Completed Project Summary


                                      Annex A – Project Summary

          Project: IT Infrastructure Solution of DSE (Dhaka Stock
          Exchange) Trading application “MSA Plus” for Banco
          Securities Ltd.

           Name of Client:                                        Country/ Location:
           Banco Securities Limited                               Bangladesh/Dhaka

           Approximate Value of Services: BDT 2,600,000.

                                                                  Start Date:                    Completion Date:
           Duration of Assignments: 30 Days
                                                                  14/09/2010                     21/10/2010

           No of Staff: 10                                        No of Person per Days: 300
                                                                  Eng. K.A.Sheikh – Project Director
           Name of Senior Staff (Project Director,                (Infrastructure)
           System Administrator):                                 Md. Shahajahan Sagor –System Engineer
                                                                  KBM Abdullah Chisti – Assist System Engineer
           Name of Associated Consultants (If Any):
                                                                  Staff provided by Consultants:
           Spectrum Engineering Consortium Ltd
           Technology Used:
                   Data Center: Tier 4.
                   SCS: TIA/EIA - 568B, UTP CAT 6. Product – Panduit.
                   Routing & Switching: Layer 2, Layer 3, MLS, VLAN, Ethernet Switching, OSPF protocol. Product – Cisco 2911
                   Router, Cisco catalyst 2960, Dell Power-Connect 2808.
                   Firewall: Firewall, VPN. Product – Check-Point CPSB – 1000N – U.
                   Rack Console KVM: Aten CL 5708.
                   Server: Dell Power-Edge R710.
                   Platform/ OS: W2K8, RHEL 5.0.
                   Web-Server: Apache Tomcat 6.0.
                   Application & DB Server: JBoss 4.0.4 with RC1 & JDK 1.6. MySQL 5.1.
                   Internet Security Service: Kaspersky Business Space Security (10 User Pack) 2011.
                   Electrical power backup: AEC.

           Scope of Work:
                   Data Center architecture.
                   Structure of the Cabling System (SCS).
                   Network infrastructure.
                   JBoss 4.0.4 application server with RC1 and JDK 1.6 and MySQL 5.1 Database server.
                   Apache Tomcat 6.0 web server.
                   Kaspersky Internet security services.
                   Centralized electrical power backup system.
                   Workstation terminal.


           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable



           Official Reference:
           Mr. Shafiul Azam
           Director, Banco Securities Limited
           Cell # +8801917702700
           E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com




                                                                                                                               1
Completed Project Summary

          Logical Infrastructure layout:




          Physical Infrastructure layout:




                                            2
Completed Project Summary


          Project:  Planning,   designing,    implementing                                                        and
          maintaining Olam IT Infrastructure.

           Name of Client:                                       Country/ Location:
           Olam International Ltd                                Russia/Moscow

           Approximate Value of Services: USD 100,000.

                                                                 Start Date:                   Completion Date:
           Duration of Assignments: 55 Days
                                                                 15/01/2007                    30/03/2007

           No of Staff: 12                                       No of Person per Days: 660
                                                                 Ramesh Kumar PVP – Project Director
           Name of Senior Staff (Project Director,               Engr K A Sheikh – System Engineer &
           System Engineer and Administrator):                   Infrastructure Architect
                                                                 Aleksander Zakharov – System Administrator
           Name of Associated Consultants (If Any):              Staff provided by Consultants:

           Technology Used:
                   Server Operating System: MS Windows 2003 Server, RHEL 3.0.
                   Router and Switch: Cisco 2950, 3550, D-Link.
                   Servers and Service: DNS, DHCP, RRAS, DC, AD DS, Terminal Server, Proxy Server (Static & Transparent),
                   Configure VLAN (Static), Access List (Standard & Extended), MS SQL Server, Antivirus Server (NOD32),
                   routing protocol OSPF, Backup Esex 11d.
                   SCS: WAN, MAN and LAN cabling system.

           Scope of Work:
                   Designing, Planning, Implementing and maintaining Structure of the Cabling system
                   (SCS) of the LAN and WAN systems.
                   Planning, Implementing, managing and maintaining of Router, Switches and Access point.
                   Planning, Implementing, managing and maintaining of Cisco switches and routers
                   including the 2950, 3550, 3750, series platforms.
                   Planning, Implementing, Configuring, managing and maintaining of Layer 2 and Layer 3
                   switching, including MLS, VLAN, Ethernet LAN Switching, static routing and Dynamic
                   routing protocols (RIP, IGRP, EIGRP, OSPF and BGP).
                   Planning, Implementing, managing and maintaining of a multi-platform environment
                   which includes Microsoft Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver.
                   Designing, Planning, Implementing and maintaining Backup Exec 11d Server.
                   Implementing and maintaining Datacenter.
                   Designing, Planning, Implementing and maintaining Rack mount server and workstation.
                   Designing, Planning, Implementing and maintaining MS SQL server 2005.
                   Installing, configuring, administering bank client system on BSGV-sossce.
                   Designing, Planning, Implementing and maintaining Antivirus Server (ESET Nod32).
                   Planning, Implementing and maintaining Electrical Power Backup system.


