1. Childrens’ Hospital and Research Center
at Oakland
Laboratory Remodel
IN OPERATION AFTER
BEFORE
Efficiency, Productivity and the Ability to Change as Lab Needs Change
Replacing a tight, cluttered, poorly functioning lab with poor sightlines due to
numerous built-in cabinets, this new lab will be served with movable ergo-
nomic lab tables, clear visibility across the lab and highly efficient insulation in
the walls, ceiling and floor to produce a better work environment and shield
the New Adjacent Patient Blood Draw Rooms. As equipment and the needs of
the Lab changes, this Lab will be able to be changed on the spot and without
further OSHPD review.
Also includes new Patient Blood Draw Dept, Conference Rm., Break Rm.,
updated Pathology offices & a whole new HVAC service.
Reilly & Company
Architects / Structural Engineers