  1. 1. GREENE & BRADFORD, INC. 3501 Constitution Drive Springfield, IL 62711 (P) (217) 793-8844 (F) (217) 793-6227 www.greeneandbradford.com Village of Sherman Drainage and Hydraulic Study
  2. 2. <ul><li>This presentation will cover: </li></ul>OUTLINE <ul><ul><li>A Description Of Sherman’s Drainage Network </li></ul></ul><ul><ul><li>An Overview Of Sherman’s Areas Of Concern </li></ul></ul><ul><ul><li>Solution Alternatives For Each Problem Area </li></ul></ul><ul><ul><li>A List Of Priorities For Alleviating Flooding At Each Problem Area </li></ul></ul><ul><ul><li>Additional Recommendations </li></ul></ul>
  3. 3. SHERMAN’S DRAINAGE Quail Ridge Flaggland Lynndale North Haven Villa West Villa East Red Bud Georgetowne Oaks Steeplechase Old Tipton School Rd. I 55 Sangamon River Andrew Rd. UP Railroad
  4. 4. AREAS OF CONCERN Quail Ridge UP Railroad North Haven Red Bud Georgetowne Oaks Flaggland Park Meredith Dr. A B C D
  5. 5. MEREDITH DR. AT THE UNION PACIFIC RAILROAD & GEORGETOWNE OAKS Union Pacific RR 6’ x 4’ Arch Culvert Under UP RR 12’ x 8’ Box Culvert Meredith Dr. Private Bridge Georgetowne Rd Culvert Bus. 55 Culvert
  6. 6. RED BUD & NORTH HAVEN Old Tipton School Rd. Culvert Stardust Dr. Channel 6’ x 6’ Box Culvert Under Bus. 55 6’ x 4’ Arch Culvert Under UP RR
  7. 7. FLAGGLAND PARK Flaggland Lake AG Field Old Tipton School Rd. Andrew Rd. 2 1 5 4 3 Upper Flaggland Lake
  8. 8. FLAGGLAND PARK (small network) AG Field Flaggland Lake Phase 1: Re-grade Ditch Phase 2: Divert Ag Runoff Disconnect Existing Pipe 2 1
  9. 9. FLAGGLAND PARK (large network) Flaggland Lake Upper Flaggland Lake Phase 3: Lower Culvert Phase 4: Replace Existing Pipe With Larger Pipe Phase 3: Break Network In Two Halves 5 4 3 Phase 5: Replace Existing Pipe With Larger Pipe
  10. 10. QUAIL RIDGE 6’ x 4’ Arch Culvert Under UP RR Quail Ridge Park Union Pacific RR First St.
  11. 11. <ul><li>The Village of Sherman needs to: </li></ul><ul><ul><li>Update the Village Ordinances. </li></ul></ul><ul><ul><li>Hire an ordinance enforcer. </li></ul></ul>ADDITIONAL RECOMMENDATIONS
  12. 12. EXAMPLE (DAYCARE CENTER) Triple 60 inch Culverts Triple 60 inch Culverts Daycare Center
  13. 13. RECOMMENDATION PRIORITY
  14. 14. GREENE & BRADFORD, INC. 3501 Constitution Drive Springfield, IL 62711 (P) (217) 793-8844 (F) (217) 793-6227 www.greeneandbradford.com Conclusion

×