           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable


           Official Reference:
           Mr. Ramesh Kumar PVP
           IT Manager, Olam International Ltd
           mail # rameshkumarpvp@yahoo.com
           cell # +7-906-7793822




                                                                                                                            3
Completed Project Summary




              Physical Infrastructure layout:



                                                                          Singapore Office
                                                    T1

                POP



                MDF
                                          Catalyst 3508   Catalyst 3508




                IDF
                      Catalyst 2950G-48                    Catalyst 2950G-48



                       T1
                       1000 BASE-SX
                       100 BASE-TX


             Logical Infrastructure layout:




                                                                                             4
Completed Project Summary


          Project: Intranet Data connectivity solution for Banco
          Securities Ltd

           Name of Client:                                        Country/ Location:
           Banco Securities Limited                               Bangladesh/Dhaka

           Approximate Value of Services: BDT 360,000.

                                                                  Start Date:                    Completion Date:
           Duration of Assignments: 20 Days
                                                                  14/09/2010                     21/10/2010

           No of Staff: 10                                        No of Person per Days: 200
                                                                  Eng. K.A.Sheikh – Project Director
                                                                  (Infrastructure)
           Name of Senior Staff (Project Director,
                                                                  Md. Shahajahan Sagor –Sr. System Engineer
           System Administrator):
                                                                  Md Kabir Hosen – System Engineer
                                                                  Md Rokunuzzaman Opu – Network Engineer
           Name of Associated Consultants (If Any):
           Telnet Communication Ltd, XNET, BTS, Link3,            Staff provided by Consultants:
           Solution, DDN.

           Technology Used:
                   SCS: TIA/EIA - 568B, UTP CAT 6. WAN, MAN, LAN methodology. Product – Panduit.
                   Routing & Switching: Layer 2, Layer 3, MLS, VLAN, Ethernet Switching, OSPF protocol. Product – Cisco 2911
                   Router, Cisco catalyst 2960, Dell Power-Connect 2808.
                   Firewall: Firewall, VPN. Product – Check-Point CPSB – 1000N – U.

           Scope of Work:
                   1024 kbps up and 1024 kbps down data bandwidth between Banco Securities                      corporate
                   office and CDBL office through Telnet Communication Ltd.
                   1024 kbps up and 1024 kbps down data bandwidth between Banco Securities                      corporate
                   office and CDBL office through XNET.
                   1024 kbps up and 1024 kbps down data bandwidth between Banco Securities                      corporate
                   office and Banco Gulshan branch office through BTS.
                   1024 kbps up and 1024 kbps down data bandwidth between Banco Securities                      corporate
                   office and Banco Gulshan branch office through Link3.
                   1024 kbps up and 1024 kbps down data bandwidth between Banco Securities                      corporate
                   office and Banco Palton branch office through Solution.
                   128 kbps up and 128 kbps down data bandwidth between Banco Securities                        corporate
                   office and Banco Al-Hamra Shopping City, Sylhet branch office through BTS.
                   128 kbps up and 128 kbps down data bandwidth between Banco Securities                        corporate
                   office and Banco R N Tower, Sylhet branch office through BTS.
                   128 kbps up and 128 kbps down data bandwidth between Banco Securities                        corporate
                   office and Banco Sreemongol branch office through BTS.
                   128 kbps up and 128 kbps down data bandwidth between Banco Securities                        corporate
                   office and Banco Moulovibazar branch office through DDN.

           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable



           Official Reference:
           Mr. Shafiul Azam
           Director, Banco Securities Limited
           Cell # +8801917702700
           E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com




                                                                                                                               5
Completed Project Summary




                            6
Completed Project Summary


          Project: Gulshan Branch office IT IS for Banco Securities
          Ltd

           Name of Client:                                       Country/ Location:
           Banco Securities Limited                              Bangladesh/Dhaka

           Approximate Value of Services: BDT 2,200,000.

                                                                 Start Date:                   Completion Date:
           Duration of Assignments: 60 Days
                                                                 14/09/2010                    21/10/2010

           No of Staff: 10                                       No of Person per Days: 180
                                                                 Eng. K.A.Sheikh – Project Director
           Name of Senior Staff (Project Director,               (Infrastructure)
           System Administrator):                                Md. Shahajahan Sagor –System Engineer
                                                                 KBM Abdullah Chisti – Assist System Engineer
           Name of Associated Consultants (If Any):
                                                                 Staff provided by Consultants:
           Spectrum Engineering Consortium Ltd

           Technology Used:
                   Operating System: MS Windows 2008 Server, RHEL 5.0
                   Router and Switch: Cisco 2960, Linksys, D-Link.
                   Servers and Service: DNS, DHCP, RRAS, DC, AD DS, Terminal Server, Proxy Server (Static & Transparent),
                   VPN through Link3 & BTS, Antivirus Server (Kaspersky Business Space Security).
                   SCS: WAN, MAN and LAN cabling system.
                   Terminal & Workstation: WXP, W7.




