1. Completed Project Summary
Annex A – Project Summary
Project: IT Infrastructure Solution of DSE (Dhaka Stock
Exchange) Trading application “MSA Plus” for Banco
Securities Ltd.
Name of Client: Country/ Location:
Banco Securities Limited Bangladesh/Dhaka
Approximate Value of Services: BDT 2,600,000.
Start Date: Completion Date:
Duration of Assignments: 30 Days
14/09/2010 21/10/2010
No of Staff: 10 No of Person per Days: 300
Eng. K.A.Sheikh – Project Director
Name of Senior Staff (Project Director, (Infrastructure)
System Administrator): Md. Shahajahan Sagor –System Engineer
KBM Abdullah Chisti – Assist System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Spectrum Engineering Consortium Ltd
Technology Used:
Data Center: Tier 4.
SCS: TIA/EIA - 568B, UTP CAT 6. Product – Panduit.
Routing & Switching: Layer 2, Layer 3, MLS, VLAN, Ethernet Switching, OSPF protocol. Product – Cisco 2911
Router, Cisco catalyst 2960, Dell Power-Connect 2808.
Firewall: Firewall, VPN. Product – Check-Point CPSB – 1000N – U.
Rack Console KVM: Aten CL 5708.
Server: Dell Power-Edge R710.
Platform/ OS: W2K8, RHEL 5.0.
Web-Server: Apache Tomcat 6.0.
Application & DB Server: JBoss 4.0.4 with RC1 & JDK 1.6. MySQL 5.1.
Internet Security Service: Kaspersky Business Space Security (10 User Pack) 2011.
Electrical power backup: AEC.
Scope of Work:
Data Center architecture.
Structure of the Cabling System (SCS).
Network infrastructure.
JBoss 4.0.4 application server with RC1 and JDK 1.6 and MySQL 5.1 Database server.
Apache Tomcat 6.0 web server.
Kaspersky Internet security services.
Centralized electrical power backup system.
Workstation terminal.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Shafiul Azam
Director, Banco Securities Limited
Cell # +8801917702700
E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com
1
3. Completed Project Summary
Project: Planning, designing, implementing and
maintaining Olam IT Infrastructure.
Name of Client: Country/ Location:
Olam International Ltd Russia/Moscow
Approximate Value of Services: USD 100,000.
Start Date: Completion Date:
Duration of Assignments: 55 Days
15/01/2007 30/03/2007
No of Staff: 12 No of Person per Days: 660
Ramesh Kumar PVP – Project Director
Name of Senior Staff (Project Director, Engr K A Sheikh – System Engineer &
System Engineer and Administrator): Infrastructure Architect
Aleksander Zakharov – System Administrator
Name of Associated Consultants (If Any): Staff provided by Consultants:
Technology Used:
Server Operating System: MS Windows 2003 Server, RHEL 3.0.
Router and Switch: Cisco 2950, 3550, D-Link.
Servers and Service: DNS, DHCP, RRAS, DC, AD DS, Terminal Server, Proxy Server (Static & Transparent),
Configure VLAN (Static), Access List (Standard & Extended), MS SQL Server, Antivirus Server (NOD32),
routing protocol OSPF, Backup Esex 11d.
SCS: WAN, MAN and LAN cabling system.
Scope of Work:
Designing, Planning, Implementing and maintaining Structure of the Cabling system
(SCS) of the LAN and WAN systems.
Planning, Implementing, managing and maintaining of Router, Switches and Access point.
Planning, Implementing, managing and maintaining of Cisco switches and routers
including the 2950, 3550, 3750, series platforms.
Planning, Implementing, Configuring, managing and maintaining of Layer 2 and Layer 3
switching, including MLS, VLAN, Ethernet LAN Switching, static routing and Dynamic
routing protocols (RIP, IGRP, EIGRP, OSPF and BGP).
Planning, Implementing, managing and maintaining of a multi-platform environment
which includes Microsoft Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver.
Designing, Planning, Implementing and maintaining Backup Exec 11d Server.
Implementing and maintaining Datacenter.
Designing, Planning, Implementing and maintaining Rack mount server and workstation.
Designing, Planning, Implementing and maintaining MS SQL server 2005.
Installing, configuring, administering bank client system on BSGV-sossce.
Designing, Planning, Implementing and maintaining Antivirus Server (ESET Nod32).
Planning, Implementing and maintaining Electrical Power Backup system.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Ramesh Kumar PVP
IT Manager, Olam International Ltd
mail # rameshkumarpvp@yahoo.com
cell # +7-906-7793822
3
5. Completed Project Summary
Project: Intranet Data connectivity solution for Banco
Securities Ltd
Name of Client: Country/ Location:
Banco Securities Limited Bangladesh/Dhaka
Approximate Value of Services: BDT 360,000.
