BUSINESS MODELAn end term project on operations Research Submitted to: Prof. Raju Gundala.Members of group –Fahim- 20, Vijay – 25, Ranjan-41, Rosh-44, Anoop-57PGBM-IB (2009-11), Section-c, Term - 2<br />ACKNOWLEDGEMENT<br />First we would like to extend our gratitude to our faculty Prof. Raju Gundala for supervising and guiding us throughout the various stages of our project.<br />We thank one and all who have helped in making key decisions and held discussions which helped us to complete this project successfully in time.<br />Last but not least we would like to thank our families for extending their support.<br />This project is not the Endeavour of any one individual, but is the result of valuable time, effort and co-operation of one and all of us. So, we would like to acknowledge each other for a great teamwork, Thank You. <br />Members of group – <br />Fahim- 20<br />Vijay – 25<br />Ranjan-41<br />Rosh-44<br />Anoop-57<br />Introduction<br />In this paper, we solve a transportation problem which is a real time problem at Eureka Forbes. In which n vehicles, (of given capacity) are routed in real time in a fast varying environment to deliver m Products. When both n and m are big from different locations to meet the demand according to supply. The aim is to minimize the cost. Therefore, the formulation has to take in to account the cumulative Cost incurred.<br />Due to the optimization being based on the product cost functions as opposed to being driven by cost window constrains as used in package delivery optimization, this problem is fundamentally done because at Eureka Forbes Ltd., the billing would be more at the Last date of the Month. For an example, if the monthly sales are around Rs 1 crore then almost Rs 65 lacks worth of billing is done on the last date of the month, which mean almost 65% of supply is billed on that day but not delivered, and the time available is approximately within 3 days to deliver the products to retailers from the date of Billing. As Eureka Forbes Ltd., uses SAP (ERP), so the time take to virtually transfer the Products from one warehouse to another warehouse would take less than 15min. The interesting fact is that the warehouses are located at all the major cities across India and one for every state. This Business model is focused mainly on such a procedure, since it represents the most difficult piece of the Cost minimization which in turn help the company to maximize the profits and improve the customer relation.<br />The speed required to attain a solution strongly depends on the specific type of problem. For instance, it is not necessary for a truck company (performing interstate services) to have a transportation model that attains the solution in 5 seconds to route their vehicles. This issue is particularly important, and it is clear that the computational speed needed to reach a solution of a given problem depends on the time scale and of course cost incurred.<br />The problem treated is stochastic in nature, both in terms of network conditions and in future occurrence of demand points. A possible way to tackle the entire problem would be to solve it in Network model. The importance of network models for many business problems lend themselves to a network formulation. Optimal solutions of network problems are guaranteed integer solutions, because of special mathematical structures.  No special restrictions are needed to ensure integrality.  Network problems can be efficiently solved by compact algorithms due to their special mathematical structure, even for large scale models.  <br />can be efficiently solved by compact algorithms due to their special mathematical structure, even for large scale models.  <br />Problem Definition<br />At Eureka Forbes Ltd., there are two manufacturing plants, one for Aquasure Water purifier which is manufactured by Aquamall water solutions ltd., a 100% fully owned subsidiary of Eureka Forbes ltd. Aquamall have three manufacturing houses which are located at Bangalore, Hyderabad, and Bhimtal (Uttaranchal), which have a capacity of 11 thousand units per month of water purifier from each manufacturing house. The manufactured water purifiers would then be transported to various regional warehouse and finally to the Retail outlets. On the other side Aquamall water solutions ltd’s have 100% fully own subsidy, Forbes Aquamall Ltd. (FAML) have 2 units set up at Bhimtal in Uttaranchal and at Chennai in Tamil Nadu for manufacturing Vacuum Cleaners, with a current capacity of manufacturing 10 thousand units of vacuum cleaners per month, which are then transported to various regional warehouses and finally to retail outlets.<br />Due to the economic condition and the competition from all the major consumer durable companies, Eureka Forbes ltd., want to minimize the transportation cost and the time taken to deliver so it can compete with the competitors, Below table gives the current inventory at different warehouses, and for the month of August 35% of the July billed inventory is forecasted.<br />Inventory as on 01-08-2009 at 00:00amWater purifiersVacuum CleanersCityAquasure 3ltrsAquasure 5ltrsTrendy SteelTrendy XeonBangalore150133222Hyderabad1691324524Chennai17236254Mumbai255214212Delhi32142134134Ahmadabad 63176223Kolkata 75121340Total761519451269<br />Below is the table for the Inventory billed on 31-07-2009<br />Inventory Billed on 31-07-2009 Water purifiersVacuum CleanersCityAquasure 3ltrsAquasure 5 ltrsTrendy SteelTrendy XeonBangalore2850164012251065Hyderabad276314261060895Chennai255015201063890Mumbai3440205014381200Delhi2750175012451000Kolkata 1650900923876Total16003928669545926<br />Below is the table which shows the transportation cost from different factories to different warehouses per truck:<br />Particulars(in Rs)FactoriesBangaloreHyderabadChennaiMumbaiDelhiKolkataWarehousesBangalore02000015000250005000058000Hyderabad20000025000250004500045000Bhimtal560005000060000500001500045000Chennai15000250000420006500065000<br />Each truck have a capacity of 5000units of water purifiers or 4000units of Vacuum cleaner or 2500 units of Water purifier &2000units of  Vacuum cleaner.<br />PROBLEM OBJECTIVE:<br />Minimizing the total shipping cost of supplying the destinations with the required demand from the available supplies at the sources (warehouses).<br />centercenter<br />APPROACH:<br />,[object Object]
Here, from the above network model the red nodes represents both factory and warehouse, blue nodes represents only warehouse.
Thus the following methods were used to forecast the minimum cost for the transportation.
Transportation method.SOLUTION:<br />Transportation model:<br />In this model we would know the cost of the transportation roughly. Here in this case we need find the cost which is going to deliver the units to the respective warehouses.<br />Here we are considering two cases as follows:<br />,[object Object]
Vacuum cleaner (CASE-2).August Inventory forecasting for Water Purifiers Aquasure 3ltrsCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore28509981503698Hyderabad27639671693561Chennai2550892173425Mumbai24408542553039Delhi2750962323680Kolkata1650577752152August Inventory forecasting for Water Purifiers Aquasure 5ltrsCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore1650577132214Hyderabad14264991321793Chennai1520532232029Mumbai2050717212746Delhi17506121422220Kolkata900315121203August Inventory forecasting for Vacuum Cleaners Trendy SteelCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore1225428321621Hyderabad1060371451386Chennai1063372621373Mumbai1438503421899Delhi12454351341546Kolkata9233231341112August Inventory forecasting for Vacuum Cleaners Trendy XeonCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore1065372321405Hyderabad895313451163Chennai890311621139Mumbai1200420421578Delhi10003501341216Kolkata8763061341048<br />ExpectedWarehouse CapacityWPVCTotalActual CapacityBangalore59123026893810000Hyderabad5354254979039000Chennai5454251279669000Mumbai57853477926210000Delhi5900276286629000Kolkata3355216055157000<br />CASE-1:<br />In this case only BANGALORE, HYDERABAD and BHIMTAL are the only factories who are producing the WATER PURIFIERS and those units have to be transported from different factories to different warehouses in the country.