Introduction
The US electric distribution system may need to integrate over 300,000 MWs of distributed energy
resources by 2025.1
This number would roughly equate to an average of over 30% penetration on the
typical distribution feeders likely to be affected – twice the amount allowed under many distributed
generator integration standards.2
This is a fundamental shift from traditional distribution systems that
deliver power from controllable centralized generation to meet highly predictable aggregate demand.
The emerging distribution system of the future is far more complicated given tremendous energy
variability and changing customer relationship – “one hour a consumer and the next hour a producer.”
Customer adoption of on-site generation and other distributed energy resources is a fundamental driver
of distribution network transformation. The pace of adoption has accelerated in recent years, for
example, in 2012 commercial and residential customer solar photovoltaic systems combined came
online an average of about one every seven minutes.
This future distribution system involves development and implementation of a sophisticated yet simple
architecture to reliably, safely and securely integrate advanced technologies and control systems to
accommodate multi-directional power from distributed and variable generation. This future system
development is being done concurrently as the existing distribution “Grid 2.0”3
is being upgraded at the
rate of about $22 billion a year. This transformation is not unlike converting a 737 passenger jet into an
aircraft with the advanced fly-by wire sophistication needed to fly an inherently unstable B-2 bomber -
without landing the plane and continuing to fly reliably and safely. Not surprisingly, questions remain on
how to a) reliably integrate distributive resources, b) develop effective market designs and architectures
to address operational challenges, and c) evolve regulation to address integration, innovation and
investment, and reasonable cost allocation. This paper highlights these issues drawing on the
presentations and discussion on the Edison Electric Institute’s webinar held November 27, 2012.
Customer Adoption of Distributed Energy Resources
While residential solar adoption has garnered significant attention, the larger customer market for
onsite generation and distributed resources is the commercial sector. In the US, businesses,
institutional and government facilities already have over 80,000 MWs of combined heat and power
systems installed and the White House recently announced a goal of increasing that figure by 50% in
2020.4
Additionally, nearly 3,000 MWs of solar PV is expected to be installed in 2012 with another 7,000
1
Solar power: Darkest before dawn, McKinsey & Co., May 2012 and US Executive Order, Accelerating Investment
in Industrial Energy Efficiency, August 2012
2
Grid 2020: Toward a Policy of Renewable and Distributed Energy Resources, Caltech Resnick Institute, 2012
3
EPRI Staff, Needed: A Grid Operating System to Facilitate Grid Transformation, EPRI, July 2011
4
US Executive Order, Accelerating Investment in Industrial Energy Efficiency, August 2012
EEI Webinar 3 Paper draft
2
megawatts over the next five years. What are the factors driving commercial customer decisions?
According to Ernst & Young (E&Y) in their recent cleantech report surveying 100 global corporations5
,
the reason given is that “energy strategy has become an integral aspect of managing key financial,
energy security, brand, regulatory and competitive risks.” E&Y summarized five key factors:
• Energy expenditures are becoming a growing
share of operational costs as fossil fuel-based
energy prices increase and price fluctuations in
traditional energy sources impact the bottom
line.
• The Fukushima disaster in Japan and political
turmoil in the Middle East highlight energy
availability risks.
• Increased consumer focus on sustainability is
changing how industry leadership is being
defined.
• Long-term carbon penalties and license-to
operate risks arise as governments focus on
energy efficiency and environmental objectives.
• The new reality of the resource-constrained,
low-carbon economy changes the basis of competitive advantage.
In this context, it is not surprising that at over 75% of the firms surveyed, final decisions on energy mix
strategy are made by C-level officers. Also, one-third of the multi-national firms expected to meet a
greater share of their energy needs through self-generation over the next five years. For example, the
Solar Energy Industries Association (SEIA) reports6
that the Top 20 corporate solar users’ installations
generate an estimated $47.3 million worth of electricity each year and reduced business’ utility bills by
hundreds of millions of dollars annually. The following quote from General Motors in the E&Y report
illustrates this trend;
“…our focus on renewable energy doesn’t stop at the sun. By 2020, our goal is to promote the use of all
forms of renewable energy by using 125 megawatts across our entire corporate footprint.” said Mike
Robinson, GM vice president, sustainability and global regulatory affairs
The distribution system implications of these global corporate energy strategies are clear when
combined with similar US Federal and state government energy strategies. The most prominent is the
Department of Defense energy strategy to reduce “reliance on a fragile commercial electricity grid [that]
places continuity of missions at growing risk”7
. DoD’s plan includes a legislated and Executive ordered8
5
Cleantech Matters, Global competitiveness Global cleantech insights and trends report, Ernst & Young, 2012
6
Solar Means Business: Top Commercial Solar Customers in the U.S., SEIA and Vote Solar, 2012
7
Defense Science Board, “More Fight – Less Fuel,” DoD, February 2008
8
US Federal Legislation and Executive Orders; EPAct 2005, EISA 2007, NDAA, EO 13423, EO 13514
Figure 1. Campus Microgrid
EEI Webinar 3 Paper draft
3
37.5% reduction in energy consumed by their 2.2 billion square feet of facilities by 2020 and to produce
or procure 25% of the resulting energy needed from renewable resources by 2025. This has spurred
significant clean energy development effort at DoD, as highlighted by a 2012 DoD feasibility study9
of
solar PV installation potential at military bases in the California and Nevada deserts. The study
concluded that using only 4% of the facilities’ area it was possible to generate “7000 megawatts (MW) of
solar energy -- equivalent to the output of seven nuclear power plants” and “more than 30 times the
electricity consumed by the bases.”
The example in Figure 2 below illustrates a typical business case for on-site generation/microgrid today
that is largely based on tax and incentive benefits avoiding otherwise applicable retail power rates,
reliability improvement, environmental objectives and increasingly the opportunity for new revenue
streams is playing a role. Typical benefit categories are:
• Tax and incentive benefits from Federal and state programs
• Reduced energy costs both in terms of lowering net energy consumed, and demand charges
• Protection of business revenue through improved operational reliability and disaster recovery
• Hedge against volatile energy prices including electricity prices and for fuel switching CHP
systems that accept a variety of fuel sources (e.g., natural gas, biogas, coal, biomass)
• Offset capital costs for CHP when installed in place of boilers or chillers in new construction
projects, or when major HVAC equipment needs to be replaced or updated.
• Organizational environmental objectives
• Incremental revenue streams from sales of excess energy and ancillary services
Figure 2. New York Microgrid Business Case
9
ICF International, Solar Energy Development on DoD Installations in the Mojave & Colorado Deserts, DoD Office of
Installations and Environment, January 2012
EEI Webinar 3 Paper draft
4
As another example, the DoD solar study also identified that private development of the solar potential
on those desert bases with no capital investment requirement from DoD, and that the development
could yield the federal government up to $100 million a year in benefits from rental payments, reduced
cost power, in-kind considerations, or some combination.
Grid 3.0
Interconnection
An ongoing challenge for all stakeholders is the lack of sufficient interconnection rules, technology and
standards to enable the scale of DER adoption and seamless integration and islanding during power
outages. Today, most on-site generation facilities are not able and/or allowed to seamlessly separate
into an islanding mode to provide uninterrupted power to the customer’s facility during a power outage.
For example, in Stanford, Connecticut several large global financial trading floors have remarkable
