
Boro was struggling with
picking up ground balls, giv-
ing away possession to the
Blue Devils on more than one
occasion.
Lassen stressed the need
for the players to be aggres-
sive, saying, “You got to be
hungry to get a ground ball.
You can’t think — you just go
for the ground ball.”
Shore Regional ran up the
score with another six goals
before the end of the first
half. The 12th goal came with
Point Boro down a player af-
ter being called for a slashing
penalty.
Shore’s faster and more
physical play was taking its
toll on the Panthers, who
were already struggling with
missed passes and ground
balls. During the 10-minute
half, the young Point Boro
team spent eight minutes
huddled up listening to ad-
vice from Lassen and his as-
sistant coach.
“At halftime we said it’s not
about winning the game, now
we need to set small goals,”
explained Lassen after the
game. “The goal should be to
win a faceoff. The goal
should be to get nice passes.
The goal should be to score a
goal. The goal should be to
win the quarter, then win the
half.”
With the pressure of win-
ning off and their goals set,
the Panthers came alive in
the second half.
The Blue Devils opened up
the third quarter with one
more goal, increasing their
lead to 13-0. With 4:07 left in
the quarter, Point Boro’s Vin-
cent Ceres hit his second goal
of the season and the team’s
first goal of the game.
Ceres, a senior, keeps a
positive attitude no matter
what and always works to
play his best despite the
score.
“The main thing we can do
is stay positive and keep
everyone’s spirits high no
matter if we’re going up
against a really good team or
a really bad team,” stated
Ceres. “We just have to go
out there and play hard.”
Shore Regional responded
40 seconds later with a goal
from James Bedell, making
the score 14-1.
The goal was the Blue Dev-
ils’ last of the game as the rest
of the half belonged to the
Panthers.
The team had made the
necessary defensive adjust-
ments and came out strong
According to Point Beach
head coach Angelo Fiore,
the team was hard pressed
to find time to practice this
preseason.
Between snow and rain
they found themselves
practicing inside more than
outside.
Much to Fiore’s delight,
the team worked their way
to a 33-1 win over Asbury
Park in their season opener
on the road.
When one sees a score
like that, it’s easy to say the
offense did a lot of the
work, but what it really
came down to was the
pitcher on the mound.
Freshman Kylee Kells ac-
counted for 11 of the 12 outs
in the game against Asbury.
Not only did she have the 11
outs, they were all strike-
outs.
The only out that did not
come from a strikeout came
on a fly ball to right field.
Kells pitches fast, strong
and accurate.
Judging from the reac-
tions of the Asbury Park
players, they were not ready
to face such a consistent
pitcher.
Fiore was more than im-
pressed with his freshman
talent, saying, “A good thing
is how my freshman pitcher
pitched — Kylee Kells did a
nice job, and then we all just
settled down.”
Kells was not perfect,
walking two batters in the
first inning and giving up a
single and one run before
striking out the last batter.
But Fiore attributed that to
preseason jitters.
In the second inning she
struck out the first three
batters and did the same to
end the game in the fourth
inning.
Fiore is excited that he
will have Kells on the team
for the coming years.
She will continue to get
better and become a strong
weapon for the Garnet
Gulls.
Sneakers Plus Athlete of the Week
KYLEE KELLS
Sneakers Plus
K-Mart Plaza, Hwy. 35, Wall
732-280-2921
Log onto our website: www.sneakersplus.com
SHOP LOCAL. SHOP SNEAKERS PLUS.
Kylee Kells strikes out 11 batters
Five different Panthers
scored in loss to Shore
Regional Saturday
SEE OPENER PAGE 37
WWW.STARNEWSGROUP.COM FRIDAY, APRIL 3, 2015 THE OCEAN STAR PAGE 37SPORTS
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: BRICK TWP. HOLDS A
CLAIM FOR TAXES DUE
AND/OR OTHER MUNICIPAL
UTILITIES SUCH AS WATER
AND/OR SEWER IN THE
AMOUNT OF $796.83 AS OF
2/1/2015
BRICK TWP. MUA HOLDS
A CLAIM FOR TAXES DUE
AND/OR OTHER MUNICIPAL
UTILITIES SUCH AS WATER
AND/OR SEWER IN THE
AMOUNT OF $309.03 AS OF
11/06/2014
The amount of the judgment to
be satisfied by said sale is the sum
of $237,921.79 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
WILLIE CANADA, ET ALS, and
taken in execution at the suit of
FEDERAL NATIONAL MORT-
GAGE ASSOCIATION, to be sold
by Michael G. Mastronardy,
Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Powers Kirn, LLC
728 Marne Highway, Suite
200
Moorestown, NJ 08057
Sheriff’s Docket: CH 767808
Dated: March 26, 2015;
April 2, 9, 16, 2015
($146.52) (444) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
DAIRO SANDOVAL, ET ALS,
and taken in execution at the suit
of BAYVIEW LOAN SERVIC-
ING, LLC, to be sold by Michael
G. Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Fein, Such, Kahn & Shepard
7 Century Drive
Suite 201
Parsippany, NJ 07054
Sheriff’s Docket: CH 767807
Dated: March 26, 2015;
April 2, 9, 16, 2015
($157.08) (476) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F6310409, will
be exposed to sale at public venue
on TUESDAY the 21ST DAY OF
APRIL, A.D. 2015 between the
hours of 12 o’clock and 5 o’clock
(at 2 o’clock) Prevailing Time in
the afternoon of said day at the
Office of the Sheriff, Toms River,
Township of Toms River, County
of Ocean, New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 162
GREENWOOD LOOP ROAD
Tax Lot and Block No.: LOT:
18 C0162; BLOCK: 1386
Dimensions: APPROXI-
MATELY: UNIT NO. G BLDG. 7
Nearest Cross Street: GREEN-
WOOD PARK, A CONDOMINI-
UM
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
Office of the Sheriff, Toms River,
Township of Toms River, County
of Ocean, New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 441
CARLISA DR.
Tax Lot and Block No.: LOT:
52, 53 & 54; BLOCK: 562
Dimensions: APPROXI-
MATELY: 60 X 100
Nearest Cross Street: APPLE-
GATE AVE. BEGINNING AT AN
IRON REBAR FOUND IN THE
SOUTHEASTERLY LINE OF
CARLISA DR. (33 FEET WIDE
FORMERLY METEDECONK
AVENUE) SAID POINT BEING
DISTANT 100.00 FEET NORTH-
WESTWARDLY FROM A MON-
UMENT FOUND AT THE
INTERSECTION OF THE
NORTHEASTERLY LINE OF
APPLEGATE AVENUE (33
FEET WIDE) WITH THE SAID
SOUTHEASTERLY LINE OF
CARLISA DRIVE AND FROM
SAID POINT RUNNING:
THENCE
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
PRIOR LIENS/ENCUM-
BRANCES: WATER OPEN
PLUS PENALTY $1.31
SEWER OPEN PLUS
PENALTY $1.50
FOR A TOTAL AS OF
DECEMBER 17, 2014 OF $2.81
The amount of the judgment to
be satisfied by said sale is the sum
of $349,047.26 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
This sale was previously
scheduled to be sold on JANU-
ARY 11, 2011. On or about that
day sale was canceled per attorney
for Plaintiff. Sale is now being
advertised for 4 consecutive weeks
in order to inform the public of the
rescheduled date of sale per the
attorney for the Plaintiff.
Seized as the property of
SUSAN DOBROWOLSKI, and
taken in execution at the suit of
WACHOVIA MORTGAGE, FSB
F/K/A WORLD SAVINGS
BANK, FSB, to be sold by
Michael G. Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Powers, Kirn, LLC
728 Marne Highway, Suite
200
Moorestown, NJ 08057
Sheriff’s Docket: CH 764574
Dated: March 26, 2015;
April 2, 9, 16, 2015
($147.84) (448) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F4490913, will
be exposed to sale at public venue
on TUESDAY the 21ST DAY OF
APRIL, A.D. 2015 between the
hours of 12 o’clock and 5 o’clock
(at 2 o’clock) Prevailing Time in
the afternoon of said day at the
in execution at the suit of SYL-
VAN GLADE CONDOMINIUM
ASSOCIATION, INC., D/B/A
MAPLE LEAF PARK ASSOCIA-
TION, INC., to be sold by Michael
G. Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
McGovern Legal Services,
LLC
850 Route 1
New Brunswick, NJ 08902
Sheriff’s Docket: L 767739
Dated: March 12, 19, 26,
2015; April 2, 2015
($146.52) (444) (3/13, 3/20,
3/27, 4/3)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F4629908, will
be exposed to sale at public venue
on TUESDAY the 21ST DAY OF
APRIL, A.D. 2015 between the
hours of 12 o’clock and 5 o’clock
(at 2 o’clock) Prevailing Time in
the afternoon of said day at the
Office of the Sheriff, Toms River,
Township of Toms River, County
of Ocean, New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 27
TAMANY COURT
Tax Lot and Block No.: LOT:
52.01 C0027; BLOCK: 646
Dimensions: APPROXI-
MATELY: UNIT 27, BUILDING
3
Nearest Cross Street: VIL-
LAGE EAST CONDOMINIUM
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: BRICK TWP - $1,204.54
AS OF 11/07/2014
The amount of the judgment to
be satisfied by said sale is the sum
of $176,857.78 more or less, plus
interest; and in the second place to
Defendant Wachovia Mortgage,
FSB F/K/A World Savings Bank,
FSB the sum of $25,862.55 more
or less, plus interest..
Surplus Money: If after the
sale and satisfaction of the mort-
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 303
SAWMILL ROAD
Tax Lot and Block No.: LOT:
10 C086; BLOCK: 1386
Dimensions: APPROXI-
MATELY: UNAVAILABLE
Nearest Cross Street:
UNAVAILABLE
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT:
BAYVIEW LOAN SERVIC-
ING, LLC - $155,000.00 (PRIN-
CIPAL AMOUNT)
US BANKCUST FOR PRO
CAPITAL II, LLC TAX SALE
CERTIFICATE - $452.36
BRICK TWP OPEN WATER -
$196.37 (OPEN PLUS PENAL-
TY)
BRICK TWP OPEN SEWER -
$326.64 (OPEN PLUS PENAL-
TY)
TOTAL: $155,975.37
The amount of the judgment to
be satisfied by said sale is the sum
of $3,407.67 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
LARISSA BASANOW, and taken
The amount of the judgment to
be satisfied by said sale is the sum
of $502,115.11 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
DONALD ZMUDA, ET AL, and
taken in execution at the suit of
NATIONSTAR MORTGAGE,
LLC, to be sold by Michael G.
Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Milstead & Associates, LLC
1 E. Stow Road
Marlton, NJ 08053
Sheriff’s Docket: CH 767783
Dated: March 19, 26, 2015;
April 2, 9, 2015
($167.64) (508) (3/20, 3/27,
4/3, 4/10)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, LAW DIVISION Docket
No. DJ17441614, will be exposed
to sale at public venue on TUES-
DAY the 7TH DAY OF APRIL,
A.D. 2015 between the hours of 12
o’clock and 5 o’clock (at 2
o’clock) Prevailing Time in the
afternoon of said day at the Office
of the Sheriff, Toms River,
Township of Toms River, County
of Ocean, New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F02272613,
will be exposed to sale at public
venue on TUESDAY the 14TH
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 2413
HOOPER AVENUE
Tax Lot and Block No.: LOT:
91; BLOCK: 340
Dimensions: APPROXI-
MATELY: .7524 AC
Nearest Cross Street:
SAILORS QUAY DRIVE
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
THE SALE IS SUBJECT TO
ANY UNPAID TAXES AND
ASSESSMENTS, TAX, WATER
AND SEWER LIENS AND
OTHER MUNICIPAL ASSESS-
MENTS. THE AMOUNT DUE
CAN BE OBTAINED FROM
THE LOCAL TAXING
AUTHORITY.
ALL INTERESTED PARTIES
ARE TO CONDUCT AND RELY
UPON THEIR OWN INDE-
PENDENT INVESTIGATION
TO ASCERTAIN WHETHER OR
NOT ANY OUTSTANDING
INTERESTS REMAIN OF
RECORD AND/OR HAVE PRI-
ORITY OVER THE LIEN BEING
FORECLOSED AND, IF SAL,
THE CURRENT AMOUNT DUE
THEREON. **IF THE SALE IS
SET ASIDE FOR ANY REA-
SON, THE PURCHASER AT
THE SALE SHALL ONLY BE
ENTITLED TO A RETURN OF
THE DEPOSIT PAID. THE PUR-
CHASER SHALL HAVE NO
FURTHER RECOURSE
AGAINST THE MORTGAGEE
OR THE MORTGAGEE’S
ATTORNEY.
and cohesive in the final 15
minutes of the game.
Junior goalie Ryan Bedle
explained the defensive ad-
justments, saying, “They [the
defense] just needed to slide
a little better and they let a
couple people shoot on the
crease. We quickly fixed that
and won the second half.”
The defense was alive and
the offense was seeing more
and more opportunities to at-
tack as the third quarter
came to close. With a Shore
Regional player on the side-
line for an illegal body check
to the head, Panther Kyler
Rossi found the back of the
net for the team’s second
goal.
“The defense has to work,”
said Lassen. “I told them it’s
not about the offense — it’s
defense first. If we can stop
them from scoring then we
have more opportunities on
offense.”
This showed even more in
the final quarter as Point
Boro added three more to
their total from three differ-
ent players. Getting in on the
action were Darian Healy,
Matt Youmans and Tom Pick-
ering.
Although the Blue Devils
took the 14-5 victory, the Pan-
ther players walked with
their heads up and spirits
high realizing the potential
with which they can com-
pete.
“I think the second half we
did a great job, we just need
to figure out how we can
compete early on and it’s all
about confidence,” said
Lassen. “If they get confi-
dence we can make some
noise here in the Shore Con-
ference.”
Ceres, who has been work-
ing hard in the offseason, is
happy about their perform-
ance and emphasizes keeping
one’s head in the game, say-
ing, “You have to keep your
head in the game. That’s the
biggest thing that any coach
or player will stress to you.
You got to keep your head in
the game no matter what the
score is and you have to try
hard until the last whistle.”
Ceres say he wants to keep
that mindset throughout the
rest of the season and hopes
his team follows suit.
Bedle recognizes the strug-
gle of being a first-year varsi-
ty team and believes it all
comes down to practice and
preparation.
“The first varsity season
for the school — it’s going to
be the hardest one. It’s only
going to get easier as long as
you practice during the off-
season and at after-school
practice, it will only get easi-
er,” he said.
Lassen and his team keep
looking ahead with improve-
ment being their number-one
priority.
“We have 16 more games
left,” said Lassen. “I expect us
to get better each and every
day and that’s all I ask of
them.”
The Panthers traveled to
take on Lacey yesterday in a
game occurring too late for
this week’s edition of The
Ocean Star. Check back next
week for full coverage.
Point Boro will host Long
Branch at Stadium Field on
Monday with the faceoff
scheduled for 10 a.m.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
Panthers stay positive despite loss
OPENER
FROM PAGE 36
BY DOMINICK POLLIO
THE OCEAN STAR
MANCHESTER — Point Boro
baseball played their season
opener on the road against
Manchester Township on
Wednesday. The Panthers
lost 7-4 after starting offen-
sively strong.
With one out in the top of
the first inning, Will Feehan
of Point Boro hit a home run
to right field to give the Pan-
thers a run to start the game.
They did not score anymore
in the inning with the last out
coming off a fly ball to center
off the bat of Jack Fitzsim-
mons.
Manchester then had their
turn on offense and batted in
two runs off of a triple and a
single.
On the mound for Point
Boro was Frank Graziano
who began the inning with a
strikeout and closed the in-
ning with a strikeout.
In the second inning the
Panthers left a player strand-
ed on base, not adding any
more runs to their total.
Meanwhile, in the bottom
of the second, Manchester
added two more runs to their
total with a two-run home
run. Graziano struck out two
batters in the inning and the
Panthers went back to work
on offense.
With Manchester up 4-1,
Point Boro scored a run off of
an error by Manchester’s
short stop. In the bottom of
the third the Panthers’ de-
fense held true and kept
Manchester scoreless.
The next two innings did
not go as planned for Boro as
they allowed a run in each. A
pitching change came in the
fourth inning and Michael
Falconetti took the mound
for Point Boro.
Unfortunately, Manchester
kept producing hits on of-
fense and by the beginning of
the sixth inning the Panthers
were down 6-2.
With the bases loaded and
only one out, Feehan hit a
sacrifice fly, which was good
enough for another run.
Sebation Severio then hit a
single to center field on a
hard grounder, knocking in
one more run for Point Boro.