<br />Thus the following is the transportation model:<br />HYDERABADBANGALOREBANGALOREBHIMTALMUMBAICHENNAIHYDERABADDELHIKOLKATAWATER PURIFIER TRANSPROTATION  MODEL<br />Particulars(in Rs)WAREHOUSESBangaloreHyderabadChennaiMumbaiDelhiKolkataFACTORYBangalore04351011.6Hyderabad405599Bhimtal11.210121039<br />DECISION VARIABLE:<br />The decision variables are the units and the cost per unit which is going to give  cost estimation, are as follows:<br />OBJECTIVE FUNCTION:<br />This function is going to give the minimized cost of the transportation:<br />0*X11 + 4*X12 + 3*X13 +  5*X14 + 10*X15 + 11.6*X16 + 4*X21 + 0*X22 + 5*X23 + 5*X24 + 9*X25 + 9*X26 + 11.2*X31 + 10*X32 + 12*X33 + 10*X34 + 3*X35 + 9*X36<br />CONSTARINTS:<br />SUPPLY CONSTRAINTS:<br />0*X11 + 4*X12 + 3*X13 + 5*X14 + 10*X15 + 11.6*X16 <= 11000.<br />4*X21 + 0*X22 + 5*X23 + 5*X24 + 9*X25 + 9*X26 <= 11000.<br />11.2*X31 + 10*X32 + 12*X33 + 10*X34 +3*X35 + 9*X36 <= 11000.<br />DEMAND CONSTRAINTS:<br />0*X11 + 4*X21 + 11.2*X31 = 5912.<br />4*X12 + 0*X22 + 10*X32 = 5354.<br />3*X13 + 5*X23 + 12*X33 = 5454.<br />5*X14 + 5*X24 + 10*X34 = 5785.<br />10*X15 + 9*X25 + 3*X35 = 5900.<br />11.6*X16 + 9*X26 + 9*X36 = 3355.<br />USING EXCEL THE ANSWER REPORT IS AS FOLLOWS:<br />Microsoft Excel 12.0 Answer ReportWorksheet: [Inventory2.xlsx]Sheet6Report Created: 12/7/2009 11:42:08 AMTarget Cell (Min)CellNameOriginal ValueFinal Value$B$22OBJECTIVE FUNCTION X113176031760Adjustable CellsCellNameOriginal ValueFinal Value$B$5X1100$C$5X12660$D$5X1300$E$5X14481157$F$5X15590522$G$5X162890$H$5X21066$I$5X2200$J$5X2310911091$K$5X2411090$L$5X25076$M$5X260373$N$5X31422403$O$5X32509535$P$5X3300$Q$5X3400$R$5X3500$S$5X3600ConstraintsCellNameCell ValueFormulaStatusSlack$B$10SUPPLY CONSTTRAINTS X1111000$B$10<=$D$10Binding0$B$11X119760$B$11<=$D$11Not Binding1240$B$12X1111000$B$12<=$D$12Binding0$B$14DEMAND CONTRAINTS X115912$B$14=$D$14Not Binding0$B$15X115354$B$15=$D$15Not Binding0$B$16X115454$B$16=$D$16Not Binding0$B$17X115785$B$17=$D$17Not Binding0$B$18X115900$B$18=$D$18Not Binding0$B$19X113355$B$19=$D$19Not Binding0Microsoft Excel 12.0 Sensitivity ReportWorksheet: [Inventory2.xlsx]Sheet6Report Created: 12/7/2009 11:42:08 AMAdjustable Cells  FinalReducedObjectiveAllowableAllowableCellNameValueCostCoefficientIncreaseDecrease$B$5X110001E+300$C$5X120041E+300$D$5X130031E+300$E$5X14115704.99999999901E+30$F$5X1552201000$G$5X160011.61E+300$H$5X21660400$I$5X220001E+300$J$5X2310910501E+30$K$5X240051E+300$L$5X257608.99999999800$M$5X2637308.99999999801E+30$N$5X3140301400$O$5X3253501001E+30$P$5X3300121E+300$Q$5X34009.9999999981E+300$R$5X350031E+300$S$5X36008.9999999981E+300Constraints  FinalShadowConstraintAllowableAllowableCellNameValuePriceR.H. SideIncreaseDecrease$B$10SUPPLY CONSTTRAINTS X1111000011000684.99999981240$B$11X1197600110001E+301240$B$12X11110000110002661240$B$14DEMAND CONTRAINTS X115912159121240266$B$15X115354153541240266$B$16X1154541545412405454$B$17X115785157851240684.9999998$B$18X115900159001240684.9999998$B$19X1133551335512403355<br />Microsoft Excel 12.0 Limits ReportWorksheet: [Inventory2.xlsx]Limits Report 1Report Created: 12/7/2009 11:42:09 AM Target CellNameValue$B$22OBJECTIVE FUNCTION X1131760 Adjustable LowerTargetUpperTargetCellNameValueLimitResultLimitResult$B$5X110#N/A#N/A#N/A#N/A$C$5X120#N/A#N/A#N/A#N/A$D$5X130#N/A#N/A#N/A#N/A$E$5X141157#N/A#N/A#N/A#N/A$F$5X15522#N/A#N/A#N/A#N/A$G$5X160#N/A#N/A#N/A#N/A$H$5X2166#N/A#N/A#N/A#N/A$I$5X220#N/A#N/A#N/A#N/A$J$5X231091#N/A#N/A#N/A#N/A$K$5X240#N/A#N/A#N/A#N/A$L$5X2576#N/A#N/A#N/A#N/A$M$5X26373#N/A#N/A#N/A#N/A$N$5X31403#N/A#N/A#N/A#N/A$O$5X32535#N/A#N/A#N/A#N/A$P$5X330#N/A#N/A#N/A#N/A$Q$5X340#N/A#N/A#N/A#N/A$R$5X350#N/A#N/A#N/A#N/A$S$5X360#N/A#N/A#N/A#N/A<br />Thus the above are the excel reports where the minimized cost is 16486.