Project Management (Project 1 - Defining and documenting a project) Presentat...
my cv
1. 2011 - Present
(3 years 11 months)
SITE MANAGER
PT. Sentra Design
I
RESPONSIBILITIES - Analyze document of tender - prepare to fulfill biding price of bill of quantity -
preparing and coordinating manpower, subcontractor , to run the project - Prepare schedule, method of
work, and approval material to the client or consultant. - Coordination with client and consultant, attend
meeting to report the progress work . - produce shop drawing until as build drawing. - Lead to solve
problem in constrains project - Maintains the project to meet timeline schedule, budget, and quality
requirement of client or consultant. - Responsibility to runs project from kick of meeting until handover.
PROJECT : - Head Office Xl Axiata, tbk Graha xl 6th floor , Kuningan Jakarta - XL Center Bengkulu,
Bangka, Dumai, Pekan Baru,Serang,Indramayu,sukabumi - BTPN FBC Sinaya Padang, ITC roxi, - BTPN
KC Syariah Medan ,Palembang - Head Office BTPN Cyber 2 Building 3th & 5 th floor, Kuningan Jakarta -
Head Office BTPN Cyber 2 Building 23th & 25 th floor, Kuningan Jakarta - Head Office BTPN Menara
Prima 11th & 15th floor, kuningan Jakarta - BII KC, Lippo Cikarang, Office 8 Senopati, MTC BAndung -
Mandiri Axa General Insurance, Medan,Pekan Baru, Palembang,Lampung,Jakarta Wijaya, Jakarta
Kelapa Gading, Bogor, yogya,semarang,Banjarmasin,Samarinda, Balikpapan,Makasar, Manado - CIMB
Niaga KC Cibinong, KC CIkini Jkt ,- Bank Danamon KC Radio Dalam
Jan 2011 - Apr 2011
(3 months)
PROJECT ARCHITECT
Agung Sedayu Group
RESPONSIBILITIES: - Distributing and checking the drawing produced by head office division of
architecture landed housing to all contractors and applicator. - ensure that the drawing can be executing
and implementing in to field. - Coordination with head office about all aspect of design. - Accounting &
reporting work progress of the contractor to the project manager - Liaise with clients and marketing
division to prepare, execute and fulfill project and schedule - Attend meeting with all contractor and
applicator - Ensure that the quality project meet requirement of client - Ensure projects are carry out
smoothly on time
PROJECT : - GRAND GALAXI CITY , Bekasi
2. Feb 2009 - Jan 2011
(1 year 11 months)
PROJECT SUPERVISOR
PT. DECOPLASTER LARASTAMA
RESPONSIBILITIES - Making material budget to one project - Preparing and making Shop Drawing, until
As build Drawing - preparing Method of Job Instruction - Preparing Approval Material to the Owner or MK
- Purchase the material whose needed every day - Accounting & reporting work Progress - Accounting
The op name of "mandor" - Accounting the addendum Work - Coordinating with Main Contractor ,Owner,
or MK to meet the final result correlation with time schedule, Quality , and budget. QUALIFICATION -
Honest and responsibilities to the job -Able to operate computer (AUTO CAD 2D&3D,3MAX,MS Office). -
Able to make bill of quantity. -Having good skill in sketcher drawing and good sense of art of and object. -
Have experience both studio and field supervising. -Strong leadership in order to make effective and
efficient result. -Able to make daily, weekly progress report. REASON FOR LEAVING -Seek the new
challenge and developing carrier.
PROJECT - THE LAVANDE APARTEMENT,Tebet Jakarta Selatan Owner : Agung Podomoro - THE
GRAND KARTINI APARTEMENT & SWISS BEL HOTEL, Mangga Besar Jakarta Pusat Owner : PT . IJS
- THE CLUSTER ELLYSIUM, Lippo Cikarang Oner : PT. Lippo
Dec 2007 - Feb 2009
(1 year 2 months)
ARCHITECT ENGINEER
PT.INTRACO LESTARI
RESPONSIBILITIES : -Checking and controlling shop drawings that produces by the drafter. -Calculates
materials and tools that needed every day in order to make sustainable progress in one project. -
Controlling and ensuring the quality result made by employers to meet the owner requirement. -Approval
materials to the designer. -Make daily and weekly report. -Field inspection and supervision. -Prepare as
build drawing. -Maintain good relationship with the owner. EXPERIENCES GAINED : -Fluently drawing by
AUTOCAD 2007 , 3D MAX. -Have experience both field supervision and studio
PROJECT : 1. EXECUTIVE POLY Dr. SUKAMAN RS. HARAPAN KITA Slipi,West Jakarta Owner:
HARAPAN KITA HOSPITAL 2. BNI 46 EMERALD Jend Sudirman Street, Central Jakarta Owner: BNI 46
REASON FOR LEAVING : -Seek for better career advancement opportunities and exposure.
3. Dec 2006 - Dec 2007
(1 year)
ARCHITECT
CV. ERINTA JAYA
RESPONSIBILITIES : -Make presentation drawing and shop drawing - supervising and controlling shop
drawing prepared by the drafter - calculated the material and toll that needed everyday - coordinated with
contractions management and the owner - Report To Director
PROJECT : - PUSLATKAPRANG KOLAT KOARMATIM, CUBICLE ROOM, Pangkalan Ujung Tanjung
Perak Surabaya. - Owner : TNI AL
Mar 2002 - Nov 2006
(4 years 8 months)
PROJECT SUPERVISOR
CV. DISTORSI
RESPONSIBILITIES : -Make project schedule -Count of work progress of the "mandor" -Make Progress
Report of the whole project -Field supervising -Responsibility to Director
PROJECT : - THE BULL EYE'S GRIIL & RESTO, Mayjen Sungkono Surabaya - several private house in
surabaya
Mar 2000 - Oct 2001
(1 year 7 months)
DRAFTER
BMJ. Int"
Work Description : - Make a perfective drawing and full-size drawing - Make cutting list from one product
or sample to execution in production department - Responsibility to HRD manager