EQUIPMENT VALIDATION :
HOT AIR OVEN
5/29/2016 1
Mr. Sagar Kishor Savale
[Department of Pharmaceutics]
avengersagar16@gmail.com
2015-2016
Department of Pharmacy (Pharmaceutics) | Sagar savale
Content
• Definition of Equipment validation
• Introduction
• Types of Dry Heat Sterilizers
• Principles of Heat Transfer And Circulation
• Validation Test Equipment
• Basic Validation Approach
• Process Qualification Cycle Development
• Routine Monitor After Validation
• Documentation
• Conclusion
2
5/29/2016
Introduction1,4,III
• A validation programme involves various components in
pharmaceutical organisation related to process, equipment and
product.
• Equipment Validation ensures that an instrument is appropriate for
its intended use.
• Dry heat is one of the most commonly used method to sterilize and
depyrogenate pharmaceutical components and product.
3
5/29/2016
Types of Dry Heat Sterilizers 1
Conventional Hot Air Oven
Tunnel Sterilizers
4
5/29/2016
HOT AIR OVEN 2,3,I
• Higher temperatures and longer exposure times required
• Typical cycles:
 160°C for 120 minutes
 170°C for 60 minutes
 180°C for 30 minutes
• Used for:
 glassware and product containers used in aseptic manufacture, non
aqueous thermostable powders and liquids (oils)
 also used for depyrogenation of glassware.
5
5/29/2016
The hot air oven is the equipment which is utilized to provide the dry heat
medium and it must be validated to ensure that the system is able to provides
sterile and depyrogenated components, on a reproducible basis
6
5/29/2016
Principles of Heat Transfer and Circulation 1,2,II
• Convection
 Heat flows from one body to another due to the temperature difference
between them.
• Radiation
 Photon propagation will transfer thermal energy to the object and increase
the surface temperature
• Circulation
 Booster fan or blowers are used in the oven to increase the circulation of
the heat throughout the load.
7
5/29/2016
Validation Test Equipment 1,IV
Equipment used for validation testing of oven are listed below:
 Resistance temperature detectors
 Thermocouples
 Data logger
 Constant temperature bath
 Stopwatch
 Voltmeter
 Optical tachometer
8
5/29/2016
Basic Validation Approach 3,4, V
Design qualification:
• The DQ outline the key features of the system designed to address
the user requirement, regulatory compliance and selection rationale
of a particular supplier.
• The following are the key considerations for DQ:
 Physical dimensions of the equipment and accessories
 Suitable operating environment of the instrument
 Health and safety requirement 9
5/29/2016
• It is carried out after or concurrently with the installation of the equipment at
the user’s premises.
• The purpose is to provide documentary evidence that the correct equipment
has been received and installed as per plan and protocol.
• IQ documents should be reviewed and approved by designated responsible
individuals.
• It includes details of-
 Structural- Check dimensions, presence of seal
 Filters- Proper identification,type,size,air capacity, flow rate
10
Installation Qualification
5/29/2016
11
 Electricals- Proper identification, safety cutoff
 HVAC- System provides the temperature and pressure differential required.
 Air supply- Identify source, duct size.
 Air or natural gas- Check that the source and type of supply are consistent
with the manufacturer’s recommendations.
 Heaters- Record the manufacturer's model no., the no. of heating elements.
 Blowers- Check for use of correct fan belt & that is in good condition.
5/29/2016
Operational Qualification
• It is documented verification that the system or subsystem performs as
intended throughout all specified operating range
.
• The OQ document should be reviewed and signed by the required
department representatives.
• The components of system must satisfy the operating ranges as determined
by the purchase order specifications.
• Each of the following process components must be identified & the
operating performance & range determined.
Temperature monitors
12
5/29/2016
13
 Cycle timer-
The accuracy of timer must be determined, so that assurance is
provided for cycle time.
 Door interlocks-
If a unit is equipped with double doors, the interlocks must operate
such that the door leading to the aseptic area cannot be opened if the
door to the non-aseptic area is opened.
 Heaters-
All of the heating elements must be functional.
 Blowers-
The air velocity consistent and motor speed of blowers should be
noted in the OQ records.
5/29/2016
14
 Cooling Coils-
If coils are present, the type and size of the coils and temperature of
the cooling medium at the inlet and outlet of the coils should be
recorded.
 Chamber leaks-
The perimeter of the doors for batch sterilizers should be checked for
air leakage while operating.
 Particulates counts-
Particulate count should be checked within the containers before and
after sterilization to quantitate the particle load contributed to the
product by sterilization process
5/29/2016
Performance Qualification 5
• Verifies that the equipment performs according to design specifications and
user defined requirements in a reliable & reproducible manner under
normal production conditions
• Physical -
Heat penetration studies on empty chamber
Heat distribution study on loaded chamber
Heat penetration study on loaded chamber
• Microbiological-
Bio-challenge/ Pyro-challenge studies
15
5/29/2016
Heat Penetration Studies On Empty Chamber 1,2,IV
• To identify heat distribution patterns including slowest heating points
• Multiple temperature sensing devices should be used(Thermocouples)
• Temperature profile locate hot/cold areas in the sterilizer by mapping