<br />CASE-2:<br />In this case only two factories BHIMTAL and CHENNAI produce the VACUUM CLEANERS.<br />Thus the transportation model is as follows:<br />BANGALORECHENNAIBHIMTALMUMBAICHENNAIHYDERABADDELHIKOLKATAVACUUM CLEANER TRANSPORTATION MODEL<br />Particulars(in Rs)WAREHOUSESBangaloreHyderabadChennaiMumbaiDelhiKolkataFACTORYBhimtal1412.51512.53.7511.25Chennai3.756.25010.516.2516.25<br />DECISION VARIABLES:<br />In this the decision variables are the units and also the cost incurred to transport those units.<br />OBJECTIVE FUNCTION:<br />The objective function gives the minimized cost.<br />14*X11 + 12.5*X12 + 15*X13 + 12.5*X14+ 3.75*X15 + 11.25*X16 + 3.75*X21 + 6.25*X22 + 0*X23 + 10.5*X24 + 16.25*X25 + 16.25*X26<br />CONSTRAINTS:<br />SUPPLY CONSTARINTS:<br />14*X11 + 12.5*X12 + 15*X13 + 12.5*X14+ 3.75*X15 + 11.25*X16 <= 10000.<br />3.75*X21 + 6.25*X22 + 0*X23 + 10.5*X24 + 16.25*X25 + 16.25*X26 <= 10000.<br />DEMAND CONSTRAINTS:<br />14*X11 + 3.75*X21 = 3026.<br />12.5*X12 +6.25*X22 = 2549.<br />15*X13 + 0*X23 = 2512.<br />12.5*X14 + 10.5*X24 = 3477.<br />3.75*X15 + 16.25*X25 = 2762.<br />11.25*X16 + 16.25*X26 = 2160.<br />USING THE EXCEL THE REPORTS:<br />Microsoft Excel 12.0 Answer ReportWorksheet: [Inventory1.xlsx]Sheet5Report Created: 12/7/2009 11:29:36 AMTarget Cell (Min)CellNameOriginal ValueFinal Value$B$22OBJECTIVE FUNCTION x111648616486Adjustable CellsCellNameOriginal ValueFinal Value$B$5x1100$C$5x1200$D$5x1300$E$5x1400$F$5x15169.97169.97$G$5x16132.92132.92$H$5x21216.14216.14$I$5x22203.92203.92$J$5x23167.47167.47$K$5x24278.16278.16$L$5x2500$M$5x2600ConstraintsCellNameCell ValueFormulaStatusSlack$B$11SUPPLY CONSTRAINTS x1153$B$11<=$D$11Not Binding9947$B$12x1169$B$12<=$D$12Not Binding9931$B$15DEMAND CONSTRAINTS x113026$B$15=$D$15Not Binding0$B$16x112549$B$16=$D$16Not Binding0$B$17x112512$B$17=$D$17Not Binding0$B$18x113477$B$18=$D$18Not Binding0$B$19x112762$B$19=$D$19Not Binding0$B$20x112160$B$20=$D$20Not Binding0<br />Microsoft Excel 12.0 Sensitivity ReportWorksheet: [Inventory1.xlsx]Sheet5Report Created: 12/7/2009 11:29:36 AMAdjustable Cells  FinalReducedObjectiveAllowableAllowableCellNameValueCostCoefficientIncreaseDecrease$B$5x11003.751E+300$C$5x12006.2500000021E+300$D$5x130001E+300$E$5x140010.51E+300$F$5x15169.9692308016.2501E+30$G$5x16132.9230769016.2501E+30$H$5x21216.142857101401E+30$I$5x22203.92012.501E+30$J$5x23167.46666670151E+301E+30$K$5x24278.16012.501E+30$L$5x25003.751E+300$M$5x260011.251E+300Constraints  FinalShadowConstraintAllowableAllowableCellNameValuePriceR.H. SideIncreaseDecrease$B$11SUPPLY CONSTRAINTS x11530100001E+309947$B$12x11690100001E+309931$B$15DEMAND CONSTRAINTS x113026130261E+303026$B$16x112549125491E+302549$B$17x112512125121E+302512$B$18x113477134771E+303477$B$19x112762127621E+302762$B$20x112160121601E+302160<br />Microsoft Excel 12.0 Limits ReportWorksheet: [Inventory1.xlsx]Limits Report 1Report Created: 12/7/2009 11:29:36 AM Target CellNameValue$B$22OBJECTIVE FUNCTION x1116486 Adjustable LowerTargetUpperTargetCellNameValueLimitResultLimitResult$B$5x110016486016486$C$5x120016486016486$D$5x130016486#N/A#N/A$E$5x140-4.33093E-1416486-4.33093E-1416486$F$5x15169.9692308169.969230816486169.969230816486$G$5x16132.9230769132.923076916486132.923076916486$H$5x21216.1428571216.142857116486216.142857116486$I$5x22203.92203.9216486203.9216486$J$5x23167.4666667167.466666716486167.466666716486$K$5x24278.16278.1616486278.1616486$L$5x250016486016486$M$5x260016486016486<br />CONCLUSION:<br />Thus from the above analysis this is to say that the cost occurred to transport the WATER PURIFIER and VACUUM CLEANERS are 31760 and 16486. <br />
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project
Business Model Optimization Project