distributed telecommunications and computing capabilities in the event of disruptions to these systems,
but the lack of a similar capability for seamless power operations between the grid and their onsite
generation leaves them exposed to outages during system outages. In another example, the University
of California, San Diego which has a renowned campus microgrid took over 6 hours to transfer its
operations to an island mode after an extensive outage due to a substation failure last year. In the wake
of the major natural disasters over the past decade, including Hurricane Sandy, there is increased
urgency resolving the regulation and technical issues to safely and affordably integrate distributed
power so that they can provide uninterrupted power.
Figure 3. Local Energy Network
Grid 3.0 Operating System
As desirable as seamless integration and islanding is to most, there are real technical and safety issues to
resolve for specific projects and for the system at scale of expected adoption. To accomplish this goal
EPRI identifies the need for a Grid 3.0 operating system as 10
:
10
EPRI staff, Needed: A Grid Operating System to Facilitate Grid Transformation, EPRI, 2011
EEI Webinar 3 Paper draft
5
“The grid operating system must monitor, protect and automatically optimize the operation of its
interconnected elements – from the central and distributed generator through the high-voltage network
and distribution system, to industrial users and building automation systems, to energy storage
installations, and to end-use consumers including their thermostats, electric vehicles, appliances, and
other household devices. Tomorrow’s grid operating system must manage a two-way flow of electricity
and information to create an automated, widely distributed energy delivery network. The grid operating
system must facilitate high levels of security, quality, reliability, and availability of electric power;
improve economic productivity and quality of life; and minimize environmental impact while maximizing
safety.“
Paraphrasing EPRI, achieving Grid 3.0 requires development of an ultra-large scale architecture which
“can facilitate the informational, financial, and physical transactions necessary to assure adequate
security, quality, reliability and availability of power systems operating in complex and continually
evolving electricity markets.” DoE’s GridWise Architecture Council (GWAC) defines transactions in this
context as “techniques for managing the generation, consumption or flow
of electric power within an electric power system through the use of
economic or market based constructs while considering grid reliability
constraints.”11
Such a transactive energy framework is focused on the convergence of
multi-party business and grid operational objectives and constraints. Not
just markets, but also a broader integrated cyber-physical control system
to ensure reliable electric services. Also, not “Prices to Devices”, but
coordinated and federated engineering-economic signals aligned to
differentiated services across a broad time range. The term “transactive”
comes from considering that decisions are made based on a value. These
decisions may be analogous to or literally economic transactions.12
EPRI’s concept of Grid 3.0 provides a useful “perspective on how to manage transactions given the
nature of the existing and emerging distributed, heterogeneous communications and control network
combined with the extensive use of new innovations on the power system. What is needed is an
architecture that allows future developers to access this framework as a resource or design pattern for
developing distributed software applications, taking into account the core concepts of interoperability
and support for multiple operational criteria including business rules.”13
Ultra-Large Scale Architecture
It is becoming very clear that the industry and researcher need to address the architectural and
engineering issues related to modernizing a grid to support the scale and scope of the resources
envisioned in existing legislative and regulatory mandates in many parts of the developed world. In
addition to EPRI’s design scope, Cisco has identified the need to consider the rise of social networks in
11
GridWise Architecture Council, Transactive Energy Workshop Summary, Summer 2012
12
Grid Interop Foundation Session presentation, GWAC, December 2012
13
EPRI staff, Needed: A Grid Operating System to Facilitate Grid Transformation, EPRI, 2011
EEI Webinar 3 Paper draft
6
shaping commercial business and the expectation of a prominent role in customer engagement and
commercial relationships.14
Therefore, architecture must address the integration of four networks:
1. Electric network with its inviolable set of physical rules
2. Information and communication networks
3. Energy Markets, especially participation of customers and merchant-provided DER services
4. Social networks as grids become interactive with customers and their smart devices
Earlier efforts to create reference “smart grid” architectures have been based largely on enterprise IT
principles – effectively “Grid 2.5” type architectures. The industry recognized gap is the need to
consider the control of the cyber-physical system based on control system theory and practice. Without
new control architecture, the grid of the future will not scale to support the policy mandates already in
place. Cisco describes the architectural design thesis for Grid 3.0 as:
“Given highly volatile and dispersed resources and physical constraints across the grid, provide a unified
multi-tier control schema that simultaneously optimizes operation across all parts of the power delivery
system, from the markets, balancing and operational levels to the transactive and prosumer level.”15
It is important to look at multiple levels in the entire power delivery chain not just distribution
operations. Traditionally those layers were individually controlled with limited control between the
transmission to distribution and distribution to customer layers. This was because power flowed from
transmission through distribution to customers – so in effect, customers and distribution floated on bulk
power system operations. As variable and bi-directional power flows increase there is a need to actively
manage de-stabilizing and harmful power quality effects. Integrating customer DER, distribution system
and markets into overall grid control schemes is needed. The foundation of control systems are:
observability, controllability and algorithms.
Grid 3.0 requires an ultra-large scale architectural solution based on a distributed control model with
federated controls across the bulk power system, distribution and customer tiers. Today’s centralized
control systems won’t scale to manage millions of distributed resources as they will become too
complicated, unwielding and unreliable. Distributed control contrasts with decentralized as the concept
is decentralized but with the additional property that multiple devices/algorithms cooperate with each
other on a common problem - overall grid control. Such multi-tier, distributed control architecture
allows each tier to “selfishly optimize” in coordination with the other tiers. This federated approach also
enables flexibility in terms of energy business models and encouraging innovation but preserves grid
stability and security.
Traditional grids are going to be the back-bone for a long time as Grid 3.0 is deployed at the pace of
value/need and so a transition plan is needed to blend new and old approaches without compromising
the essential integrity of our power system. This requires an investment plan to prioritize no regrets
decisions regarding long term investments in the distribution system, including less obvious assets like
14
L. von Prellwitz, Gridonomics, Cisco, 2011
15
J. Taft, Ultra-Large Scale Power System Control Architecture, Cisco 2012
EEI Webinar 3 Paper draft
7
grid control management systems and communications infrastructure to supports this evolution and
that typically have 10-15 year asset lives, respectively.
Regulation & Policy considerations
Innovation & Technology Adoption
There is a tremendous amount of innovation that’s needed to develop the technologies and systems
associated with Grid 3.0 described above. The challenge is that the current level of regulatory
authorized funding for utility research and development is about 0.2% of revenues. Without utility
involvement, the technology development cycle significantly slows. In contrast, the UK regulator
recognized the critical role utilities play in applied research in collaboration with research institutions
and in new product development with technology suppliers. Ofgem targeted R&D spending at 0.5% of
utility revenues through its Innovation Funding Incentive (IFI) program for distribution utilities to meet