Manchester’s pitcher then
struck out the next batter,
closing the inning with Point
Boro down 6-4.
Manchester added one run
to their total before the Pan-
thers had one last chance to
take a lead in the seventh and
final inning. Fitzsimmons
started the inning with an out
on a popup to third. Falconet-
ti then went down swinging.
With a man on first and
second, Sean Connor hit a
line drive to right field and
Manchester managed to snag
Quin Hornish, who was try-
ing to advance past second
on the play. It was the final
out and the Panthers took the
loss 7-4.
Graziano and Falconetti
both recorded five strikeouts
in the game. Feehan finished
with the homer and two
RBIs.
The baseball team then
went on to face Barnegat at
home yesterday. The game
occurred too late for this is-
sue of The Ocean Star. For
full coverage, be sure to
check out next week’s issue.
The Panthers’ next game
will be tomorrow at home
against Neptune. The game is
scheduled to begin at 10.am.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
POINT PLEASANT BOROUGH BASEBALL NOTEBOOK
Panthers fall short against
Manchester in season opener
Will Feehan hit solo
home run in his
first at bat
STEVE WEXLER THE OCEAN STAR
KYLER ROSSI
COURTESY OF JEFF GUILFOYLE
CONGRATS TO POINT SURF!
The Point Pleasant Surf fifth-grade boys basketball team fin-
ished the fall/winter season in the Mid-Jersey Basketball
League [MJBL] with an impressive 16-5 record. The team
includes Mathew Martin [top row, from left], Jeffrey
Guilfoyle, Colton MacGlashan, Darren Van Pelt, Mitchell
Decker [bottom row, from left], Aiden Kirk, Brent Bucchino
and Logan Hanrahan. To find out more about Point Pleasant
Surf, go to www.pointpleasantsurfaau.wix.com/pointpleas-
antsurf.
WWW.STARNEWSGROUP.COMPAGE 38 THE OCEAN STAR FRIDAY, APRIL 3, 2015 SPORTS
**IF THE SALE IS SET
ASIDE FOR ANY REASON,
THE PURCHASER AT THE
SALE SHALL BE ENTITLED
ONLY TO A RETURN OF THE
DEPOSIT PAID. THE PUR-
CHASER SHALL HAVE NO
FURTHER RECOURSE
AGAINST THE MORTGAGOR,
THE MORTGAGEE OR THE
MORTGAGEE’S ATTORNEY.
The amount of the judgment to
be satisfied by said sale is the sum
of $192,161.61 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
JOSEPH P. MCGINTY, ET UX,
and taken in execution at the suit
of WELLS FARGO BANK, N.A.,
to be sold by Michael G.
Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Phelan Hallinan & Diamond,
PC
400 Fellowship Rd., Suite 100
Mt. Laurel, NJ 08054
Sheriff’s Docket: CH 767779
Dated: March 19, 26, 2015;
April 2, 9, 2015
($170.28) (516) (3/20, 3/27,
4/3, 4/10)
The Ocean Star
($179.52) (544) (3/20, 3/27,
4/3, 4/10)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F02652113,
will be exposed to sale at public
venue on TUESDAY the 14TH
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 479
MONMOUTH AVENUE
Tax Lot and Block No.: LOT:
1.01, 2.01-4.01; BLOCK: 570
Dimensions: APPROXI-
MATELY: 80.00 FT X 27.00 FT X
80.00 FT X 27.00 FT
Nearest Cross Street: LYN-
WOOD AVENUE
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
*SUBJECT TO ANY
UNPAID TAXES, MUNICIPAL
LIENS OR OTHER CHARGES,
AND ANY SUCH TAXES,
CHARGES, LIENS, INSUR-
ANCE PREMIUMS OR OTHER
ADVANCES MADE BY PLAIN-
TIFF PRIOR TO THIS SALE.
ALL INTERESTED PARTIES
ARE TO CONDUCT AND RELY
UPON THEIR OWN INDE-
PENDENT INVESTIGATION
TO ASCERTAIN WHETHER OR
NOT ANY OUTSTANDING
INTEREST REMAIN OF
RECORD AND/OR HAVE PRI-
ORITY OVER THE LIEN BEING
FORECLOSED AND, IF SO THE
CURRENT AMOUNT DUE
THEREON.
BERG AND ACKERMAN, LLC
ENCOURAGES AND SUP-
PORTS THE EQUAL HOUSING
PRACTICES OF THE FAIR
HOUSING ACT IN THE CON-
DUCT OF ITS BUSINESS.”
The amount of the judgment to
be satisfied by said sale is the sum
of $199,680.45 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
MERVIN E. SMITH, III, ET ALS,
and taken in execution at the suit
of FEDERAL HOME LOAN
MORTGAGE CORPORATION
(“FREDDIE MAC”) A CORPO-
RATION ORGANIZED AND
EXISTING UNDER THE LAWS
OF THE UNITED STATES OF
AMERICA, to be sold by Michael
G. Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Zucker, Goldberg &
Ackerman
200 Sheffield Street
P.O. Box 1024
Mountainside, NJ 07092-
0024
Phone: 1-908-233-8500
File #XWZ-150078
Sheriff’s Docket: CH 767762
Dated: March 19, 26, 2015;
April 2, 9, 2015
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F03619713,
will be exposed to sale at public
venue on TUESDAY the 14TH
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 89
GREENWOOD LOOP ROAD,
UNIT 89, BLDG. 25
Tax Lot and Block No.: LOT:
10; BLOCK: 1386
Dimensions: APPROXI-
MATELY: CONDOMINIUM
Nearest Cross Street: N/A
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
SUBJECT TO ANY OPEN
TAXES, WATER/SEWER,
MUNICIPAL OR TAX LIENS
THAT MAY BE DUE.
AT THE TIME OF PUBLICA-
TION TAXES/SEWER/WATER
INFORMATION WAS NOT
AVAILABLE. YOU MUST
CHECK WITH THE TAX COL-
LECTOR FOR EXACT
AMOUNTS DUE.
“THE FAIR HOUSING ACT
PROHIBITS ANY PREFER-
ENCE, LIMITATION, OR DIS-
CRIMINATION BECAUSE OF
RACE, COLOR, RELIGION,
SEX, HANDICAP, FAMILIAL
STATUS, OR NATIONAL ORI-
GIN, OR INTENTION TO
MAKE SUCH PREFERENCE,
LIMITATION OR DISCRIMINA-
TION IN CONNECTION WITH
ANY ASPECT OF A RESIDEN-
TIAL REAL ESTATE TRANS-
ACTION. ZUCKER, GOLD-
ACTION. ZUCKER, GOLD-
BERG AND ACKERMAN, LLC
ENCOURAGES AND SUP-
PORTS THE EQUAL HOUSING
PRACTICES OF THE FAIR
HOUSING ACT IN THE CON-
DUCT OF ITS BUSINESS.”
The amount of the judgment to
be satisfied by said sale is the sum
of $265,616.48 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
PATRICIA O’BRIEN, ET ALS,
and taken in execution at the suit
of FEDERAL HOME LOAN
MORTGAGE CORPORATION,
to be sold by Michael G.
Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Zucker, Goldberg &
Ackerman
200 Sheffield Street
P.O. Box 1024
Mountainside, NJ 07092-
0024
Phone: 1-908-233-8500
File #XWZ-132805
Sheriff’s Docket: CH 767761
Dated: March 19, 26, 2015;
April 2, 9, 2015
($182.16) (552) (3/20, 3/27,
4/3, 4/10)
The Ocean Star
___________________________
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F117710, will
be exposed to sale at public venue
on TUESDAY the 14TH DAY OF
APRIL, A.D. 2015 between the
hours of 12 o’clock and 5 o’clock
(at 2 o’clock) Prevailing Time in
the afternoon of said day at the
Office of the Sheriff, Toms River,
Township of Toms River, County
of Ocean, New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 656
CARROLL FOX ROAD A/K/A
654 CARROLL FOX ROAD
Tax Lot and Block No.: LOT:
1, 2 & 8; BLOCK: 973
Dimensions: APPROXI-
MATELY: 148 X 73 X 75 X 154 X
50
Nearest Cross Street: CAR-
ROLL FOX ROAD AND
HAWK’S NEST ROAD
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
SUBJECT TO ANY OPEN
TAXES, WATER/SEWER,
MUNICIPAL OR TAX LIENS
THAT MAY BE DUE.
SUBJECT TO ANY OPEN
TAXES, WATER/SEWER,
MUNICIPAL OR TAX LIENS
THAT MAY BE DUE.
AT THE TIME OF PUBLI-
CATION TAXES/SEWER/
WATER INFORMATION WAS
NOT AVAILABLE. YOU MUST
CHECK WITH THE TAX COL-
LECTOR FOR EXACT
AMOUNTS DUE.
“THE FAIR HOUSING ACT
PROHIBITS ANY PREFER-
ENCE, LIMITATION, OR DIS-
CRIMINATION BECAUSE OF
RACE, COLOR, RELIGION,
SEX, HANDICAP, FAMILIAL
STATUS, OR NATIONAL ORI-
GIN, OR INTENTION TO
MAKE SUCH PREFERENCE,
LIMITATION OR DISCRIMINA-
TION IN CONNECTION WITH
ANY ASPECT OF A RESIDEN-
TIAL REAL ESTATE TRANS-
SALE SHALL BE ENTITLED
ONLY TO A RETURN OF THE
DEPOSIT PAID. THE PUR-
CHASER SHALL HAVE NO
FURTHER RECOURSE
AGAINST THE MORTGAGOR,
THE MORTGAGEE OR THE
MORTGAGEE’S ATTORNEY.
The amount of the judgment to
be satisfied by said sale is the sum
of $874,769.02 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
HELENA DEVARIS, ET AL, and
taken in execution at the suit of
HUDSON CITY SAVINGS
BANK, to be sold by Michael G.
Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Phelan Hallinan & Diamond,
PC
400 Fellowship Rd., Suite 100
Mt. Laurel, NJ 08054
Sheriff’s Docket: CH 767756
Dated: March 19, 26, 2015;
April 2, 9, 2015
($171.60) (520) (3/20, 3/27,
4/3, 4/10)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F01875813,
will be exposed to sale at public
venue on TUESDAY the 14TH
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 109
OSPREY LANE
Tax Lot and Block No.: LOT:
4.01; BLOCK: 39
Dimensions: APPROXI-
MATELY: 64.04 FT X 105.50 FT
X 84.92 FT X 88.60 FT X 32.58
FT
Nearest Cross Street: NJ
STATE HIGHWAY ROUTE 35
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
*SUBJECT TO ANY
UNPAID TAXES, MUNICIPAL
LIENS OR OTHER CHARGES,
AND ANY SUCH TAXES,
CHARGES, LIENS, INSUR-
ANCE PREMIUMS OR OTHER
ADVANCES MADE BY PLAIN-
TIFF PRIOR TO THIS SALE.
ALL INTERESTED PARTIES
ARE TO CONDUCT AND RELY
UPON THEIR OWN INDE-
PENDENT INVESTIGATION
TO ASCERTAIN WHETHER OR
NOT ANY OUTSTANDING
INTEREST REMAIN OF
RECORD AND/OR HAVE PRI-
ORITY OVER THE LIEN BEING
FORECLOSED AND, IF SO THE
CURRENT AMOUNT DUE
THEREON.
**IF THE SALE IS SET
ASIDE FOR ANY REASON,
THE PURCHASER AT THE
for this year.
“I think over the years
we’ve got a lot more chem-
istry together,” said Alfonso.
“When I started the seniors
were a little detached, so over
the years we’ve gotten better
and we really bonded.”
The three girls agreed that
this season has potential to
be better than last year and
the preseason has started
them off on the right path.
“It’s completely different
this year. I think we have a lot
of potential for this season,”
said Caputo. “Everyone is still
learning everything.”
“Preseason looks a lot bet-
ter. There are a lot of younger
kids who can learn to step up
and make the plays,” added
Blisnuk. “I think having a
younger team will benefit us
in the future. I think we will
have a better season this
year.”
Alfonso, a catcher by trade,
feels that defense is the key to
success for this year, saying,
“This year I really hope to ob-
viously see more wins, im-
prove the program, and step
up our offense because typi-
cally it’s not our strongest
point. And then remain sound
on defense because we need
to make sure our defense is
right where we need it to be
so that we can come back on
offense and come back if we
need to and get the spark go-
ing.”
According to Ferullo, they
have the whole infield back,
which should benefit them
greatly. He has some brand
new people in the outfield but
the team has been working to
be in form for the year.
“We’re still working on dif-
ferent situations,” explained
Ferullo. “Softball is a game of
situations and the more situa-
tions they see hopefully the
better they’re going to get. We
just got to get the ball over the
plate and keep us in the
game.”
The players directed a lot
of attention to their game
during the offseason.
Caputo, a pitcher, goes to
training once a week and
played on a travel team over
the summer.
Blisnuk, who plays third
base, is coming off of her sec-
ond anterior cruciate liga-
ment [ACL] surgery from an
injury she suffered during
soccer.
“Personally for me I just
had my second ACL surgery
in August,” explained Blisnuk.
“I was actually cleared two
weeks ago. I’ve been in physi-
cal therapy and doing stuff to
get myself back into shape. So
I still have to work on that.
Certain things are tough for
me, so I’ve been doing what I
can, but it’s been hard.”
While she said it has been
hard, Caputo said one can
never tell if Blisnuk is having
a bad day because she still
plays hard and makes her
plays.
Alfonso also put in offsea-
son work to improve the tech-
nical skills of her position.
“I started private lessons
this season for hitting. I also
took catching lessons to re-
fine my skills for blocking and
throw downs and every-
thing,” said Alfonso.
She also played with a trav-
el team and participated in
basketball, which is good for
conditioning and staying in
shape.
According to Ferullo, the
Panthers will compete against
tough teams like Pinelands,
Central Regional, Manchester
Township and Jackson Liber-
ty.
The outlook is hopeful and
through practice and dili-
gence, the team should see
positive results this spring
season.
“I hope that we can really
step it up,” stated Alfonso
with conviction. “I think that
if we really work on refining
our skills and getting our
skills better — that in game
time situations it will show
through and we’ll know what
to do and when, and hopeful-
ly that will result in more
wins.”
BORO VS MANCHESTER TOWNSHIP
The Panther softball team
opened up their season on the
road Wednesday. They took
on Manchester Township,
where they lost by a score of
10-0.
The Panthers committed
six errors early in the game,
which put them in a hole.
Alfonso had the only two
hits of the game for Point
Boro.
The Manchester offense
was swinging strong, includ-
ing a two-run home run in the
fourth inning.
The Panthers could not
muster a comeback in the B
South matchup.
Point Boro then took on
Barnegat at home on Thurs-
day. The game occurred too
late for this edition of The
Ocean Star. Check back next
week for full coverage.
The Panthers’ next game
will be on the road against
Central Regional on Tuesday
April 7. The game is sched-
uled to begin at 10 a.m.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
Point Boro gives up 10 runs to Manchester
BORO
FROM PAGE 35
STEVE WEXLER THE OCEAN STAR
AMANDA CAPUTO
Gulls were back to work
on offense in the top of the
second.
They added four more
runs to their totals before
Asbury Park managed the
third out. Fiore really want-
ed to give pitcher Kevin
Donnelly some time on the
mound since the preseason
was rough for the Gulls due
to inclement weather. So
Donnelly took the mound
for the second, third and
fourth innings.
“We were trying to get
Kevin Donnelly some work
today. With the weather this
preseason, it’s been kind of
rough,” explained Fiore.
“We had three scrimmages
cancelled so with that and
the fact we didn’t get a lot of
pitchers to work he’s strug-
gling to find the strike zone.
We need to get him right for
us to get good down the
stretch.”
Donnelly found his form
striking out seven batters in
his three innings on the
mound. Only one run was
allowed in, which came in
the bottom of the fourth.
“We had great pitching
from John and Kevin, and
we’re hitting the ball real
well,” said Frauenheim. “I’m
seeing the ball a lot better
this year. I’m just looking for
my right pitch and being pa-
tient up there.”
Frauenheim finished the
game with two hits, a single
and a double, and two RBIs.
At the start of the fifth in-
ning the Gulls were up 14-1.
Asbury needed to hold them
there and get within 10 runs
if they were going to keep
the game going past five in-
nings.
The Gulls kept swinging
and batted in three more
runs before Asbury closed
out the inning.
On the mound to close
out the game for the Garnett
Gulls was Chris Russo. He
found himself in trouble af-
ter walking a couple batters
and giving up a hit that led
to two runs for Asbury. But
Russo settled down, struck
out a batter, and let the de-
fense secure the other two
outs.