           Scope of Work:
                   Develop project plan, provide hands on training, project monitoring and control, and
                   manage human resource,
                   Designing and Planning Structure of the Cabling system (SCS) of the LAN and WAN
                   systems.
                   Planning, and managing of Router, Switches and Access point.
                   Planning and managing of a multi-platform environment which includes Microsoft
                   Windows 2008 for AD DS, DNS, DHCP, GPO, Fileserver, Terminal server, RRAS.
                   Planning and managing of Proxy server on RHEL 5.0 (Static and Transparent).
                   Implementing and maintaining Datacenter.
                   Designing and Planning Rack mount server and workstation.
                   Designing and Planning Antivirus Server (Kaspersky Business Space Security).
                   Planning Electrical Power Backup system.




           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable



           Official Reference:
           Mr. Shafiul Azam
           Director, Banco Securities Limited
           Cell # +8801917702700
           E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com




                                                                                                                            7
Completed Project Summary



           Project: Optimize                       workstations                  for       Bishwa            Sahitya
           Kendra (BSK).

           Name of Client:                                         Country/ Location:
           Bishwa Sahitya Kendra                                   Bangladesh/Dhaka

           Approximate Value of Services: BDT 520,000.

                                                                   Start Date:                    Completion Date:
           Duration of Assignments: 10 Days
                                                                   02/08/2010                     05/08/2010

           No of Staff: 03                                         No of Person per Days: 30
                                                                   Engr K A Sheikh – Project Director
           Name of Senior Staff (Project Director,
                                                                   (Infrastructure)
           System Administrator):
                                                                   Md. Shahajahan Sagor –System Engineer

           Name of Associated Consultants (If Any):
                                                                   Staff provided by Consultants:
           Spectrum Engineering Consortium Ltd



           Technology Used:
                   Operating System: MS Windows 2003 Server.
                   Router and Switch: Linksys, D-Link.
                   SCS: WAN, MAN and LAN cabling system.




           Scope of Work:
                   Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
                   systems.
                   Planning, Implementing, managing and maintaining of Print server..
                   Planning, Implementing and maintaining Electrical Power Backup system.




           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable


           Official Reference:
           Mr. Monir
           Coordinator, Bishwa Sahitya Kendra
           Cell # +88001713456077




                                                                                                                                8
Completed Project Summary


           Project: Implementing network and power system of
           IIDFC.

           Name of Client:
                                                                    Country/ Location:
           Industrial and Infrastructure Development Finance
                                                                    Bangladesh/Dhaka
           Company (IIDFC) Limited

           Approximate Value of Services: BDT 370,000.

                                                                    Start Date:                    Completion Date:
           Duration of Assignments: 10 Days
                                                                    08/06/2010                     19/06/2010

           No of Staff: 03                                          No of Person per Days: 30
                                                                    Engr K A Sheikh – Project Director
           Name of Senior Staff (Project Director,
                                                                    (Infrastructure)
           System Administrator):
                                                                    Md. Shahajahan Sagor –System Engineer

           Name of Associated Consultants (If Any):
                                                                    Staff provided by Consultants:
           Spectrum Engineering Consortium Ltd



           Technology Used:
                    Operating System: MS Windows 2003 Server.
                    Router and Switch: Linksys, D-Link.
                    SCS: WAN, MAN and LAN cabling system.




           Scope of Work:
                    Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
                    systems.
                    Planning, Implementing, managing and maintaining of Print server..
                    Planning, Implementing and maintaining Electrical Power Backup system.




           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable


           Official Reference:
           Mr. Hasan
           IT Manager, IIDFC Ltd
           Cell # +8801716334852
           E-mail: hasan@iidfc.com URL: www.iidfc.com




                                                                                                                                 9
Completed Project Summary


           Project: IT Infrastructure and Networking services for
           Swan Group

           Name of Client:                                         Country/ Location:
           Swan Group                                              Bangladesh/Dhaka

           Approximate Value of Services: BDT 370,000.

                                                                   Start Date:                    Completion Date:
           Duration of Assignments: 10 Days
                                                                   10/08/2010                     16/08/2010

           No of Staff: 03                                         No of Person per Days: 30
                                                                   Engr K A Sheikh – Project Director
           Name of Senior Staff (Project Director,
                                                                   (Infrastructure)
           System Administrator):
                                                                   Md. Shahajahan Sagor –System Engineer

           Name of Associated Consultants (If Any):
                                                                   Staff provided by Consultants:
           Spectrum Engineering Consortium Ltd



           Technology Used:
                   Operating System: MS Windows 2003 Server.
                   Router and Switch: Linksys, D-Link.
                   SCS: WAN, MAN and LAN cabling system.




           Scope of Work:
                   Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
                   systems.
                   Planning, Implementing, managing and maintaining of Router, Switches and Access point.
                   Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft
                   Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver, RRAS.
                   Designing, Planning, Implementing and maintaining Exec 11d Backup server.
                   Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE).




           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable


           Official Reference:
           Mr. Ismail Tareen khan
           Director, Swan group
           Cell # +8801713452717




                                                                                                                                10
Completed Project Summary


          Project: Planning, designing and implementing security
          and file sharing system of Luke Studio.


           Name of Client:                                         Country/ Location:
           Luke studio Ltd                                         Bangladesh/Dhaka

           Approximate Value of Services: BDT 175,000.

