SlideShare a Scribd company logo
1 of 11
PRODUCTION PLANNING
AND PROCESS
PLANNING
Unit-3
PRODUCT PLANNING
• Product Planning is the ongoing process of
identifying and articulating market
requirements that define a product’s feature
set.
• Product planning serves as the basis for
decisions about price, distribution and
promotion.
EXTENDING ORIGINAL PRODUCT
INFORMATION
VALUE ANALYSIS
• Value, as defined, is the ratio of function
to cost. Value can therefore be increased by
either improving the function or reducing
the cost
LACK OF PRODUCT PLANNING
• Unsatisfied customer
• Durability deteriaration
• Lack of quality
• Loss of brand name., Etc
PROCESS PLANNING
ROUTING
SCHEDULING
DISPATCHING
FOLLOW UP
PROCESS PLANNING – INPUT INFO.
• PRODUCT
• PROCESS
• CAPACITY
• ORDERS
• DUE DATES
• RESOURCES
• ETC.,
STEPS IN PROCESS PLANNING
• Analyzing environment
• Establishing objectives or goals
• Seeking necessary Information
QUANTITY DETERMINATION –
BATCH PRODUCTION
• Economic batch quantity (EBQ), also called "optimal batch
quantity" or economic production quantity, is a measure used
to determine the quantity of units that can be produced at
minimum average costs in a given batch or production run.
• Economic Production Quantity model (also known as the EPQ
model) is an extension of the Economic Order Quantity
model. The Economic Batch Quantity model, or production
lot-size model, is similar to the EOQ model in that an optimum
is to be calculated for the batch quantity to be produced.
EBQ
In working with this EBQ model, principal assumptions are:
• The demand (D) is known and constant within a certain period of time
• The unit cost of the inventory item (U) is constant
• The annual holding-cost per unit (Ch) is constant
• The setup-cost per batch (C) is constant
• The production time (tp) is known and constant
• there is one kind of product
• There is no interaction with other products
• The aspect of time does not play a role, just the setup time does
• The setup cost is constant and does not act upon the batch quantity.
Variables
• K = setup cost
• D = demand rate
• F = holding cost
• T = cycle length
• P = production rate
Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)

More Related Content

Similar to unit 3.ppt

ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfahirwarrajeev198
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and controlkarthi keyan
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.PraveenManickam2
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptxhafidhisaidi
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxkshitij808555
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
MG6863 Engineering Economics
MG6863 Engineering EconomicsMG6863 Engineering Economics
MG6863 Engineering EconomicsP Manimaran
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aRai University
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsStephen Ong
 
Session 8 cost planning and definition (1)
Session 8  cost planning and definition (1)Session 8  cost planning and definition (1)
Session 8 cost planning and definition (1)Marwan AL Hashdei
 
NUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain ManagementNUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain Managementyxiinyu
 

Similar to unit 3.ppt (20)

Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
 
ACCA
ACCAACCA
ACCA
 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
 
UNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTINGUNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTING
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Standard costing
Standard costingStandard costing
Standard costing
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
MG6863 Engineering Economics
MG6863 Engineering EconomicsMG6863 Engineering Economics
MG6863 Engineering Economics
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management a
 
Inventory mgt
Inventory mgtInventory mgt
Inventory mgt
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
 
Session 8 cost planning and definition (1)
Session 8  cost planning and definition (1)Session 8  cost planning and definition (1)
Session 8 cost planning and definition (1)
 
NUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain ManagementNUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain Management
 
15 operations, quality and productivity
15  operations, quality and productivity15  operations, quality and productivity
15 operations, quality and productivity
 

More from rknatarajan

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energyUNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energyrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
types of gears - bearings
types of gears - bearingstypes of gears - bearings
types of gears - bearingsrknatarajan
 
Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2rknatarajan
 
Unit 3 machine vision
Unit 3 machine vision Unit 3 machine vision
Unit 3 machine vision rknatarajan
 
Robotics - unit-2 - end effector
Robotics - unit-2 - end effectorRobotics - unit-2 - end effector
Robotics - unit-2 - end effectorrknatarajan
 
Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2rknatarajan
 

More from rknatarajan (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energyUNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
UNIT - III.ppt
UNIT - III.pptUNIT - III.ppt
UNIT - III.ppt
 
UNIT - V.ppt
UNIT - V.pptUNIT - V.ppt
UNIT - V.ppt
 
UNIT - I.ppt
UNIT - I.pptUNIT - I.ppt
UNIT - I.ppt
 
UNIT - II.ppt
UNIT - II.pptUNIT - II.ppt
UNIT - II.ppt
 
UNIT - IV.ppt
UNIT - IV.pptUNIT - IV.ppt
UNIT - IV.ppt
 
unit 5.ppt
unit 5.pptunit 5.ppt
unit 5.ppt
 
unit 4.ppt
unit 4.pptunit 4.ppt
unit 4.ppt
 
unit 2.pptx
unit 2.pptxunit 2.pptx
unit 2.pptx
 
types of gears - bearings
types of gears - bearingstypes of gears - bearings
types of gears - bearings
 
DTS Unit i
DTS Unit   iDTS Unit   i
DTS Unit i
 
Mechanism1
Mechanism1Mechanism1
Mechanism1
 
Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2
 
Unit 3 machine vision
Unit 3 machine vision Unit 3 machine vision
Unit 3 machine vision
 
Robotics - unit-2 - end effector
Robotics - unit-2 - end effectorRobotics - unit-2 - end effector
Robotics - unit-2 - end effector
 
Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2
 

Recently uploaded

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

unit 3.ppt

  • 2. PRODUCT PLANNING • Product Planning is the ongoing process of identifying and articulating market requirements that define a product’s feature set. • Product planning serves as the basis for decisions about price, distribution and promotion.
  • 3.
  • 5. VALUE ANALYSIS • Value, as defined, is the ratio of function to cost. Value can therefore be increased by either improving the function or reducing the cost
  • 6. LACK OF PRODUCT PLANNING • Unsatisfied customer • Durability deteriaration • Lack of quality • Loss of brand name., Etc
  • 8. PROCESS PLANNING – INPUT INFO. • PRODUCT • PROCESS • CAPACITY • ORDERS • DUE DATES • RESOURCES • ETC.,
  • 9. STEPS IN PROCESS PLANNING • Analyzing environment • Establishing objectives or goals • Seeking necessary Information
  • 10. QUANTITY DETERMINATION – BATCH PRODUCTION • Economic batch quantity (EBQ), also called "optimal batch quantity" or economic production quantity, is a measure used to determine the quantity of units that can be produced at minimum average costs in a given batch or production run. • Economic Production Quantity model (also known as the EPQ model) is an extension of the Economic Order Quantity model. The Economic Batch Quantity model, or production lot-size model, is similar to the EOQ model in that an optimum is to be calculated for the batch quantity to be produced.
  • 11. EBQ In working with this EBQ model, principal assumptions are: • The demand (D) is known and constant within a certain period of time • The unit cost of the inventory item (U) is constant • The annual holding-cost per unit (Ch) is constant • The setup-cost per batch (C) is constant • The production time (tp) is known and constant • there is one kind of product • There is no interaction with other products • The aspect of time does not play a role, just the setup time does • The setup cost is constant and does not act upon the batch quantity. Variables • K = setup cost • D = demand rate • F = holding cost • T = cycle length • P = production rate Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)