Since Asbury could not
get within 10 runs of Point
Beach, the game was called
after five innings with the
score 17-3 as Point Beach
claimed its first win of the
season.
“This one right here we
came out and the guys did a
great job of staying focused
and locked in all the way
through,” Fiore said about
the win. “They kept the in-
tensity up and we were able
to get some of the younger
guys in. A lot of the fresh-
man kids were able to come
off the bench and do some
good things, as well. I saw a
lot of good stuff.”
Frauenheim, who did not
see a lot of action out in left
field during the win, was
proud of how the offense
played and how the pitchers
threw the baseball. He be-
lieves the team will have a
lot of success going forward,
saying, “If we keep hitting
the way we’re hitting, now I
feel like we can beat any-
body. We just need our
pitching to be the same and
make no mistakes on de-
fense.”
Point Beach then faced
Keyport at home on yester-
day. The game occurred too
late for this edition of The
Ocean Star. For full cover-
age, pick up next week’s is-
sue.
The Garnet Gulls’ next
game will be on the road
against St. Rose on Tuesday,
April 7. The game is sched-
uled to start at 10 a.m.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at
dpollio@theoceanstar.com or 732-
899-7606 Ext 15. Follow him on
Twitter @dompollio.
Beach looks to improve pitching
BEACH
FROM PAGE 35
STEVE WEXLER THE OCEAN STAR
Kenny MacPherson makes a throw in Point Beach’s 17-3 win over
Asbury Park on Wednesday.
WWW.STARNEWSGROUP.COM FRIDAY, APRIL 3, 2015 THE OCEAN STAR PAGE 39SPORTS
tion; and
BE IT FURTHER
ORDAINED, that a certified copy
of this ordinance upon adoption,
with the recorded vote included
thereon, be filed with said Director
within 5 days after such adoption.
NOTICE
NOTICE IS HEREBY
GIVEN that the foregoing
Ordinance was introduced and
passed on first reading at the regu-
lar meeting of the Borough
Council of the Borough of Point
Pleasant Beach, in the County of
Ocean, held on the 24th day of
March 2015 and will be consid-
ered for second reading and final
passage at the regular meeting of
said governing body to be held on
the 21st day of April 2015 at 7:30
P.M. in the Council Chambers of
the Borough Hall, 416 New Jersey
Avenue, at which time and place
any person desiring to be heard
will be given an opportunity to be
so heard.
EILEEN A. FARRELL, RMC
Municipal Clerk
($40.26) (122) (4/3)
The Ocean Star
___________________________
BOROUGH OF
POINT PLEASANT BEACH
ZONING BOARD OF
ADJUSTMENT
NOTICE OF HEARING
Take notice that on the 16th
day of April 2015 at 7:30pm, a
hearing will be held before the
Borough of Point Pleasant Beach
Board of Adjustment at the
Municipal Building located at 416
New Jersey Avenue, Point
Pleasant Beach, New Jersey on the
appeal or application of the under-
signed for a variance or other relief
so as to permit 6 foot PVC Fence
and Gates on premises located at
111 New Jersey Avenue, Point
Pleasant Beach, NJ 08742 and des-
ignated as Block 48 and Lot(s) 6
on the Borough of Point Pleasant
Beach Tax map. The applicant
reserves the right to seek any other
waiver or variance relief as deter-
mined to be necessary by the
Board or its staff prior to or during
the public hearing.
The application, sealed survey
and plans are on file in the
Municipal Building located at 416
New Jersey Avenue in Point
Pleasant Beach and are available
for inspection 10 days prior to
hearing between the hours of 9am
and 4pm.
Any interested party may
appear at said hearing and partici-
pate therein in accordance with the
rules of the Zoning Board of
Adjustment.
111 NEW JERSEY AVENUE
LLC c/o MICHAEL J. BAL-
MANN
Applicant
($14.85) (45) (4/3)
The Ocean Star
AUTHORIZING THE BOR-
OUGH TO ESTABLISH A CAP
BANK
WHEREAS, the Local
Government Cap Law, N.J.S.A.
40A:4-45.1 et.seq., provides that
in the preparation of its annual
budget, a municipality shall limit
any increase in said budget up to
1.5% unless authorized by ordi-
nance to increase it to 3.5% over
the previous year’s final appropri-
ations, subject to certain excep-
tions; and,
WHEREAS, N.J.S.A. 40A:4-
45.15a provides that a municipali-
ty may, when authorized by ordi-
nance, appropriate the difference
between the amount of its actual
final appropriation and the 3.5%
rate as an exception to its final
appropriations in either of the next
two succeeding years; and,
WHEREAS, the Borough
Council of the Borough of Point
Pleasant Beach, in the County of
Ocean, finds it advisable and nec-
essary to increase its CY2015
budget by up to 3.5% over the pre-
vious year’s final appropriations,
in the interest of promoting the
health, safety and welfare of the
citizens; and
WHEREAS, the Borough
Council hereby determines that a
2.0% increase in the budget for
said year, amounting to
$212,522.34 in excess of the
increase in final appropriations
otherwise permitted by the Local
Government Cap Law, is advisable
and necessary; and
WHEREAS, the Borough
Council hereby determines that
any amount authorized herein-
above that is not appropriated as
part of the final budget shall be
retained as an exception to final
appropriation in either of the next
two succeeding years;
NOW THEREFORE BE IT
ORDAINED, by the Borough
Council of the Borough of Point
Pleasant Beach, in the County of
Ocean, a majority of the full
authorized membership of this
governing body affirmatively con-
curring that, in the CY2015 budg-
et year, the final appropriations of
the Borough of Point Pleasant
Beach shall, in accordance with
this ordinance and N.J.S.A.
40A:4-45.14, be increased by
2.0% amounting to $212,522.34,
and that the CY2015 municipal
budget for the Borough of Point
Pleasant Beach be approved and
adopted in accordance with this
ordinance; and
BE IT FURTHER
ORDAINED, that any amount
authorized hereinabove that is not
appropriated as part of the final
budget shall be retained as an
exception to final appropriation in
either of the next two succeeding
years; and
BE IT FURTHER
ORDAINED, that a certified copy
of this ordinance as introduced be
filed with the Director of the
Division of Local Government
Services within 5 days of introduc-
PRIOR LIENS OF AFFI-
DAVIT:
BRICK TWP. HOLDS A
CLAIM FOR TAXES DUE
AND/OR OTHER MUNICIPAL
UTILITIES SUCH AS WATER
AND/OR SEWER IN THE
AMOUNT OF $1234.53 AS OF
2/1/2015
BRICK TWP. MUA HOLDS
A CLAIM FOR TAXES DUE
AND/OR OTHER MUNICIPAL
UTILITIES SUCH AS WATER
AND/OR SEWER IN THE
AMOUNT OF $123.12 AS OF
10/14/2014
The amount of the judgment to
be satisfied by said sale is the sum
of $231,756.65 more or less, plus
interest; and in the second place to
Defendant Wells Fargo Bank,
N.A. the sum of $46,959.80 more
or less, plus interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of KIM
MARIE SESTA-MARINO, ETC.,
ET AL, and taken in execution at
the suit of WELLS FARGO
BANK, N.A., to be sold by
Michael G. Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Powers Kirn, LLC
728 Marne Highway, Suite
200
Moorestown, NJ 08057
Sheriff’s Docket: CH 767809
Dated: March 26, 2015;
April 2, 9, 16, 2015
($149.16) (452) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
___________________________
BOROUGH OF
POINT PLEASANT BEACH
BOROUGH COUNCIL
ORDINANCE 2015-05
AN ORDINANCE OF THE
BOROUGH OF POINT
PLEASANT BEACH, OCEAN
COUNTY, NEW JERSEY
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
MICHAEL J. VANNOTE, ETC.,
ET ALS, and taken in execution at
the suit of CP-SRMOF II 2012-A
TRUST, to be sold by Michael G.
Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Milstead & Associates, LLC
1 E. Stow Road
Marlton, NJ 08053
Sheriff’s Docket: CH 767817
Dated: March 26, 2015;
April 2, 9, 16, 2015
($167.64) (508) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F1237110, will
be exposed to sale at public venue
on TUESDAY the 21ST DAY OF
APRIL, A.D. 2015 between the
hours of 12 o’clock and 5 o’clock
(at 2 o’clock) Prevailing Time in
the afternoon of said day at the
Office of the Sheriff, Toms River,
Township of Toms River, County
of Ocean, New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 252
VERMONT DRIVE
Tax Lot and Block No.: LOT:
18; BLOCK: 383.19
Dimensions: APPROXI-
MATELY: 1430 SQ FT
Nearest Cross Street: ESSEX
DRIVE
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F00704614,
will be exposed to sale at public
venue on TUESDAY the 21ST
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 16 DIVI-
SION STREET
Tax Lot and Block No.: LOT:
28; BLOCK: 856
Dimensions: APPROXI-
MATELY: .1463 AC
Nearest Cross Street: WALLIS
COURT
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
THE SALE IS SUBJECT TO
UNPAID TAXES AND ASSESS-
MENTS, TAX, WATER AND
SEWER LIENS AND OTHER
MUNICIPAL ASSESSMENTS.
THE AMOUNT DUE CAN BE
OBTAINED FROM THE LOCAL
TAXING AUTHORITY.
ALL INTERESTED PARTIES
ARE TO CONDUCT AND RELY
UPON THEIR OWN INDE-
PENDENT INVESTIGATION
TO ASCERTAIN WHETHER OR
NOT ANY OUTSTANDING
INTEREST REMAIN OF
RECORD AND/OR HAVE PRI-
ORITY OVER THE LIEN BEING
FORECLOSED AND, IF SO THE
CURRENT AMOUNT DUE
THEREON.
**IF THE SALE IS SET
ASIDE FOR ANY REASON,
THE PURCHASER AT THE
SALE SHALL BE ENTITLED
ONLY TO A RETURN OF THE
DEPOSIT PAID. THE PUR-
CHASER SHALL HAVE NO
FURTHER RECOURSE
AGAINST THE MORTGAGEE
OR THE MORTGAGEE’S
ATTORNEY.
The amount of the judgment to
be satisfied by said sale is the sum
of $226,547.39 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
UNPAID TAXES AND ASSESS-
MENTS, TAX, WATER AND
SEWER LIENS AND OTHER
MUNICIPAL ASSESSMENTS.
THE AMOUNT DUE CAN BE
OBTAINED FROM THE LOCAL
TAXING AUTHORITY.
ALL INTERESTED PARTIES
ARE TO CONDUCT AND RELY
UPON THEIR OWN INDE-
PENDENT INVESTIGATION
TO ASCERTAIN WHETHER OR
NOT ANY OUTSTANDING
INTEREST REMAIN OF
RECORD AND/OR HAVE PRI-
ORITY OVER THE LIEN BEING
FORECLOSED AND, IF SO THE
CURRENT AMOUNT DUE
THEREON.
**IF THE SALE IS SET
ASIDE FOR ANY REASON,
THE PURCHASER AT THE
SALE SHALL BE ENTITLED
ONLY TO A RETURN OF THE
DEPOSIT PAID. THE PUR-
CHASER SHALL HAVE NO
FURTHER RECOURSE
AGAINST THE MORTGAGEE
OR THE MORTGAGEE’S
ATTORNEY.
The amount of the judgment to
be satisfied by said sale is the sum
of $297,610.02 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
EDWARD W. DAMON, ET UX,
and taken in execution at the suit
of SRMOF 2009-1 TRUST, to be
sold by Michael G. Mastronardy,
Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Milstead & Associates, LLC
1 E. Stow Road
Marlton, NJ 08053
Sheriff’s Docket: CH 767816
Dated: March 26, 2015;
April 2, 9, 16, 2015
($167.64) (508) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
order directing payment of the sur-
plus money. The Sheriff or other
person conducting the sale will
have information regarding the
surplus, if any.
May be subject to an
Ordinance by the Ocean County
Board of Health: 87-01, Section
10. The Sheriff’s Department will
require notification of the certifi-
cation of the wells where applica-
ble.
The Sheriff shall deduct his
fees, costs and commissions of
sale from the total amount bid at
the sale.
A 20% deposit (cash or certi-
fied funds) is required from the
Successful Bidder at the time of
sale.
Seized as the property of
DENISE GUZZARDO, ET ALS,
and taken in execution at the suit
of BANK OF AMERICA, N.A., to
be sold by Michael G.
Mastronardy, Sheriff.
This sale is subject to post-
ponement without further notice.
Attorneys for Plaintiff
Stern, Lavinthal &
Frankenberg, LLC
105 Eisenhower Parkway
Suite 302
Roseland, NJ 07068
Sheriff’s Docket: CH 767810
Dated: March 26, 2015;
April 2, 9, 16, 2015
($161.04) (488) (3/27, 4/3,
4/10, 4/17)
The Ocean Star
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F02418113,
will be exposed to sale at public
venue on TUESDAY the 21ST
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the TOWNSHIP OF
BRICK, County of Ocean and
State of New Jersey.
Street and Street No.: 223 CIR-
CLE DRIVE
Tax Lot and Block No.: LOT:
28; BLOCK: 323
Dimensions: APPROXI-
MATELY: 100 X 279
Nearest Cross Street: CHER-
RY QUAY ROAD
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: NONE
THE SALE IS SUBJECT TO
___________________________
OCEAN COUNTY
SHERIFF’S SALE
By virtue of the above stated
writ, to me directed, issued out of
the SUPERIOR COURT OF NEW
JERSEY, CHANCERY DIVI-
SION Docket No. F03369613,
will be exposed to sale at public
venue on TUESDAY the 21ST
DAY OF APRIL, A.D. 2015
between the hours of 12 o’clock
and 5 o’clock (at 2 o’clock)
Prevailing Time in the afternoon of
said day at the Office of the
Sheriff, Toms River, Township of
Toms River, County of Ocean,
New Jersey.
All that tract or parcel of land
and premises, situate, lying and
being in the BOROUGH OF
POINT PLEASANT, County of
Ocean and State of New Jersey.
Street and Street No.: 233
JAEHNEL PARKWAY
Tax Lot and Block No.: LOT:
18; BLOCK: 14
Dimensions: APPROXI-
MATELY: 50 FEET WIDE BY
100 FEET LONG
Nearest Cross Street: HER-
BERTSVILLE ROAD
The above description does not
constitute a full legal description,
said description is filed at the
Office of the Sheriff, 120 Hooper
Avenue, Toms River, NJ.
THE SHERIFF HEREBY
RESERVES THE RIGHT TO
ADJOURN THIS SALE WITH-
OUT FURTHER NOTICE BY
PUBLICATION.
PRIOR LIENS OF AFFI-
DAVIT: SUBJECT TO PAST
DUE BALANCE AS OF
12/01/2014 IN THE AMOUNT
OF $0.37 FOR UNPAID WATER
AND SEWER.
SUBJECT TO ANY UNPAID
TAXES, MUNICIPAL LIENS OR
OTHER CHARGES, AND ANY
SUCH TAXES, CHARGES,
LIENS, INSURANCE PREMI-
UMS OR OTHER ADVANCES
MADE BY PLAINTIFF PRIOR
TO THIS SALE. ALL INTER-
ESTED PARTIES ARE TO CON-
DUCT AND RELY UPON
THEIR OWN INDEPENDENT
INVESTIGATION TO ASCER-
TAIN WHETHER OR NOT ANY
OUTSTANDING INTEREST
REMAIN OF RECORD AND/OR
HAVE PRIORITY OVER THE
LIEN BEING FORECLOSED
AND, IF SO THE CURRENT
AMOUNT DUE THEREON.
The amount of the judgment to
be satisfied by said sale is the sum
of $292,394.15 more or less, plus
interest.
Surplus Money: If after the
sale and satisfaction of the mort-
gage debt, including costs and
expenses, there remains any sur-
plus money, the money will be
deposited into the Superior Court
Trust Fund and any person claim-
ing the surplus, or any part thereof,
may file a motion pursuant to
Court Rules 4:64-3 and 4:57-2
stating the nature and extent of that
person’s claim and asking for an
before Asbury Park managed
the third out.
Freshman Kylee Kells took
the mound for Point Beach
and performed like she was a
seasoned veteran. She struck
out the first batter on five
pitches and then struck out
the second batter on three
pitches. Kells hit some trou-
ble walking the next two bat-
ters and giving up a single
that resulted in a run for As-
bury. She quickly got back on
track and retired the next bat-
ter in three pitches.
Up 7-1 the Gulls got back to
work on offense in the top of
the second inning. It looked
to be a quick one as second
baseman Sam Kelly grounded
out followed by Alex Barnes
lining out to third.
