SAP Solution Manager 
Change Request Management 
Normal Correction with Change Request Management 
h t t p : / / w w w . l i n k e d i n . c o m / i n / s o l u t i o n m a n a g e r 
W e n c e s l a o L a c a z e
Change Request Management – Normal Correction Lifecycle 
Table of Contents 
Versioning ..............................................................................................................................................................................3 
Author Bio ..............................................................................................................................................................................3 
Landscape Preparation: ....................................................................................................................................................4 
Users Preparation: ..............................................................................................................................................................4 
Project Preparation.............................................................................................................................................................4 
Cycle overview......................................................................................................................................................................5 
Start the Maintenance Cycle............................................................................................................................................5 
Create the Change Request .........................................................................................................................................5 
Aprove the Change Request ............................................................................................................................................7 
Authorize change ............................................................................................................................................................7 
Create the Transports ...................................................................................................................................................8 
Start the corrections......................................................................................................................................................9 
The Maintenance Cycle................................................................................................................................................... 11 
Release the Transports.............................................................................................................................................. 11 
Import in QA .................................................................................................................................................................. 12 
Start the Testing Phase................................................................................................................................................... 14 
Import in Production ...................................................................................................................................................... 16 
Start the import in Production ............................................................................................................................... 16 
Close the Change Document ......................................................................................................................................... 18 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 2 of 18
Change Request Management – Normal Correction Lifecycle 
Versioning 
Version Change Date 
1.0 Original 10/06/2008 
2.0 Webpage Link. 23/06/2008 
Author Bio 
My name is Wenceslao Lacaze and I’ve been working as a SAP basis 
Administrator and Solution Manager Consultant for the last 8 years. 
I’m a Techno-Functional SAP Solution Manager Subject Matter Expert (SME), I 
Design, Build and Implement the product using “Run Sap” Methodology. 
I have developed a very extended experience with medium and large scaled 
SAP installations in several (multi)national environments. 
I am based in Argentina, but work all around the World. 
I work directly for clients or via an agency. 
I do speak Spanish, Italian and English fluently. 
You can contact me at: 
Email: wlacaze@gmail.com 
http://www.linkedin.com/in/solutionmanager 
You can found more papers at : 
http://wlacaze.googlepages.com/home 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 3 of 18
Change Request Management – Normal Correction Lifecycle 
Landscape Preparation: 
For this Demo we use 3 client inside Solution Manager 
• 801 Development 
• 802 Quality 
• 803 Productive 
Users Preparation: 
We create 5 diferent users and profiles 
Creates and confirm the Change Request 
Categorizes, Approve and monitors Change Request. 
Is the Steering Committee in the Change Management 
Implements a change, and hands it over to the Tester 
Test changes and ajust the Change Document Status 
Manages and coordinates software logistics 
Project Preparation 
We create a project and 1 Maintenace cycle 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 4 of 18
Change Request Management – Normal Correction Lifecycle 
Cycle overview 
Start the Maintenance Cycle 
The Change Manager set the Maintenance Cycle in “Development with Release Phase” 