                                                                   Start Date:                    Completion Date:
           Duration of Assignments: 06 Days
                                                                   28/01/2010                     07/02/2010

           No of Staff: 02                                         No of Person per Days: 12
                                                                   Eng. K.A.Sheikh – Project Director
           Name of Senior Staff (Project Director,                 (Infrastructure)
           System Administrator):                                  Md. Shahajahan Sagor –System Engineer


           Name of Associated Consultants (If Any):
                                                                   Staff provided by Consultants:


           Technology Used:
                   Operating System: MS Windows 2003 Server.
                   Router and Switch: D-Link.
                   Servers and Service: DNS, DHCP, RRAS, DC, AD DS, VPN.
                   SCS: WAN and LAN cabling system.




           Scope of Work:
                   Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
                   systems.
                   Planning, Implementing, managing and maintaining of Router, Switches and Access point.
                   Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft
                   Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver, RRAS.
                   Developing rack mount network system.
                   Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE).




           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable


           Official Reference:
           Mr. MD Seahan
           Managing Director, Luke studio Ltd
           Cell # +8801713009800




                                                                                                                                11
Completed Project Summary


          Project: Implementing Network system of Pacific Group.


           Name of Client:                                         Country/ Location:
           Pacific Group                                           Bangladesh/Dhaka

           Approximate Value of Services: BDT 305,000.

                                                                   Start Date:                    Completion Date:
           Duration of Assignments: 04 Days
                                                                   19/06/2010                     23/06/2010

           No of Staff: 02                                         No of Person per Days: 08
                                                                   Eng. K.A.Sheikh – Project Director
           Name of Senior Staff (Project Director,                 (Infrastructure)
           System Administrator):                                  Md. Shahajahan Sagor –System Engineer


           Name of Associated Consultants (If Any):
                                                                   Staff provided by Consultants:



           Technology Used:
                   Router and Switch: DLink.
                   Servers and Service: DNS, DHCP, RRAS, Antivirus Server (ESET NOD32).
                   SCS: LAN cabling system.




           Scope of Work:
                   Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
                   systems.
                   Planning, Implementing, managing and maintaining of Router, Switches and Access point.
                   Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE).
                   Planning, Implementing and maintaining Electrical Power Backup system.




           Detailed Description of Actual Services Provided by Your Staff:
           Design, plan, implement, manage & Maintenance of the above mentioned deliverable


           Official Reference:
           Mr. Syed Shan –A- Sarwar Azad
           General Manager, Pacific Group
           Cell # +8801713452913
           E-mail: sssazad@pacificgroupbd.com URL: www.pacificgroup-bd.com




                                                                                                                                12

More Related Content

What's hot

The Java EE 7 Platform: Developing for the Cloud
The Java EE 7 Platform: Developing for the CloudThe Java EE 7 Platform: Developing for the Cloud
The Java EE 7 Platform: Developing for the CloudArun Gupta
 
Siebel Enterprise Data Quality for Siebel
Siebel Enterprise Data Quality for SiebelSiebel Enterprise Data Quality for Siebel
Siebel Enterprise Data Quality for SiebelJeroen Burgers
 
Effective Usage of SQL Server 2005 Database Mirroring
Effective Usage of SQL Server 2005 Database MirroringEffective Usage of SQL Server 2005 Database Mirroring
Effective Usage of SQL Server 2005 Database Mirroringwebhostingguy
 
The Native NDB Engine for Memcached
The Native NDB Engine for MemcachedThe Native NDB Engine for Memcached
The Native NDB Engine for MemcachedJohn David Duncan
 
Java ee 7 platform developing for the cloud kshitiz saxena
Java ee 7 platform developing for the cloud   kshitiz saxenaJava ee 7 platform developing for the cloud   kshitiz saxena
Java ee 7 platform developing for the cloud kshitiz saxenaIndicThreads
 
Jfokus 2012 : The Java EE 7 Platform: Developing for the Cloud
Jfokus 2012 : The Java EE 7 Platform: Developing for the CloudJfokus 2012 : The Java EE 7 Platform: Developing for the Cloud
Jfokus 2012 : The Java EE 7 Platform: Developing for the CloudArun Gupta
 
PaaSing a Java EE 6 Application at Geecon 2012
PaaSing a Java EE 6 Application at Geecon 2012PaaSing a Java EE 6 Application at Geecon 2012
PaaSing a Java EE 6 Application at Geecon 2012Arun Gupta
 
2009 Q2 WSO2 Technical Update
2009 Q2 WSO2 Technical Update2009 Q2 WSO2 Technical Update
2009 Q2 WSO2 Technical UpdateWSO2
 
TDC 2011: OSGi-enabled Java EE Application
TDC 2011: OSGi-enabled Java EE ApplicationTDC 2011: OSGi-enabled Java EE Application
TDC 2011: OSGi-enabled Java EE ApplicationArun Gupta
 
Java EE Technical Keynote at JavaOne Latin America 2011
Java EE Technical Keynote at JavaOne Latin America 2011Java EE Technical Keynote at JavaOne Latin America 2011
Java EE Technical Keynote at JavaOne Latin America 2011Arun Gupta
 
Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011
Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011
Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011Arun Gupta
 