similar grid modernization goals.16
Aside from insufficient R&D funding, early stage technology failure risk is often too great for most
utilities to consider adopting for critical operations and later stage technology run the risk of failing to
“cross the chasm” from pilot to large scale deployment. There are two basic issues. One issue is related
to traditional regulatory rules in which utility shareholders bear a large burden risk of failed or
premature technology obsolescence. This asymmetric risk compounds the lack of R&D funding approval.
The second issue is that the industry and regulators would benefit from a more systematic approach to
technology development and adoption that links the R&D stage to field testing to large scale role out. In
this context, the opportunity to accelerate technology development and adoption would benefit greatly
from shared knowledge through joint research, development and demonstrations. EPRI’s expansion of
its traditional research programs into a collaborative framework for field demonstrations is very useful.
Perhaps there is an opportunity for state commissions to benefit from this information similar to how
utilities leverage for technology investment decisions. Such an exchange of information from
commission to commission could accelerate the knowledge transfer a pilot done in one service area or
one state or one region can be transferred to another without having to repeat or reinvent.
The time cycle for new technology products from research through system-wide deployment are long.
At first glance, many believe far too long – wrongly comparing the adoption cycle of consumer
electronics from the time they reach market to consumer purchase. Looking closer it becomes clearer
why the overall duration for technologies deployed at scale in the grid or grid operating systems may
take between 10-18 years. First, the time before a product is commercially ready for system-wide
deployment needs to be considered – mostly the time technology firms and institutions are researching
and developing new products. Also, the regulatory approval process through general rate cases or
separate proceedings can add 2 years or more. Deployment timelines a function of the technology to be
deployed, large operational software can take about 2 years while system-wide deployment of field
devices can take up to ten years depending on the number of devices and the complexity of the
replacement/installation. For example, system-wide deployment of 5 million meters in California took
16
Grid 2020: Toward a Policy of Renewable and Distributed Energy Resources, Caltech Resnick Institute, 2012
EEI Webinar 3 Paper draft
8
ten years from customer dynamic pricing research in 2003 through final meter installs in 2012. Below is
a conceptual timeline for electric industry product development and adoption. This timeline does not
reflect potential re-work loops if products don’t pass tests, business cases don’t pass regulatory review
or products fail or become prematurely obsolete during deployment.
Figure 4. Conceptual Technology Development & Adoption Timeline
Regulatory Decision Cycles
Regulatory decisions regarding investments for a future distribution system are significantly more
complex, involving multi-disciplinary experts within and outside a commission, and blurred Federal and
state jurisdictional boundaries. This is important as the regulatory decision process is on critical path –
given existing policies for DER the industry (technology firms, utilities & regulators) is behind schedule in
several jurisdictions. This was highlighted in a recent report by the Hoover Institution at Stanford
University17
;
“California’s energy system transformation depends upon an unprecedented level of innovation, in
technologies, grid systems, and new market entrants. Indeed, the very concept of the “smart grid” entails
advanced grid infrastructure, new control and energy management systems, and two-way
communication, as well as electric vehicles, microgrids, and energy storage. No such system yet exists,
and while some elements are in use or in development, going from scattered pilots to comprehensive use
in an electricity system for the 8th largest economy in the world that must remain reliable, secure, and
affordable, requires a massive integrated effort that cannot simply be mandated into existence.”
The complexity of the decisions is based on the range of factors driving the need for investment. Many
of these factors result from various DER related policies that are supported by different commissioners
and staff which can lead to siloed and slow decision making. There is a significant public benefit from
ensuring collection of a full range of evidence for multimillion dollar decisions, and hearing from all the
parties. However, at the current pace of change this model may become a bottleneck for advancement.
This can be further acerbated if commissions have separate dockets on energy efficiency, renewables
and another on demand response with each of these operating on its own timeline and its own
reasonable/benefits tests and cost recovery methods. An integrated approach will be necessary to have
a sensible rate regulatory structure for the scope and scale of electric system changes anticipated.
Fundamental to this approach will be the use of scenario planning and development of investment road
17
D. Grueneich, J. Carl, et al., Renewable and Distributed Power in California, Hoover Institution, Stanford
University, November 2012
YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8 YR9 YR10 YR11 YR12 YR13 YR14 YR15 YR16 YR17 YR18
Industry/Institutional Research
Vendor Product Development
Utility lab test & demonstration
Utility busn case development
Regulatory decision process
Utility system-wide deployment
(software 2yrs - field devices up to 10 yrs)
EEI Webinar 3 Paper draft
9
maps that address advanced distribution systems and reliable integration of distributed energy
resources.
Distributed Markets
Another area to consider is the evolution of markets to enable the billions of transactions resulting from
Federal policy and regulation involving millions of customer resources. Several questions arise regarding
customer participation in markets at scale.
• How are the markets going to evolve?
• Who would participate in these markets?
• Who will run these markets?
• How will they be organized and governed?
• What is the role of state commissions and FERC?
As described earlier, there is a growing recognition in the industry among engineers and market
operators that the creation of a distribution level market for distributed energy resources may be
necessary as adoption reaches scale. For context, organized wholesale markets (e.g., Independent
System Operators) are primarily markets for deviations and reliability services. As such, less than 10% of
the energy in an ISO market is transacted in day-ahead or real-time market. Most energy is transacted
via bi-lateral contracts, such as Power Purchase Agreements. ISOs are also not designed to manage
transactions for millions of small resources, nor is it desirable from a control architecture perspective.
As the market adoption of distributed energy resources (DER) reaches regional scale it will create
significant issues in the management of the distribution system related to existing protection and
control systems. Therefore, it is important to consider the relationship between market design and grid
control systems as it relates to distributed energy resources to ensure market structures, power systems
and participation rules maintain a highly reliable system. If not addressed, this is likely to lead to issues
for customer power quality and reliability because of two issues resulting wholesale pricing models for
distributed resources that currently don’t reflect distribution level information related to location,
reliability or power quality considerations; (1) pricing schemes involving real-time spot market prices,
like Locational Marginal Pricing, are likely to create significant price volatility or operational oscillations
for customer resources that is not desirable and may be destructive; and (2) integrating distributed
resources into wholesale markets without aligning distribution control schemes may create
unacceptable instability and reliability consequences.18
Afterword
This paper is part of the Future of Distribution series and will be followed by a paper summarizing the
fourth EEI webinar discussion on regulatory policy related to DER related cost allocation, rate design and
utility business model implications.
18
P. De Martini, A. Wierman, S. Meyn and E. Bitar, Integrated Distributed Energy Resource Pricing and Control,
CIGRE Grid of the Future Symposium Proceedings, 2012