Create the Change Request 
The Requester logon to SM and run the transaction CRMD_ORDER. 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 5 of 18
Change Request Management – Normal Correction Lifecycle 
Click in the Button “Normal Correction”, if you don’t have add manually in “Extra  Settings  
Specific  Push Button 1 = SDCR 
This is the Main Change Request Window. 
For create a Normal Correction you need to identify some information: 
• Description 
• SoldTo Party 
• Requestor 
• Change Manager 
• Change Advisory Board 
• Ibase/Component 
• Description of the Change 
Then Save. 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 6 of 18
Change Request Management – Normal Correction Lifecycle 
Aprove the Change Request 
The Change Advisory Board decide wich kind of change document are necessary for this change. 
document , in this case select Normal Correction(Maintenace) and save. 
Authorize change 
The Change Manager recive the notification and then select “Authorize Change Request” 
When the Change Manager approve the Change Document, Solution Manager change the 
document to Authorized and Create a new Normal Correction Document. 
The Change Manager open the Normal Correcion 800000170 and select “In Development” in the 
TaskList 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 7 of 18
Change Request Management – Normal Correction Lifecycle 
Create the Transports 
Now the Normal Correction is in Status “In Development”. 
The Project Leader ,Change Manager or Developer inside Solution Manager create the New 
Transport Request. 
Solution Manager ask for the Request Owner, Short Descriotion and the developer who make the 
tasks, the system create 2 transport in the development system, 1 for Customizing, 1 for 
Workbench, 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 8 of 18
Change Request Management – Normal Correction Lifecycle 
Start the corrections 
Tthe Developer logon to Solution Manager and and open the Normal Correction 8000000170. 
Inside the Tasklist select “Logon to System” 
Inside the Development system(SMR-801) , the developer make some change and Save. 
The Satellite System (SM4-801) ask for a request, 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 9 of 18
Change Request Management – Normal Correction Lifecycle 
The Developer select the request SM4K900051 Created for AOMEADM with the TASK 
SMK4900052 for DEVELOPER 
Then the Developer release his Task SM4K900052 , 
The Developer return to SOLUTION MANAGER and in “Test Instruction” put the instruction to the 
Tester, then move the Normal Correction to “Complete Development” 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 10 of 18
Change Request Management – Normal Correction Lifecycle 
The Maintenance Cycle 
Release the Transports 
At this point the Change Manager release the transport Request manually using the transacction 
SCMA and then execute the task “Release transport Request” 
Right Click over “Release Transport Request” and select “Schedule” 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 11 of 18
Change Request Management – Normal Correction Lifecycle 
The Change Manager select the Execution Data and then run 
The System show the Transport Request ready for release 
Import in QA 
The Change import the transport in QA Environment 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 12 of 18
Change Request Management – Normal Correction Lifecycle 
Solution Manager show the Execution Data 
Change Manager select the Import parameters and then start the process 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 13 of 18
Change Request Management – Normal Correction Lifecycle 
Start the Testing Phase 
The Change Manager move the Phase of the Maintenance Cycle to Test to make the integration test 
The Tester logon to solution Manager and open the Normal Correction, Read the Test Instrucction 
, then use the TASKLIST for connect to the TEST system. 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 14 of 18
Change Request Management – Normal Correction Lifecycle 
In the TEST System check the value 
The TESTER return to SOLUTION MANAGER and write the Test Report, then in the TASKLIST 
select “Confirm Successful Test” 
At this point the Normal correction is in Status Consolidated 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 15 of 18
Change Request Management – Normal Correction Lifecycle 
Import in Production 
The Change Manager move the Phase to Go-Live to start the imports in the Productive enviroment 
Start the import in Production 
The change Manager run the “Import Transport Request” 
Select the import execution and run the transaction 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 16 of 18
Change Request Management – Normal Correction Lifecycle 
The Requester logon to the Production for check the import, if is correct change the Normal 
Correction to “Production Status”. 
The Normal correction is in Production status. 
When the Normal Correction change the status to “Production”, the Change document change 
automatic to “Implemented” the status 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 17 of 18
Change Request Management – Normal Correction Lifecycle 
Close the Change Document 
The Change Manager control all the documentation and then move the Change Request to 
“Confirms Realization”. 
The Change Request in Status “Confirmed” closing the cycle for this maintenace. 
SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 18 of 18