Shared Personalization Service - How To Scale to 15K RPS, Patrice Pelland
Shared Personalization Service - How To Scale to 15K RPS, Patrice PellandShared Personalization Service - How To Scale to 15K RPS, Patrice Pelland
Shared Personalization Service - How To Scale to 15K RPS, Patrice PellandFuenteovejuna
 
2011 04-dsi-javaee-in-the-cloud-andreadis
2011 04-dsi-javaee-in-the-cloud-andreadis2011 04-dsi-javaee-in-the-cloud-andreadis
2011 04-dsi-javaee-in-the-cloud-andreadisdandre
 
WebLogic Diagnostic Framework Dr. Frank Munz / munz & more WLS11g
WebLogic Diagnostic Framework  Dr. Frank Munz / munz & more WLS11gWebLogic Diagnostic Framework  Dr. Frank Munz / munz & more WLS11g
WebLogic Diagnostic Framework Dr. Frank Munz / munz & more WLS11gInSync Conference
 
Interoperable Provisioning in a distributed world
Interoperable Provisioning in a distributed worldInteroperable Provisioning in a distributed world
Interoperable Provisioning in a distributed worldRamesh Nagappan
 
Windows Server 2008 R2 Overview 1225768142880746 9
Windows Server 2008 R2 Overview 1225768142880746 9Windows Server 2008 R2 Overview 1225768142880746 9
Windows Server 2008 R2 Overview 1225768142880746 9Stephan - Gabriel Georgescu
 
CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...
CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...
CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...ServiceVirtualization.Com
 
Lync 2010 High Availability
Lync 2010 High AvailabilityLync 2010 High Availability
Lync 2010 High AvailabilityHarold Wong
 

What's hot (19)

The Java EE 7 Platform: Developing for the Cloud
The Java EE 7 Platform: Developing for the CloudThe Java EE 7 Platform: Developing for the Cloud
The Java EE 7 Platform: Developing for the Cloud
 
Siebel Enterprise Data Quality for Siebel
Siebel Enterprise Data Quality for SiebelSiebel Enterprise Data Quality for Siebel
Siebel Enterprise Data Quality for Siebel
 
Effective Usage of SQL Server 2005 Database Mirroring
Effective Usage of SQL Server 2005 Database MirroringEffective Usage of SQL Server 2005 Database Mirroring
Effective Usage of SQL Server 2005 Database Mirroring
 
The Native NDB Engine for Memcached
The Native NDB Engine for MemcachedThe Native NDB Engine for Memcached
The Native NDB Engine for Memcached
 
Java ee 7 platform developing for the cloud kshitiz saxena
Java ee 7 platform developing for the cloud   kshitiz saxenaJava ee 7 platform developing for the cloud   kshitiz saxena
Java ee 7 platform developing for the cloud kshitiz saxena
 
Jfokus 2012 : The Java EE 7 Platform: Developing for the Cloud
Jfokus 2012 : The Java EE 7 Platform: Developing for the CloudJfokus 2012 : The Java EE 7 Platform: Developing for the Cloud
Jfokus 2012 : The Java EE 7 Platform: Developing for the Cloud
 
PaaSing a Java EE 6 Application at Geecon 2012
PaaSing a Java EE 6 Application at Geecon 2012PaaSing a Java EE 6 Application at Geecon 2012
PaaSing a Java EE 6 Application at Geecon 2012
 
2009 Q2 WSO2 Technical Update
2009 Q2 WSO2 Technical Update2009 Q2 WSO2 Technical Update
2009 Q2 WSO2 Technical Update
 
TDC 2011: OSGi-enabled Java EE Application
TDC 2011: OSGi-enabled Java EE ApplicationTDC 2011: OSGi-enabled Java EE Application
TDC 2011: OSGi-enabled Java EE Application
 
Java EE Technical Keynote at JavaOne Latin America 2011
Java EE Technical Keynote at JavaOne Latin America 2011Java EE Technical Keynote at JavaOne Latin America 2011
Java EE Technical Keynote at JavaOne Latin America 2011
 
Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011
Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011
Java EE / GlassFish Strategy & Roadmap @ JavaOne 2011
 
Shared Personalization Service - How To Scale to 15K RPS, Patrice Pelland
Shared Personalization Service - How To Scale to 15K RPS, Patrice PellandShared Personalization Service - How To Scale to 15K RPS, Patrice Pelland
Shared Personalization Service - How To Scale to 15K RPS, Patrice Pelland
 
2011 04-dsi-javaee-in-the-cloud-andreadis
2011 04-dsi-javaee-in-the-cloud-andreadis2011 04-dsi-javaee-in-the-cloud-andreadis
2011 04-dsi-javaee-in-the-cloud-andreadis
 
WebLogic Diagnostic Framework Dr. Frank Munz / munz & more WLS11g
WebLogic Diagnostic Framework  Dr. Frank Munz / munz & more WLS11gWebLogic Diagnostic Framework  Dr. Frank Munz / munz & more WLS11g
WebLogic Diagnostic Framework Dr. Frank Munz / munz & more WLS11g
 
Interoperable Provisioning in a distributed world
Interoperable Provisioning in a distributed worldInteroperable Provisioning in a distributed world
Interoperable Provisioning in a distributed world
 
Windows Server 2008 R2 Overview 1225768142880746 9
Windows Server 2008 R2 Overview 1225768142880746 9Windows Server 2008 R2 Overview 1225768142880746 9
Windows Server 2008 R2 Overview 1225768142880746 9
 
Server 2008 R2 Yeniliklər
Server 2008 R2 YeniliklərServer 2008 R2 Yeniliklər
Server 2008 R2 Yeniliklər
 
CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...
CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...
CA John Michelsen - Oracle OpenWorld 2012 - "ServiceVirtualization Reality is...
 
