Introduction
In a combined endeavor with the Army Contracting Command - Rock Island
(ACC-RI), the Army Computer Hardware Enterprise Software and Solutions
desires contracts for supporting the army's requirements, inside the Continental
United States (CONUS) and Outside the Continental United States (OCONUS) to
incorporate far off OCONUS, covering a full scope of Information Technology (IT)
equipment for customer, server, storage, and network environment; for related
incidental services and software; for support/warranty of legacy IT equipment;
and warranty variations as a feature of an Information Technology Enterprise
Solutions - 4 Hardware (ITES-4H) arrangement. The equipment and services will
be commercial following the definition of commercial items in Federal
Acquisition Regulation (FAR).
Technical Functional Requirements
contractors must adhere to before
going for ITES-4H Contract
Related Incidental Services
Services will be directly identified with the ITES-4H equipment requirements. All services
will proceed as negotiated and as incorporated into separate delivery orders by the
ordering contracting official.
The contractor will likewise give legacy hardware upkeep/warranty as a component of
system configuration and integration services. The legacy equipment
guarantee/support will be identified with the incorporation of equipment acquired
under this agreement or ITES-3H, and will plainly characterize things to be kept up and
the level of service required.
All services will be proceeded as arranged and consented to by the requiring action.
Other direct costs for things utilized in offering the related incidental types of
assistance will be evaluated on a firm-fixed value premise.
Travel will be quoted on a firmly fixed cost estimate basis and will be evaluated as per
the then current form of the Federal Travel Regulation (FTR)/Joint Travel Regulation (JTR)
under the other direct cost Contract Line Item Number (CLIN).
The project worker will offer services on a site-explicit basis, as needed, to the
Government in all issues identifying with the installation and support of ITES-4H items.
The services incorporate, however, are not restricted to, the accompanying areas:
a. System Configuration and Integration
b. Physical Site Analysis
c. Installation and Relocation
d. High Availability Configuration
e. Warranty Variations
A. System Configuration and Integration:
Review, analyze, assess, migrate, and give technical advice relating to the
presentation and usefulness of the framework;
Analyze and assess the application software design and its integration into the
contractor provided equipment and software;
Provide assistance and direction on installing software;
Give consultation and direction to Government framework expert and software
engineers relating to the application frameworks design;
Give help and direction to the system operators relating to system generation,
troubleshooting, and general system operation; and
Support in the resolution of framework and application program mistakes.
The contractor will give system configuration and integration services. Functions
performed during framework configuration and integration may likewise incorporate,
yet are not restricted to, the accompanying:
B. Physical Site Analysis
In view of a Government created SOW, PWS, or SOO, the contractor will perform the
examination at the proposed location(s) within 15 schedule days of the contractor's
acknowledgment of the conveyance order except if specified otherwise. The
Government will facilitate start dates and access with the contractor. The assigned
building(s) will be investigated to verify that it meets the prerequisites of the proposed
equipment. B. Physical Site AnalysisAny changes/updates needed for the
establishment of the proposed solution will be noted in the Site Analysis Report. The
Government maintains all authority to have a delegate with the analysis group. The
Government will be answerable for performing site changes identified in the Site
Analysis Report.
C. Installation and Relocation Services:
The contractor will be liable for conveyance/establishment or relocation of equipment
at assigned facilities, because of a Government created SOW, PWS, or SOO at the
ordering level. On the off chance that establishment services are requested, the
contractor will guarantee the Government that all necessities recognized by the
contractor's general site installation guideline or Physical Site Analysis are finished. The
contractor's installation guideline will plot the essential equipment prerequisites of the
proposed equipment. Equipment installation will begin within 15 schedule preparation
culmination except if specified otherwise. The Government will organize start dates and
access with the contractor. The installation and relocation will incorporate a final site
drawing of the installed and uninstalled equipment.
The contractor will be liable for all contractor-furnished gear, incorporating stacking,
unloading, packing, unpacking, stock, inspection, and security. Secure, dry, and clean
stockpiling territories will be given by the Government as consented to in the
coordination subtleties remembered for the SOW, PWS, or SOO. After establishment or
relocation, the contractor will reestablish the storage areas to a clean condition and
discard packing materials and installation debris.
D. High Availability Configuration:
The contractor may offer the services for a client requiring the installation of a high
accessibility solution. In light of a Government created SOW, PWS, or SOO at the
ordering level, the contractor will help the Government with building up a high
accessibility establishment and execution plan. High availability is a system design