temperature at various locations
• A detailed diagram of the location of the thermocouples should be included
in the empty chamber data file
16
5/29/2016
Heat Distribution Study on Loaded Chamber1,2
• Multiple thermocouples throughout chamber (not inside product
containers) to determine effect of load configuration on temperature
distribution.
• Temperature distribution for all loads using all container sizes used in
production should be tested.
• Repeat runs should be performed to check variability.
• Temperature profile for each chamber load configuration should be
documented
17
5/29/2016
Heat Penetration Study on Loaded Chamber 1,2
• Designed to determine the location of the slowest heating point within a
oven at various locations.
• Each size & type of material should be tested by penetration studies.
• Hot areas in the load are more important for heat labile items.
• Data obtained by placing thermocouples inside the container in such a way
as to ensure contact with the surface.
18
5/29/2016
Bio-Challenge/ Pyro-Challenge Studies 1,2
• The challenge should demonstrate the lethality delivered by the cycle with
either microorganisms or endotoxin
• Resistant bacterial spores are available as BIs primarily in the form of:
• Spore strips:
• Spore suspension:
19
5/29/2016
Process Qualification Cycle Development 1,2,II
• The sterilization cycle is designed to inactivate the heat resistant spores as
well as any vegetative cells which could potentially be present during
processing.
• D-value:
 It is used to express the rate of killing of microorganisms during
sterilization.
 The time required at a certain temperature to kill 90% of the organism
being tested.
 Dry heat sterilization:Therotical requirment-170°C,32 min.
20
5/29/2016
21
• Z-value:
 The relationship of lethality to temperature is expressed the in Z-
value.
 The Z value will define the number of degrees that are required for a
change in the D-value by a factor of 10
 Dry heat sterilization Z =20°C
• F-value:
 It is a unit of lethality used as a measurement of sterilization
effectiveness.
 It indicates the equivalent amount of time delivered by a heat process at
a particular temperature.
5/29/2016
Routine Monitor After Validation 1,5
• The unit must be monitored so that it remains in a state of control
• This is achieved by the use of various programs including-
• Sanitization:
 It should detailed the cleaning methods used for the equipment, the
SOPs covering each method, and the cleaning materials utilized.
 Cleaning materials should be nontoxic and leave no residues.
22
5/29/2016
23
• Preventive maintenance-
 It provides a schedule by which the equipment is maintained.
 A proper PM program will help to prevent breakdown during
production.
• Change control-
 Changes to the equipment that might compromise the validation
must be brought to the attention of the group or individuals in
charge of the change control program.
• Revalidation-
 It may be required after changes or repairs are made on the unit or
an a predetermined periodic interval.
5/29/2016
Documentation 1,5
• All validation information should be easily identified and kept in a
permanent central file, where it can be readily retrieved.
• The validation file should include the following information:
• Qualifications-
This includes all steps performed in the certification of the equipment .
All original data, results and conclusion must be contained in this file.
All reports should be dated,signed,and approved by the responsible
individuals.
24
5/29/2016
25
• Process Qualification Protocol:
 The protocol is located in this file.
• Raw Data:
 All original data, results, calculation and conclusions must be retained for
empty- and loaded chamber and biochallenge studies
• Process Qualification Report:
 It is the formal document available for regulatory review
• Routine Monitoring:
 All change-control information and postvalidation mechanical changes are
recorded along with any revalidation work
5/29/2016
Conclusion
• Equipment is one of the basic component of pharma processing and
therefore equipment validation is an important aspect.
• Validation of Hot Air Oven is the part of comprehensive validation
program within a company.
• The validation of Hot Air Oven prove its repeatability.
• Equipment validation give the surety that equipment having good
qualification like design, operation, installation and performance
qualification which have predetermined.
26
5/29/2016
References
1. Laurie BC, Gayle DH, Dry Heat Sterilization and Depyrogenation
Validation and Monitoring, In:, James AF, Carleton J, Editors.Validation
Of Pharmaceutical Process, informa healthcare; P. 223-239
2. Michael JA,Neil RA. Sterilization Validation. In : Robert AN, Alfred HW,
Editors. Pharmaceutical Process Validation, New York: informa healthcare
; 2011 .P. 83-111
3. Gupta GD, Garg R, Aggarwal S. Guidlines On General Principles Of
Validation :Solid, Liquid and Sterile Dosage Forms, latest review, vol-
6(1),01/10/2008
4. Potdar AM. Pharmaceutical Quality Assurance,1st ed. Published by
Nirali Prakashan; 2006.P. 8.13-8.20
5. Syed Imtiaz Haider. Pharmaceutical Master Validation Plan. The Ultimate
Guide to FDA,GMP and GLP Compliance. informa healthcare;2010. P.
138-139
27
5/29/2016
Web References
I. http://www.mackpharmatech.com/doc.htm
II. http://www.radiantenergy.com/fin.htm
III. http://www.pharmainfo.net/equipment-validation-
articles/laboratory-equipment-qualification
IV. http://www.validation-online.net/validation-protocol-
standards.html
V. http://www.ehow.com/list_6809815_equipment-qualification-
protocols.html
VI. http://www.ikev.org/haber/2002validpdf/Sunum%20Suat%20Ku
mser.pdf
28
5/29/2016
29
5/29/2016