More Related Content

Viewers also liked

Viewers also liked (12)

Job forcasting 210709
Job forcasting 210709Job forcasting 210709
Job forcasting 210709
 
Portfolio (3)
Portfolio (3)Portfolio (3)
Portfolio (3)
 
British transports
British transportsBritish transports
British transports
 
Tecnologia e educação
Tecnologia e educaçãoTecnologia e educação
Tecnologia e educação
 
CV_Gangadhar 1
CV_Gangadhar 1CV_Gangadhar 1
CV_Gangadhar 1
 
Norvina Luna (01) Pa Mi2
Norvina Luna (01) Pa Mi2Norvina Luna (01) Pa Mi2
Norvina Luna (01) Pa Mi2
 
Golden Sections Composition
Golden Sections CompositionGolden Sections Composition
Golden Sections Composition
 
Tecnologia da educacao
Tecnologia da educacaoTecnologia da educacao
Tecnologia da educacao
 
Prezentacija final
Prezentacija finalPrezentacija final
Prezentacija final
 
Einführung in die Schematherapie
Einführung in die Schematherapie Einführung in die Schematherapie
Einführung in die Schematherapie
 
Newsletter
NewsletterNewsletter
Newsletter
 
Gestao De Vendas Aula 1
Gestao De Vendas Aula 1Gestao De Vendas Aula 1
Gestao De Vendas Aula 1
 

Similar to Business Model Optimization Project

IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...
IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...
IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...IRJET Journal
 
Dye House Projectonly
Dye House ProjectonlyDye House Projectonly
Dye House ProjectonlySanjaya Khs
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...IRJET Journal
 
SIP REPORT-TATA CUMMINS JSR.
SIP REPORT-TATA CUMMINS JSR.SIP REPORT-TATA CUMMINS JSR.
SIP REPORT-TATA CUMMINS JSR.Shubhajit Mitra
 
IRJET- Solving Supply Chain Network Design Problem using Center of Gravit...
IRJET-  	  Solving Supply Chain Network Design Problem using Center of Gravit...IRJET-  	  Solving Supply Chain Network Design Problem using Center of Gravit...
IRJET- Solving Supply Chain Network Design Problem using Center of Gravit...IRJET Journal
 
Select A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul ShanmugaveluSelect A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul ShanmugaveluRubber & Tyre Machinery World
 
Global cement magazine operational transformation feature article jan 2017
Global cement magazine operational transformation feature article  jan 2017Global cement magazine operational transformation feature article  jan 2017
Global cement magazine operational transformation feature article jan 2017Angus Maclean
 
final year report of (11BIE024,037,056)
final year report of (11BIE024,037,056)final year report of (11BIE024,037,056)
final year report of (11BIE024,037,056)Hardyk Mehta
 
ppr on folding wall(cement)
ppr on folding wall(cement)ppr on folding wall(cement)
ppr on folding wall(cement)patelkrupa1701
 
IUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main PartIUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main PartMd.Mehedi Hasan
 
Proceess technology life cycle
Proceess technology life cycleProceess technology life cycle
Proceess technology life cycleAmresh Kumar Panda
 
Evaluation and Reduction of Truck Turnaround Time
Evaluation and Reduction of Truck Turnaround Time Evaluation and Reduction of Truck Turnaround Time
Evaluation and Reduction of Truck Turnaround Time Rutulshah15
 

Similar to Business Model Optimization Project (20)

IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...
IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...
IRJET- Supply Chain Network Design for Plant Location and Selection of Capaci...
 
Dye House Projectonly
Dye House ProjectonlyDye House Projectonly
Dye House Projectonly
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
Crompton Greaves
Crompton Greaves Crompton Greaves
Crompton Greaves
 
Project on sdl 01
Project  on sdl 01Project  on sdl 01
Project on sdl 01
 
SIP REPORT-TATA CUMMINS JSR.
SIP REPORT-TATA CUMMINS JSR.SIP REPORT-TATA CUMMINS JSR.
SIP REPORT-TATA CUMMINS JSR.
 
D04942231
D04942231D04942231
D04942231
 
IOM assignment
IOM assignment IOM assignment
IOM assignment
 
Auto miraj
Auto mirajAuto miraj
Auto miraj
 
www.uniko.in
www.uniko.inwww.uniko.in
www.uniko.in
 
IRJET- Solving Supply Chain Network Design Problem using Center of Gravit...
IRJET-  	  Solving Supply Chain Network Design Problem using Center of Gravit...IRJET-  	  Solving Supply Chain Network Design Problem using Center of Gravit...
IRJET- Solving Supply Chain Network Design Problem using Center of Gravit...
 
Select A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul ShanmugaveluSelect A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul Shanmugavelu
 
Global cement magazine operational transformation feature article jan 2017
Global cement magazine operational transformation feature article  jan 2017Global cement magazine operational transformation feature article  jan 2017
Global cement magazine operational transformation feature article jan 2017
 
final year report of (11BIE024,037,056)
final year report of (11BIE024,037,056)final year report of (11BIE024,037,056)
final year report of (11BIE024,037,056)
 
ppr on folding wall(cement)
ppr on folding wall(cement)ppr on folding wall(cement)
ppr on folding wall(cement)
 
IUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main PartIUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main Part
 
Proceess technology life cycle
Proceess technology life cycleProceess technology life cycle
Proceess technology life cycle
 
Toyota
ToyotaToyota
Toyota
 
Evaluation and Reduction of Truck Turnaround Time
Evaluation and Reduction of Truck Turnaround Time Evaluation and Reduction of Truck Turnaround Time
Evaluation and Reduction of Truck Turnaround Time
 

More from ranjanshetty

MTR - Quality as Competitive Advantage
MTR - Quality as Competitive AdvantageMTR - Quality as Competitive Advantage
MTR - Quality as Competitive Advantageranjanshetty
 
Rating rational of vijaya bank
Rating rational of vijaya bankRating rational of vijaya bank
Rating rational of vijaya bankranjanshetty
 
Banking dictionary
Banking dictionaryBanking dictionary
Banking dictionaryranjanshetty
 