approach and associated service implementation that guarantees a prearranged level
of operational execution will be met during a legally binding measurement period. For
instance, getting ready for high availability, by and large, revolves around reinforcement
and fail-over processing and data storage and access. For storage, a redundant array of
independent disks (RAID) is one methodology. A more recent methodology is the
storage area network (SAN).
E. Warranty Variations:
The contractor will likewise give warranty varieties not covered by the ITES catalog
offering as requested in individual orders, including, yet not restricted to, extended
warranty, reaction time, and on-site uphold for Remote OCONUS. The offeror has the
alternative to utilize either a replacement warranty or an on-location warranty at
Remote OCONUS areas. Warranty variations of this sort will be haggled with the
Ordering Contracting Officer.
Warranty
(a) The point of convergence for all warranty support will be the contractor. The
Government will not incur extra charges (i.e., shipping, conveyance) for warranty
support. As a feature of the purchase price, all gear provided under the agreement will
be provided with a standard Original Equipment Manufacturers (OEM) business
warranty. The consideration of the standard warranty will not add cost to the base
equipment purchase price.
The contractor will give commercial warranties for all equipment at both CONUS and
named OCONUS areas. On-site warranty support will be provided for Non-versatile
frameworks, for example, desktops (PCs) and servers. On-site warranty uphold, mail-
back or advanced trade warranties will be provided for compact things, for example,
note pads, top quality displays, and so forth. The offeror has the alternative to utilize
either a high-level trade warranty or an on-site warranty at no extra expense to the
Government.
1.) CONUS and Named OCONUS Warranty Support:
2.) Remote OCONUS Warranty Support:
The Contractor will give a technique for performing warranty service for Remote
OCONUS areas. In the event that on-site warranty support is needed by a client, it will
be taken care of as a warranty variation.
(b) ESA and Non-ESA, obtained Software Warranty:
The contractor will give a 90-day guarantee that, at the very least, the software
conveyance medium is liberated from absconds. The contractor will likewise give the
software EULA to any of the software being proposed. The Government maintains
whatever authority is needed to survey the EULA before buying the software.
(c) Warranty Registration: The Contractor will enroll things into its warranty
information base before shipment to the Government. Accommodation of a warranty
enrollment card by the Government will not be needed to acquire warranty service.
(d) Replacement Parts: When the contractor replaces a damaged part during the
warranty time frame, the newly established part will become Government property. The
deficient part will turn into the property of the contractor apart from the fact that the
Government holds the option to buy blemished hard drives and removable hard drives
containing sensitive or classified material that is needed by statute to be wrecked or
held by the Government. The effective warranty for all new parts will be the more
prominent of the leftover warranty time frame on the original item or a 90-schedule day
warranty.
(e) New or Warranted Parts: Only new parts will be used when fixes are made. The
utilization of restored or utilized parts is permitted just when justified by the OEM as
equivalent to new, are recognized in that capacity, and those parts should be approved
by the client, as suitable.
(f) Warranty of Repair: The contractor guarantees to fix at no charge any glitch which
reoccurs, or a breakdown coming about because of the maintenance performed by him
or his approved specialist, inside 90 schedule days of the initial repair. The 90-day
schedule warranty restarts each time the same part needs to be fixed or supplanted
during the 90-day schedule warranty.
VARStreet as a Solution
A rigorous customer support service for the best possible experience: 24x5 days
and through call and email.
Product demo to ensure that the client is completely aware of what they are going
to experience, and how will their business grow through VARStreet's support and
services.
Top-notch bid support guidance along with some real insights (exclusively for ITES-
4H awardees)
Availability of both standard and custom pricing options so that both Pre and Post
contract award can be met.
ITES CHESS 3 Federal Contract Requirements
ITES CHESS 3 Federal Contract Awards
VARStreet endeavors at, through its expertise in business management, ensuring 360
degrees turn around for companies in terms of business development opportunities. It
supports its customers from the very beginning till the time the clients achieve all the
goals and targets set.
Not only will VARStreet aid you with respect to ITES-4H but also various other IT
contracts such as C4ISR-TLS, CEC-NG, GSA Schedule 70, and more. It is advisable that
before continuing with any other research, grab some good insights about the ITES
CHESS 3 Federal contract as it would provide a solid foundation for this one, and the
two most important things to search in it are:
1.
2.
Conclusion
Just like without actually riding a bike one cannot learn how to completely learn to ride,
similarly, without going out for a shot at grabbing the opportunity of winning the ITES-
4H contract you would not be able to get it. How to do it?
Get hold of a top-notch eCommerce solution and watch yourself winning the
government contracts with minimal effort.