Point Beach put it behind
them loading the bases with
the next three batters. Erinne
Regan then hit a fly ball that
dropped in center field bring-
ing home two more runs for
the Gulls. They then batted in
three more runs off of a sin-
gle and a double before hit-
ting a fly ball for the third
out.
Kells went back to the
mound for the bottom of the
second inning. She struck out
the three batters she faced,
only throwing three balls in
the process.
In the third inning the girls
added nine more runs to
their total for a score of 21-1.
Kells came out again for the
Gulls, retiring the first batter
on a fly ball to center, then
striking out the next two on
eight pitches.
The best inning for Point
Beach was the fourth and fi-
nal inning where they batted
through the order almost
twice, putting up 12 more
runs. The only outs came off
of base runners leaving their
base too early.
With the score at 33-1 in fa-
vor of Point Beach the mercy
rule was in effect and Kells
and the Garnet Gull defense
had to get three outs and the
game would be over. In a per-
fect inning, the freshman
threw nine pitches for nine
strikes and the final three
outs of the game.
Head coach Silvio De-
Cristifano was more than im-
pressed with his pitcher’s
performance.
“A good thing is how my
freshman pitcher pitched,”
said DeCristofano after the
game. “Kylee Kells did a nice
job and then we all just set-
tled down.”
As the score indicates, the
Gulls’ offense was on point
and they really stayed consis-
tent with their hitting
throughout the game.
“Our strengths — definite-
ly our bats,” said Russell.
“Definitely I think we play-
when we all work together
we play hard together. I think
that’s a huge strong point.”
The win was a great way to
open the season but there are
still small things that De-
Cristofano hopes to improve
on as the season continues.
“We’re still rusty,” he said.
“Plays that are automatics
were a little rusty today.”
Last season Point Beach
finished with an overall
record of 9-9 and are really
looking to improve that
record this year.
They compete in the B
Central division with tough
opponents like Mater Dei, St.
Rose, and Henry Hudson.
“Last year we had a lot of
injuries. It was an up and
down year but we did finish
strong, I thought,” explained
DeCristofano. “And now
we’re pretty settled. We have
four seniors, we have a lot of
juniors and this freshman
pitcher who throws really
nice.”
During the offseason the
players have been working on
their game, always looking
for ways to improve.
“Some girls play year
round. A lot of girls are hit-
ting all year long. I think this
is the most ready we’ve been
for a start to the season,” said
DeCristofano. “Even though
we didn’t have the preseason
we liked, the girls are ready
to play.
“I think we’re starting to fi-
nally fill in those positions
that some people haven’t re-
ally played or practiced this
past year,” explained Russell.
“We’re working to just get
ready for the season. We’re a
little rusty with our bats but
we’re doing pretty well with
that.”
Russell has been hitting
year round and working on
her arm strength to make
harder and faster throws
from her short stop position.
Russell says a goal she has
for the team this season is to
beat Mater Dei in both games
they play with them this year.
She also feels the area that
needs the most improvement
for the team is communica-
tion, saying, “We could work
on communication — talking
and position wise. Who has
the ball and who covers
where. If we talk, we have it
all together.”
The softball team has a
positive outlook for this
spring season and definitely
started off strong with the
impressive win over Asbury
Park.
The Garnet Gulls went on
to face Keyport at home on
Thursday. The game oc-
curred too late for this edi-
tion of The Ocean Star. Be
sure to read next week’s issue
for full coverage.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
Gulls hope to build off win
GULLS
FROM PAGE 35
STEVE WEXLER THE OCEAN STAR
Shortstop Alexa Russell covers the base as an Asbury Park player advances. Point Beach held Asbury to
only one run in the season opening win.
BY DOMINICK POLLIO
THE OCEAN STAR
MIDDLETOWN — Point Beach
boys tennis opened up their
season Wednesday on the
road against Mater Dei. The
Gulls took the win 3-2.
In first singles, Gerrard
Giordano defeated his oppo-
nent in two sets, 6-1 and 6-0.
Second singles player
Trevor Hinds also won in two
sets, 6-1 and 6-0.
Rob Lissenden lost the
third singles match to his op-
ponent in two sets by a score
of 6-2 and 6-2.
The Gulls were able to se-
cure the win in first doubles
play. The duo of Miles
Mancini and Steven Dyson
beat their opponents in two
sets. They won the first set 6-
2 and the second set 6-1.
Point Beach dropped their
second doubles match in two
sets, but it was not enough
for Mater Dei to take a win.
The Garnet Gulls’ next
match will be on April 13 at
home against Ranney. The
match is scheduled for a 4
p.m. start.
POINT BORO VS LAKEWOOD
Point Boro boys tennis
opened up their season
against Lakewood yesterday
on the road. The game oc-
curred too late for this edi-
tion of The Ocean Star. Read
next week’s edition for full
coverage.
The Panthers next match is
away against Jackson Liberty
on Monday April 6. The
match is scheduled to start at
10 a.m.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
Giordano, Hinds secure
early wins in singles
play for Point Beach
Garnet Gulls top their competition
POINT BEACH 3 TENNIS MATER DEI 2
WWW.STARNEWSGROUP.COMPAGE 40 THE OCEAN STAR FRIDAY, APRIL 3, 2015 SPORTS
Opening day of trout sea-
son begins this Saturday at 8
a.m. for all New Jersey waters
across the state.
For trout season this year
the Division of Fish and
Wildlife is stocking some
570,000 rainbow trout across
the state throughout the
spring, with 200,000 in the
water and ready to be hooked
on opening day. “Trout fish-
ing in New Jersey is as strong
as ever,” said Richard
Boornazian, Department of
Environment Protection
[DEP] Assistant
Commissioner for Natural
and Historic Resources. “Our
lakes and streams are being
stocked with lots of healthy
rainbows, ready to be hooked
and help make fond memo-
ries.” “Opening day of trout
season is one of the most
anticipated days on the cal-
endar for outdoors lovers,
connecting families and
friends in the enjoyment of
our state’s natural resources
and splendid scenery,” added
Division of Fish and Wildlife
Director David Chanda.
This year all designated
trout waters are being
stocked exclusively with
rainbow trout. The Pequest
Hatchery is shifting to more
intensive production of rain-
bow trout, which is resistant
to furunculosis, a disease
common in cold water fish
species that impacted brown
and brook trout reared at the
Warren County hatchery.
This issue limited stocking in
some of New Jersey’s trout
waters last year.
Daily bag limits for rain-
bow trout are April 4 to May
31, six trout measuring at
least nine inches and from
June 1 to December 31, four
trout measuring at least nine
inches. To fish for trout a
valid annual New Jersey fish-
ing license and trout stamp
are both required for resi-
dents at least 16 years old and
less than 70 years of age, plus
all non-residents 16 years and
older. Fees are Resident fish-
ing license ages 16 to 64 years
$22.50, Sr. Resident Fishing
ages 65 to 69 years $12.50,
Resident Trout Stamp $10.50,
Non-Resident Fishing ages 16
and up $34.00, Non-Resident
Trout Stamp $20. During the
season the Manasquan,
Metedeconk, and Toms
rivers will be stocked on
Mondays April 6, 13, 20, 27,
May 4, 11, and 18. Fishing will
be closed from 5 a.m. until 5
p.m. on these in season
stocking dates. Spring Lake
will be stocked three times
during the season by the
state but not closed to fish-
ing. Mac’s Pond will also be
stocked but just for opening
day. The trout stocking hot-
line is 609-633-6765.
On Saturday you can also
look forward to the Shark
River Surf Anglers Kid’s
Trout Contest starting at 8
a.m. at Spring Lake. This is
the largest kid’s trout fishing
contest anywhere in the
state. It is open to anyone 15
years old and younger. Greg
Hueth, the SRSA President
and Trout Committee
Chairman said, “This year’s
contest is scheduled for
opening day from 8 a.m. to
1:30 p.m. and it is offered free
of charge to all children ages
15 and under. Great prizes
will be a huge part of the day,
as we award a sensational
Grand Prize to an overall
winner, and first, second and
third place prizes to individ-
ual winners in each of four
different age categories. We
are especially pleased that
each and every contestant
will go home a winner, as we
present all participants with
a “thank you” prize package
that typically contains $40
worth of goods and gear.
On Saturday, we will have
several large tents on the
north side of the lake to serve
as contest headquarters. Our
club members will be gath-
ered there to answer any
questions, provide fishing
guidance and instruction,
and supply bait and tackle to
anyone that needs it. And
that’s not all. Certainly a
great day of outdoor family
fun isn’t complete without
food, right? Thanks to gra-
cious donations by our spon-
sors, we are able to offer free
hot chocolate, donuts, bagels,
hot dogs, chips, juice, ice
cream and soda to partici-
pants throughout the day.
We hope you will consider
supporting us as we promote
this entertaining and healthy
family oriented outdoor
activity. With your continued
support we expect another
fun day of fishing, food, and
family. For donations checks
can be made payable to
“SRSA Children’s Trout
Tournament” and mailed to
Gregory Hueth, 2167 Gregory
Place, Sea Girt, NJ 08750.
Your contributions are
greatly appreciated. Thank
you in advance and we look
forward to seeing you with
your family and friends down
at the lake on Saturday, best
regards, Greg Hueth”. Jeff
Merrill of the IGFA has
announced, “The
International Game Fish
Association’s New Jersey
Representatives are pleased
to announce their 18th
Annual Fund Raising
Banquet and Auction will be
held on Friday, April 17 at 7
p.m. at Doolan’s Restaurant
located on Route 71 in Spring
Lake Heights. Hosted by
New Jersey representatives
Bill Feinberg, David
Matagiese, Rich Keller, Jeff
Merrill and Gene Nigro, pro-
ceeds from the evening will
benefit IGFA’s Junior Angler
and Conservation Programs.
Reservations are limited to
the first 225 people and can
be made by sending a check
for $75 for each person drawn
to IGFA and sent to: IGFA
Banquet, c/o Jeff Merrill, 918
Houston St., South Plainfield,
NJ 07080. For further infor-
mation contact Jeff Merrill at
908-451-1110 or via e-mail at
jeffmerrill2@verizon.net.
Bob over at Fishermen’s
Den in Belmar reports “I
have yet to see the first win-
ter flounder. Most years we
see flounder by now and
years past when the season
opened March 1st anglers
caught double digits. This
might be the week with the
warmer forecast. I have had
no reports of stripers yet but
we are waiting for any sign of
life. We will have a complete
supply of live bait for trout
coming this week and trout
lures, rods, and reels.”
Captain Ryan of the
Jamaica II out of Brielle
reports “We are catching
some codfish every trip,
everybody went home with
some meat this past week-
end, nothing thrilling but
something to fish for at least.
Some guys are catching two,
three or four keepers some
trips with pool winners rang-
ing from eight to 20+ lbs.
Recent pool winners were
Carl Weigand from
Philadelphia with four cod
up to 14 pounds and six ling,
Ezra Cloister from Trenton
with 12 cod with four keepers
to 10 pounds and eight ling.
We are sailing the usual
schedule: 12 hour departing 5
a.m. every Wednesday,
Saturday and Sunday except
Easter weekend, only Friday
and Saturday, there is no trip
Easter Sunday.
Jim Freda covers fishing for Star News
Group. He can be emailed at jimfre-
da@optonline.net.
FISHING TIPS BY JIM FREDA
Trout season begins Saturday
TIP OF THE WEEK
FROM JIM FREDA
You can buy your NJ trout
license online at www.njfis-
handwildlife.com/als/web-
salesintro.htm.
BY DOMINICK POLLIO
THE OCEAN STAR
POINT PLEASANT BEACH —
Clemson University girls
track has run back to its spot
atop the Atlantic Coast Con-
ference [ACC]. In February
the team won the ACC In-
door Championship at Vir-
ginia Tech.
This is their fifth title in six
years and sixth overall. Clem-
son placed first ahead of
Florida State in second and
Notre Dame in third.
More recently, Point Beach
graduate Brianna Feerst
placed third in the seeded
mile at the Shamrock Invita-
tional in Myrtle Beach at
Coastal Carolina University.
She finished with a time of
4:59.85.
She also ran the 4x800 me-
ter relay and clocked in with
a time of 2:15.
At the Crimson Tide Invi-
tational, Feerst ran in the
1500, where she finished with
a time of 4:36.34 — good
enough for sixth place.
All three of her times were
personal bests for the junior.
“In high school I ran five
flat,” said Feerst about break-
ing the five-minute mark in
the mile. “It was really awe-
some because it made me
feel good individually and
helped the team.”
Feerst was also proud the
Tiger team took the ACC In-
door championship after not
winning it last year, saying,
“This year coming back with
the win felt awesome. Last
year was kind of disappoint-
ing since we had been doing
so well previous years so it
was good to come back and
compete and win.”
According to Feerst, she
has been training really hard,
training as a team, and taking
care of her body. All of this
hard work attributed to her
being able to produce per-
sonal bests and she has no
plans to stop improving.
Feerst graduated from
Point Pleasant Beach High
School in 2012. As a Garnet
Gull she won 17 state champi-
onships, competing in cross
country, indoor track and
outdoor track. In addition,
she was a three-year captain
and third-team all-state for
cross country in 2010 and
2011. Also, she was an Ocean
County cross country cham-
pion in 2010.
The Clemson girls team
will compete this weekend at
the Florida Relays in
Gainesville. Feerst will com-
pete in the steeplechase, an
event that she ranks fourth in
for Clemson history.
Feerst explained that last
year she could not compete
in the event due to a stress
fracture in her foot, so she is
excited about competing this
year.
VERGARI PLAYING STRONG
FOR PENN STATE ALTOONA
The Penn State Altoona
men’s tennis team is also do-
ing well in part to a Point
Beach graduate.
Tony Vergari helped the
Nittany Lions to their second
straight win on Wednesday
March 25. They faced non-
conference opponent Saint
Vincent College and came
away with an 8-1 victory.
Vergari, along with doubles
partner Adam Cook, won the
second doubles match 8-6.
Then in the no. 6 singles
match Vergari rounded out
the Altoona win 6-3 and 6-2.
As a team, the Altoona
team lost their first match of
this season but have won four
straight since then.
They hold a 4-1 record and
are 2-1 in the Allegheny
Mountain Collegiate Confer-
ence.
In high school Vergari was
a four-year varsity tennis let-
ter winner and a member of
the 2009 team that won the B
Central title and the Central
Jersey Group I crown.
Vergari is currently a jun-
ior and is majoring in verte-
brate physiology.
The Altoona squad will
take on Mount Aloysius Col-
lege on Tuesday April 7.
Dominick Pollio covers sports for The
Ocean Star. He can be reached at dpol-
lio@theoceanstar.com or 732-899-
7606 Ext 15. Follow him on Twitter
@dompollio.
COLLEGE NOTEBOOK
Feerst records three personal
bests at Clemson University
Brianna Feerst of Point
Beach broke the five
minute mark in the mile
BRIANNA
FEERST
TONY
VERGARI

0010SportsOS03Apr2015

  • 1.