More Related Content

What's hot

Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...
Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...
Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...Robert Max
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Flevy.com Best Practices
 
Failure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQMFailure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQMPalanivel rajan
 
Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01MaheshMamidi3
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Ims Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeIms Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeMatthew Clemens
 
Sap Solman Imptools Test Management
Sap Solman Imptools Test ManagementSap Solman Imptools Test Management
Sap Solman Imptools Test Managementwlacaze
 
Wcm overview
Wcm overviewWcm overview
Wcm overviewamit1858
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceTri Dung Nguyen
 

What's hot (13)

Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...
Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...
Using SolMan ChaRM, CSOL and Retrofit to support a dual project and productio...
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 
Failure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQMFailure Mode Effective Analysis in TQM
Failure Mode Effective Analysis in TQM
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
Ims Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeIms Maint Mgmt Best Practice
Ims Maint Mgmt Best Practice
 
Sap Solman Imptools Test Management
Sap Solman Imptools Test ManagementSap Solman Imptools Test Management
Sap Solman Imptools Test Management
 
8 D Report
8 D Report8 D Report
8 D Report
 
Wcm overview
Wcm overviewWcm overview
Wcm overview
 
Work clearance management config and steps
Work clearance management   config and stepsWork clearance management   config and steps
Work clearance management config and steps
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 

Viewers also liked

Brutopalk II kvartal 2013 Eestis
Brutopalk II kvartal 2013 EestisBrutopalk II kvartal 2013 Eestis
Brutopalk II kvartal 2013 EestisKadri Seeder
 
Nupp toole tutvustus
Nupp toole tutvustusNupp toole tutvustus
Nupp toole tutvustusKadri Seeder
 
Palgauuringute läbiviimine
Palgauuringute läbiviiminePalgauuringute läbiviimine
Palgauuringute läbiviimineKadri Seeder
 
Grosswage iii quarter_2014_estonia_eng
Grosswage iii quarter_2014_estonia_engGrosswage iii quarter_2014_estonia_eng
Grosswage iii quarter_2014_estonia_engKadri Seeder
 
Average gross wage_in_estonia
Average gross wage_in_estoniaAverage gross wage_in_estonia
Average gross wage_in_estoniaKadri Seeder
 
Sektorite palgastatistika jaan_2014
Sektorite palgastatistika jaan_2014Sektorite palgastatistika jaan_2014
Sektorite palgastatistika jaan_2014Kadri Seeder
 
Lithuania country report_demo
Lithuania country report_demoLithuania country report_demo
Lithuania country report_demoKadri Seeder
 

Viewers also liked (8)

Brutopalk II kvartal 2013 Eestis
Brutopalk II kvartal 2013 EestisBrutopalk II kvartal 2013 Eestis
Brutopalk II kvartal 2013 Eestis
 
Nupp toole tutvustus
Nupp toole tutvustusNupp toole tutvustus
Nupp toole tutvustus
 
Palgauuringute läbiviimine
Palgauuringute läbiviiminePalgauuringute läbiviimine
Palgauuringute läbiviimine
 
Grosswage iii quarter_2014_estonia_eng
Grosswage iii quarter_2014_estonia_engGrosswage iii quarter_2014_estonia_eng
Grosswage iii quarter_2014_estonia_eng
 
Average gross wage_in_estonia
Average gross wage_in_estoniaAverage gross wage_in_estonia
Average gross wage_in_estonia
 
Sektorite palgastatistika jaan_2014
Sektorite palgastatistika jaan_2014Sektorite palgastatistika jaan_2014
Sektorite palgastatistika jaan_2014
 
Nupud toole
Nupud tooleNupud toole
Nupud toole
 
Lithuania country report_demo
Lithuania country report_demoLithuania country report_demo
Lithuania country report_demo
 

Similar to Normalcorrectionprocess 8

SAP-SOLMAN-CHARM-UrgentCorrection-v2
SAP-SOLMAN-CHARM-UrgentCorrection-v2SAP-SOLMAN-CHARM-UrgentCorrection-v2
SAP-SOLMAN-CHARM-UrgentCorrection-v2wlacaze
 
Sap Solution Manager - Administrative
Sap Solution Manager - AdministrativeSap Solution Manager - Administrative
Sap Solution Manager - Administrativeumarfakih
 
Sap Solman Charm Issue Management
Sap Solman Charm Issue ManagementSap Solman Charm Issue Management
Sap Solman Charm Issue Managementwlacaze
 
Itm116 using cha rm csol and retrofit to support a dual project and production
Itm116  using cha rm csol and retrofit to support a dual project and productionItm116  using cha rm csol and retrofit to support a dual project and production
Itm116 using cha rm csol and retrofit to support a dual project and productionRobert Max
 
SolMan CHARM Webinar
SolMan CHARM WebinarSolMan CHARM Webinar
SolMan CHARM WebinarWise Men
 