More Related Content

Similar to Technical functional requirements every contractor must adhere to before applying for ITES 4H contract

Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin alAshish Khandelwal
 
The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...Shane Emerson
 
Pad for sow ht lab bahria (class assignment)
Pad for sow ht lab bahria (class assignment)Pad for sow ht lab bahria (class assignment)
Pad for sow ht lab bahria (class assignment)Sulaiman Jehangir
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Shane Emerson
 
Construction plan
Construction planConstruction plan
Construction planMianusama14
 
Case Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxCase Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxMaxytjClarkf
 
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docxRunning head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docxSUBHI7
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Shane Emerson
 
The Basic Fundamentals About Defense Offset Guidelines – Miracle Electronics
The Basic Fundamentals About Defense Offset Guidelines – Miracle ElectronicsThe Basic Fundamentals About Defense Offset Guidelines – Miracle Electronics
The Basic Fundamentals About Defense Offset Guidelines – Miracle ElectronicsMiracle Electronic Devices Private Limited
 
The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...Shane Emerson
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Shane Emerson
 
The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...Shane Emerson
 
The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...Shane Emerson
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Shane Emerson
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfHabtamuGaroma3
 
Source Code Escrow Agreements 2010.02.12
Source Code Escrow Agreements   2010.02.12Source Code Escrow Agreements   2010.02.12
Source Code Escrow Agreements 2010.02.12Richard Austin
 
The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...Shane Emerson
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 

Similar to Technical functional requirements every contractor must adhere to before applying for ITES 4H contract (20)

Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin al
 
The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...
 
Pad for sow ht lab bahria (class assignment)
Pad for sow ht lab bahria (class assignment)Pad for sow ht lab bahria (class assignment)
Pad for sow ht lab bahria (class assignment)
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
Construction plan
Construction planConstruction plan
Construction plan
 
Case Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docxCase Exercise Complete the following case exercise as directed by your.docx
Case Exercise Complete the following case exercise as directed by your.docx
 
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docxRunning head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
The Basic Fundamentals About Defense Offset Guidelines – Miracle Electronics
The Basic Fundamentals About Defense Offset Guidelines – Miracle ElectronicsThe Basic Fundamentals About Defense Offset Guidelines – Miracle Electronics
The Basic Fundamentals About Defense Offset Guidelines – Miracle Electronics
 
The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...
 
The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...The must have program/project management reporting feature before applying fo...
The must have program/project management reporting feature before applying fo...
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdf
 
Source Code Escrow Agreements 2010.02.12
Source Code Escrow Agreements   2010.02.12Source Code Escrow Agreements   2010.02.12
Source Code Escrow Agreements 2010.02.12
 
OBA Presentation on Warranties
OBA Presentation on WarrantiesOBA Presentation on Warranties
OBA Presentation on Warranties
 
AVAITION SANG QASP
AVAITION SANG QASPAVAITION SANG QASP
AVAITION SANG QASP
 
The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...The must-have program/project management reporting feature before applying fo...
The must-have program/project management reporting feature before applying fo...
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 

Recently uploaded

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 

Recently uploaded (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 

Technical functional requirements every contractor must adhere to before applying for ITES 4H contract