More Related Content

Similar to equipmentsvalidation.pdf

Validation utility system
Validation utility systemValidation utility system
Validation utility systemPRANJAY PATIL
 
HVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdfHVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdfBALASUNDARESAN M
 
Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...Malla Reddy College of Pharmacy
 
Sterilization validation
Sterilization validationSterilization validation
Sterilization validationRavish Yadav
 
Validation of dry heat sterilization
Validation of dry heat sterilizationValidation of dry heat sterilization
Validation of dry heat sterilizationDeepak Shanbhag
 
Technology Transfer and Scale-up in Pharmaceutical Industry
Technology Transfer and Scale-up in Pharmaceutical IndustryTechnology Transfer and Scale-up in Pharmaceutical Industry
Technology Transfer and Scale-up in Pharmaceutical IndustryPranjalWagh1
 
Qualification of Manufacturing Equipments.
Qualification of Manufacturing Equipments. Qualification of Manufacturing Equipments.
Qualification of Manufacturing Equipments. Ashish Hingnekar
 
Qualification of Tray Dryer.pptx
Qualification of Tray Dryer.pptxQualification of Tray Dryer.pptx
Qualification of Tray Dryer.pptxDhruvi50
 
Final Io Pp Mdptc Pack Expo Nov 3 2010 3
Final  Io Pp Mdptc Pack Expo Nov 3 2010 3Final  Io Pp Mdptc Pack Expo Nov 3 2010 3
Final Io Pp Mdptc Pack Expo Nov 3 2010 3KKGPackaging
 
Documentation control - principles of GMP
Documentation control - principles of GMPDocumentation control - principles of GMP
Documentation control - principles of GMPAJAYKUMAR4872
 
Auditing of sterile poduction
Auditing of sterile poductionAuditing of sterile poduction
Auditing of sterile poductionprakhar rai pk
 
Packaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketPackaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketApril Bright
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection modelDhrutiPatel61
 
Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryPooja Harkal
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validationaqsa fatima
 
Qualification of Autoclave - Dipankar.pptx
Qualification of Autoclave - Dipankar.pptxQualification of Autoclave - Dipankar.pptx
Qualification of Autoclave - Dipankar.pptxGNIPST
 
Sterile Facilities
Sterile FacilitiesSterile Facilities
Sterile FacilitiesEric Sipe
 

Similar to equipmentsvalidation.pdf (20)

Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Validation of gc instrument
Validation of gc instrumentValidation of gc instrument
Validation of gc instrument
 
HVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdfHVAC Validation (Air Handling Units).pdf
HVAC Validation (Air Handling Units).pdf
 
Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...Equipment qualification & validation of autoclave, dry heat sterilization and...
Equipment qualification & validation of autoclave, dry heat sterilization and...
 