Start Date: Completion Date:
Duration of Assignments: 20 Days
14/09/2010 21/10/2010
No of Staff: 10 No of Person per Days: 200
Eng. K.A.Sheikh – Project Director
(Infrastructure)
Name of Senior Staff (Project Director,
Md. Shahajahan Sagor –Sr. System Engineer
System Administrator):
Md Kabir Hosen – System Engineer
Md Rokunuzzaman Opu – Network Engineer
Name of Associated Consultants (If Any):
Telnet Communication Ltd, XNET, BTS, Link3, Staff provided by Consultants:
Solution, DDN.
Technology Used:
SCS: TIA/EIA - 568B, UTP CAT 6. WAN, MAN, LAN methodology. Product – Panduit.
Routing & Switching: Layer 2, Layer 3, MLS, VLAN, Ethernet Switching, OSPF protocol. Product – Cisco 2911
Router, Cisco catalyst 2960, Dell Power-Connect 2808.
Firewall: Firewall, VPN. Product – Check-Point CPSB – 1000N – U.
Scope of Work:
1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate
office and CDBL office through Telnet Communication Ltd.
1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate
office and CDBL office through XNET.
1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate
office and Banco Gulshan branch office through BTS.
1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate
office and Banco Gulshan branch office through Link3.
1024 kbps up and 1024 kbps down data bandwidth between Banco Securities corporate
office and Banco Palton branch office through Solution.
128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate
office and Banco Al-Hamra Shopping City, Sylhet branch office through BTS.
128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate
office and Banco R N Tower, Sylhet branch office through BTS.
128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate
office and Banco Sreemongol branch office through BTS.
128 kbps up and 128 kbps down data bandwidth between Banco Securities corporate
office and Banco Moulovibazar branch office through DDN.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Shafiul Azam
Director, Banco Securities Limited
Cell # +8801917702700
E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com
5
7. Completed Project Summary
Project: Gulshan Branch office IT IS for Banco Securities
Ltd
Name of Client: Country/ Location:
Banco Securities Limited Bangladesh/Dhaka
Approximate Value of Services: BDT 2,200,000.
Start Date: Completion Date:
Duration of Assignments: 60 Days
14/09/2010 21/10/2010
No of Staff: 10 No of Person per Days: 180
Eng. K.A.Sheikh – Project Director
Name of Senior Staff (Project Director, (Infrastructure)
System Administrator): Md. Shahajahan Sagor –System Engineer
KBM Abdullah Chisti – Assist System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Spectrum Engineering Consortium Ltd
Technology Used:
Operating System: MS Windows 2008 Server, RHEL 5.0
Router and Switch: Cisco 2960, Linksys, D-Link.
Servers and Service: DNS, DHCP, RRAS, DC, AD DS, Terminal Server, Proxy Server (Static & Transparent),
VPN through Link3 & BTS, Antivirus Server (Kaspersky Business Space Security).
SCS: WAN, MAN and LAN cabling system.
Terminal & Workstation: WXP, W7.
Scope of Work:
Develop project plan, provide hands on training, project monitoring and control, and
manage human resource,
Designing and Planning Structure of the Cabling system (SCS) of the LAN and WAN
systems.
Planning, and managing of Router, Switches and Access point.
Planning and managing of a multi-platform environment which includes Microsoft
Windows 2008 for AD DS, DNS, DHCP, GPO, Fileserver, Terminal server, RRAS.
Planning and managing of Proxy server on RHEL 5.0 (Static and Transparent).
Implementing and maintaining Datacenter.
Designing and Planning Rack mount server and workstation.
Designing and Planning Antivirus Server (Kaspersky Business Space Security).
Planning Electrical Power Backup system.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Shafiul Azam
Director, Banco Securities Limited
Cell # +8801917702700
E-mail: munnabanco@yahoo.com URL: www.bancosecurities.com
7
8. Completed Project Summary
Project: Optimize workstations for Bishwa Sahitya
Kendra (BSK).
Name of Client: Country/ Location:
Bishwa Sahitya Kendra Bangladesh/Dhaka
Approximate Value of Services: BDT 520,000.
Start Date: Completion Date:
Duration of Assignments: 10 Days
02/08/2010 05/08/2010
No of Staff: 03 No of Person per Days: 30
Engr K A Sheikh – Project Director
Name of Senior Staff (Project Director,
(Infrastructure)
System Administrator):
Md. Shahajahan Sagor –System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Spectrum Engineering Consortium Ltd
Technology Used:
Operating System: MS Windows 2003 Server.
Router and Switch: Linksys, D-Link.
SCS: WAN, MAN and LAN cabling system.
Scope of Work:
Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
systems.
Planning, Implementing, managing and maintaining of Print server..
Planning, Implementing and maintaining Electrical Power Backup system.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Monir
Coordinator, Bishwa Sahitya Kendra
Cell # +88001713456077
8
9. Completed Project Summary
Project: Implementing network and power system of
IIDFC.