  • 1. Technical functional requirements every contractor must adhere to before applying for ITES 4H contract
  • 3. In a combined endeavor with the Army Contracting Command - Rock Island (ACC-RI), the Army Computer Hardware Enterprise Software and Solutions desires contracts for supporting the army's requirements, inside the Continental United States (CONUS) and Outside the Continental United States (OCONUS) to incorporate far off OCONUS, covering a full scope of Information Technology (IT) equipment for customer, server, storage, and network environment; for related incidental services and software; for support/warranty of legacy IT equipment; and warranty variations as a feature of an Information Technology Enterprise Solutions - 4 Hardware (ITES-4H) arrangement. The equipment and services will be commercial following the definition of commercial items in Federal Acquisition Regulation (FAR).
  • 4. Technical Functional Requirements contractors must adhere to before going for ITES-4H Contract
  • 5. Related Incidental Services Services will be directly identified with the ITES-4H equipment requirements. All services will proceed as negotiated and as incorporated into separate delivery orders by the ordering contracting official. The contractor will likewise give legacy hardware upkeep/warranty as a component of system configuration and integration services. The legacy equipment guarantee/support will be identified with the incorporation of equipment acquired under this agreement or ITES-3H, and will plainly characterize things to be kept up and the level of service required. All services will be proceeded as arranged and consented to by the requiring action. Other direct costs for things utilized in offering the related incidental types of assistance will be evaluated on a firm-fixed value premise. Travel will be quoted on a firmly fixed cost estimate basis and will be evaluated as per the then current form of the Federal Travel Regulation (FTR)/Joint Travel Regulation (JTR) under the other direct cost Contract Line Item Number (CLIN). The project worker will offer services on a site-explicit basis, as needed, to the Government in all issues identifying with the installation and support of ITES-4H items. The services incorporate, however, are not restricted to, the accompanying areas: a. System Configuration and Integration b. Physical Site Analysis c. Installation and Relocation d. High Availability Configuration e. Warranty Variations
  • 6. A. System Configuration and Integration: Review, analyze, assess, migrate, and give technical advice relating to the presentation and usefulness of the framework; Analyze and assess the application software design and its integration into the contractor provided equipment and software; Provide assistance and direction on installing software; Give consultation and direction to Government framework expert and software engineers relating to the application frameworks design; Give help and direction to the system operators relating to system generation, troubleshooting, and general system operation; and Support in the resolution of framework and application program mistakes. The contractor will give system configuration and integration services. Functions performed during framework configuration and integration may likewise incorporate, yet are not restricted to, the accompanying: B. Physical Site Analysis In view of a Government created SOW, PWS, or SOO, the contractor will perform the examination at the proposed location(s) within 15 schedule days of the contractor's acknowledgment of the conveyance order except if specified otherwise. The Government will facilitate start dates and access with the contractor. The assigned building(s) will be investigated to verify that it meets the prerequisites of the proposed equipment. B. Physical Site AnalysisAny changes/updates needed for the establishment of the proposed solution will be noted in the Site Analysis Report. The Government maintains all authority to have a delegate with the analysis group. The Government will be answerable for performing site changes identified in the Site Analysis Report.
  • 7. C. Installation and Relocation Services: The contractor will be liable for conveyance/establishment or relocation of equipment at assigned facilities, because of a Government created SOW, PWS, or SOO at the ordering level. On the off chance that establishment services are requested, the contractor will guarantee the Government that all necessities recognized by the contractor's general site installation guideline or Physical Site Analysis are finished. The contractor's installation guideline will plot the essential equipment prerequisites of the proposed equipment. Equipment installation will begin within 15 schedule preparation culmination except if specified otherwise. The Government will organize start dates and access with the contractor. The installation and relocation will incorporate a final site drawing of the installed and uninstalled equipment. The contractor will be liable for all contractor-furnished gear, incorporating stacking, unloading, packing, unpacking, stock, inspection, and security. Secure, dry, and clean stockpiling territories will be given by the Government as consented to in the coordination subtleties remembered for the SOW, PWS, or SOO. After establishment or relocation, the contractor will reestablish the storage areas to a clean condition and discard packing materials and installation debris. D. High Availability Configuration: The contractor may offer the services for a client requiring the installation of a high accessibility solution. In light of a Government created SOW, PWS, or SOO at the ordering level, the contractor will help the Government with building up a high accessibility establishment and execution plan. High availability is a system design approach and associated service implementation that guarantees a prearranged level of operational execution will be met during a legally binding measurement period. For instance, getting ready for high availability, by and large, revolves around reinforcement and fail-over processing and data storage and access. For storage, a redundant array of independent disks (RAID) is one methodology. A more recent methodology is the storage area network (SAN).