Sterilization validation
Sterilization validationSterilization validation
Sterilization validation
 
Validation of dry heat sterilization
Validation of dry heat sterilizationValidation of dry heat sterilization
Validation of dry heat sterilization
 
Technology Transfer and Scale-up in Pharmaceutical Industry
Technology Transfer and Scale-up in Pharmaceutical IndustryTechnology Transfer and Scale-up in Pharmaceutical Industry
Technology Transfer and Scale-up in Pharmaceutical Industry
 
Qualification of Manufacturing Equipments.
Qualification of Manufacturing Equipments. Qualification of Manufacturing Equipments.
Qualification of Manufacturing Equipments.
 
Qualification of Tray Dryer.pptx
Qualification of Tray Dryer.pptxQualification of Tray Dryer.pptx
Qualification of Tray Dryer.pptx
 
Final Io Pp Mdptc Pack Expo Nov 3 2010 3
Final  Io Pp Mdptc Pack Expo Nov 3 2010 3Final  Io Pp Mdptc Pack Expo Nov 3 2010 3
Final Io Pp Mdptc Pack Expo Nov 3 2010 3
 
Documentation control - principles of GMP
Documentation control - principles of GMPDocumentation control - principles of GMP
Documentation control - principles of GMP
 
Preformulation
PreformulationPreformulation
Preformulation
 
Auditing of sterile poduction
Auditing of sterile poductionAuditing of sterile poduction
Auditing of sterile poduction
 
Packaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketPackaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to Market
 
Validatn of fbd
Validatn of fbdValidatn of fbd
Validatn of fbd
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection model
 
Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical Industry
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validation
 
Qualification of Autoclave - Dipankar.pptx
Qualification of Autoclave - Dipankar.pptxQualification of Autoclave - Dipankar.pptx
Qualification of Autoclave - Dipankar.pptx
 
Sterile Facilities
Sterile FacilitiesSterile Facilities
Sterile Facilities
 

Recently uploaded

꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Callshivangimorya083
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...ThinkInnovation
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一fhwihughh
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998YohFuh
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130Suhani Kapoor
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...soniya singh
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]📊 Markus Baersch
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Sapana Sha
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一F sss
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...Florian Roscheck
 

Recently uploaded (20)

꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
 

equipmentsvalidation.pdf

  • 1. EQUIPMENT VALIDATION : HOT AIR OVEN 5/29/2016 1 Mr. Sagar Kishor Savale [Department of Pharmaceutics] avengersagar16@gmail.com 2015-2016 Department of Pharmacy (Pharmaceutics) | Sagar savale
  • 2. Content • Definition of Equipment validation • Introduction • Types of Dry Heat Sterilizers • Principles of Heat Transfer And Circulation • Validation Test Equipment • Basic Validation Approach • Process Qualification Cycle Development • Routine Monitor After Validation • Documentation • Conclusion 2 5/29/2016
  • 3. Introduction1,4,III • A validation programme involves various components in pharmaceutical organisation related to process, equipment and product. • Equipment Validation ensures that an instrument is appropriate for its intended use. • Dry heat is one of the most commonly used method to sterilize and depyrogenate pharmaceutical components and product. 3 5/29/2016
  • 4. Types of Dry Heat Sterilizers 1 Conventional Hot Air Oven Tunnel Sterilizers 4 5/29/2016
  • 5. HOT AIR OVEN 2,3,I • Higher temperatures and longer exposure times required • Typical cycles:  160°C for 120 minutes  170°C for 60 minutes  180°C for 30 minutes • Used for:  glassware and product containers used in aseptic manufacture, non aqueous thermostable powders and liquids (oils)  also used for depyrogenation of glassware. 5 5/29/2016
  • 6. The hot air oven is the equipment which is utilized to provide the dry heat medium and it must be validated to ensure that the system is able to provides sterile and depyrogenated components, on a reproducible basis 6 5/29/2016
  • 7. Principles of Heat Transfer and Circulation 1,2,II • Convection  Heat flows from one body to another due to the temperature difference between them. • Radiation  Photon propagation will transfer thermal energy to the object and increase the surface temperature • Circulation  Booster fan or blowers are used in the oven to increase the circulation of the heat throughout the load. 7 5/29/2016
  • 8. Validation Test Equipment 1,IV Equipment used for validation testing of oven are listed below:  Resistance temperature detectors  Thermocouples  Data logger  Constant temperature bath  Stopwatch  Voltmeter  Optical tachometer 8 5/29/2016
  • 9. Basic Validation Approach 3,4, V Design qualification: • The DQ outline the key features of the system designed to address the user requirement, regulatory compliance and selection rationale of a particular supplier. • The following are the key considerations for DQ:  Physical dimensions of the equipment and accessories  Suitable operating environment of the instrument  Health and safety requirement 9 5/29/2016
  • 10. • It is carried out after or concurrently with the installation of the equipment at the user’s premises. • The purpose is to provide documentary evidence that the correct equipment has been received and installed as per plan and protocol. • IQ documents should be reviewed and approved by designated responsible individuals. • It includes details of-  Structural- Check dimensions, presence of seal  Filters- Proper identification,type,size,air capacity, flow rate 10 Installation Qualification 5/29/2016
  • 11. 11  Electricals- Proper identification, safety cutoff  HVAC- System provides the temperature and pressure differential required.  Air supply- Identify source, duct size.  Air or natural gas- Check that the source and type of supply are consistent with the manufacturer’s recommendations.  Heaters- Record the manufacturer's model no., the no. of heating elements.  Blowers- Check for use of correct fan belt & that is in good condition. 5/29/2016
  • 12. Operational Qualification • It is documented verification that the system or subsystem performs as intended throughout all specified operating range . • The OQ document should be reviewed and signed by the required department representatives. • The components of system must satisfy the operating ranges as determined by the purchase order specifications. • Each of the following process components must be identified & the operating performance & range determined. Temperature monitors 12 5/29/2016
  • 13. 13  Cycle timer- The accuracy of timer must be determined, so that assurance is provided for cycle time.  Door interlocks- If a unit is equipped with double doors, the interlocks must operate such that the door leading to the aseptic area cannot be opened if the door to the non-aseptic area is opened.  Heaters- All of the heating elements must be functional.  Blowers- The air velocity consistent and motor speed of blowers should be noted in the OQ records. 5/29/2016
  • 14. 14  Cooling Coils- If coils are present, the type and size of the coils and temperature of the cooling medium at the inlet and outlet of the coils should be recorded.  Chamber leaks- The perimeter of the doors for batch sterilizers should be checked for air leakage while operating.  Particulates counts- Particulate count should be checked within the containers before and after sterilization to quantitate the particle load contributed to the product by sterilization process 5/29/2016
  • 15. Performance Qualification 5 • Verifies that the equipment performs according to design specifications and user defined requirements in a reliable & reproducible manner under normal production conditions • Physical - Heat penetration studies on empty chamber Heat distribution study on loaded chamber Heat penetration study on loaded chamber • Microbiological- Bio-challenge/ Pyro-challenge studies 15 5/29/2016
  • 16. Heat Penetration Studies On Empty Chamber 1,2,IV • To identify heat distribution patterns including slowest heating points • Multiple temperature sensing devices should be used(Thermocouples) • Temperature profile locate hot/cold areas in the sterilizer by mapping temperature at various locations • A detailed diagram of the location of the thermocouples should be included in the empty chamber data file 16 5/29/2016