Automating sap testing with qtp10 & qc10
Automating sap testing with qtp10 & qc10Automating sap testing with qtp10 & qc10
Automating sap testing with qtp10 & qc10Patrick Sun
 
Solution Manager 7.2 SAP Monitoring - Part 3 - Managed System Configuration
Solution Manager 7.2 SAP Monitoring - Part 3 - Managed System ConfigurationSolution Manager 7.2 SAP Monitoring - Part 3 - Managed System Configuration
Solution Manager 7.2 SAP Monitoring - Part 3 - Managed System ConfigurationLinh Nguyen
 
Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02Kamalaksha Das
 
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02Pompee Das
 
SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0Argos
 
Sap Solman Servdesk Oss Message V2.0
Sap Solman Servdesk Oss Message V2.0Sap Solman Servdesk Oss Message V2.0
Sap Solman Servdesk Oss Message V2.0wlacaze
 
Assessment checklist
Assessment checklistAssessment checklist
Assessment checklistKASC
 
Six sigma full report
Six sigma full reportSix sigma full report
Six sigma full reporttapan27591
 
2015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V5
2015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V52015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V5
2015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V5Masud Rana
 
Sap Solman Servdesk Support Message V
Sap Solman Servdesk Support Message VSap Solman Servdesk Support Message V
Sap Solman Servdesk Support Message Vwlacaze
 
0 sap - conversion guide for sap s4 hana 1610
0   sap - conversion guide for sap s4 hana 16100   sap - conversion guide for sap s4 hana 1610
0 sap - conversion guide for sap s4 hana 1610Catire2000
 
Why Automation is the Best Practice for SAP Changes
Why Automation is the Best Practice for SAP ChangesWhy Automation is the Best Practice for SAP Changes
Why Automation is the Best Practice for SAP ChangesDavid Milano
 
Iso 9001 2015 checklist
Iso 9001 2015 checklistIso 9001 2015 checklist
Iso 9001 2015 checklistAtul Sharma
 
Bpm10gperformancetuning 476208
Bpm10gperformancetuning 476208Bpm10gperformancetuning 476208
Bpm10gperformancetuning 476208Vibhor Rastogi
 

Similar to Normalcorrectionprocess 8 (20)

SAP-SOLMAN-CHARM-UrgentCorrection-v2
SAP-SOLMAN-CHARM-UrgentCorrection-v2SAP-SOLMAN-CHARM-UrgentCorrection-v2
SAP-SOLMAN-CHARM-UrgentCorrection-v2
 
Sap Solution Manager - Administrative
Sap Solution Manager - AdministrativeSap Solution Manager - Administrative
Sap Solution Manager - Administrative
 
Sap Solman Charm Issue Management
Sap Solman Charm Issue ManagementSap Solman Charm Issue Management
Sap Solman Charm Issue Management
 
Itm116 using cha rm csol and retrofit to support a dual project and production
Itm116  using cha rm csol and retrofit to support a dual project and productionItm116  using cha rm csol and retrofit to support a dual project and production
Itm116 using cha rm csol and retrofit to support a dual project and production
 
SolMan CHARM Webinar
SolMan CHARM WebinarSolMan CHARM Webinar
SolMan CHARM Webinar
 
Automating sap testing with qtp10 & qc10
Automating sap testing with qtp10 & qc10Automating sap testing with qtp10 & qc10
Automating sap testing with qtp10 & qc10
 
Solution Manager 7.2 SAP Monitoring - Part 3 - Managed System Configuration
Solution Manager 7.2 SAP Monitoring - Part 3 - Managed System ConfigurationSolution Manager 7.2 SAP Monitoring - Part 3 - Managed System Configuration
Solution Manager 7.2 SAP Monitoring - Part 3 - Managed System Configuration
 
Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02
 
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
 
SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0
 
Quality management
Quality management Quality management
Quality management
 
Sap Solman Servdesk Oss Message V2.0
Sap Solman Servdesk Oss Message V2.0Sap Solman Servdesk Oss Message V2.0
Sap Solman Servdesk Oss Message V2.0
 
Assessment checklist
Assessment checklistAssessment checklist
Assessment checklist
 