More Related Content

What's hot

Steve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 PaperSteve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 Paper
Steven Avary
 
Njatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte NaaeNjatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte Naae
rvb1019
 
Combined heat and power CHP _ ARES _ DOE
Combined heat and power  CHP _ ARES _ DOE Combined heat and power  CHP _ ARES _ DOE
Combined heat and power CHP _ ARES _ DOE
Dmitry Tseitlin
 
Opportunity Maine Policy Webinar
Opportunity Maine Policy Webinar Opportunity Maine Policy Webinar
Opportunity Maine Policy Webinar
opportunitymaine
 
Silicon Valley Bank Solar Industry Report
Silicon Valley Bank Solar Industry ReportSilicon Valley Bank Solar Industry Report
Silicon Valley Bank Solar Industry Report
Silicon Valley Bank
 
Canadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USACanadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USA
Eliot Norman
 
zahedi_cameron_s_201512_ma
zahedi_cameron_s_201512_mazahedi_cameron_s_201512_ma
zahedi_cameron_s_201512_ma
Cameron Zahedi
 
A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...
A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...
A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...
rahulmonikasharma
 
Energy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As PublishedEnergy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As Published
jrosh
 
DOE Solar Energy Industry Forecast
DOE Solar Energy Industry ForecastDOE Solar Energy Industry Forecast
DOE Solar Energy Industry Forecast
kiakaha
 

What's hot (20)

Steve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 PaperSteve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 Paper
 
Njatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte NaaeNjatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte Naae
 
Combined heat and power CHP _ ARES _ DOE
Combined heat and power  CHP _ ARES _ DOE Combined heat and power  CHP _ ARES _ DOE
Combined heat and power CHP _ ARES _ DOE
 
Industrial Energy Management and the Emerging ISO 50001 Standard
Industrial Energy Management and the Emerging ISO 50001 StandardIndustrial Energy Management and the Emerging ISO 50001 Standard
Industrial Energy Management and the Emerging ISO 50001 Standard
 
Opportunity Maine Policy Webinar
Opportunity Maine Policy Webinar Opportunity Maine Policy Webinar
Opportunity Maine Policy Webinar
 
CIGRE WG “Network of the Future” Electricity Supply Systems of the future
CIGRE WG “Network of the Future” Electricity Supply Systems of the futureCIGRE WG “Network of the Future” Electricity Supply Systems of the future
CIGRE WG “Network of the Future” Electricity Supply Systems of the future
 
Silicon Valley Bank Solar Industry Report
Silicon Valley Bank Solar Industry ReportSilicon Valley Bank Solar Industry Report
Silicon Valley Bank Solar Industry Report
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy Overview
 
2010 IEEE-USA National Energy Policy Recommendations
2010 IEEE-USA National Energy Policy Recommendations2010 IEEE-USA National Energy Policy Recommendations
2010 IEEE-USA National Energy Policy Recommendations
 
Canadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USACanadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USA
 
State Grid Modernization presentation from SEPA's 2018 Utility Conference
State Grid Modernization presentation from SEPA's 2018 Utility ConferenceState Grid Modernization presentation from SEPA's 2018 Utility Conference
State Grid Modernization presentation from SEPA's 2018 Utility Conference
 
OCRI Cleantech
OCRI CleantechOCRI Cleantech
OCRI Cleantech
 
GridCure_Distributed and Renewable Energy Strategy Panel (Panel Proposal)
GridCure_Distributed and Renewable Energy Strategy Panel (Panel Proposal)GridCure_Distributed and Renewable Energy Strategy Panel (Panel Proposal)
GridCure_Distributed and Renewable Energy Strategy Panel (Panel Proposal)
 
Unlocking the energy contracting opportunity
Unlocking the energy contracting opportunityUnlocking the energy contracting opportunity
Unlocking the energy contracting opportunity
 
zahedi_cameron_s_201512_ma
zahedi_cameron_s_201512_mazahedi_cameron_s_201512_ma
zahedi_cameron_s_201512_ma
 
A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...
A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...
A Result Paper on: Power Grid Associated With Web Using Non-Conventional Ener...
 
Energy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As PublishedEnergy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As Published
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
 
Wind Energy Business Case PowerGenz
Wind Energy Business Case PowerGenzWind Energy Business Case PowerGenz
Wind Energy Business Case PowerGenz
 
DOE Solar Energy Industry Forecast
DOE Solar Energy Industry ForecastDOE Solar Energy Industry Forecast
DOE Solar Energy Industry Forecast
 

Viewers also liked

EEI Future of Distribution 2012
EEI Future of Distribution 2012EEI Future of Distribution 2012
EEI Future of Distribution 2012
Paul De Martini
 

Viewers also liked (10)

The Evolving Distribution Grid article
The Evolving Distribution Grid article The Evolving Distribution Grid article
The Evolving Distribution Grid article
 
EEI Future of Distribution 2012
EEI Future of Distribution 2012EEI Future of Distribution 2012
EEI Future of Distribution 2012
 
Transactive Energy article 2013
Transactive Energy article 2013Transactive Energy article 2013
Transactive Energy article 2013
 
Customer-oriented Networks paper - CSIRO Australia
Customer-oriented Networks paper - CSIRO AustraliaCustomer-oriented Networks paper - CSIRO Australia
Customer-oriented Networks paper - CSIRO Australia
 
Two Visions of a Transactive Electric System
Two Visions of a Transactive Electric SystemTwo Visions of a Transactive Electric System
Two Visions of a Transactive Electric System
 
LBNL Distribution Systems in High DER Future
LBNL Distribution Systems in High DER FutureLBNL Distribution Systems in High DER Future
LBNL Distribution Systems in High DER Future
 
21st C.Electric Distribution System Operations, 2014
21st C.Electric Distribution System Operations, 201421st C.Electric Distribution System Operations, 2014
21st C.Electric Distribution System Operations, 2014
 
EEI State of Distribution, 2012
EEI State of Distribution, 2012EEI State of Distribution, 2012
EEI State of Distribution, 2012
 
DOE Integrated Distribution Planning
DOE Integrated Distribution Planning DOE Integrated Distribution Planning
DOE Integrated Distribution Planning
 
Data and The Electricity Grid
Data and The Electricity GridData and The Electricity Grid
Data and The Electricity Grid
 

Similar to Toward a New Grid Operating Paradigm 2013

Rauluk Testimony Final no pics
Rauluk Testimony Final no picsRauluk Testimony Final no pics
Rauluk Testimony Final no pics
Valerie Rauluk
 
Microgrids-Macro-Benefits
Microgrids-Macro-BenefitsMicrogrids-Macro-Benefits
Microgrids-Macro-Benefits
James Milam
 
Abb whitepaper final 022316 integrating renewables into microgrids
Abb whitepaper final 022316 integrating renewables into microgridsAbb whitepaper final 022316 integrating renewables into microgrids
Abb whitepaper final 022316 integrating renewables into microgrids
Steve Wittrig
 
Development Trends in Energy - Calvin Speight, Jr.
Development Trends in Energy - Calvin Speight, Jr.Development Trends in Energy - Calvin Speight, Jr.
Development Trends in Energy - Calvin Speight, Jr.
Career Communications Group
 
Electricity_Reliability_031611 Galvin Power ORG
Electricity_Reliability_031611 Galvin Power ORGElectricity_Reliability_031611 Galvin Power ORG
Electricity_Reliability_031611 Galvin Power ORG
Ronnie Waterman
 
Smarter computing in Energy and Utilities
Smarter computing in Energy and UtilitiesSmarter computing in Energy and Utilities
Smarter computing in Energy and Utilities
jabenjamusibm
 
Smart Grid - Concept to Reality 21.09.22.pptx
Smart Grid - Concept to Reality  21.09.22.pptxSmart Grid - Concept to Reality  21.09.22.pptx
Smart Grid - Concept to Reality 21.09.22.pptx
shivarajCSRaj
 
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
Zach Pollock
 
Modern Grid 8-page Brief
Modern Grid 8-page BriefModern Grid 8-page Brief
Modern Grid 8-page Brief
David Amdal
 

Similar to Toward a New Grid Operating Paradigm 2013 (20)

Clareo jaouiche utility
Clareo jaouiche utilityClareo jaouiche utility
Clareo jaouiche utility
 
Andrew Ritch: Interruption in the Utility Industry
Andrew Ritch: Interruption in the Utility IndustryAndrew Ritch: Interruption in the Utility Industry
Andrew Ritch: Interruption in the Utility Industry
 
Renewables...Storage...What's next?
Renewables...Storage...What's next?Renewables...Storage...What's next?
Renewables...Storage...What's next?
 