Sunil mittal case study (developed by ranjan shetty)
Sunil mittal   case study (developed by ranjan shetty)Sunil mittal   case study (developed by ranjan shetty)
Sunil mittal case study (developed by ranjan shetty)ranjanshetty
 
Mastering workforce through hrmis
Mastering workforce through hrmisMastering workforce through hrmis
Mastering workforce through hrmisranjanshetty
 
The recipe of retail sucess in india
The recipe of retail sucess in indiaThe recipe of retail sucess in india
The recipe of retail sucess in indiaranjanshetty
 
Business plan for fertilizers distributors
Business plan for fertilizers distributorsBusiness plan for fertilizers distributors
Business plan for fertilizers distributorsranjanshetty
 

More from ranjanshetty (9)

MTR - Quality as Competitive Advantage
MTR - Quality as Competitive AdvantageMTR - Quality as Competitive Advantage
MTR - Quality as Competitive Advantage
 
Reverse logostics
Reverse logosticsReverse logostics
Reverse logostics
 
Project finance
Project financeProject finance
Project finance
 
Rating rational of vijaya bank
Rating rational of vijaya bankRating rational of vijaya bank
Rating rational of vijaya bank
 
Banking dictionary
Banking dictionaryBanking dictionary
Banking dictionary
 
Sunil mittal case study (developed by ranjan shetty)
Sunil mittal   case study (developed by ranjan shetty)Sunil mittal   case study (developed by ranjan shetty)
Sunil mittal case study (developed by ranjan shetty)
 
Mastering workforce through hrmis
Mastering workforce through hrmisMastering workforce through hrmis
Mastering workforce through hrmis
 
The recipe of retail sucess in india
The recipe of retail sucess in indiaThe recipe of retail sucess in india
The recipe of retail sucess in india
 
Business plan for fertilizers distributors
Business plan for fertilizers distributorsBusiness plan for fertilizers distributors
Business plan for fertilizers distributors
 

Recently uploaded

Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 

Recently uploaded (20)

Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 

Business Model Optimization Project

  • 1.
  • 2. Here, from the above network model the red nodes represents both factory and warehouse, blue nodes represents only warehouse.
  • 3. Thus the following methods were used to forecast the minimum cost for the transportation.
  • 4.
  • 5. Vacuum cleaner (CASE-2).August Inventory forecasting for Water Purifiers Aquasure 3ltrsCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore28509981503698Hyderabad27639671693561Chennai2550892173425Mumbai24408542553039Delhi2750962323680Kolkata1650577752152August Inventory forecasting for Water Purifiers Aquasure 5ltrsCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore1650577132214Hyderabad14264991321793Chennai1520532232029Mumbai2050717212746Delhi17506121422220Kolkata900315121203August Inventory forecasting for Vacuum Cleaners Trendy SteelCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore1225428321621Hyderabad1060371451386Chennai1063372621373Mumbai1438503421899Delhi12454351341546Kolkata9233231341112August Inventory forecasting for Vacuum Cleaners Trendy XeonCityBilled for JulyInventory for AugustJuly InventoryTotal requiredBangalore1065372321405Hyderabad895313451163Chennai890311621139Mumbai1200420421578Delhi10003501341216Kolkata8763061341048<br />ExpectedWarehouse CapacityWPVCTotalActual CapacityBangalore59123026893810000Hyderabad5354254979039000Chennai5454251279669000Mumbai57853477926210000Delhi5900276286629000Kolkata3355216055157000<br />CASE-1:<br />In this case only BANGALORE, HYDERABAD and BHIMTAL are the only factories who are producing the WATER PURIFIERS and those units have to be transported from different factories to different warehouses in the country.<br />Thus the following is the transportation model:<br />HYDERABADBANGALOREBANGALOREBHIMTALMUMBAICHENNAIHYDERABADDELHIKOLKATAWATER PURIFIER TRANSPROTATION MODEL<br />Particulars(in Rs)WAREHOUSESBangaloreHyderabadChennaiMumbaiDelhiKolkataFACTORYBangalore04351011.6Hyderabad405599Bhimtal11.210121039<br />DECISION VARIABLE:<br />The decision variables are the units and the cost per unit which is going to give cost estimation, are as follows:<br />OBJECTIVE FUNCTION:<br />This function is going to give the minimized cost of the transportation:<br />0*X11 + 4*X12 + 3*X13 + 5*X14 + 10*X15 + 11.6*X16 + 4*X21 + 0*X22 + 5*X23 + 5*X24 + 9*X25 + 9*X26 + 11.2*X31 + 10*X32 + 12*X33 + 10*X34 + 3*X35 + 9*X36<br />CONSTARINTS:<br />SUPPLY CONSTRAINTS:<br />0*X11 + 4*X12 + 3*X13 + 5*X14 + 10*X15 + 11.6*X16 <= 11000.<br />4*X21 + 0*X22 + 5*X23 + 5*X24 + 9*X25 + 9*X26 <= 11000.<br />11.2*X31 + 10*X32 + 12*X33 + 10*X34 +3*X35 + 9*X36 <= 11000.<br />DEMAND CONSTRAINTS:<br />0*X11 + 4*X21 + 11.2*X31 = 5912.<br />4*X12 + 0*X22 + 10*X32 = 5354.<br />3*X13 + 5*X23 + 12*X33 = 5454.<br />5*X14 + 5*X24 + 10*X34 = 5785.<br />10*X15 + 9*X25 + 3*X35 = 5900.<br />11.6*X16 + 9*X26 + 9*X36 = 3355.<br />USING EXCEL THE ANSWER REPORT IS AS FOLLOWS:<br />Microsoft Excel 12.0 Answer ReportWorksheet: [Inventory2.xlsx]Sheet6Report Created: 12/7/2009 11:42:08 AMTarget Cell (Min)CellNameOriginal ValueFinal Value$B$22OBJECTIVE FUNCTION X113176031760Adjustable CellsCellNameOriginal ValueFinal Value$B$5X1100$C$5X12660$D$5X1300$E$5X14481157$F$5X15590522$G$5X162890$H$5X21066$I$5X2200$J$5X2310911091$K$5X2411090$L$5X25076$M$5X260373$N$5X31422403$O$5X32509535$P$5X3300$Q$5X3400$R$5X3500$S$5X3600ConstraintsCellNameCell ValueFormulaStatusSlack$B$10SUPPLY CONSTTRAINTS X1111000$B$10<=$D$10Binding0$B$11X119760$B$11<=$D$11Not Binding1240$B$12X1111000$B$12<=$D$12Binding0$B$14DEMAND CONTRAINTS X115912$B$14=$D$14Not Binding0$B$15X115354$B$15=$D$15Not Binding0$B$16X115454$B$16=$D$16Not Binding0$B$17X115785$B$17=$D$17Not Binding0$B$18X115900$B$18=$D$18Not Binding0$B$19X113355$B$19=$D$19Not Binding0Microsoft Excel 12.0 Sensitivity ReportWorksheet: [Inventory2.xlsx]Sheet6Report Created: 12/7/2009 11:42:08 AMAdjustable Cells  FinalReducedObjectiveAllowableAllowableCellNameValueCostCoefficientIncreaseDecrease$B$5X110001E+300$C$5X120041E+300$D$5X130031E+300$E$5X14115704.99999999901E+30$F$5X1552201000$G$5X160011.61E+300$H$5X21660400$I$5X220001E+300$J$5X2310910501E+30$K$5X240051E+300$L$5X257608.99999999800$M$5X2637308.99999999801E+30$N$5X3140301400$O$5X3253501001E+30$P$5X3300121E+300$Q$5X34009.9999999981E+300$R$5X350031E+300$S$5X36008.9999999981E+300Constraints  FinalShadowConstraintAllowableAllowableCellNameValuePriceR.H. SideIncreaseDecrease$B$10SUPPLY CONSTTRAINTS X1111000011000684.99999981240$B$11X1197600110001E+301240$B$12X11110000110002661240$B$14DEMAND