This document outlines the labor costs and equipment costs for a project. It lists 6 roles and their duration, daily wages, and total wages. It also lists 2 pieces of equipment, their costs, and total equipment costs. The total labor costs are Rp26,890,000 and total equipment costs are Rp9,000,000, for a combined total project cost of Rp35,890,000.