Lync 2010 High Availability
Lync 2010 High AvailabilityLync 2010 High Availability
Lync 2010 High Availability
 

Similar to Annex A Project Summary

Similar to Annex A Project Summary (20)

Ravi
RaviRavi
Ravi
 
Netwrok Engineer
     Netwrok Engineer      Netwrok Engineer
Netwrok Engineer
 
Netwrok Engineer
Netwrok EngineerNetwrok Engineer
Netwrok Engineer
 
Database As A Service: OEM + ODA (OOW 15 Presentation)
Database As A Service: OEM + ODA (OOW 15 Presentation)Database As A Service: OEM + ODA (OOW 15 Presentation)
Database As A Service: OEM + ODA (OOW 15 Presentation)
 
Mohammad Bannob Resume
Mohammad Bannob ResumeMohammad Bannob Resume
Mohammad Bannob Resume
 
Amiya das cv
Amiya das cvAmiya das cv
Amiya das cv
 
AMIYA DAS CV
AMIYA DAS CVAMIYA DAS CV
AMIYA DAS CV
 
Sambit kumar nayak resume
Sambit kumar nayak resumeSambit kumar nayak resume
Sambit kumar nayak resume
 
Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)Md Sohrab Khan(Resume)
Md Sohrab Khan(Resume)
 
ITT CNS Capstone Project
ITT CNS Capstone ProjectITT CNS Capstone Project
ITT CNS Capstone Project
 
Suraj Kumar A.S._22.12.15
Suraj Kumar A.S._22.12.15  Suraj Kumar A.S._22.12.15
Suraj Kumar A.S._22.12.15
 
Abdul ghafoor
Abdul ghafoorAbdul ghafoor
Abdul ghafoor
 
dheerj singh
dheerj singhdheerj singh
dheerj singh
 
Harish Resume
Harish ResumeHarish Resume
Harish Resume
 
Network Engineer (Switching & Routing)
Network Engineer (Switching & Routing)Network Engineer (Switching & Routing)
Network Engineer (Switching & Routing)
 
Consolidated Gulf Company
Consolidated Gulf CompanyConsolidated Gulf Company
Consolidated Gulf Company
 