  • 17. Heat Distribution Study on Loaded Chamber1,2 • Multiple thermocouples throughout chamber (not inside product containers) to determine effect of load configuration on temperature distribution. • Temperature distribution for all loads using all container sizes used in production should be tested. • Repeat runs should be performed to check variability. • Temperature profile for each chamber load configuration should be documented 17 5/29/2016
  • 18. Heat Penetration Study on Loaded Chamber 1,2 • Designed to determine the location of the slowest heating point within a oven at various locations. • Each size & type of material should be tested by penetration studies. • Hot areas in the load are more important for heat labile items. • Data obtained by placing thermocouples inside the container in such a way as to ensure contact with the surface. 18 5/29/2016
  • 19. Bio-Challenge/ Pyro-Challenge Studies 1,2 • The challenge should demonstrate the lethality delivered by the cycle with either microorganisms or endotoxin • Resistant bacterial spores are available as BIs primarily in the form of: • Spore strips: • Spore suspension: 19 5/29/2016
  • 20. Process Qualification Cycle Development 1,2,II • The sterilization cycle is designed to inactivate the heat resistant spores as well as any vegetative cells which could potentially be present during processing. • D-value:  It is used to express the rate of killing of microorganisms during sterilization.  The time required at a certain temperature to kill 90% of the organism being tested.  Dry heat sterilization:Therotical requirment-170°C,32 min. 20 5/29/2016
  • 21. 21 • Z-value:  The relationship of lethality to temperature is expressed the in Z- value.  The Z value will define the number of degrees that are required for a change in the D-value by a factor of 10  Dry heat sterilization Z =20°C • F-value:  It is a unit of lethality used as a measurement of sterilization effectiveness.  It indicates the equivalent amount of time delivered by a heat process at a particular temperature. 5/29/2016
  • 22. Routine Monitor After Validation 1,5 • The unit must be monitored so that it remains in a state of control • This is achieved by the use of various programs including- • Sanitization:  It should detailed the cleaning methods used for the equipment, the SOPs covering each method, and the cleaning materials utilized.  Cleaning materials should be nontoxic and leave no residues. 22 5/29/2016
  • 23. 23 • Preventive maintenance-  It provides a schedule by which the equipment is maintained.  A proper PM program will help to prevent breakdown during production. • Change control-  Changes to the equipment that might compromise the validation must be brought to the attention of the group or individuals in charge of the change control program. • Revalidation-  It may be required after changes or repairs are made on the unit or an a predetermined periodic interval. 5/29/2016
  • 24. Documentation 1,5 • All validation information should be easily identified and kept in a permanent central file, where it can be readily retrieved. • The validation file should include the following information: • Qualifications- This includes all steps performed in the certification of the equipment . All original data, results and conclusion must be contained in this file. All reports should be dated,signed,and approved by the responsible individuals. 24 5/29/2016
  • 25. 25 • Process Qualification Protocol:  The protocol is located in this file. • Raw Data:  All original data, results, calculation and conclusions must be retained for empty- and loaded chamber and biochallenge studies • Process Qualification Report:  It is the formal document available for regulatory review • Routine Monitoring:  All change-control information and postvalidation mechanical changes are recorded along with any revalidation work 5/29/2016
  • 26. Conclusion • Equipment is one of the basic component of pharma processing and therefore equipment validation is an important aspect. • Validation of Hot Air Oven is the part of comprehensive validation program within a company. • The validation of Hot Air Oven prove its repeatability. • Equipment validation give the surety that equipment having good qualification like design, operation, installation and performance qualification which have predetermined. 26 5/29/2016
  • 27. References 1. Laurie BC, Gayle DH, Dry Heat Sterilization and Depyrogenation Validation and Monitoring, In:, James AF, Carleton J, Editors.Validation Of Pharmaceutical Process, informa healthcare; P. 223-239 2. Michael JA,Neil RA. Sterilization Validation. In : Robert AN, Alfred HW, Editors. Pharmaceutical Process Validation, New York: informa healthcare ; 2011 .P. 83-111 3. Gupta GD, Garg R, Aggarwal S. Guidlines On General Principles Of Validation :Solid, Liquid and Sterile Dosage Forms, latest review, vol- 6(1),01/10/2008 4. Potdar AM. Pharmaceutical Quality Assurance,1st ed. Published by Nirali Prakashan; 2006.P. 8.13-8.20 5. Syed Imtiaz Haider. Pharmaceutical Master Validation Plan. The Ultimate Guide to FDA,GMP and GLP Compliance. informa healthcare;2010. P. 138-139 27 5/29/2016
  • 28. Web References I. http://www.mackpharmatech.com/doc.htm II. http://www.radiantenergy.com/fin.htm III. http://www.pharmainfo.net/equipment-validation- articles/laboratory-equipment-qualification IV. http://www.validation-online.net/validation-protocol- standards.html V. http://www.ehow.com/list_6809815_equipment-qualification- protocols.html VI. http://www.ikev.org/haber/2002validpdf/Sunum%20Suat%20Ku mser.pdf 28 5/29/2016