This document outlines the work experience of an individual as a site manager, project architect, project supervisor, architect engineer, architect, and drafter from 2011 to 2000. As a site manager, the individual's responsibilities included analyzing documents, preparing budgets and schedules, coordinating teams, and ensuring projects met quality standards. Notable projects included work for telecom and banking clients. Previous roles involved supervision of contractors, preparing drawings and reports, and coordinating with clients.
A Talented, Results-driven Civil Engineering Professional with 10 years 07 month of Experience in Construction of Infrastructure, Roads, utilities, and Landscaping in the site inspections, supervision, quality control and construction management. Possess excellent analytical, problem solving, negotiation, client-contractor-consultant coordination, technical correspondence, management, communication, interpersonal and computer skills.
A Talented, Results-driven Civil Engineering Professional with 10 years 07 month of Experience in Construction of Infrastructure, Roads, utilities, and Landscaping in the site inspections, supervision, quality control and construction management. Possess excellent analytical, problem solving, negotiation, client-contractor-consultant coordination, technical correspondence, management, communication, interpersonal and computer skills.
BIM Designer having 6 years of professional experience in design, modeling and coordination of commercial,residential, hospital projects seeking for a better opportunity.
Project Management (Project 1 - Defining and documenting a project) Presentat...
my cv
1. 2011 - Present
(3 years 11 months)
SITE MANAGER
PT. Sentra Design
I
RESPONSIBILITIES - Analyze document of tender - prepare to fulfill biding price of bill of quantity -
preparing and coordinating manpower, subcontractor , to run the project - Prepare schedule, method of
work, and approval material to the client or consultant. - Coordination with client and consultant, attend
meeting to report the progress work . - produce shop drawing until as build drawing. - Lead to solve
problem in constrains project - Maintains the project to meet timeline schedule, budget, and quality
requirement of client or consultant. - Responsibility to runs project from kick of meeting until handover.
PROJECT : - Head Office Xl Axiata, tbk Graha xl 6th floor , Kuningan Jakarta - XL Center Bengkulu,
Bangka, Dumai, Pekan Baru,Serang,Indramayu,sukabumi - BTPN FBC Sinaya Padang, ITC roxi, - BTPN
KC Syariah Medan ,Palembang - Head Office BTPN Cyber 2 Building 3th & 5 th floor, Kuningan Jakarta -
Head Office BTPN Cyber 2 Building 23th & 25 th floor, Kuningan Jakarta - Head Office BTPN Menara
Prima 11th & 15th floor, kuningan Jakarta - BII KC, Lippo Cikarang, Office 8 Senopati, MTC BAndung -
Mandiri Axa General Insurance, Medan,Pekan Baru, Palembang,Lampung,Jakarta Wijaya, Jakarta
Kelapa Gading, Bogor, yogya,semarang,Banjarmasin,Samarinda, Balikpapan,Makasar, Manado - CIMB
Niaga KC Cibinong, KC CIkini Jkt ,- Bank Danamon KC Radio Dalam
Jan 2011 - Apr 2011
(3 months)
PROJECT ARCHITECT
Agung Sedayu Group
RESPONSIBILITIES: - Distributing and checking the drawing produced by head office division of
architecture landed housing to all contractors and applicator. - ensure that the drawing can be executing
and implementing in to field. - Coordination with head office about all aspect of design. - Accounting &
reporting work progress of the contractor to the project manager - Liaise with clients and marketing
division to prepare, execute and fulfill project and schedule - Attend meeting with all contractor and
applicator - Ensure that the quality project meet requirement of client - Ensure projects are carry out
smoothly on time
PROJECT : - GRAND GALAXI CITY , Bekasi
2. Feb 2009 - Jan 2011
(1 year 11 months)
PROJECT SUPERVISOR
PT. DECOPLASTER LARASTAMA
RESPONSIBILITIES - Making material budget to one project - Preparing and making Shop Drawing, until
As build Drawing - preparing Method of Job Instruction - Preparing Approval Material to the Owner or MK
- Purchase the material whose needed every day - Accounting & reporting work Progress - Accounting
The op name of "mandor" - Accounting the addendum Work - Coordinating with Main Contractor ,Owner,
or MK to meet the final result correlation with time schedule, Quality , and budget. QUALIFICATION -
Honest and responsibilities to the job -Able to operate computer (AUTO CAD 2D&3D,3MAX,MS Office). -
Able to make bill of quantity. -Having good skill in sketcher drawing and good sense of art of and object. -
Have experience both studio and field supervising. -Strong leadership in order to make effective and
efficient result. -Able to make daily, weekly progress report. REASON FOR LEAVING -Seek the new
challenge and developing carrier.
PROJECT - THE LAVANDE APARTEMENT,Tebet Jakarta Selatan Owner : Agung Podomoro - THE
GRAND KARTINI APARTEMENT & SWISS BEL HOTEL, Mangga Besar Jakarta Pusat Owner : PT . IJS
- THE CLUSTER ELLYSIUM, Lippo Cikarang Oner : PT. Lippo
Dec 2007 - Feb 2009
(1 year 2 months)
ARCHITECT ENGINEER
PT.INTRACO LESTARI
RESPONSIBILITIES : -Checking and controlling shop drawings that produces by the drafter. -Calculates
materials and tools that needed every day in order to make sustainable progress in one project. -
Controlling and ensuring the quality result made by employers to meet the owner requirement. -Approval
materials to the designer. -Make daily and weekly report. -Field inspection and supervision. -Prepare as
build drawing. -Maintain good relationship with the owner. EXPERIENCES GAINED : -Fluently drawing by
AUTOCAD 2007 , 3D MAX. -Have experience both field supervision and studio
PROJECT : 1. EXECUTIVE POLY Dr. SUKAMAN RS. HARAPAN KITA Slipi,West Jakarta Owner:
HARAPAN KITA HOSPITAL 2. BNI 46 EMERALD Jend Sudirman Street, Central Jakarta Owner: BNI 46
REASON FOR LEAVING : -Seek for better career advancement opportunities and exposure.
3. Dec 2006 - Dec 2007
(1 year)
ARCHITECT
CV. ERINTA JAYA
RESPONSIBILITIES : -Make presentation drawing and shop drawing - supervising and controlling shop
drawing prepared by the drafter - calculated the material and toll that needed everyday - coordinated with
contractions management and the owner - Report To Director
PROJECT : - PUSLATKAPRANG KOLAT KOARMATIM, CUBICLE ROOM, Pangkalan Ujung Tanjung
Perak Surabaya. - Owner : TNI AL
Mar 2002 - Nov 2006
(4 years 8 months)
PROJECT SUPERVISOR
CV. DISTORSI
RESPONSIBILITIES : -Make project schedule -Count of work progress of the "mandor" -Make Progress
Report of the whole project -Field supervising -Responsibility to Director
PROJECT : - THE BULL EYE'S GRIIL & RESTO, Mayjen Sungkono Surabaya - several private house in
surabaya
Mar 2000 - Oct 2001
(1 year 7 months)
DRAFTER
BMJ. Int"
Work Description : - Make a perfective drawing and full-size drawing - Make cutting list from one product
or sample to execution in production department - Responsibility to HRD manager