CONTRAINTS X115912159121240266$B$15X115354153541240266$B$16X1154541545412405454$B$17X115785157851240684.9999998$B$18X115900159001240684.9999998$B$19X1133551335512403355<br />Microsoft Excel 12.0 Limits ReportWorksheet: [Inventory2.xlsx]Limits Report 1Report Created: 12/7/2009 11:42:09 AM Target CellNameValue$B$22OBJECTIVE FUNCTION X1131760 Adjustable LowerTargetUpperTargetCellNameValueLimitResultLimitResult$B$5X110#N/A#N/A#N/A#N/A$C$5X120#N/A#N/A#N/A#N/A$D$5X130#N/A#N/A#N/A#N/A$E$5X141157#N/A#N/A#N/A#N/A$F$5X15522#N/A#N/A#N/A#N/A$G$5X160#N/A#N/A#N/A#N/A$H$5X2166#N/A#N/A#N/A#N/A$I$5X220#N/A#N/A#N/A#N/A$J$5X231091#N/A#N/A#N/A#N/A$K$5X240#N/A#N/A#N/A#N/A$L$5X2576#N/A#N/A#N/A#N/A$M$5X26373#N/A#N/A#N/A#N/A$N$5X31403#N/A#N/A#N/A#N/A$O$5X32535#N/A#N/A#N/A#N/A$P$5X330#N/A#N/A#N/A#N/A$Q$5X340#N/A#N/A#N/A#N/A$R$5X350#N/A#N/A#N/A#N/A$S$5X360#N/A#N/A#N/A#N/A<br />Thus the above are the excel reports where the minimized cost is 16486.<br />CASE-2:<br />In this case only two factories BHIMTAL and CHENNAI produce the VACUUM CLEANERS.<br />Thus the transportation model is as follows:<br />BANGALORECHENNAIBHIMTALMUMBAICHENNAIHYDERABADDELHIKOLKATAVACUUM CLEANER TRANSPORTATION MODEL<br />Particulars(in Rs)WAREHOUSESBangaloreHyderabadChennaiMumbaiDelhiKolkataFACTORYBhimtal1412.51512.53.7511.25Chennai3.756.25010.516.2516.25<br />DECISION VARIABLES:<br />In this the decision variables are the units and also the cost incurred to transport those units.<br />OBJECTIVE FUNCTION:<br />The objective function gives the minimized cost.<br />14*X11 + 12.5*X12 + 15*X13 + 12.5*X14+ 3.75*X15 + 11.25*X16 + 3.75*X21 + 6.25*X22 + 0*X23 + 10.5*X24 + 16.25*X25 + 16.25*X26<br />CONSTRAINTS:<br />SUPPLY CONSTARINTS:<br />14*X11 + 12.5*X12 + 15*X13 + 12.5*X14+ 3.75*X15 + 11.25*X16 <= 10000.<br />3.75*X21 + 6.25*X22 + 0*X23 + 10.5*X24 + 16.25*X25 + 16.25*X26 <= 10000.<br />DEMAND CONSTRAINTS:<br />14*X11 + 3.75*X21 = 3026.<br />12.5*X12 +6.25*X22 = 2549.<br />15*X13 + 0*X23 = 2512.<br />12.5*X14 + 10.5*X24 = 3477.<br />3.75*X15 + 16.25*X25 = 2762.<br />11.25*X16 + 16.25*X26 = 2160.<br />USING THE EXCEL THE REPORTS:<br />Microsoft Excel 12.0 Answer ReportWorksheet: [Inventory1.xlsx]Sheet5Report Created: 12/7/2009 11:29:36 AMTarget Cell (Min)CellNameOriginal ValueFinal Value$B$22OBJECTIVE FUNCTION x111648616486Adjustable CellsCellNameOriginal ValueFinal Value$B$5x1100$C$5x1200$D$5x1300$E$5x1400$F$5x15169.97169.97$G$5x16132.92132.92$H$5x21216.14216.14$I$5x22203.92203.92$J$5x23167.47167.47$K$5x24278.16278.16$L$5x2500$M$5x2600ConstraintsCellNameCell ValueFormulaStatusSlack$B$11SUPPLY CONSTRAINTS x1153$B$11<=$D$11Not Binding9947$B$12x1169$B$12<=$D$12Not Binding9931$B$15DEMAND CONSTRAINTS x113026$B$15=$D$15Not Binding0$B$16x112549$B$16=$D$16Not Binding0$B$17x112512$B$17=$D$17Not Binding0$B$18x113477$B$18=$D$18Not Binding0$B$19x112762$B$19=$D$19Not Binding0$B$20x112160$B$20=$D$20Not Binding0<br />Microsoft Excel 12.0 Sensitivity ReportWorksheet: [Inventory1.xlsx]Sheet5Report Created: 12/7/2009 11:29:36 AMAdjustable Cells  FinalReducedObjectiveAllowableAllowableCellNameValueCostCoefficientIncreaseDecrease$B$5x11003.751E+300$C$5x12006.2500000021E+300$D$5x130001E+300$E$5x140010.51E+300$F$5x15169.9692308016.2501E+30$G$5x16132.9230769016.2501E+30$H$5x21216.142857101401E+30$I$5x22203.92012.501E+30$J$5x23167.46666670151E+301E+30$K$5x24278.16012.501E+30$L$5x25003.751E+300$M$5x260011.251E+300Constraints  FinalShadowConstraintAllowableAllowableCellNameValuePriceR.H. SideIncreaseDecrease$B$11SUPPLY CONSTRAINTS x11530100001E+309947$B$12x11690100001E+309931$B$15DEMAND CONSTRAINTS x113026130261E+303026$B$16x112549125491E+302549$B$17x112512125121E+302512$B$18x113477134771E+303477$B$19x112762127621E+302762$B$20x112160121601E+302160<br />Microsoft Excel 12.0 Limits ReportWorksheet: [Inventory1.xlsx]Limits Report 1Report Created: 12/7/2009 11:29:36 AM Target CellNameValue$B$22OBJECTIVE FUNCTION x1116486 Adjustable LowerTargetUpperTargetCellNameValueLimitResultLimitResult$B$5x110016486016486$C$5x120016486016486$D$5x130016486#N/A#N/A$E$5x140-4.33093E-1416486-4.33093E-1416486$F$5x15169.9692308169.969230816486169.969230816486$G$5x16132.9230769132.923076916486132.923076916486$H$5x21216.1428571216.142857116486216.142857116486$I$5x22203.92203.9216486203.9216486$J$5x23167.4666667167.466666716486167.466666716486$K$5x24278.16278.1616486278.1616486$L$5x250016486016486$M$5x260016486016486<br />CONCLUSION:<br />Thus from the above analysis this is to say that the cost occurred to transport the WATER PURIFIER and VACUUM CLEANERS are 31760 and 16486. <br />