    SPORTS The Ocean Star FRIDAY,APRIL 3, 2015 PAGE 35 LACROSSE 36 BASEBALL 37 TENNIS 39 COLLEGE NOTEBOOK 40 BY DOMINICK POLLIO THE OCEAN STAR ASBURY PARK — The Garnet Gulls baseball team opened up the spring season on the road against Asbury Park on Wednesday. With the mercy rule in play, Point Beach walked away with a 17-3 victory in five innings of play. “It’s a good opening game,” said Beach coach Angelo Fiore. “You come out here and you play a team like As- bury and it’s rough because you don’t know what you’re going to get.” According to Fiore, a cou- ple of years ago the Gulls faced Asbury Park and did not fare as well as they thought they would. “A couple years ago we played these guys and we came out with a lazy attitude and they threw up 10 runs on us in the first inning,” Fiore said. “The whole time we had to play catch up and we weren’t able to pull that one out.” The story was different this time with Point Beach going up early, batting in 8 runs in the first inning. “We got off to a hot start, batted around the first in- ning,” said senior Mike Frauenheim. “From there, we just never looked back.” On the mound for the Gulls in the bottom of the first was John VanSchoick, a reliable pitcher. “The pitching was solid. John VanSchoick came out, threw the first inning and he was good,” said Fiore. “He is about as dependable as you can get.” VanSchoick finished with one strikeout and then the POINT BEACH 17 BASEBALL ASBURY PARK 3 Beach baseball cruises to season-opening win Mike Frauenheim finished with a single, a double & two RBIs STEVE WEXLER THE OCEAN STAR Kevin Donnelly throws a pitch against Asbury Park on Wednesday. Donnelly finished with seven strike- outs through three innings in the season-opening win. BY DOMINICK POLLIO THE OCEAN STAR ASBURY PARK — The presea- son has been a rough one as the weather dictated the time Point Beach softball was able to dedicate to on-field prac- tice. Most of the time, the Gulls found themselves prac- ticing in a gym — nothing close to real game action. Despite these less-than- ideal circumstances, Point Beach opened up its season with ease on Wednesday. The Gulls traveled to face Asbury Park High School, where the Garnet Gulls bat- ted their way to a 33-1 victory in only four innings of play. Alexa Russell opened the first inning with a double to center field. Teammate Kellyann Ohlinger hit a ground ball for another dou- ble, and Russell booked it home for the first score of the game. The Gulls then batted their way through the order and put up six more runs POINT BEACH 33 SOFTBALL ASBURY PARK 1 Garnet Gulls soar high in their season opener Freshman pitcher Kylee Kells threw 11 strikeouts STEVE WEXLER THE OCEAN STAR ALEXA RUSSELL STEVE WEXLER THE OCEAN STAR Freshman pitcher Kylee Kells had 11 stikeouts in Point Beach’s sea- son opener against Asbury Park. BY DOMINICK POLLIO THE OCEAN STAR POINT PLEASANT BOROUGH — The Point Pleasant Borough varsity softball team has been back on its grind and is ready for the 2015 season. The Panther squad com- petes in the B South divi- sion and is coming off of a 5- 15 overall 2014 season. The team lost around six seniors from last year, so coach Steve Ferullo will be relying a lot on the younger players and the two return- ing seniors, Amanda Caputo and Alli Blisnuk. “Basically, we didn’t have a lot of wins last year. We’re looking to improve on that,” said Ferullo. “The kids have been working hard so far. I have a very, very young team — I only have two sen- iors on the team. A couple freshmen start and a bunch of sophomores. It’s just go- ing to take the kids getting used to playing on a varsity level to work out for us.” Caputo, along with Blis- nuk, are prepared to shoul- der the burden of being the only seniors on the team and hope their leadership can have a lasting effect on the younger girls. “We did have more sen- iors last year so there was more leadership,” explained Caputo. “We’re a younger team so we have to kind of lead them to be a stronger team.” Blisnuk agreed with her teammate and also wants to impress upon the rest of the team that the key is to have fun, saying, “It’s not worth it if you’re not having fun. You have to make the most out of it. There are days where you don’t want to be here — you just have to push through it. There will be days where it’s worth it.” Blisnuk was referring in particular to a game last season where the Panthers found themselves down 9-2 in the seventh inning. Through the rain and the odds the team pulled out the win, a testament to what hard work can translate to during the season. Junior catcher Melissa Al- fonso, who has been on the varsity team since freshman year, notices the positive change of the past few sea- sons. She remains hopeful POINT PLEASANT BOROUGH SOFTBALL PREVIEW Panthers start season with a loss on the road STEVE WEXLER THE OCEAN STAR Point Boro returns the same infield as last season, a plus for their defense. According to the play- ers, offense is not their strongest suit so they have been working on hitting during the preseason. Point Boro drops season opener to Manchester Township SEE GULLS PAGE 39 SEE BEACH PAGE 38 SEE BORO PAGE 38
  • 2.
    WWW.STARNEWSGROUP.COMPAGE 36 THEOCEAN STAR FRIDAY, APRIL 3, 2015 SPORTS POINT PLEASANT BOROUGH GIRLS LACROSSE NOTEBOOK Panthers fall to Manasquan in season opening game BY DOMINICK POLLIO THE OCEAN STAR MANASQUAN — The Point Boro girls lacrosse team opened up their season on the road Monday against the Manasquan Warriors, where they lost by a score of 15-1. After the Panthers’ first two games were canceled due to weather, it was a tough opening to their season, but the girls never let up and put forth a strong effort until the final whistle. “I’m just really proud of my girls for never giving up,” said Boro head coach Megan Fritz. “They kept going no matter the score — no matter what was happening, they just nev- er gave up.” Fritz was also happy the team tried to incorporate all they have been working on in practice, saying, “They were willing to try new things. Working on things that we’ve been working on in practice. That’s always a plus that they’re putting in that effort. “I saw good things from each and every one of them. I’m just really proud of them for that,” she added. The first half was sluggish for the Panthers as Man- asquan found the back of the net 11 times. Point Boro had a difficult time keeping up with the Warrior offense and often found themselves a step be- hind a pass or cut. “We have a completely new defense really so we’re just getting comfortable with each other,” explained Fritz. “We talked a lot about it at halftime just how they should be moving with their girl and how they should be cutting with her. I think taking that and using it in the second half really helped a lot.” The Panther defense stepped up in the second half, adding pressure and moving more aggressively on the field. Manasquan managed an- other three goals before the Panther offense had their mo- ment. Nicole Favato of Point Boro took the ball through the defense and laid it in past the Warrior goalie to keep their season opener from be- ing a shut out. Favato, an unselfish player, saw the goal as a statement for the team, saying, “It was awesome, it showed us we can do it.” With “we” being the opera- tive word, Fritz and the team were proud of the lone goal. “No one wants to walk away from a game not having scored at all,” said Fritz. “It’s really nice when we can get on the board like that. Nicole is one of our strongest shoot- ers so I was really happy that she could get one in today.” The Panthers did have oth- er opportunities to score throughout the game but some shots just did not have enough power behind them, making easy saves for the Warrior goalie. “I keep telling them to be confident in their shots and just go from the core and re- ally put power behind it,” ex- plained Fritz. “Against a varsi- ty goalie that’s the only way you’re going to get it in the net. What works on JV isn’t going to work on varsity, so we have to up the ante a bit.” Manasquan found the net one last time before the final whistle, claiming the victory 15-1. Despite the loss, the Pan- thers remain upbeat about their team and walk away with things to improve. Fava- to and Fritz both agree that communication is a big as- pect of the game they need to work on. “Our team will just play better if we’re all talking, knowing who is open, and when to pass and when to not,” stated Favato. Fritz also noticed some things to work on for the of- fense and the defense, saying, “On offense we’re continuing to work on movement and how we should be cutting and how we should be clear- ing the field and putting our- selves in positions where we can go in and score. On de- fense — just really working on that man-to-man and how you cut with your girl and how you defend that eight- meter and also defend your girl at the same time. Some- times we pick one or the oth- er and we need to realize we need to do both.” The Panther girls have plenty of time to improve their game and are anxious to continue getting better as the season moves on. Point Boro went on to face Jackson Liberty on the road Wednesday. The Panthers lost a close game 8-7. Jackson Liberty scored five goals in the first half while Point Boro only managed three. With the game close, the Panthers won the second half netting four goals. Unfortu- nately Jackson Liberty scored another three, just enough to claim the one-goal victory. The Panthers played yes- terday against St. Rose in a game occurring too late for this week’s edition of The Ocean Star. Be sure to read next week’s edition for full coverage. Point Boro’s next game will be at home against Shore Re- gional on Tuesday April 7. The game is scheduled to start at 10 a.m. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. Nicole Favato netted a goal for Point Boro in Monday’s loss STEVE WEXLER THE OCEAN STAR According to Boro coach Megan Fritz, communication is an aspect of their game that needs to improve for the team to see success as the season moves on. STEVE WEXLER THE OCEAN STAR While the Panthers struggled in the first half against Manasquan on Monday, they came out strong in the second half and eventually scored a goal. POINT BOROUGH BOYS LACROSSE NOTEBOOK Defense leads to offense in home opener BY DOMINICK POLLIO THE OCEAN STAR POINT PLEASANT BOROUGH — The Panthers played their first home game on Saturday morning at Stadium Field. The boys lacrosse team faced off against the Shore Region- al Blue Devils, who walked away with a 14-5 victory. The Blue Devils came out fast and aggressive to start the first quarter. They netted three quick goals within the first three minutes. Two goals came from Shore’s Jack Britton and the opening goal came off the stick of Chris Johnsen. Point Boro’s head coach Guy Lassen called a timeout following the third goal to have a word with his team. “The thing is in the begin- ning of the game they feel the stress, they feel the pressure and the game is moving fast,” said Lassen. “When the pres- sure is off they start playing. They have to understand, to win the game, they have to play a full game.” For the following eight and one-half minutes, the Pan- thers stood strong on defense before the Blue Devils man- aged three more goals in the final minute of the first quar- ter. In the second quarter Point Boro was struggling with picking up ground balls, giv- ing away possession to the Blue Devils on more than one occasion. Lassen stressed the need for the players to be aggres- sive, saying, “You got to be hungry to get a ground ball. You can’t think — you just go for the ground ball.” Shore Regional ran up the score with another six goals before the end of the first half. The 12th goal came with Point Boro down a player af- ter being called for a slashing penalty. Shore’s faster and more physical play was taking its toll on the Panthers, who were already struggling with missed passes and ground balls. During the 10-minute half, the young Point Boro team spent eight minutes huddled up listening to ad- vice from Lassen and his as- sistant coach. “At halftime we said it’s not about winning the game, now we need to set small goals,” explained Lassen after the game. “The goal should be to win a faceoff. The goal should be to get nice passes. The goal should be to score a goal. The goal should be to win the quarter, then win the half.” With the pressure of win- ning off and their goals set, the Panthers came alive in the second half. The Blue Devils opened up the third quarter with one more goal, increasing their lead to 13-0. With 4:07 left in the quarter, Point Boro’s Vin- cent Ceres hit his second goal of the season and the team’s first goal of the game. Ceres, a senior, keeps a positive attitude no matter what and always works to play his best despite the score. “The main thing we can do is stay positive and keep everyone’s spirits high no matter if we’re going up against a really good team or a really bad team,” stated Ceres. “We just have to go out there and play hard.” Shore Regional responded 40 seconds later with a goal from James Bedell, making the score 14-1. The goal was the Blue Dev- ils’ last of the game as the rest of the half belonged to the Panthers. The team had made the necessary defensive adjust- ments and came out strong According to Point Beach head coach Angelo Fiore, the team was hard pressed to find time to practice this preseason. Between snow and rain they found themselves practicing inside more than outside. Much to Fiore’s delight, the team worked their way to a 33-1 win over Asbury Park in their season opener on the road. When one sees a score like that, it’s easy to say the offense did a lot of the work, but what it really came down to was the pitcher on the mound. Freshman Kylee Kells ac- counted for 11 of the 12 outs in the game against Asbury. Not only did she have the 11 outs, they were all strike- outs. The only out that did not come from a strikeout came on a fly ball to right field. Kells pitches fast, strong and accurate. Judging from the reac- tions of the Asbury Park players, they were not ready to face such a consistent pitcher. Fiore was more than im- pressed with his freshman talent, saying, “A good thing is how my freshman pitcher pitched — Kylee Kells did a nice job, and then we all just settled down.” Kells was not perfect, walking two batters in the first inning and giving up a single and one run before striking out the last batter. But Fiore attributed that to preseason jitters. In the second inning she struck out the first three batters and did the same to end the game in the fourth inning. Fiore is excited that he will have Kells on the team for the coming years. She will continue to get better and become a strong weapon for the Garnet Gulls. Sneakers Plus Athlete of the Week KYLEE KELLS Sneakers Plus K-Mart Plaza, Hwy. 35, Wall 732-280-2921 Log onto our website: www.sneakersplus.com SHOP LOCAL. SHOP SNEAKERS PLUS. Kylee Kells strikes out 11 batters Five different Panthers scored in loss to Shore Regional Saturday SEE OPENER PAGE 37
  • 3.