Six sigma full report
Six sigma full reportSix sigma full report
Six sigma full report
 
2015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V5
2015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V52015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V5
2015 02 27_ Research on Car Painting Quality Control Based on FMEA and SPC V5
 
Sap Solman Servdesk Support Message V
Sap Solman Servdesk Support Message VSap Solman Servdesk Support Message V
Sap Solman Servdesk Support Message V
 
0 sap - conversion guide for sap s4 hana 1610
0   sap - conversion guide for sap s4 hana 16100   sap - conversion guide for sap s4 hana 1610
0 sap - conversion guide for sap s4 hana 1610
 
Why Automation is the Best Practice for SAP Changes
Why Automation is the Best Practice for SAP ChangesWhy Automation is the Best Practice for SAP Changes
Why Automation is the Best Practice for SAP Changes
 
Iso 9001 2015 checklist
Iso 9001 2015 checklistIso 9001 2015 checklist
Iso 9001 2015 checklist
 
Bpm10gperformancetuning 476208
Bpm10gperformancetuning 476208Bpm10gperformancetuning 476208
Bpm10gperformancetuning 476208
 

Normalcorrectionprocess 8

  • 1. SAP Solution Manager Change Request Management Normal Correction with Change Request Management h t t p : / / w w w . l i n k e d i n . c o m / i n / s o l u t i o n m a n a g e r W e n c e s l a o L a c a z e
  • 2. Change Request Management – Normal Correction Lifecycle Table of Contents Versioning ..............................................................................................................................................................................3 Author Bio ..............................................................................................................................................................................3 Landscape Preparation: ....................................................................................................................................................4 Users Preparation: ..............................................................................................................................................................4 Project Preparation.............................................................................................................................................................4 Cycle overview......................................................................................................................................................................5 Start the Maintenance Cycle............................................................................................................................................5 Create the Change Request .........................................................................................................................................5 Aprove the Change Request ............................................................................................................................................7 Authorize change ............................................................................................................................................................7 Create the Transports ...................................................................................................................................................8 Start the corrections......................................................................................................................................................9 The Maintenance Cycle................................................................................................................................................... 11 Release the Transports.............................................................................................................................................. 11 Import in QA .................................................................................................................................................................. 12 Start the Testing Phase................................................................................................................................................... 14 Import in Production ...................................................................................................................................................... 16 Start the import in Production ............................................................................................................................... 16 Close the Change Document ......................................................................................................................................... 18 SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 2 of 18
  • 3. Change Request Management – Normal Correction Lifecycle Versioning Version Change Date 1.0 Original 10/06/2008 2.0 Webpage Link. 23/06/2008 Author Bio My name is Wenceslao Lacaze and I’ve been working as a SAP basis Administrator and Solution Manager Consultant for the last 8 years. I’m a Techno-Functional SAP Solution Manager Subject Matter Expert (SME), I Design, Build and Implement the product using “Run Sap” Methodology. I have developed a very extended experience with medium and large scaled SAP installations in several (multi)national environments. I am based in Argentina, but work all around the World. I work directly for clients or via an agency. I do speak Spanish, Italian and English fluently. You can contact me at: Email: wlacaze@gmail.com http://www.linkedin.com/in/solutionmanager You can found more papers at : http://wlacaze.googlepages.com/home SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 3 of 18