Power management for a changing world
Power management for a changing worldPower management for a changing world
Power management for a changing world
 
Rauluk Testimony Final no pics
Rauluk Testimony Final no picsRauluk Testimony Final no pics
Rauluk Testimony Final no pics
 
De Martini - UCLA SMERC conf. Mar 22, 2013
De Martini - UCLA SMERC conf.  Mar 22, 2013De Martini - UCLA SMERC conf.  Mar 22, 2013
De Martini - UCLA SMERC conf. Mar 22, 2013
 
2023 -power-utilities-outlook.pdf
2023 -power-utilities-outlook.pdf2023 -power-utilities-outlook.pdf
2023 -power-utilities-outlook.pdf
 
Microgrids-Macro-Benefits
Microgrids-Macro-BenefitsMicrogrids-Macro-Benefits
Microgrids-Macro-Benefits
 
Abb whitepaper final 022316 integrating renewables into microgrids
Abb whitepaper final 022316 integrating renewables into microgridsAbb whitepaper final 022316 integrating renewables into microgrids
Abb whitepaper final 022316 integrating renewables into microgrids
 
NEW BUSINESS MODELS & DIGITALIZATION IN THE ENERGY SECTOR
NEW BUSINESS MODELS & DIGITALIZATION IN THE ENERGY SECTORNEW BUSINESS MODELS & DIGITALIZATION IN THE ENERGY SECTOR
NEW BUSINESS MODELS & DIGITALIZATION IN THE ENERGY SECTOR
 
Building a Thriving and Extended Utilities Value Chain
Building a Thriving and Extended Utilities Value ChainBuilding a Thriving and Extended Utilities Value Chain
Building a Thriving and Extended Utilities Value Chain
 
Development Trends in Energy - Calvin Speight, Jr.
Development Trends in Energy - Calvin Speight, Jr.Development Trends in Energy - Calvin Speight, Jr.
Development Trends in Energy - Calvin Speight, Jr.
 
Capgemini ses - smart grid operational services - leveraging technology to ...
Capgemini   ses - smart grid operational services - leveraging technology to ...Capgemini   ses - smart grid operational services - leveraging technology to ...
Capgemini ses - smart grid operational services - leveraging technology to ...
 
998 2095-07-26-13 ar0-en
998 2095-07-26-13 ar0-en998 2095-07-26-13 ar0-en
998 2095-07-26-13 ar0-en
 
Electricity_Reliability_031611 Galvin Power ORG
Electricity_Reliability_031611 Galvin Power ORGElectricity_Reliability_031611 Galvin Power ORG
Electricity_Reliability_031611 Galvin Power ORG
 
Overview of Utility Challenges and Responses to Distributed Solar Energy
Overview of Utility Challenges and Responses to Distributed Solar EnergyOverview of Utility Challenges and Responses to Distributed Solar Energy
Overview of Utility Challenges and Responses to Distributed Solar Energy
 
Smarter computing in Energy and Utilities
Smarter computing in Energy and UtilitiesSmarter computing in Energy and Utilities
Smarter computing in Energy and Utilities
 
Smart Grid - Concept to Reality 21.09.22.pptx
Smart Grid - Concept to Reality  21.09.22.pptxSmart Grid - Concept to Reality  21.09.22.pptx
Smart Grid - Concept to Reality 21.09.22.pptx
 
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
DSP02110-2 Next Gen Energy Storage White Paper_INTER V1
 
Modern Grid 8-page Brief
Modern Grid 8-page BriefModern Grid 8-page Brief
Modern Grid 8-page Brief
 

More from Paul De Martini

More from Paul De Martini (20)

Defense Logistics Agency Conf 2017
Defense Logistics Agency Conf 2017Defense Logistics Agency Conf 2017
Defense Logistics Agency Conf 2017
 
DSPx NARUC July 2017
DSPx NARUC July 2017DSPx NARUC July 2017
DSPx NARUC July 2017
 
NARUC Smart Inverters 2017
NARUC Smart Inverters 2017NARUC Smart Inverters 2017
NARUC Smart Inverters 2017
 
MISO Info forum 072517
MISO Info forum 072517MISO Info forum 072517
MISO Info forum 072517
 
De Martini PUCO final 041817
De Martini PUCO final 041817De Martini PUCO final 041817
De Martini PUCO final 041817
 
De Martini 3 stage Distribution Evolution
De Martini 3 stage Distribution Evolution De Martini 3 stage Distribution Evolution
De Martini 3 stage Distribution Evolution
 
Future market platforms and electric network optimization
Future market platforms and electric network optimization Future market platforms and electric network optimization
Future market platforms and electric network optimization
 
Customer-oriented Electric Networks
Customer-oriented Electric Networks  Customer-oriented Electric Networks
Customer-oriented Electric Networks
 
Utility Business Evolution & Innovation 072815
Utility Business Evolution & Innovation  072815Utility Business Evolution & Innovation  072815
Utility Business Evolution & Innovation 072815
 
Electric Networks & Convergence paper 2015
Electric Networks & Convergence paper 2015Electric Networks & Convergence paper 2015
Electric Networks & Convergence paper 2015
 
De Martini 2014 CCIF
De Martini 2014 CCIF De Martini 2014 CCIF
De Martini 2014 CCIF
 
More Than Smart Overview Volume 2
More Than Smart Overview Volume 2 More Than Smart Overview Volume 2
More Than Smart Overview Volume 2
 
More Than Smart Overview Volume 1
More Than Smart Overview Volume 1 More Than Smart Overview Volume 1
More Than Smart Overview Volume 1
 
De Martini CCIF 030915
De Martini CCIF 030915De Martini CCIF 030915
De Martini CCIF 030915
 
De Martini DOE EAC mtg 032615
De Martini DOE EAC mtg  032615De Martini DOE EAC mtg  032615
De Martini DOE EAC mtg 032615
 
De Martini - Sanders GWAC-PJM preso on DSO model 031014
De Martini - Sanders GWAC-PJM preso on DSO model  031014De Martini - Sanders GWAC-PJM preso on DSO model  031014
De Martini - Sanders GWAC-PJM preso on DSO model 031014
 