    WWW.STARNEWSGROUP.COM FRIDAY, APRIL3, 2015 THE OCEAN STAR PAGE 37SPORTS PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: BRICK TWP. HOLDS A CLAIM FOR TAXES DUE AND/OR OTHER MUNICIPAL UTILITIES SUCH AS WATER AND/OR SEWER IN THE AMOUNT OF $796.83 AS OF 2/1/2015 BRICK TWP. MUA HOLDS A CLAIM FOR TAXES DUE AND/OR OTHER MUNICIPAL UTILITIES SUCH AS WATER AND/OR SEWER IN THE AMOUNT OF $309.03 AS OF 11/06/2014 The amount of the judgment to be satisfied by said sale is the sum of $237,921.79 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of WILLIE CANADA, ET ALS, and taken in execution at the suit of FEDERAL NATIONAL MORT- GAGE ASSOCIATION, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Powers Kirn, LLC 728 Marne Highway, Suite 200 Moorestown, NJ 08057 Sheriff’s Docket: CH 767808 Dated: March 26, 2015; April 2, 9, 16, 2015 ($146.52) (444) (3/27, 4/3, 4/10, 4/17) The Ocean Star Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of DAIRO SANDOVAL, ET ALS, and taken in execution at the suit of BAYVIEW LOAN SERVIC- ING, LLC, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Fein, Such, Kahn & Shepard 7 Century Drive Suite 201 Parsippany, NJ 07054 Sheriff’s Docket: CH 767807 Dated: March 26, 2015; April 2, 9, 16, 2015 ($157.08) (476) (3/27, 4/3, 4/10, 4/17) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F6310409, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 162 GREENWOOD LOOP ROAD Tax Lot and Block No.: LOT: 18 C0162; BLOCK: 1386 Dimensions: APPROXI- MATELY: UNIT NO. G BLDG. 7 Nearest Cross Street: GREEN- WOOD PARK, A CONDOMINI- UM The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 441 CARLISA DR. Tax Lot and Block No.: LOT: 52, 53 & 54; BLOCK: 562 Dimensions: APPROXI- MATELY: 60 X 100 Nearest Cross Street: APPLE- GATE AVE. BEGINNING AT AN IRON REBAR FOUND IN THE SOUTHEASTERLY LINE OF CARLISA DR. (33 FEET WIDE FORMERLY METEDECONK AVENUE) SAID POINT BEING DISTANT 100.00 FEET NORTH- WESTWARDLY FROM A MON- UMENT FOUND AT THE INTERSECTION OF THE NORTHEASTERLY LINE OF APPLEGATE AVENUE (33 FEET WIDE) WITH THE SAID SOUTHEASTERLY LINE OF CARLISA DRIVE AND FROM SAID POINT RUNNING: THENCE The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE PRIOR LIENS/ENCUM- BRANCES: WATER OPEN PLUS PENALTY $1.31 SEWER OPEN PLUS PENALTY $1.50 FOR A TOTAL AS OF DECEMBER 17, 2014 OF $2.81 The amount of the judgment to be satisfied by said sale is the sum of $349,047.26 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. This sale was previously scheduled to be sold on JANU- ARY 11, 2011. On or about that day sale was canceled per attorney for Plaintiff. Sale is now being advertised for 4 consecutive weeks in order to inform the public of the rescheduled date of sale per the attorney for the Plaintiff. Seized as the property of SUSAN DOBROWOLSKI, and taken in execution at the suit of WACHOVIA MORTGAGE, FSB F/K/A WORLD SAVINGS BANK, FSB, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Powers, Kirn, LLC 728 Marne Highway, Suite 200 Moorestown, NJ 08057 Sheriff’s Docket: CH 764574 Dated: March 26, 2015; April 2, 9, 16, 2015 ($147.84) (448) (3/27, 4/3, 4/10, 4/17) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F4490913, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the in execution at the suit of SYL- VAN GLADE CONDOMINIUM ASSOCIATION, INC., D/B/A MAPLE LEAF PARK ASSOCIA- TION, INC., to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff McGovern Legal Services, LLC 850 Route 1 New Brunswick, NJ 08902 Sheriff’s Docket: L 767739 Dated: March 12, 19, 26, 2015; April 2, 2015 ($146.52) (444) (3/13, 3/20, 3/27, 4/3) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F4629908, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 27 TAMANY COURT Tax Lot and Block No.: LOT: 52.01 C0027; BLOCK: 646 Dimensions: APPROXI- MATELY: UNIT 27, BUILDING 3 Nearest Cross Street: VIL- LAGE EAST CONDOMINIUM The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: BRICK TWP - $1,204.54 AS OF 11/07/2014 The amount of the judgment to be satisfied by said sale is the sum of $176,857.78 more or less, plus interest; and in the second place to Defendant Wachovia Mortgage, FSB F/K/A World Savings Bank, FSB the sum of $25,862.55 more or less, plus interest.. Surplus Money: If after the sale and satisfaction of the mort- BRICK, County of Ocean and State of New Jersey. Street and Street No.: 303 SAWMILL ROAD Tax Lot and Block No.: LOT: 10 C086; BLOCK: 1386 Dimensions: APPROXI- MATELY: UNAVAILABLE Nearest Cross Street: UNAVAILABLE The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: BAYVIEW LOAN SERVIC- ING, LLC - $155,000.00 (PRIN- CIPAL AMOUNT) US BANKCUST FOR PRO CAPITAL II, LLC TAX SALE CERTIFICATE - $452.36 BRICK TWP OPEN WATER - $196.37 (OPEN PLUS PENAL- TY) BRICK TWP OPEN SEWER - $326.64 (OPEN PLUS PENAL- TY) TOTAL: $155,975.37 The amount of the judgment to be satisfied by said sale is the sum of $3,407.67 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of LARISSA BASANOW, and taken The amount of the judgment to be satisfied by said sale is the sum of $502,115.11 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of DONALD ZMUDA, ET AL, and taken in execution at the suit of NATIONSTAR MORTGAGE, LLC, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Milstead & Associates, LLC 1 E. Stow Road Marlton, NJ 08053 Sheriff’s Docket: CH 767783 Dated: March 19, 26, 2015; April 2, 9, 2015 ($167.64) (508) (3/20, 3/27, 4/3, 4/10) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, LAW DIVISION Docket No. DJ17441614, will be exposed to sale at public venue on TUES- DAY the 7TH DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F02272613, will be exposed to sale at public venue on TUESDAY the 14TH DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 2413 HOOPER AVENUE Tax Lot and Block No.: LOT: 91; BLOCK: 340 Dimensions: APPROXI- MATELY: .7524 AC Nearest Cross Street: SAILORS QUAY DRIVE The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE THE SALE IS SUBJECT TO ANY UNPAID TAXES AND ASSESSMENTS, TAX, WATER AND SEWER LIENS AND OTHER MUNICIPAL ASSESS- MENTS. THE AMOUNT DUE CAN BE OBTAINED FROM THE LOCAL TAXING AUTHORITY. ALL INTERESTED PARTIES ARE TO CONDUCT AND RELY UPON THEIR OWN INDE- PENDENT INVESTIGATION TO ASCERTAIN WHETHER OR NOT ANY OUTSTANDING INTERESTS REMAIN OF RECORD AND/OR HAVE PRI- ORITY OVER THE LIEN BEING FORECLOSED AND, IF SAL, THE CURRENT AMOUNT DUE THEREON. **IF THE SALE IS SET ASIDE FOR ANY REA- SON, THE PURCHASER AT THE SALE SHALL ONLY BE ENTITLED TO A RETURN OF THE DEPOSIT PAID. THE PUR- CHASER SHALL HAVE NO FURTHER RECOURSE AGAINST THE MORTGAGEE OR THE MORTGAGEE’S ATTORNEY. and cohesive in the final 15 minutes of the game. Junior goalie Ryan Bedle explained the defensive ad- justments, saying, “They [the defense] just needed to slide a little better and they let a couple people shoot on the crease. We quickly fixed that and won the second half.” The defense was alive and the offense was seeing more and more opportunities to at- tack as the third quarter came to close. With a Shore Regional player on the side- line for an illegal body check to the head, Panther Kyler Rossi found the back of the net for the team’s second goal. “The defense has to work,” said Lassen. “I told them it’s not about the offense — it’s defense first. If we can stop them from scoring then we have more opportunities on offense.” This showed even more in the final quarter as Point Boro added three more to their total from three differ- ent players. Getting in on the action were Darian Healy, Matt Youmans and Tom Pick- ering. Although the Blue Devils took the 14-5 victory, the Pan- ther players walked with their heads up and spirits high realizing the potential with which they can com- pete. “I think the second half we did a great job, we just need to figure out how we can compete early on and it’s all about confidence,” said Lassen. “If they get confi- dence we can make some noise here in the Shore Con- ference.” Ceres, who has been work- ing hard in the offseason, is happy about their perform- ance and emphasizes keeping one’s head in the game, say- ing, “You have to keep your head in the game. That’s the biggest thing that any coach or player will stress to you. You got to keep your head in the game no matter what the score is and you have to try hard until the last whistle.” Ceres say he wants to keep that mindset throughout the rest of the season and hopes his team follows suit. Bedle recognizes the strug- gle of being a first-year varsi- ty team and believes it all comes down to practice and preparation. “The first varsity season for the school — it’s going to be the hardest one. It’s only going to get easier as long as you practice during the off- season and at after-school practice, it will only get easi- er,” he said. Lassen and his team keep looking ahead with improve- ment being their number-one priority. “We have 16 more games left,” said Lassen. “I expect us to get better each and every day and that’s all I ask of them.” The Panthers traveled to take on Lacey yesterday in a game occurring too late for this week’s edition of The Ocean Star. Check back next week for full coverage. Point Boro will host Long Branch at Stadium Field on Monday with the faceoff scheduled for 10 a.m. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. Panthers stay positive despite loss OPENER FROM PAGE 36 BY DOMINICK POLLIO THE OCEAN STAR MANCHESTER — Point Boro baseball played their season opener on the road against Manchester Township on Wednesday. The Panthers lost 7-4 after starting offen- sively strong. With one out in the top of the first inning, Will Feehan of Point Boro hit a home run to right field to give the Pan- thers a run to start the game. They did not score anymore in the inning with the last out coming off a fly ball to center off the bat of Jack Fitzsim- mons. Manchester then had their turn on offense and batted in two runs off of a triple and a single. On the mound for Point Boro was Frank Graziano who began the inning with a strikeout and closed the in- ning with a strikeout. In the second inning the Panthers left a player strand- ed on base, not adding any more runs to their total. Meanwhile, in the bottom of the second, Manchester added two more runs to their total with a two-run home run. Graziano struck out two batters in the inning and the Panthers went back to work on offense. With Manchester up 4-1, Point Boro scored a run off of an error by Manchester’s short stop. In the bottom of the third the Panthers’ de- fense held true and kept Manchester scoreless. The next two innings did not go as planned for Boro as they allowed a run in each. A pitching change came in the fourth inning and Michael Falconetti took the mound for Point Boro. Unfortunately, Manchester kept producing hits on of- fense and by the beginning of the sixth inning the Panthers were down 6-2. With the bases loaded and only one out, Feehan hit a sacrifice fly, which was good enough for another run. Sebation Severio then hit a single to center field on a hard grounder, knocking in one more run for Point Boro. Manchester’s pitcher then struck out the next batter, closing the inning with Point Boro down 6-4. Manchester added one run to their total before the Pan- thers had one last chance to take a lead in the seventh and final inning. Fitzsimmons started the inning with an out on a popup to third. Falconet- ti then went down swinging. With a man on first and second, Sean Connor hit a line drive to right field and Manchester managed to snag Quin Hornish, who was try- ing to advance past second on the play. It was the final out and the Panthers took the loss 7-4. Graziano and Falconetti both recorded five strikeouts in the game. Feehan finished with the homer and two RBIs. The baseball team then went on to face Barnegat at home yesterday. The game occurred too late for this is- sue of The Ocean Star. For full coverage, be sure to check out next week’s issue. The Panthers’ next game will be tomorrow at home against Neptune. The game is scheduled to begin at 10.am. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. POINT PLEASANT BOROUGH BASEBALL NOTEBOOK Panthers fall short against Manchester in season opener Will Feehan hit solo home run in his first at bat STEVE WEXLER THE OCEAN STAR KYLER ROSSI COURTESY OF JEFF GUILFOYLE CONGRATS TO POINT SURF! The Point Pleasant Surf fifth-grade boys basketball team fin- ished the fall/winter season in the Mid-Jersey Basketball League [MJBL] with an impressive 16-5 record. The team includes Mathew Martin [top row, from left], Jeffrey Guilfoyle, Colton MacGlashan, Darren Van Pelt, Mitchell Decker [bottom row, from left], Aiden Kirk, Brent Bucchino and Logan Hanrahan. To find out more about Point Pleasant Surf, go to www.pointpleasantsurfaau.wix.com/pointpleas- antsurf.
  • 4.
    WWW.STARNEWSGROUP.COMPAGE 38 THEOCEAN STAR FRIDAY, APRIL 3, 2015 SPORTS **IF THE SALE IS SET ASIDE FOR ANY REASON, THE PURCHASER AT THE SALE SHALL BE ENTITLED ONLY TO A RETURN OF THE DEPOSIT PAID. THE PUR- CHASER SHALL HAVE NO FURTHER RECOURSE AGAINST THE MORTGAGOR, THE MORTGAGEE OR THE MORTGAGEE’S ATTORNEY. The amount of the judgment to be satisfied by said sale is the sum of $192,161.61 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of JOSEPH P. MCGINTY, ET UX, and taken in execution at the suit of WELLS FARGO BANK, N.A., to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Phelan Hallinan & Diamond, PC 400 Fellowship Rd., Suite 100 Mt. Laurel, NJ 08054 Sheriff’s Docket: CH 767779 Dated: March 19, 26, 2015; April 2, 9, 2015 ($170.28) (516) (3/20, 3/27, 4/3, 4/10) The Ocean Star ($179.52) (544) (3/20, 3/27, 4/3, 4/10) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F02652113, will be exposed to sale at public venue on TUESDAY the 14TH DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 479 MONMOUTH AVENUE Tax Lot and Block No.: LOT: 1.01, 2.01-4.01; BLOCK: 570 Dimensions: APPROXI- MATELY: 80.00 FT X 27.00 FT X 80.00 FT X 27.00 FT Nearest Cross Street: LYN- WOOD AVENUE The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE *SUBJECT TO ANY UNPAID TAXES, MUNICIPAL LIENS OR OTHER CHARGES, AND ANY SUCH TAXES, CHARGES, LIENS, INSUR- ANCE PREMIUMS OR OTHER ADVANCES MADE BY PLAIN- TIFF PRIOR TO THIS SALE. ALL INTERESTED PARTIES ARE TO CONDUCT AND RELY UPON THEIR OWN INDE- PENDENT INVESTIGATION TO ASCERTAIN WHETHER OR NOT ANY OUTSTANDING INTEREST REMAIN OF RECORD AND/OR HAVE PRI- ORITY OVER THE LIEN BEING FORECLOSED AND, IF SO THE CURRENT AMOUNT DUE THEREON. BERG AND ACKERMAN, LLC ENCOURAGES AND SUP- PORTS THE EQUAL HOUSING PRACTICES OF THE FAIR HOUSING ACT IN THE CON- DUCT OF ITS BUSINESS.” The amount of the judgment to be satisfied by said sale is the sum of $199,680.45 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of MERVIN E. SMITH, III, ET ALS, and taken in execution at the suit of FEDERAL HOME LOAN MORTGAGE CORPORATION (“FREDDIE MAC”) A CORPO- RATION ORGANIZED AND EXISTING UNDER THE LAWS OF THE UNITED STATES OF AMERICA, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Zucker, Goldberg & Ackerman 200 Sheffield Street P.O. Box 1024 Mountainside, NJ 07092- 0024 Phone: 1-908-233-8500 File #XWZ-150078 Sheriff’s Docket: CH 767762 Dated: March 19, 26, 2015; April 2, 9, 2015 OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F03619713, will be exposed to sale at public venue on TUESDAY the 14TH DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 89 GREENWOOD LOOP ROAD, UNIT 89, BLDG. 25 Tax Lot and Block No.: LOT: 10; BLOCK: 1386 Dimensions: APPROXI- MATELY: CONDOMINIUM Nearest Cross Street: N/A The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE SUBJECT TO ANY OPEN TAXES, WATER/SEWER, MUNICIPAL OR TAX LIENS THAT MAY BE DUE. AT THE TIME OF PUBLICA- TION TAXES/SEWER/WATER INFORMATION WAS NOT AVAILABLE. YOU MUST CHECK WITH THE TAX COL- LECTOR FOR EXACT AMOUNTS DUE. “THE FAIR HOUSING ACT PROHIBITS ANY PREFER- ENCE, LIMITATION, OR DIS- CRIMINATION BECAUSE OF RACE, COLOR, RELIGION, SEX, HANDICAP, FAMILIAL STATUS, OR NATIONAL ORI- GIN, OR INTENTION TO MAKE SUCH PREFERENCE, LIMITATION OR DISCRIMINA- TION IN CONNECTION WITH ANY ASPECT OF A RESIDEN- TIAL REAL ESTATE TRANS- ACTION. ZUCKER, GOLD- ACTION. ZUCKER, GOLD- BERG AND ACKERMAN, LLC ENCOURAGES AND SUP- PORTS THE EQUAL HOUSING PRACTICES OF THE FAIR HOUSING ACT IN THE CON- DUCT OF ITS BUSINESS.” The amount of the judgment to be satisfied by said sale is the sum of $265,616.48 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of PATRICIA O’BRIEN, ET ALS, and taken in execution at the suit of FEDERAL HOME LOAN MORTGAGE CORPORATION, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Zucker, Goldberg & Ackerman 200 Sheffield Street P.O. Box 1024 Mountainside, NJ 07092- 0024 Phone: 1-908-233-8500 File #XWZ-132805 Sheriff’s Docket: CH 767761 Dated: March 19, 26, 2015; April 2, 9, 2015 ($182.16) (552) (3/20, 3/27, 4/3, 4/10) The Ocean Star ___________________________ the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F117710, will be exposed to sale at public venue on TUESDAY the 14TH DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 656 CARROLL FOX ROAD A/K/A 654 CARROLL FOX ROAD Tax Lot and Block No.: LOT: 1, 2 & 8; BLOCK: 973 Dimensions: APPROXI- MATELY: 148 X 73 X 75 X 154 X 50 Nearest Cross Street: CAR- ROLL FOX ROAD AND HAWK’S NEST ROAD The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE SUBJECT TO ANY OPEN TAXES, WATER/SEWER, MUNICIPAL OR TAX LIENS THAT MAY BE DUE. SUBJECT TO ANY OPEN TAXES, WATER/SEWER, MUNICIPAL OR TAX LIENS THAT MAY BE DUE. AT THE TIME OF PUBLI- CATION TAXES/SEWER/ WATER INFORMATION WAS NOT AVAILABLE. YOU MUST CHECK WITH THE TAX COL- LECTOR FOR EXACT AMOUNTS DUE. “THE FAIR HOUSING ACT PROHIBITS ANY PREFER- ENCE, LIMITATION, OR DIS- CRIMINATION BECAUSE OF RACE, COLOR, RELIGION, SEX, HANDICAP, FAMILIAL STATUS, OR NATIONAL ORI- GIN, OR INTENTION TO MAKE SUCH PREFERENCE, LIMITATION OR DISCRIMINA- TION IN CONNECTION WITH ANY ASPECT OF A RESIDEN- TIAL REAL ESTATE TRANS- SALE SHALL BE ENTITLED ONLY TO A RETURN OF THE DEPOSIT PAID. THE PUR- CHASER SHALL HAVE NO FURTHER RECOURSE AGAINST THE MORTGAGOR, THE MORTGAGEE OR THE MORTGAGEE’S ATTORNEY. The amount of the judgment to be satisfied by said sale is the sum of $874,769.02 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of HELENA DEVARIS, ET AL, and taken in execution at the suit of HUDSON CITY SAVINGS BANK, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Phelan Hallinan & Diamond, PC 400 Fellowship Rd., Suite 100 Mt. Laurel, NJ 08054 Sheriff’s Docket: CH 767756 Dated: March 19, 26, 2015; April 2, 9, 2015 ($171.60) (520) (3/20, 3/27, 4/3, 4/10) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F01875813, will be exposed to sale at public venue on TUESDAY the 14TH DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 109 OSPREY LANE Tax Lot and Block No.: LOT: 4.01; BLOCK: 39 Dimensions: APPROXI- MATELY: 64.04 FT X 105.50 FT X 84.92 FT X 88.60 FT X 32.58 FT Nearest Cross Street: NJ STATE HIGHWAY ROUTE 35 The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE *SUBJECT TO ANY UNPAID TAXES, MUNICIPAL LIENS OR OTHER CHARGES, AND ANY SUCH TAXES, CHARGES, LIENS, INSUR- ANCE PREMIUMS OR OTHER ADVANCES MADE BY PLAIN- TIFF PRIOR TO THIS SALE. ALL INTERESTED PARTIES ARE TO CONDUCT AND RELY UPON THEIR OWN INDE- PENDENT INVESTIGATION TO ASCERTAIN WHETHER OR NOT ANY OUTSTANDING INTEREST REMAIN OF RECORD AND/OR HAVE PRI- ORITY OVER THE LIEN BEING FORECLOSED AND, IF SO THE CURRENT AMOUNT DUE THEREON. **IF THE SALE IS SET ASIDE FOR ANY REASON, THE PURCHASER AT THE for this year. “I think over the years we’ve got a lot more chem- istry together,” said Alfonso. “When I started the seniors were a little detached, so over the years we’ve gotten better and we really bonded.” The three girls agreed that this season has potential to be better than last year and the preseason has started them off on the right path. “It’s completely different this year. I think we have a lot of potential for this season,” said Caputo. “Everyone is still learning everything.” “Preseason