Roy
RoyRoy
Roy
 
Sunil Resume
Sunil ResumeSunil Resume
Sunil Resume
 
shabeer_kuniyil
shabeer_kuniyilshabeer_kuniyil
shabeer_kuniyil
 
Resume
ResumeResume
Resume
 

Annex A Project Summary

  • 1. Completed Project Summary Annex A – Project Summary Project: IT Infrastructure Solution of DSE (Dhaka Stock Exchange) Trading application “MSA Plus” for Banco Securities Ltd. Name of Client: Country/ Location: Banco Securities Limited Bangladesh/Dhaka Approximate Value of Services: BDT 2,600,000. Start Date: Completion Date: Duration of Assignments: 30 Days 14/09/2010 21/10/2010 No of Staff: 10 No of Person per Days: 300 Eng. K.A.Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer KBM Abdullah Chisti – Assist System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Spectrum Engineering Consortium Ltd Technology Used: Data Center: Tier 4. SCS: TIA/EIA - 568B, UTP CAT 6. Product – Panduit. Routing & Switching: Layer 2, Layer 3, MLS, VLAN, Ethernet Switching, OSPF protocol. Product – Cisco 2911 Router, Cisco catalyst 2960, Dell Power-Connect 2808. Firewall: Firewall, VPN. Product – Check-Point CPSB – 1000N – U. Rack Console KVM: Aten CL 5708. Server: Dell Power-Edge R710. Platform/ OS: W2K8, RHEL 5.0. Web-Server: Apache Tomcat 6.0. Application & DB Server: JBoss 4.0.4 with RC1 & JDK 1.6. MySQL 5.1. Internet Security Service: Kaspersky Business Space Security (10 User Pack) 2011. Electrical power backup: AEC. Scope of Work: Data Center architecture. Structure of the Cabling System (SCS). Network infrastructure. JBoss 4.0.4 application server with RC1 and JDK 1.6 and MySQL 5.1 Database server. Apache Tomcat 6.0 web server. Kaspersky Internet security services. Centralized electrical power backup system. Workstation terminal. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Shafiul Azam Director, Banco Securities Limited Cell # +8801917702700 E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com 1
  • 2. Completed Project Summary Logical Infrastructure layout: Physical Infrastructure layout: 2
  • 3. Completed Project Summary Project: Planning, designing, implementing and maintaining Olam IT Infrastructure. Name of Client: Country/ Location: Olam International Ltd Russia/Moscow Approximate Value of Services: USD 100,000. Start Date: Completion Date: Duration of Assignments: 55 Days 15/01/2007 30/03/2007 No of Staff: 12 No of Person per Days: 660 Ramesh Kumar PVP – Project Director Name of Senior Staff (Project Director, Engr K A Sheikh – System Engineer & System Engineer and Administrator): Infrastructure Architect Aleksander Zakharov – System Administrator Name of Associated Consultants (If Any): Staff provided by Consultants: Technology Used: Server Operating System: MS Windows 2003 Server, RHEL 3.0. Router and Switch: Cisco 2950, 3550, D-Link. Servers and Service: DNS, DHCP, RRAS, DC, AD DS, Terminal Server, Proxy Server (Static & Transparent), Configure VLAN (Static), Access List (Standard & Extended), MS SQL Server, Antivirus Server (NOD32), routing protocol OSPF, Backup Esex 11d. SCS: WAN, MAN and LAN cabling system. Scope of Work: Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, Implementing, managing and maintaining of Router, Switches and Access point. Planning, Implementing, managing and maintaining of Cisco switches and routers including the 2950, 3550, 3750, series platforms. Planning, Implementing, Configuring, managing and maintaining of Layer 2 and Layer 3 switching, including MLS, VLAN, Ethernet LAN Switching, static routing and Dynamic routing protocols (RIP, IGRP, EIGRP, OSPF and BGP). Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver. Designing, Planning, Implementing and maintaining Backup Exec 11d Server. Implementing and maintaining Datacenter. Designing, Planning, Implementing and maintaining Rack mount server and workstation. Designing, Planning, Implementing and maintaining MS SQL server 2005. Installing, configuring, administering bank client system on BSGV-sossce. Designing, Planning, Implementing and maintaining Antivirus Server (ESET Nod32). Planning, Implementing and maintaining Electrical Power Backup system. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Ramesh Kumar PVP IT Manager, Olam International Ltd mail # rameshkumarpvp@yahoo.com cell # +7-906-7793822 3
  • 4. Completed Project Summary Physical Infrastructure layout: Singapore Office T1 POP MDF Catalyst 3508 Catalyst 3508 IDF Catalyst 2950G-48 Catalyst 2950G-48 T1 1000 BASE-SX 100 BASE-TX Logical Infrastructure layout: 4
  • 5. Completed Project Summary Project: Intranet Data connectivity solution for Banco Securities Ltd Name of Client: Country/ Location: Banco Securities Limited Bangladesh/Dhaka Approximate Value of Services: BDT 360,000. Start Date: Completion Date: Duration of Assignments: 20 Days 14/09/2010 21/10/2010 No of Staff: 10 No of Person per Days: 200 Eng. K.A.Sheikh – Project Director (Infrastructure) Name of Senior Staff (Project Director, Md. Shahajahan Sagor –Sr. System Engineer System Administrator): Md Kabir Hosen – System Engineer Md Rokunuzzaman Opu – Network Engineer Name of Associated Consultants (If Any): Telnet Communication Ltd, XNET, BTS, Link3, Staff provided by Consultants: Solution, DDN. Technology Used: SCS: TIA/EIA - 568B, UTP CAT 6. WAN, MAN, LAN methodology. Product – Panduit. Routing & Switching: Layer 2, Layer 3, MLS, VLAN, Ethernet Switching, OSPF protocol. Product – Cisco 2911 Router, Cisco catalyst 2960, Dell Power-Connect 2808. Firewall: Firewall, VPN. Product – Check-Point CPSB – 1000N – U. Scope of Work: 1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate office and CDBL office through Telnet Communication Ltd. 1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate office and CDBL office through XNET. 1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate office and Banco Gulshan branch office through BTS. 1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate office and Banco Gulshan branch office through Link3. 1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate office and Banco Palton branch office through Solution. 128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate office and Banco Al-Hamra Shopping City, Sylhet branch office through BTS. 128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate office and Banco R N Tower, Sylhet branch office through BTS. 128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate office and Banco Sreemongol branch office through BTS. 128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate office and Banco Moulovibazar branch office through DDN. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Shafiul Azam Director, Banco Securities Limited Cell # +8801917702700 E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com 5