De Martini PNNL-NREL International Workshop Feb 19, 2014
De Martini PNNL-NREL International Workshop Feb 19, 2014De Martini PNNL-NREL International Workshop Feb 19, 2014
De Martini PNNL-NREL International Workshop Feb 19, 2014
 
European Utility Week - US Business Utility Models
European Utility Week - US Business Utility ModelsEuropean Utility Week - US Business Utility Models
European Utility Week - US Business Utility Models
 
De Martini - CIGRE USNC Oct 21, 2013
De Martini - CIGRE USNC  Oct 21, 2013 De Martini - CIGRE USNC  Oct 21, 2013
De Martini - CIGRE USNC Oct 21, 2013
 
De Martini - Cleantech OC May 5, 2013
De Martini - Cleantech OC May 5, 2013 De Martini - Cleantech OC May 5, 2013
De Martini - Cleantech OC May 5, 2013
 

Recently uploaded

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

Toward a New Grid Operating Paradigm 2013

  • 1. EEI Webinar 3 Paper draft 1 Toward a New Operating Paradigm: Reliable Integration of DER P. De Martini, D. Grueneich, M. McGranaghan, J. Taft and J. Taylor Introduction The US electric distribution system may need to integrate over 300,000 MWs of distributed energy resources by 2025.1 This number would roughly equate to an average of over 30% penetration on the typical distribution feeders likely to be affected – twice the amount allowed under many distributed generator integration standards.2 This is a fundamental shift from traditional distribution systems that deliver power from controllable centralized generation to meet highly predictable aggregate demand. The emerging distribution system of the future is far more complicated given tremendous energy variability and changing customer relationship – “one hour a consumer and the next hour a producer.” Customer adoption of on-site generation and other distributed energy resources is a fundamental driver of distribution network transformation. The pace of adoption has accelerated in recent years, for example, in 2012 commercial and residential customer solar photovoltaic systems combined came online an average of about one every seven minutes. This future distribution system involves development and implementation of a sophisticated yet simple architecture to reliably, safely and securely integrate advanced technologies and control systems to accommodate multi-directional power from distributed and variable generation. This future system development is being done concurrently as the existing distribution “Grid 2.0”3 is being upgraded at the rate of about $22 billion a year. This transformation is not unlike converting a 737 passenger jet into an aircraft with the advanced fly-by wire sophistication needed to fly an inherently unstable B-2 bomber - without landing the plane and continuing to fly reliably and safely. Not surprisingly, questions remain on how to a) reliably integrate distributive resources, b) develop effective market designs and architectures to address operational challenges, and c) evolve regulation to address integration, innovation and investment, and reasonable cost allocation. This paper highlights these issues drawing on the presentations and discussion on the Edison Electric Institute’s webinar held November 27, 2012. Customer Adoption of Distributed Energy Resources While residential solar adoption has garnered significant attention, the larger customer market for onsite generation and distributed resources is the commercial sector. In the US, businesses, institutional and government facilities already have over 80,000 MWs of combined heat and power systems installed and the White House recently announced a goal of increasing that figure by 50% in 2020.4 Additionally, nearly 3,000 MWs of solar PV is expected to be installed in 2012 with another 7,000 1 Solar power: Darkest before dawn, McKinsey & Co., May 2012 and US Executive Order, Accelerating Investment in Industrial Energy Efficiency, August 2012 2 Grid 2020: Toward a Policy of Renewable and Distributed Energy Resources, Caltech Resnick Institute, 2012 3 EPRI Staff, Needed: A Grid Operating System to Facilitate Grid Transformation, EPRI, July 2011 4 US Executive Order, Accelerating Investment in Industrial Energy Efficiency, August 2012
  • 2. EEI Webinar 3 Paper draft 2 megawatts over the next five years. What are the factors driving commercial customer decisions? According to Ernst & Young (E&Y) in their recent cleantech report surveying 100 global corporations5 , the reason given is that “energy strategy has become an integral aspect of managing key financial, energy security, brand, regulatory and competitive risks.” E&Y summarized five key factors: • Energy expenditures are becoming a growing share of operational costs as fossil fuel-based energy prices increase and price fluctuations in traditional energy sources impact the bottom line. • The Fukushima disaster in Japan and political turmoil in the Middle East highlight energy availability risks. • Increased consumer focus on sustainability is changing how industry leadership is being defined. • Long-term carbon penalties and license-to operate risks arise as governments focus on energy efficiency and environmental objectives. • The new reality of the resource-constrained, low-carbon economy changes the basis of competitive advantage. In this context, it is not surprising that at over 75% of the firms surveyed, final decisions on energy mix strategy are made by C-level officers. Also, one-third of the multi-national firms expected to meet a greater share of their energy needs through self-generation over the next five years. For example, the Solar Energy Industries Association (SEIA) reports6 that the Top 20 corporate solar users’ installations generate an estimated $47.3 million worth of electricity each year and reduced business’ utility bills by hundreds of millions of dollars annually. The following quote from General Motors in the E&Y report illustrates this trend; “…our focus on renewable energy doesn’t stop at the sun. By 2020, our goal is to promote the use of all forms of renewable energy by using 125 megawatts across our entire corporate footprint.” said Mike Robinson, GM vice president, sustainability and global regulatory affairs The distribution system implications of these global corporate energy strategies are clear when combined with similar US Federal and state government energy strategies. The most prominent is the Department of Defense energy strategy to reduce “reliance on a fragile commercial electricity grid [that] places continuity of missions at growing risk”7 . DoD’s plan includes a legislated and Executive ordered8 5 Cleantech Matters, Global competitiveness Global cleantech insights and trends report, Ernst & Young, 2012 6 Solar Means Business: Top Commercial Solar Customers in the U.S., SEIA and Vote Solar, 2012 7 Defense Science Board, “More Fight – Less Fuel,” DoD, February 2008 8 US Federal Legislation and Executive Orders; EPAct 2005, EISA 2007, NDAA, EO 13423, EO 13514 Figure 1. Campus Microgrid
  • 3. EEI Webinar 3 Paper draft 3 37.5% reduction in energy consumed by their 2.2 billion square feet of facilities by 2020 and to produce or procure 25% of the resulting energy needed from renewable resources by 2025. This has spurred significant clean energy development effort at DoD, as highlighted by a 2012 DoD feasibility study9 of solar PV installation potential at military bases in the California and Nevada deserts. The study concluded that using only 4% of the facilities’ area it was possible to generate “7000 megawatts (MW) of solar energy -- equivalent to the output of seven nuclear power plants” and “more than 30 times the electricity consumed by the bases.” The example in Figure 2 below illustrates a typical business case for on-site generation/microgrid today that is largely based on tax and incentive benefits avoiding otherwise applicable retail power rates, reliability improvement, environmental objectives and increasingly the opportunity for new revenue streams is playing a role. Typical benefit categories are: • Tax and incentive benefits from Federal and state programs • Reduced energy costs both in terms of lowering net energy consumed, and demand charges • Protection of business revenue through improved operational reliability and disaster recovery • Hedge against volatile energy prices including electricity prices and for fuel switching CHP systems that accept a variety of fuel sources (e.g., natural gas, biogas, coal, biomass) • Offset capital costs for CHP when installed in place of boilers or chillers in new construction projects, or when major HVAC equipment needs to be replaced or updated. • Organizational environmental objectives • Incremental revenue streams from sales of excess energy and ancillary services Figure 2. New York Microgrid Business Case 9 ICF International, Solar Energy Development on DoD Installations in the Mojave & Colorado Deserts, DoD Office of Installations and Environment, January 2012