Name of Client:
Country/ Location:
Industrial and Infrastructure Development Finance
Bangladesh/Dhaka
Company (IIDFC) Limited
Approximate Value of Services: BDT 370,000.
Start Date: Completion Date:
Duration of Assignments: 10 Days
08/06/2010 19/06/2010
No of Staff: 03 No of Person per Days: 30
Engr K A Sheikh – Project Director
Name of Senior Staff (Project Director,
(Infrastructure)
System Administrator):
Md. Shahajahan Sagor –System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Spectrum Engineering Consortium Ltd
Technology Used:
Operating System: MS Windows 2003 Server.
Router and Switch: Linksys, D-Link.
SCS: WAN, MAN and LAN cabling system.
Scope of Work:
Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
systems.
Planning, Implementing, managing and maintaining of Print server..
Planning, Implementing and maintaining Electrical Power Backup system.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Hasan
IT Manager, IIDFC Ltd
Cell # +8801716334852
E-mail: hasan@iidfc.com URL: www.iidfc.com
9
10. Completed Project Summary
Project: IT Infrastructure and Networking services for
Swan Group
Name of Client: Country/ Location:
Swan Group Bangladesh/Dhaka
Approximate Value of Services: BDT 370,000.
Start Date: Completion Date:
Duration of Assignments: 10 Days
10/08/2010 16/08/2010
No of Staff: 03 No of Person per Days: 30
Engr K A Sheikh – Project Director
Name of Senior Staff (Project Director,
(Infrastructure)
System Administrator):
Md. Shahajahan Sagor –System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Spectrum Engineering Consortium Ltd
Technology Used:
Operating System: MS Windows 2003 Server.
Router and Switch: Linksys, D-Link.
SCS: WAN, MAN and LAN cabling system.
Scope of Work:
Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
systems.
Planning, Implementing, managing and maintaining of Router, Switches and Access point.
Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft
Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver, RRAS.
Designing, Planning, Implementing and maintaining Exec 11d Backup server.
Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE).
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Ismail Tareen khan
Director, Swan group
Cell # +8801713452717
10
11. Completed Project Summary
Project: Planning, designing and implementing security
and file sharing system of Luke Studio.
Name of Client: Country/ Location:
Luke studio Ltd Bangladesh/Dhaka
Approximate Value of Services: BDT 175,000.
Start Date: Completion Date:
Duration of Assignments: 06 Days
28/01/2010 07/02/2010
No of Staff: 02 No of Person per Days: 12
Eng. K.A.Sheikh – Project Director
Name of Senior Staff (Project Director, (Infrastructure)
System Administrator): Md. Shahajahan Sagor –System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Technology Used:
Operating System: MS Windows 2003 Server.
Router and Switch: D-Link.
Servers and Service: DNS, DHCP, RRAS, DC, AD DS, VPN.
SCS: WAN and LAN cabling system.
Scope of Work:
Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
systems.
Planning, Implementing, managing and maintaining of Router, Switches and Access point.
Planning, Implementing, managing and maintaining of a multi-platform environment which includes Microsoft
Windows 2003 for AD DS, DNS, DHCP, GPO, Fileserver, RRAS.
Developing rack mount network system.
Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE).
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. MD Seahan
Managing Director, Luke studio Ltd
Cell # +8801713009800
11
12. Completed Project Summary
Project: Implementing Network system of Pacific Group.
Name of Client: Country/ Location:
Pacific Group Bangladesh/Dhaka
Approximate Value of Services: BDT 305,000.
Start Date: Completion Date:
Duration of Assignments: 04 Days
19/06/2010 23/06/2010
No of Staff: 02 No of Person per Days: 08
Eng. K.A.Sheikh – Project Director
Name of Senior Staff (Project Director, (Infrastructure)
System Administrator): Md. Shahajahan Sagor –System Engineer
Name of Associated Consultants (If Any):
Staff provided by Consultants:
Technology Used:
Router and Switch: DLink.
Servers and Service: DNS, DHCP, RRAS, Antivirus Server (ESET NOD32).
SCS: LAN cabling system.
Scope of Work:
Designing, Planning, Implementing and maintaining Structure of the Cabling system (SCS) of the LAN and WAN
systems.
Planning, Implementing, managing and maintaining of Router, Switches and Access point.
Designing, Planning, Implementing and maintaining Antivirus Server (ESET Smart Security BE).
Planning, Implementing and maintaining Electrical Power Backup system.
Detailed Description of Actual Services Provided by Your Staff:
Design, plan, implement, manage & Maintenance of the above mentioned deliverable
Official Reference:
Mr. Syed Shan –A- Sarwar Azad
General Manager, Pacific Group
Cell # +8801713452913
E-mail: sssazad@pacificgroupbd.com URL: www.pacificgroup-bd.com
12