  • 8. E. Warranty Variations: The contractor will likewise give warranty varieties not covered by the ITES catalog offering as requested in individual orders, including, yet not restricted to, extended warranty, reaction time, and on-site uphold for Remote OCONUS. The offeror has the alternative to utilize either a replacement warranty or an on-location warranty at Remote OCONUS areas. Warranty variations of this sort will be haggled with the Ordering Contracting Officer. Warranty (a) The point of convergence for all warranty support will be the contractor. The Government will not incur extra charges (i.e., shipping, conveyance) for warranty support. As a feature of the purchase price, all gear provided under the agreement will be provided with a standard Original Equipment Manufacturers (OEM) business warranty. The consideration of the standard warranty will not add cost to the base equipment purchase price. The contractor will give commercial warranties for all equipment at both CONUS and named OCONUS areas. On-site warranty support will be provided for Non-versatile frameworks, for example, desktops (PCs) and servers. On-site warranty uphold, mail- back or advanced trade warranties will be provided for compact things, for example, note pads, top quality displays, and so forth. The offeror has the alternative to utilize either a high-level trade warranty or an on-site warranty at no extra expense to the Government. 1.) CONUS and Named OCONUS Warranty Support:
  • 9. 2.) Remote OCONUS Warranty Support: The Contractor will give a technique for performing warranty service for Remote OCONUS areas. In the event that on-site warranty support is needed by a client, it will be taken care of as a warranty variation. (b) ESA and Non-ESA, obtained Software Warranty: The contractor will give a 90-day guarantee that, at the very least, the software conveyance medium is liberated from absconds. The contractor will likewise give the software EULA to any of the software being proposed. The Government maintains whatever authority is needed to survey the EULA before buying the software. (c) Warranty Registration: The Contractor will enroll things into its warranty information base before shipment to the Government. Accommodation of a warranty enrollment card by the Government will not be needed to acquire warranty service. (d) Replacement Parts: When the contractor replaces a damaged part during the warranty time frame, the newly established part will become Government property. The deficient part will turn into the property of the contractor apart from the fact that the Government holds the option to buy blemished hard drives and removable hard drives containing sensitive or classified material that is needed by statute to be wrecked or held by the Government. The effective warranty for all new parts will be the more prominent of the leftover warranty time frame on the original item or a 90-schedule day warranty. (e) New or Warranted Parts: Only new parts will be used when fixes are made. The utilization of restored or utilized parts is permitted just when justified by the OEM as equivalent to new, are recognized in that capacity, and those parts should be approved by the client, as suitable. (f) Warranty of Repair: The contractor guarantees to fix at no charge any glitch which reoccurs, or a breakdown coming about because of the maintenance performed by him or his approved specialist, inside 90 schedule days of the initial repair. The 90-day schedule warranty restarts each time the same part needs to be fixed or supplanted during the 90-day schedule warranty.
  • 10. VARStreet as a Solution A rigorous customer support service for the best possible experience: 24x5 days and through call and email. Product demo to ensure that the client is completely aware of what they are going to experience, and how will their business grow through VARStreet's support and services. Top-notch bid support guidance along with some real insights (exclusively for ITES- 4H awardees) Availability of both standard and custom pricing options so that both Pre and Post contract award can be met. ITES CHESS 3 Federal Contract Requirements ITES CHESS 3 Federal Contract Awards VARStreet endeavors at, through its expertise in business management, ensuring 360 degrees turn around for companies in terms of business development opportunities. It supports its customers from the very beginning till the time the clients achieve all the goals and targets set. Not only will VARStreet aid you with respect to ITES-4H but also various other IT contracts such as C4ISR-TLS, CEC-NG, GSA Schedule 70, and more. It is advisable that before continuing with any other research, grab some good insights about the ITES CHESS 3 Federal contract as it would provide a solid foundation for this one, and the two most important things to search in it are: 1. 2. Conclusion Just like without actually riding a bike one cannot learn how to completely learn to ride, similarly, without going out for a shot at grabbing the opportunity of winning the ITES- 4H contract you would not be able to get it. How to do it? Get hold of a top-notch eCommerce solution and watch yourself winning the government contracts with minimal effort.