  • 4. EEI Webinar 3 Paper draft 4 As another example, the DoD solar study also identified that private development of the solar potential on those desert bases with no capital investment requirement from DoD, and that the development could yield the federal government up to $100 million a year in benefits from rental payments, reduced cost power, in-kind considerations, or some combination. Grid 3.0 Interconnection An ongoing challenge for all stakeholders is the lack of sufficient interconnection rules, technology and standards to enable the scale of DER adoption and seamless integration and islanding during power outages. Today, most on-site generation facilities are not able and/or allowed to seamlessly separate into an islanding mode to provide uninterrupted power to the customer’s facility during a power outage. For example, in Stanford, Connecticut several large global financial trading floors have remarkable distributed telecommunications and computing capabilities in the event of disruptions to these systems, but the lack of a similar capability for seamless power operations between the grid and their onsite generation leaves them exposed to outages during system outages. In another example, the University of California, San Diego which has a renowned campus microgrid took over 6 hours to transfer its operations to an island mode after an extensive outage due to a substation failure last year. In the wake of the major natural disasters over the past decade, including Hurricane Sandy, there is increased urgency resolving the regulation and technical issues to safely and affordably integrate distributed power so that they can provide uninterrupted power. Figure 3. Local Energy Network Grid 3.0 Operating System As desirable as seamless integration and islanding is to most, there are real technical and safety issues to resolve for specific projects and for the system at scale of expected adoption. To accomplish this goal EPRI identifies the need for a Grid 3.0 operating system as 10 : 10 EPRI staff, Needed: A Grid Operating System to Facilitate Grid Transformation, EPRI, 2011
  • 5. EEI Webinar 3 Paper draft 5 “The grid operating system must monitor, protect and automatically optimize the operation of its interconnected elements – from the central and distributed generator through the high-voltage network and distribution system, to industrial users and building automation systems, to energy storage installations, and to end-use consumers including their thermostats, electric vehicles, appliances, and other household devices. Tomorrow’s grid operating system must manage a two-way flow of electricity and information to create an automated, widely distributed energy delivery network. The grid operating system must facilitate high levels of security, quality, reliability, and availability of electric power; improve economic productivity and quality of life; and minimize environmental impact while maximizing safety.“ Paraphrasing EPRI, achieving Grid 3.0 requires development of an ultra-large scale architecture which “can facilitate the informational, financial, and physical transactions necessary to assure adequate security, quality, reliability and availability of power systems operating in complex and continually evolving electricity markets.” DoE’s GridWise Architecture Council (GWAC) defines transactions in this context as “techniques for managing the generation, consumption or flow of electric power within an electric power system through the use of economic or market based constructs while considering grid reliability constraints.”11 Such a transactive energy framework is focused on the convergence of multi-party business and grid operational objectives and constraints. Not just markets, but also a broader integrated cyber-physical control system to ensure reliable electric services. Also, not “Prices to Devices”, but coordinated and federated engineering-economic signals aligned to differentiated services across a broad time range. The term “transactive” comes from considering that decisions are made based on a value. These decisions may be analogous to or literally economic transactions.12 EPRI’s concept of Grid 3.0 provides a useful “perspective on how to manage transactions given the nature of the existing and emerging distributed, heterogeneous communications and control network combined with the extensive use of new innovations on the power system. What is needed is an architecture that allows future developers to access this framework as a resource or design pattern for developing distributed software applications, taking into account the core concepts of interoperability and support for multiple operational criteria including business rules.”13 Ultra-Large Scale Architecture It is becoming very clear that the industry and researcher need to address the architectural and engineering issues related to modernizing a grid to support the scale and scope of the resources envisioned in existing legislative and regulatory mandates in many parts of the developed world. In addition to EPRI’s design scope, Cisco has identified the need to consider the rise of social networks in 11 GridWise Architecture Council, Transactive Energy Workshop Summary, Summer 2012 12 Grid Interop Foundation Session presentation, GWAC, December 2012 13 EPRI staff, Needed: A Grid Operating System to Facilitate Grid Transformation, EPRI, 2011
  • 6. EEI Webinar 3 Paper draft 6 shaping commercial business and the expectation of a prominent role in customer engagement and commercial relationships.14 Therefore, architecture must address the integration of four networks: 1. Electric network with its inviolable set of physical rules 2. Information and communication networks 3. Energy Markets, especially participation of customers and merchant-provided DER services 4. Social networks as grids become interactive with customers and their smart devices Earlier efforts to create reference “smart grid” architectures have been based largely on enterprise IT principles – effectively “Grid 2.5” type architectures. The industry recognized gap is the need to consider the control of the cyber-physical system based on control system theory and practice. Without new control architecture, the grid of the future will not scale to support the policy mandates already in place. Cisco describes the architectural design thesis for Grid 3.0 as: “Given highly volatile and dispersed resources and physical constraints across the grid, provide a unified multi-tier control schema that simultaneously optimizes operation across all parts of the power delivery system, from the markets, balancing and operational levels to the transactive and prosumer level.”15 It is important to look at multiple levels in the entire power delivery chain not just distribution operations. Traditionally those layers were individually controlled with limited control between the transmission to distribution and distribution to customer layers. This was because power flowed from transmission through distribution to customers – so in effect, customers and distribution floated on bulk power system operations. As variable and bi-directional power flows increase there is a need to actively manage de-stabilizing and harmful power quality effects. Integrating customer DER, distribution system and markets into overall grid control schemes is needed. The foundation of control systems are: observability, controllability and algorithms. Grid 3.0 requires an ultra-large scale architectural solution based on a distributed control model with federated controls across the bulk power system, distribution and customer tiers. Today’s centralized control systems won’t scale to manage millions of distributed resources as they will become too complicated, unwielding and unreliable. Distributed control contrasts with decentralized as the concept is decentralized but with the additional property that multiple devices/algorithms cooperate with each other on a common problem - overall grid control. Such multi-tier, distributed control architecture allows each tier to “selfishly optimize” in coordination with the other tiers. This federated approach also enables flexibility in terms of energy business models and encouraging innovation but preserves grid stability and security. Traditional grids are going to be the back-bone for a long time as Grid 3.0 is deployed at the pace of value/need and so a transition plan is needed to blend new and old approaches without compromising the essential integrity of our power system. This requires an investment plan to prioritize no regrets decisions regarding long term investments in the distribution system, including less obvious assets like 14 L. von Prellwitz, Gridonomics, Cisco, 2011 15 J. Taft, Ultra-Large Scale Power System Control Architecture, Cisco 2012