  • 4. Change Request Management – Normal Correction Lifecycle Landscape Preparation: For this Demo we use 3 client inside Solution Manager • 801 Development • 802 Quality • 803 Productive Users Preparation: We create 5 diferent users and profiles Creates and confirm the Change Request Categorizes, Approve and monitors Change Request. Is the Steering Committee in the Change Management Implements a change, and hands it over to the Tester Test changes and ajust the Change Document Status Manages and coordinates software logistics Project Preparation We create a project and 1 Maintenace cycle SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 4 of 18
  • 5. Change Request Management – Normal Correction Lifecycle Cycle overview Start the Maintenance Cycle The Change Manager set the Maintenance Cycle in “Development with Release Phase” Create the Change Request The Requester logon to SM and run the transaction CRMD_ORDER. SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 5 of 18
  • 6. Change Request Management – Normal Correction Lifecycle Click in the Button “Normal Correction”, if you don’t have add manually in “Extra Settings Specific Push Button 1 = SDCR This is the Main Change Request Window. For create a Normal Correction you need to identify some information: • Description • SoldTo Party • Requestor • Change Manager • Change Advisory Board • Ibase/Component • Description of the Change Then Save. SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 6 of 18
  • 7. Change Request Management – Normal Correction Lifecycle Aprove the Change Request The Change Advisory Board decide wich kind of change document are necessary for this change. document , in this case select Normal Correction(Maintenace) and save. Authorize change The Change Manager recive the notification and then select “Authorize Change Request” When the Change Manager approve the Change Document, Solution Manager change the document to Authorized and Create a new Normal Correction Document. The Change Manager open the Normal Correcion 800000170 and select “In Development” in the TaskList SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 7 of 18
  • 8. Change Request Management – Normal Correction Lifecycle Create the Transports Now the Normal Correction is in Status “In Development”. The Project Leader ,Change Manager or Developer inside Solution Manager create the New Transport Request. Solution Manager ask for the Request Owner, Short Descriotion and the developer who make the tasks, the system create 2 transport in the development system, 1 for Customizing, 1 for Workbench, SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 8 of 18
  • 9. Change Request Management – Normal Correction Lifecycle Start the corrections Tthe Developer logon to Solution Manager and and open the Normal Correction 8000000170. Inside the Tasklist select “Logon to System” Inside the Development system(SMR-801) , the developer make some change and Save. The Satellite System (SM4-801) ask for a request, SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 9 of 18
  • 10. Change Request Management – Normal Correction Lifecycle The Developer select the request SM4K900051 Created for AOMEADM with the TASK SMK4900052 for DEVELOPER Then the Developer release his Task SM4K900052 , The Developer return to SOLUTION MANAGER and in “Test Instruction” put the instruction to the Tester, then move the Normal Correction to “Complete Development” SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 10 of 18
  • 11. Change Request Management – Normal Correction Lifecycle The Maintenance Cycle Release the Transports At this point the Change Manager release the transport Request manually using the transacction SCMA and then execute the task “Release transport Request” Right Click over “Release Transport Request” and select “Schedule” SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 11 of 18
  • 12. Change Request Management – Normal Correction Lifecycle The Change Manager select the Execution Data and then run The System show the Transport Request ready for release Import in QA The Change import the transport in QA Environment SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 12 of 18
  • 13. Change Request Management – Normal Correction Lifecycle Solution Manager show the Execution Data Change Manager select the Import parameters and then start the process SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 13 of 18
  • 14. Change Request Management – Normal Correction Lifecycle Start the Testing Phase The Change Manager move the Phase of the Maintenance Cycle to Test to make the integration test The Tester logon to solution Manager and open the Normal Correction, Read the Test Instrucction , then use the TASKLIST for connect to the TEST system. SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 14 of 18
  • 15. Change Request Management – Normal Correction Lifecycle In the TEST System check the value The TESTER return to SOLUTION MANAGER and write the Test Report, then in the TASKLIST select “Confirm Successful Test” At this point the Normal correction is in Status Consolidated SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 15 of 18
  • 16. Change Request Management – Normal Correction Lifecycle Import in Production The Change Manager move the Phase to Go-Live to start the imports in the Productive enviroment Start the import in Production The change Manager run the “Import Transport Request” Select the import execution and run the transaction SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 16 of 18
  • 17. Change Request Management – Normal Correction Lifecycle The Requester logon to the Production for check the import, if is correct change the Normal Correction to “Production Status”. The Normal correction is in Production status. When the Normal Correction change the status to “Production”, the Change document change automatic to “Implemented” the status SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 17 of 18
  • 18. Change Request Management – Normal Correction Lifecycle Close the Change Document The Change Manager control all the documentation and then move the Change Request to “Confirms Realization”. The Change Request in Status “Confirmed” closing the cycle for this maintenace. SAP-SOLMAN-CHARM-Normal Correction-v2.0.doc Page 18 of 18