looks a lot bet- ter. There are a lot of younger kids who can learn to step up and make the plays,” added Blisnuk. “I think having a younger team will benefit us in the future. I think we will have a better season this year.” Alfonso, a catcher by trade, feels that defense is the key to success for this year, saying, “This year I really hope to ob- viously see more wins, im- prove the program, and step up our offense because typi- cally it’s not our strongest point. And then remain sound on defense because we need to make sure our defense is right where we need it to be so that we can come back on offense and come back if we need to and get the spark go- ing.” According to Ferullo, they have the whole infield back, which should benefit them greatly. He has some brand new people in the outfield but the team has been working to be in form for the year. “We’re still working on dif- ferent situations,” explained Ferullo. “Softball is a game of situations and the more situa- tions they see hopefully the better they’re going to get. We just got to get the ball over the plate and keep us in the game.” The players directed a lot of attention to their game during the offseason. Caputo, a pitcher, goes to training once a week and played on a travel team over the summer. Blisnuk, who plays third base, is coming off of her sec- ond anterior cruciate liga- ment [ACL] surgery from an injury she suffered during soccer. “Personally for me I just had my second ACL surgery in August,” explained Blisnuk. “I was actually cleared two weeks ago. I’ve been in physi- cal therapy and doing stuff to get myself back into shape. So I still have to work on that. Certain things are tough for me, so I’ve been doing what I can, but it’s been hard.” While she said it has been hard, Caputo said one can never tell if Blisnuk is having a bad day because she still plays hard and makes her plays. Alfonso also put in offsea- son work to improve the tech- nical skills of her position. “I started private lessons this season for hitting. I also took catching lessons to re- fine my skills for blocking and throw downs and every- thing,” said Alfonso. She also played with a trav- el team and participated in basketball, which is good for conditioning and staying in shape. According to Ferullo, the Panthers will compete against tough teams like Pinelands, Central Regional, Manchester Township and Jackson Liber- ty. The outlook is hopeful and through practice and dili- gence, the team should see positive results this spring season. “I hope that we can really step it up,” stated Alfonso with conviction. “I think that if we really work on refining our skills and getting our skills better — that in game time situations it will show through and we’ll know what to do and when, and hopeful- ly that will result in more wins.” BORO VS MANCHESTER TOWNSHIP The Panther softball team opened up their season on the road Wednesday. They took on Manchester Township, where they lost by a score of 10-0. The Panthers committed six errors early in the game, which put them in a hole. Alfonso had the only two hits of the game for Point Boro. The Manchester offense was swinging strong, includ- ing a two-run home run in the fourth inning. The Panthers could not muster a comeback in the B South matchup. Point Boro then took on Barnegat at home on Thurs- day. The game occurred too late for this edition of The Ocean Star. Check back next week for full coverage. The Panthers’ next game will be on the road against Central Regional on Tuesday April 7. The game is sched- uled to begin at 10 a.m. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. Point Boro gives up 10 runs to Manchester BORO FROM PAGE 35 STEVE WEXLER THE OCEAN STAR AMANDA CAPUTO Gulls were back to work on offense in the top of the second. They added four more runs to their totals before Asbury Park managed the third out. Fiore really want- ed to give pitcher Kevin Donnelly some time on the mound since the preseason was rough for the Gulls due to inclement weather. So Donnelly took the mound for the second, third and fourth innings. “We were trying to get Kevin Donnelly some work today. With the weather this preseason, it’s been kind of rough,” explained Fiore. “We had three scrimmages cancelled so with that and the fact we didn’t get a lot of pitchers to work he’s strug- gling to find the strike zone. We need to get him right for us to get good down the stretch.” Donnelly found his form striking out seven batters in his three innings on the mound. Only one run was allowed in, which came in the bottom of the fourth. “We had great pitching from John and Kevin, and we’re hitting the ball real well,” said Frauenheim. “I’m seeing the ball a lot better this year. I’m just looking for my right pitch and being pa- tient up there.” Frauenheim finished the game with two hits, a single and a double, and two RBIs. At the start of the fifth in- ning the Gulls were up 14-1. Asbury needed to hold them there and get within 10 runs if they were going to keep the game going past five in- nings. The Gulls kept swinging and batted in three more runs before Asbury closed out the inning. On the mound to close out the game for the Garnett Gulls was Chris Russo. He found himself in trouble af- ter walking a couple batters and giving up a hit that led to two runs for Asbury. But Russo settled down, struck out a batter, and let the de- fense secure the other two outs. Since Asbury could not get within 10 runs of Point Beach, the game was called after five innings with the score 17-3 as Point Beach claimed its first win of the season. “This one right here we came out and the guys did a great job of staying focused and locked in all the way through,” Fiore said about the win. “They kept the in- tensity up and we were able to get some of the younger guys in. A lot of the fresh- man kids were able to come off the bench and do some good things, as well. I saw a lot of good stuff.” Frauenheim, who did not see a lot of action out in left field during the win, was proud of how the offense played and how the pitchers threw the baseball. He be- lieves the team will have a lot of success going forward, saying, “If we keep hitting the way we’re hitting, now I feel like we can beat any- body. We just need our pitching to be the same and make no mistakes on de- fense.” Point Beach then faced Keyport at home on yester- day. The game occurred too late for this edition of The Ocean Star. For full cover- age, pick up next week’s is- sue. The Garnet Gulls’ next game will be on the road against St. Rose on Tuesday, April 7. The game is sched- uled to start at 10 a.m. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpollio@theoceanstar.com or 732- 899-7606 Ext 15. Follow him on Twitter @dompollio. Beach looks to improve pitching BEACH FROM PAGE 35 STEVE WEXLER THE OCEAN STAR Kenny MacPherson makes a throw in Point Beach’s 17-3 win over Asbury Park on Wednesday.
  • 5.
    WWW.STARNEWSGROUP.COM FRIDAY, APRIL3, 2015 THE OCEAN STAR PAGE 39SPORTS tion; and BE IT FURTHER ORDAINED, that a certified copy of this ordinance upon adoption, with the recorded vote included thereon, be filed with said Director within 5 days after such adoption. NOTICE NOTICE IS HEREBY GIVEN that the foregoing Ordinance was introduced and passed on first reading at the regu- lar meeting of the Borough Council of the Borough of Point Pleasant Beach, in the County of Ocean, held on the 24th day of March 2015 and will be consid- ered for second reading and final passage at the regular meeting of said governing body to be held on the 21st day of April 2015 at 7:30 P.M. in the Council Chambers of the Borough Hall, 416 New Jersey Avenue, at which time and place any person desiring to be heard will be given an opportunity to be so heard. EILEEN A. FARRELL, RMC Municipal Clerk ($40.26) (122) (4/3) The Ocean Star ___________________________ BOROUGH OF POINT PLEASANT BEACH ZONING BOARD OF ADJUSTMENT NOTICE OF HEARING Take notice that on the 16th day of April 2015 at 7:30pm, a hearing will be held before the Borough of Point Pleasant Beach Board of Adjustment at the Municipal Building located at 416 New Jersey Avenue, Point Pleasant Beach, New Jersey on the appeal or application of the under- signed for a variance or other relief so as to permit 6 foot PVC Fence and Gates on premises located at 111 New Jersey Avenue, Point Pleasant Beach, NJ 08742 and des- ignated as Block 48 and Lot(s) 6 on the Borough of Point Pleasant Beach Tax map. The applicant reserves the right to seek any other waiver or variance relief as deter- mined to be necessary by the Board or its staff prior to or during the public hearing. The application, sealed survey and plans are on file in the Municipal Building located at 416 New Jersey Avenue in Point Pleasant Beach and are available for inspection 10 days prior to hearing between the hours of 9am and 4pm. Any interested party may appear at said hearing and partici- pate therein in accordance with the rules of the Zoning Board of Adjustment. 111 NEW JERSEY AVENUE LLC c/o MICHAEL J. BAL- MANN Applicant ($14.85) (45) (4/3) The Ocean Star AUTHORIZING THE BOR- OUGH TO ESTABLISH A CAP BANK WHEREAS, the Local Government Cap Law, N.J.S.A. 40A:4-45.1 et.seq., provides that in the preparation of its annual budget, a municipality shall limit any increase in said budget up to 1.5% unless authorized by ordi- nance to increase it to 3.5% over the previous year’s final appropri- ations, subject to certain excep- tions; and, WHEREAS, N.J.S.A. 40A:4- 45.15a provides that a municipali- ty may, when authorized by ordi- nance, appropriate the difference between the amount of its actual final appropriation and the 3.5% rate as an exception to its final appropriations in either of the next two succeeding years; and, WHEREAS, the Borough Council of the Borough of Point Pleasant Beach, in the County of Ocean, finds it advisable and nec- essary to increase its CY2015 budget by up to 3.5% over the pre- vious year’s final appropriations, in the interest of promoting the health, safety and welfare of the citizens; and WHEREAS, the Borough Council hereby determines that a 2.0% increase in the budget for said year, amounting to $212,522.34 in excess of the increase in final appropriations otherwise permitted by the Local Government Cap Law, is advisable and necessary; and WHEREAS, the Borough Council hereby determines that any amount authorized herein- above that is not appropriated as part of the final budget shall be retained as an exception to final appropriation in either of the next two succeeding years; NOW THEREFORE BE IT ORDAINED, by the Borough Council of the Borough of Point Pleasant Beach, in the County of Ocean, a majority of the full authorized membership of this governing body affirmatively con- curring that, in the CY2015 budg- et year, the final appropriations of the Borough of Point Pleasant Beach shall, in accordance with this ordinance and N.J.S.A. 40A:4-45.14, be increased by 2.0% amounting to $212,522.34, and that the CY2015 municipal budget for the Borough of Point Pleasant Beach be approved and adopted in accordance with this ordinance; and BE IT FURTHER ORDAINED, that any amount authorized hereinabove that is not appropriated as part of the final budget shall be retained as an exception to final appropriation in either of the next two succeeding years; and BE IT FURTHER ORDAINED, that a certified copy of this ordinance as introduced be filed with the Director of the Division of Local Government Services within 5 days of introduc- PRIOR LIENS OF AFFI- DAVIT: BRICK TWP. HOLDS A CLAIM FOR TAXES DUE AND/OR OTHER MUNICIPAL UTILITIES SUCH AS WATER AND/OR SEWER IN THE AMOUNT OF $1234.53 AS OF 2/1/2015 BRICK TWP. MUA HOLDS A CLAIM FOR TAXES DUE AND/OR OTHER MUNICIPAL UTILITIES SUCH AS WATER AND/OR SEWER IN THE AMOUNT OF $123.12 AS OF 10/14/2014 The amount of the judgment to be satisfied by said sale is the sum of $231,756.65 more or less, plus interest; and in the second place to Defendant Wells Fargo Bank, N.A. the sum of $46,959.80 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of KIM MARIE SESTA-MARINO, ETC., ET AL, and taken in execution at the suit of WELLS FARGO BANK, N.A., to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Powers Kirn, LLC 728 Marne Highway, Suite 200 Moorestown, NJ 08057 Sheriff’s Docket: CH 767809 Dated: March 26, 2015; April 2, 9, 16, 2015 ($149.16) (452) (3/27, 4/3, 4/10, 4/17) The Ocean Star ___________________________ BOROUGH OF POINT PLEASANT BEACH BOROUGH COUNCIL ORDINANCE 2015-05 AN ORDINANCE OF THE BOROUGH OF POINT PLEASANT BEACH, OCEAN COUNTY, NEW JERSEY Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of MICHAEL J. VANNOTE, ETC., ET ALS, and taken in execution at the suit of CP-SRMOF II 2012-A TRUST, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Milstead & Associates, LLC 1 E. Stow Road Marlton, NJ 08053 Sheriff’s Docket: CH 767817 Dated: March 26, 2015; April 2, 9, 16, 2015 ($167.64) (508) (3/27, 4/3, 4/10, 4/17) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F1237110, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 252 VERMONT DRIVE Tax Lot and Block No.: LOT: 18; BLOCK: 383.19 Dimensions: APPROXI- MATELY: 1430 SQ FT Nearest Cross Street: ESSEX DRIVE The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F00704614, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 16 DIVI- SION STREET Tax Lot and Block No.: LOT: 28; BLOCK: 856 Dimensions: APPROXI- MATELY: .1463 AC Nearest Cross Street: WALLIS COURT The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE THE SALE IS SUBJECT TO UNPAID TAXES AND ASSESS- MENTS, TAX, WATER AND SEWER LIENS AND OTHER MUNICIPAL ASSESSMENTS. THE AMOUNT DUE CAN BE OBTAINED FROM THE LOCAL TAXING AUTHORITY. ALL INTERESTED PARTIES ARE TO CONDUCT AND RELY UPON THEIR OWN INDE- PENDENT INVESTIGATION TO ASCERTAIN WHETHER OR NOT ANY OUTSTANDING INTEREST REMAIN OF RECORD AND/OR HAVE PRI- ORITY OVER THE LIEN BEING FORECLOSED AND, IF SO THE CURRENT AMOUNT DUE THEREON. **IF THE SALE IS SET ASIDE FOR ANY REASON, THE PURCHASER AT THE SALE SHALL BE ENTITLED ONLY TO A RETURN OF THE DEPOSIT PAID. THE PUR- CHASER SHALL HAVE NO FURTHER RECOURSE AGAINST THE MORTGAGEE OR THE MORTGAGEE’S ATTORNEY. The amount of the judgment to be satisfied by said sale is the sum of $226,547.39 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court UNPAID TAXES AND ASSESS- MENTS, TAX, WATER AND SEWER LIENS AND OTHER MUNICIPAL ASSESSMENTS. THE AMOUNT DUE CAN BE OBTAINED FROM THE LOCAL TAXING AUTHORITY. ALL INTERESTED PARTIES ARE TO CONDUCT AND RELY UPON THEIR OWN INDE- PENDENT INVESTIGATION TO ASCERTAIN WHETHER OR NOT ANY OUTSTANDING INTEREST REMAIN OF RECORD AND/OR HAVE PRI- ORITY OVER THE LIEN BEING FORECLOSED AND, IF SO THE CURRENT AMOUNT DUE THEREON. **IF THE SALE IS SET ASIDE FOR ANY REASON, THE PURCHASER AT THE SALE SHALL BE ENTITLED ONLY TO A RETURN OF THE DEPOSIT PAID. THE PUR- CHASER SHALL HAVE NO FURTHER RECOURSE AGAINST THE MORTGAGEE OR THE MORTGAGEE’S ATTORNEY. The amount of the judgment to be satisfied by said sale is the sum of $297,610.02 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of EDWARD W. DAMON, ET UX, and taken in execution at the suit of SRMOF 2009-1 TRUST, to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Milstead & Associates, LLC 1 E. Stow Road Marlton, NJ 08053 Sheriff’s Docket: CH 767816 Dated: March 26, 2015; April 2, 9, 16, 2015 ($167.64) (508) (3/27, 4/3, 4/10, 4/17) The Ocean Star order directing payment of the sur- plus money. The Sheriff or other person conducting the sale will have information regarding the surplus, if any. May be subject to an Ordinance by the Ocean County Board of Health: 87-01, Section 10. The Sheriff’s Department will require notification of the certifi- cation of the wells where applica- ble. The Sheriff shall deduct his fees, costs and commissions of sale from the total amount bid at the sale. A 20% deposit (cash or certi- fied funds) is required from the Successful Bidder at the time of sale. Seized as the property of DENISE GUZZARDO, ET ALS, and taken in execution at the suit of BANK OF AMERICA, N.A., to be sold by Michael G. Mastronardy, Sheriff. This sale is subject to post- ponement without further notice. Attorneys for Plaintiff Stern, Lavinthal & Frankenberg, LLC 105 Eisenhower Parkway Suite 302 Roseland, NJ 07068 Sheriff’s Docket: CH 767810 Dated: March 26, 2015; April 2, 9, 16, 2015 ($161.04) (488) (3/27, 4/3, 4/10, 4/17) The Ocean Star ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F02418113, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the TOWNSHIP OF BRICK, County of Ocean and State of New Jersey. Street and Street No.: 223 CIR- CLE DRIVE Tax Lot and Block No.: LOT: 28; BLOCK: 323 Dimensions: APPROXI- MATELY: 100 X 279 Nearest Cross Street: CHER- RY QUAY ROAD The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: NONE THE SALE IS SUBJECT TO ___________________________ OCEAN COUNTY SHERIFF’S SALE By virtue of the above stated writ, to me directed, issued out of the SUPERIOR COURT OF NEW JERSEY, CHANCERY DIVI- SION Docket No. F03369613, will be exposed to sale at public venue on TUESDAY the 21ST DAY OF APRIL, A.D. 2015 between the hours of 12 o’clock and 5 o’clock (at 2 o’clock) Prevailing Time in the afternoon of said day at the Office of the Sheriff, Toms River, Township of Toms River, County of Ocean, New Jersey. All that tract or parcel of land and premises, situate, lying and being in the BOROUGH OF POINT PLEASANT, County of Ocean and State of New Jersey. Street and Street No.: 233 JAEHNEL PARKWAY Tax Lot and Block No.: LOT: 18; BLOCK: 14 Dimensions: APPROXI- MATELY: 50 FEET WIDE BY 100 FEET LONG Nearest Cross Street: HER- BERTSVILLE ROAD The above description does not constitute a full legal description, said description is filed at the Office of the Sheriff, 120 Hooper Avenue, Toms River, NJ. THE SHERIFF HEREBY RESERVES THE RIGHT TO ADJOURN THIS SALE WITH- OUT FURTHER NOTICE BY PUBLICATION. PRIOR LIENS OF AFFI- DAVIT: SUBJECT TO PAST DUE BALANCE AS OF 12/01/2014 IN THE AMOUNT OF $0.37 FOR UNPAID WATER AND SEWER. SUBJECT TO ANY UNPAID TAXES, MUNICIPAL LIENS OR OTHER CHARGES, AND ANY SUCH TAXES, CHARGES, LIENS, INSURANCE PREMI- UMS OR OTHER ADVANCES MADE BY PLAINTIFF PRIOR TO THIS SALE. ALL INTER- ESTED PARTIES ARE TO CON- DUCT AND RELY UPON THEIR OWN INDEPENDENT INVESTIGATION TO ASCER- TAIN WHETHER OR NOT ANY OUTSTANDING INTEREST REMAIN OF RECORD AND/OR HAVE PRIORITY OVER THE LIEN BEING FORECLOSED AND, IF SO THE CURRENT AMOUNT DUE THEREON. The amount of the judgment to be satisfied by said sale is the sum of $292,394.15 more or less, plus interest. Surplus Money: If after the sale and satisfaction of the mort- gage debt, including costs and expenses, there remains any sur- plus money, the money will be deposited into the Superior Court Trust Fund and any person claim- ing the surplus, or any part thereof, may file a motion pursuant to Court Rules 4:64-3 and 4:57-2 stating the nature and extent of that person’s claim and asking for an before Asbury Park managed the third out. Freshman Kylee Kells took the mound for Point Beach and performed like she was a seasoned veteran. She struck out the first batter on five pitches and then struck out the second batter on three pitches. Kells hit some trou- ble walking the next two bat- ters and giving up a single that resulted in a run for As- bury. She quickly got back on track and retired the next bat- ter in three pitches. Up 7-1 the Gulls got back to work on offense in the top of the second inning. It looked to be a quick one as second baseman Sam Kelly grounded out followed by Alex Barnes lining out to third. Point Beach put it behind them loading the bases with the next three batters. Erinne Regan then hit a fly ball that dropped in center field bring- ing home two more runs for the Gulls. They then batted in three more runs off of a sin- gle and a double before hit- ting a fly ball for the third out. Kells went back to the mound for the bottom of the second inning. She struck out the three batters she faced, only throwing three balls in the process. In the third inning the girls added nine more runs to their total for a score of 21-1. Kells came out again for the Gulls, retiring the first batter on a fly ball to center, then striking out the next two on eight pitches. The best inning for Point Beach was the fourth and fi- nal inning where they batted through the order almost twice, putting up 12 more runs. The only outs came off of base runners leaving their base too early. With the score at 33-1 in fa- vor of Point Beach the mercy rule was in effect and Kells and the Garnet Gull defense had to get three outs and the game would be over. In a per- fect inning, the freshman threw nine pitches for nine strikes and the final three outs of the game. Head coach Silvio De- Cristifano was more than im- pressed with his pitcher’s performance. “A good thing is how my freshman pitcher pitched,” said DeCristofano after the game. “Kylee Kells did a nice job and then we all just set- tled down.” As the score indicates, the Gulls’ offense was on point and they really stayed consis- tent with their hitting throughout the game. “Our strengths — definite- ly our bats,” said Russell. “Definitely I think we play- when we all work together we play hard together. I think that’s a huge strong point.” The win was a great way to open the season but there are still small things that De- Cristofano hopes to improve on as the season continues. “We’re still rusty,” he said. “Plays that are automatics were a little rusty today.” Last season Point Beach finished with an overall record of 9-9 and are really looking to improve that record this year. They compete in the B Central division with tough opponents like Mater Dei, St. Rose, and Henry Hudson. “Last year we had a lot of injuries. It was an up and down year but we did finish strong, I thought,” explained DeCristofano. “And now we’re pretty settled. We have four seniors, we have a lot of juniors and this freshman pitcher who throws really nice.” During the offseason the players have been working on their game, always looking for ways to improve. “Some girls play year round. A lot of girls are hit- ting all year long. I think this is the most ready we’ve been for a start to the season,” said DeCristofano. “Even though we didn’t have the preseason we liked, the girls are ready to play. “I think we’re starting to fi- nally fill in those positions that some people haven’t re- ally played or practiced this past year,” explained Russell. “We’re working to just get ready for the season. We’re a little rusty with our bats but we’re doing pretty well with that.” Russell has been hitting year round and working on her arm strength to make harder and faster throws from her short stop position. Russell says a goal she has for the team this season is to beat Mater Dei in both games they play with them this year. She also feels the area that needs the most improvement for the team is communica- tion, saying, “We could work on communication — talking and position wise. Who has the ball and who covers where. If we talk, we have it all together.” The softball team has a positive outlook for this spring season and definitely started off strong with the impressive win over Asbury Park. The Garnet Gulls went on to face Keyport at home on Thursday. The game oc- curred too late for this edi- tion of The Ocean Star. Be sure to read next week’s issue for full coverage. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. Gulls hope to build off win GULLS FROM PAGE 35 STEVE WEXLER THE OCEAN STAR Shortstop Alexa Russell covers the base as an Asbury Park player advances. Point Beach held Asbury to only one run in the season opening win. BY DOMINICK POLLIO THE OCEAN STAR MIDDLETOWN — Point Beach boys tennis opened up their season Wednesday on the road against Mater Dei. The Gulls took the win 3-2. In first singles, Gerrard Giordano defeated his oppo- nent in two sets, 6-1 and 6-0. Second singles player Trevor Hinds also won in two sets, 6-1 and 6-0. Rob Lissenden lost the third singles match to his op- ponent in two sets by a score of 6-2 and 6-2. The Gulls were able to se- cure the win in first doubles play. The duo of Miles Mancini and Steven Dyson beat their opponents in two sets. They won the first set 6- 2 and the second set 6-1. Point Beach dropped their second doubles match in two sets, but it was not enough for Mater Dei to take a win. The Garnet Gulls’ next match will be on April 13 at home against Ranney. The match is scheduled for a 4 p.m. start. POINT BORO VS LAKEWOOD Point Boro boys tennis opened up their season against Lakewood yesterday on the road. The game oc- curred too late for this edi- tion of The Ocean Star. Read next week’s edition for full coverage. The Panthers next match is away against Jackson Liberty on Monday April 6. The match is scheduled to start at 10 a.m. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. Giordano, Hinds secure early wins in singles play for Point Beach Garnet Gulls top their competition POINT BEACH 3 TENNIS MATER DEI 2
  • 6.
    WWW.STARNEWSGROUP.COMPAGE 40 THEOCEAN STAR FRIDAY, APRIL 3, 2015 SPORTS Opening day of trout sea- son begins this Saturday at 8 a.m. for all New Jersey waters across the state. For trout season this year the Division of Fish and Wildlife is stocking some 570,000 rainbow trout across the state throughout the spring, with 200,000 in the water and ready to be hooked on opening day. “Trout fish- ing in New Jersey is as strong as ever,” said Richard Boornazian, Department of Environment Protection [DEP] Assistant Commissioner for Natural and Historic Resources. “Our lakes and streams are being stocked with lots of healthy rainbows, ready to be hooked and help make fond memo- ries.” “Opening day of trout season is one of the most anticipated days on the cal- endar for outdoors lovers, connecting families and friends in the enjoyment of our state’s natural resources and splendid scenery,” added Division of Fish and Wildlife Director David Chanda. This year all designated trout waters are being stocked exclusively with rainbow trout. The Pequest Hatchery is shifting to more intensive production of rain- bow trout, which is resistant to furunculosis, a disease common in cold water fish species that impacted brown and brook trout reared at the Warren County hatchery. This issue limited stocking in some of New Jersey’s trout waters last year. Daily bag limits for rain- bow trout are April 4 to May 31, six trout measuring at least nine inches and from June 1 to December 31, four trout measuring at least nine inches. To fish for trout a valid annual New Jersey fish- ing license and trout stamp are both required for resi- dents at least 16 years old and less than 70 years of age, plus all non-residents 16 years and older. Fees are Resident fish- ing license ages 16 to 64 years $22.50, Sr. Resident Fishing ages 65 to 69 years $12.50, Resident Trout Stamp $10.50, Non-Resident Fishing ages 16 and up $34.00, Non-Resident Trout Stamp $20. During the season the Manasquan, Metedeconk, and Toms rivers will be stocked on Mondays April 6, 13, 20, 27, May 4, 11, and 18. Fishing will be closed from 5 a.m. until 5 p.m. on these in season stocking dates. Spring Lake will be stocked three times during the season by the state but not closed to fish- ing. Mac’s Pond will also be stocked but just for opening day. The trout stocking hot- line is 609-633-6765. On Saturday you can also look forward to the Shark River Surf Anglers Kid’s Trout Contest starting at 8 a.m. at Spring Lake. This is the largest kid’s trout fishing contest anywhere in the state. It is open to anyone 15 years old and younger. Greg Hueth, the SRSA President and Trout Committee Chairman said, “This year’s contest is scheduled for opening day from 8 a.m. to 1:30 p.m. and it is offered free of charge to all children ages 15 and under. Great prizes will be a huge part of the day, as we award a sensational Grand Prize to an overall winner, and first, second and third place prizes to individ- ual winners in each of four different age categories. We are especially pleased that each and every contestant will go home a winner, as we present all participants with a “thank you” prize package that typically contains $40 worth of goods and gear. On Saturday, we will have several large tents on the north side of the lake to serve as contest headquarters. Our club members will be gath- ered there to answer any questions, provide fishing guidance and instruction, and supply bait and tackle to anyone that needs it. And that’s not all. Certainly a great day of outdoor family fun isn’t complete without food, right? Thanks to gra- cious donations by our spon- sors, we are able to offer free hot chocolate, donuts, bagels, hot dogs, chips, juice, ice cream and soda to partici- pants throughout the day. We hope you will consider supporting us as we promote this entertaining and healthy family oriented outdoor activity. With your continued support we expect another fun day of fishing, food, and family. For donations checks can be made payable to “SRSA Children’s Trout Tournament” and mailed to Gregory Hueth, 2167 Gregory Place, Sea Girt, NJ 08750. Your contributions are greatly appreciated. Thank you in advance and we look forward to seeing you with your family and friends down at the lake on Saturday, best regards, Greg Hueth”. Jeff Merrill of the IGFA has announced, “The International Game Fish Association’s New Jersey Representatives are pleased to announce their 18th Annual Fund Raising Banquet and Auction will be held on Friday, April 17 at 7 p.m. at Doolan’s Restaurant located on Route 71 in Spring Lake Heights. Hosted by New Jersey representatives Bill Feinberg, David Matagiese, Rich Keller, Jeff Merrill and Gene Nigro, pro- ceeds from the evening will benefit IGFA’s Junior Angler and Conservation Programs. Reservations are limited to the first 225 people and can be made by sending a check for $75 for each person drawn to IGFA and sent to: IGFA Banquet, c/o Jeff Merrill, 918 Houston St., South Plainfield, NJ 07080. For further infor- mation contact Jeff Merrill at 908-451-1110 or via e-mail at jeffmerrill2@verizon.net. Bob over at Fishermen’s Den in Belmar reports “I have yet to see the first win- ter flounder. Most years we see flounder by now and years past when the season opened March 1st anglers caught double digits. This might be the week with the warmer forecast. I have had no reports of stripers yet but we are waiting for any sign of life. We will have a complete supply of live bait for trout coming this week and trout lures, rods, and reels.” Captain Ryan of the Jamaica II out of Brielle reports “We are catching some codfish every trip, everybody went home with some meat this past week- end, nothing thrilling but something to fish for at least. Some guys are catching two, three or four keepers some trips with pool winners rang- ing from eight to 20+ lbs. Recent pool winners were Carl Weigand from Philadelphia with four cod up to 14 pounds and six ling, Ezra Cloister from Trenton with 12 cod with four keepers to 10 pounds and eight ling. We are sailing the usual schedule: 12 hour departing 5 a.m. every Wednesday, Saturday and Sunday except Easter weekend, only Friday and Saturday, there is no trip Easter Sunday. Jim Freda covers fishing for Star News Group. He can be emailed at jimfre- da@optonline.net. FISHING TIPS BY JIM FREDA Trout season begins Saturday TIP OF THE WEEK FROM JIM FREDA You can buy your NJ trout license online at www.njfis- handwildlife.com/als/web- salesintro.htm. BY DOMINICK POLLIO THE OCEAN STAR POINT PLEASANT BEACH — Clemson University girls track has run back to its spot atop the Atlantic Coast Con- ference [ACC]. In February the team won the ACC In- door Championship at Vir- ginia Tech. This is their fifth title in six years and sixth overall. Clem- son placed first ahead of Florida State in second and Notre Dame in third. More recently, Point Beach graduate Brianna Feerst placed third in the seeded mile at the Shamrock Invita- tional in Myrtle Beach at Coastal Carolina University. She finished with a time of 4:59.85. She also ran the 4x800 me- ter relay and clocked in with a time of 2:15. At the Crimson Tide Invi- tational, Feerst ran in the 1500, where she finished with a time of 4:36.34 — good enough for sixth place. All three of her times were personal bests for the junior. “In high school I ran five flat,” said Feerst about break- ing the five-minute mark in the mile. “It was really awe- some because it made me feel good individually and helped the team.” Feerst was also proud the Tiger team took the ACC In- door championship after not winning it last year, saying, “This year coming back with the win felt awesome. Last year was kind of disappoint- ing since we had been doing so well previous years so it was good to come back and compete and win.” According to Feerst, she has been training really hard, training as a team, and taking care of her body. All of this hard work attributed to her being able to produce per- sonal bests and she has no plans to stop improving. Feerst graduated from Point Pleasant Beach High School in 2012. As a Garnet Gull she won 17 state champi- onships, competing in cross country, indoor track and outdoor track. In addition, she was a three-year captain and third-team all-state for cross country in 2010 and 2011. Also, she was an Ocean County cross country cham- pion in 2010. The Clemson girls team will compete this weekend at the Florida Relays in Gainesville. Feerst will com- pete in the steeplechase, an event that she ranks fourth in for Clemson history. Feerst explained that last year she could not compete in the event due to a stress fracture in her foot, so she is excited about competing this year. VERGARI PLAYING STRONG FOR PENN STATE ALTOONA The Penn State Altoona men’s tennis team is also do- ing well in part to a Point Beach graduate. Tony Vergari helped the Nittany Lions to their second straight win on Wednesday March 25. They faced non- conference opponent Saint Vincent College and came away with an 8-1 victory. Vergari, along with doubles partner Adam Cook, won the second doubles match 8-6. Then in the no. 6 singles match Vergari rounded out the Altoona win 6-3 and 6-2. As a team, the Altoona team lost their first match of this season but have won four straight since then. They hold a 4-1 record and are 2-1 in the Allegheny Mountain Collegiate Confer- ence. In high school Vergari was a four-year varsity tennis let- ter winner and a member of the 2009 team that won the B Central title and the Central Jersey Group I crown. Vergari is currently a jun- ior and is majoring in verte- brate physiology. The Altoona squad will take on Mount Aloysius Col- lege on Tuesday April 7. Dominick Pollio covers sports for The Ocean Star. He can be reached at dpol- lio@theoceanstar.com or 732-899- 7606 Ext 15. Follow him on Twitter @dompollio. COLLEGE NOTEBOOK Feerst records three personal bests at Clemson University Brianna Feerst of Point Beach broke the five minute mark in the mile BRIANNA FEERST TONY VERGARI