  • 7. EEI Webinar 3 Paper draft 7 grid control management systems and communications infrastructure to supports this evolution and that typically have 10-15 year asset lives, respectively. Regulation & Policy considerations Innovation & Technology Adoption There is a tremendous amount of innovation that’s needed to develop the technologies and systems associated with Grid 3.0 described above. The challenge is that the current level of regulatory authorized funding for utility research and development is about 0.2% of revenues. Without utility involvement, the technology development cycle significantly slows. In contrast, the UK regulator recognized the critical role utilities play in applied research in collaboration with research institutions and in new product development with technology suppliers. Ofgem targeted R&D spending at 0.5% of utility revenues through its Innovation Funding Incentive (IFI) program for distribution utilities to meet similar grid modernization goals.16 Aside from insufficient R&D funding, early stage technology failure risk is often too great for most utilities to consider adopting for critical operations and later stage technology run the risk of failing to “cross the chasm” from pilot to large scale deployment. There are two basic issues. One issue is related to traditional regulatory rules in which utility shareholders bear a large burden risk of failed or premature technology obsolescence. This asymmetric risk compounds the lack of R&D funding approval. The second issue is that the industry and regulators would benefit from a more systematic approach to technology development and adoption that links the R&D stage to field testing to large scale role out. In this context, the opportunity to accelerate technology development and adoption would benefit greatly from shared knowledge through joint research, development and demonstrations. EPRI’s expansion of its traditional research programs into a collaborative framework for field demonstrations is very useful. Perhaps there is an opportunity for state commissions to benefit from this information similar to how utilities leverage for technology investment decisions. Such an exchange of information from commission to commission could accelerate the knowledge transfer a pilot done in one service area or one state or one region can be transferred to another without having to repeat or reinvent. The time cycle for new technology products from research through system-wide deployment are long. At first glance, many believe far too long – wrongly comparing the adoption cycle of consumer electronics from the time they reach market to consumer purchase. Looking closer it becomes clearer why the overall duration for technologies deployed at scale in the grid or grid operating systems may take between 10-18 years. First, the time before a product is commercially ready for system-wide deployment needs to be considered – mostly the time technology firms and institutions are researching and developing new products. Also, the regulatory approval process through general rate cases or separate proceedings can add 2 years or more. Deployment timelines a function of the technology to be deployed, large operational software can take about 2 years while system-wide deployment of field devices can take up to ten years depending on the number of devices and the complexity of the replacement/installation. For example, system-wide deployment of 5 million meters in California took 16 Grid 2020: Toward a Policy of Renewable and Distributed Energy Resources, Caltech Resnick Institute, 2012
  • 8. EEI Webinar 3 Paper draft 8 ten years from customer dynamic pricing research in 2003 through final meter installs in 2012. Below is a conceptual timeline for electric industry product development and adoption. This timeline does not reflect potential re-work loops if products don’t pass tests, business cases don’t pass regulatory review or products fail or become prematurely obsolete during deployment. Figure 4. Conceptual Technology Development & Adoption Timeline Regulatory Decision Cycles Regulatory decisions regarding investments for a future distribution system are significantly more complex, involving multi-disciplinary experts within and outside a commission, and blurred Federal and state jurisdictional boundaries. This is important as the regulatory decision process is on critical path – given existing policies for DER the industry (technology firms, utilities & regulators) is behind schedule in several jurisdictions. This was highlighted in a recent report by the Hoover Institution at Stanford University17 ; “California’s energy system transformation depends upon an unprecedented level of innovation, in technologies, grid systems, and new market entrants. Indeed, the very concept of the “smart grid” entails advanced grid infrastructure, new control and energy management systems, and two-way communication, as well as electric vehicles, microgrids, and energy storage. No such system yet exists, and while some elements are in use or in development, going from scattered pilots to comprehensive use in an electricity system for the 8th largest economy in the world that must remain reliable, secure, and affordable, requires a massive integrated effort that cannot simply be mandated into existence.” The complexity of the decisions is based on the range of factors driving the need for investment. Many of these factors result from various DER related policies that are supported by different commissioners and staff which can lead to siloed and slow decision making. There is a significant public benefit from ensuring collection of a full range of evidence for multimillion dollar decisions, and hearing from all the parties. However, at the current pace of change this model may become a bottleneck for advancement. This can be further acerbated if commissions have separate dockets on energy efficiency, renewables and another on demand response with each of these operating on its own timeline and its own reasonable/benefits tests and cost recovery methods. An integrated approach will be necessary to have a sensible rate regulatory structure for the scope and scale of electric system changes anticipated. Fundamental to this approach will be the use of scenario planning and development of investment road 17 D. Grueneich, J. Carl, et al., Renewable and Distributed Power in California, Hoover Institution, Stanford University, November 2012 YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8 YR9 YR10 YR11 YR12 YR13 YR14 YR15 YR16 YR17 YR18 Industry/Institutional Research Vendor Product Development Utility lab test & demonstration Utility busn case development Regulatory decision process Utility system-wide deployment (software 2yrs - field devices up to 10 yrs)
  • 9. EEI Webinar 3 Paper draft 9 maps that address advanced distribution systems and reliable integration of distributed energy resources. Distributed Markets Another area to consider is the evolution of markets to enable the billions of transactions resulting from Federal policy and regulation involving millions of customer resources. Several questions arise regarding customer participation in markets at scale. • How are the markets going to evolve? • Who would participate in these markets? • Who will run these markets? • How will they be organized and governed? • What is the role of state commissions and FERC? As described earlier, there is a growing recognition in the industry among engineers and market operators that the creation of a distribution level market for distributed energy resources may be necessary as adoption reaches scale. For context, organized wholesale markets (e.g., Independent System Operators) are primarily markets for deviations and reliability services. As such, less than 10% of the energy in an ISO market is transacted in day-ahead or real-time market. Most energy is transacted via bi-lateral contracts, such as Power Purchase Agreements. ISOs are also not designed to manage transactions for millions of small resources, nor is it desirable from a control architecture perspective. As the market adoption of distributed energy resources (DER) reaches regional scale it will create significant issues in the management of the distribution system related to existing protection and control systems. Therefore, it is important to consider the relationship between market design and grid control systems as it relates to distributed energy resources to ensure market structures, power systems and participation rules maintain a highly reliable system. If not addressed, this is likely to lead to issues for customer power quality and reliability because of two issues resulting wholesale pricing models for distributed resources that currently don’t reflect distribution level information related to location, reliability or power quality considerations; (1) pricing schemes involving real-time spot market prices, like Locational Marginal Pricing, are likely to create significant price volatility or operational oscillations for customer resources that is not desirable and may be destructive; and (2) integrating distributed resources into wholesale markets without aligning distribution control schemes may create unacceptable instability and reliability consequences.18 Afterword This paper is part of the Future of Distribution series and will be followed by a paper summarizing the fourth EEI webinar discussion on regulatory policy related to DER related cost allocation, rate design and utility business model implications. 18 P. De Martini, A. Wierman, S. Meyn and E. Bitar, Integrated Distributed Energy Resource Pricing and Control, CIGRE Grid of the Future Symposium Proceedings, 2012