  • 7. Completed Project Summary Project: Gulshan Branch office IT IS for Banco Securities Ltd Name of Client: Country/ Location: Banco Securities Limited Bangladesh/Dhaka Approximate Value of Services: BDT 2,200,000. Start Date: Completion Date: Duration of Assignments: 60 Days 14/09/2010 21/10/2010 No of Staff: 10 No of Person per Days: 180 Eng. K.A.Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer KBM Abdullah Chisti – Assist System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Spectrum Engineering Consortium Ltd Technology Used: Operating System: MS Windows 2008 Server, RHEL 5.0 Router and Switch: Cisco 2960, Linksys, D-Link. Servers and Service: DNS, DHCP, RRAS, DC, AD DS, Terminal Server, Proxy Server (Static & Transparent), VPN through Link3 & BTS, Antivirus Server (Kaspersky Business Space Security). SCS: WAN, MAN and LAN cabling system. Terminal & Workstation: WXP, W7. Scope of Work: Develop project plan, provide hands on training, project monitoring and control, and manage human resource, Designing and Planning Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, and managing of Router, Switches and Access point. Planning and managing of a multi-platform environment which includes Microsoft Windows 2008 for AD DS, DNS, DHCP, GPO, Fileserver, Terminal server, RRAS. Planning and managing of Proxy server on RHEL 5.0 (Static and Transparent). Implementing and maintaining Datacenter. Designing and Planning Rack mount server and workstation. Designing and Planning Antivirus Server (Kaspersky Business Space Security). Planning Electrical Power Backup system. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Shafiul Azam Director, Banco Securities Limited Cell # +8801917702700 E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com 7
  • 8. Completed Project Summary Project: Optimize workstations for Bishwa Sahitya Kendra (BSK). Name of Client: Country/ Location: Bishwa Sahitya Kendra Bangladesh/Dhaka Approximate Value of Services: BDT 520,000. Start Date: Completion Date: Duration of Assignments: 10 Days 02/08/2010 05/08/2010 No of Staff: 03 No of Person per Days: 30 Engr K A Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Spectrum Engineering Consortium Ltd Technology Used: Operating System: MS Windows 2003 Server. Router and Switch: Linksys, D-Link. SCS: WAN, MAN and LAN cabling system. Scope of Work: Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, Implementing, managing and maintaining of Print server.. Planning, Implementing and maintaining Electrical Power Backup system. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Monir Coordinator, Bishwa Sahitya Kendra Cell # +88001713456077 8
  • 9. Completed Project Summary Project: Implementing network and power system of IIDFC. Name of Client: Country/ Location: Industrial and Infrastructure Development Finance Bangladesh/Dhaka Company (IIDFC) Limited Approximate Value of Services: BDT 370,000. Start Date: Completion Date: Duration of Assignments: 10 Days 08/06/2010 19/06/2010 No of Staff: 03 No of Person per Days: 30 Engr K A Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Spectrum Engineering Consortium Ltd Technology Used: Operating System: MS Windows 2003 Server. Router and Switch: Linksys, D-Link. SCS: WAN, MAN and LAN cabling system. Scope of Work: Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, Implementing, managing and maintaining of Print server.. Planning, Implementing and maintaining Electrical Power Backup system. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Hasan IT Manager, IIDFC Ltd Cell # +8801716334852 E-mail: hasan@iidfc.com URL: www.iidfc.com 9
  • 10. Completed Project Summary Project: IT Infrastructure and Networking services for Swan Group Name of Client: Country/ Location: Swan Group Bangladesh/Dhaka Approximate Value of Services: BDT 370,000. Start Date: Completion Date: Duration of Assignments: 10 Days 10/08/2010 16/08/2010 No of Staff: 03 No of Person per Days: 30 Engr K A Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Spectrum Engineering Consortium Ltd Technology Used: Operating System: MS Windows 2003 Server. Router and Switch: Linksys, D-Link. SCS: WAN, MAN and LAN cabling system. Scope of Work: Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, Implementing, managing and maintaining of Router, Switches and Access point. Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver, RRAS. Designing, Planning, Implementing and maintaining Exec 11d Backup server. Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE). Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Ismail Tareen khan Director, Swan group Cell # +8801713452717 10
  • 11. Completed Project Summary Project: Planning, designing and implementing security and file sharing system of Luke Studio. Name of Client: Country/ Location: Luke studio Ltd Bangladesh/Dhaka Approximate Value of Services: BDT 175,000. Start Date: Completion Date: Duration of Assignments: 06 Days 28/01/2010 07/02/2010 No of Staff: 02 No of Person per Days: 12 Eng. K.A.Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Technology Used: Operating System: MS Windows 2003 Server. Router and Switch: D-Link. Servers and Service: DNS, DHCP, RRAS, DC, AD DS, VPN. SCS: WAN and LAN cabling system. Scope of Work: Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, Implementing, managing and maintaining of Router, Switches and Access point. Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver, RRAS. Developing rack mount network system. Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE). Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. MD Seahan Managing Director, Luke studio Ltd Cell # +8801713009800 11
  • 12. Completed Project Summary Project: Implementing Network system of Pacific Group. Name of Client: Country/ Location: Pacific Group Bangladesh/Dhaka Approximate Value of Services: BDT 305,000. Start Date: Completion Date: Duration of Assignments: 04 Days 19/06/2010 23/06/2010 No of Staff: 02 No of Person per Days: 08 Eng. K.A.Sheikh – Project Director Name of Senior Staff (Project Director, (Infrastructure) System Administrator): Md. Shahajahan Sagor –System Engineer Name of Associated Consultants (If Any): Staff provided by Consultants: Technology Used: Router and Switch: DLink. Servers and Service: DNS, DHCP, RRAS, Antivirus Server (ESET NOD32). SCS: LAN cabling system. Scope of Work: Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN systems. Planning, Implementing, managing and maintaining of Router, Switches and Access point. Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE). Planning, Implementing and maintaining Electrical Power Backup system. Detailed Description of Actual Services Provided by Your Staff: Design, plan, implement, manage & Maintenance of the above mentioned deliverable Official Reference: Mr. Syed Shan –A- Sarwar Azad General Manager, Pacific Group Cell # +8801713452913 E-mail: sssazad@pacificgroupbd.com URL: www.pacificgroup-bd.com 12