VIETNAM – THE WORLD BANK GROUP IS ASKING DUANE MORRIS ABOUT PUBLIC PROCUREMENT
Case StudyAssumptions
BidCo
Is one of the companies participating in the call for tender and meets
all solvency, technical and administrative requirements to compete;
Is a privately and domestically-owned medium-sized Limited Liability
Company (or its most common legal equivalent);
Operates in Ho Chi Minh City;
Is up to date with all regulations and is in good standing with
all relevant authorities, including those related to taxes;
Has all licenses and permits needed to operate in this technical area;
Has already responded to a public call for tender and is already
registered with the procuring entity defined below.
Contract
Entails resurfacing 20 km of a flat two-lane road (not a highway and
not under concession), connecting Ho Chi Minh City to another city within
Vietnam (and within the same state, region or province as Ho Chi Minh
City, if applicable), with an asphalt overlay of 40 to 59 mm (or its most
common equivalent in Vietnam);
Value: USD 2.5 Million (equivalent to VND 56,997,352,120);
Does not include any other work (such as site clearance, subsoil
drainage, bridgework or further routine maintenance).
Procuring Entity
Is the agency in charge of procuring construction works for the
authority that owns the road describedabove;
Is the sole funder of the works, has budget for the works and is solvent.
Procurement Process
Is an open, unrestricted, and competitive public call for tender for
resurfacing a road like the one described above;
Is completed without complaints/challenges/protests frominterested
parties;
Ends with the awarding of the contract to BidCo, whose bid satisfied
all technical and administrative criteria and offered the best value for money.
1. What is the entity that conducts procurement for the authority that owns the majority of roads comparable to
the one described above?
Directorate for Roads of Vietnam within the Ministry of Transport
2. How many open, unrestricted and competitive public calls for tenders for roadwork contracts were completed in
the last 5 years by the Procuring Entity you selected in Q.1?
More than 51
3. Please provide a list of the laws, regulations and other binding materials (including guidelines and manuals) that
regulate public procurement in Vietnam. Please include legislation or other binding materials promulgated at the
national/federal level as well as any additional legislation that is applicable to the Procuring Entity you selected in
Q.1.
2
Circular No. 04/2017/TT-BKHDT of 2017
Circular No. 05/2020/TT-BKHDT of 2020
Law on Bidding No. 43/2013/QH13 of 2013
Decree No. 63/2014/ND-CP of 2013
Law on Investment in the form of Public-Private Partnership of 2020
Decree No.25/2020/ND-CP of 2020
Commercial Law No. 36/2005/QH11 of 2005
Decree No. 37/2015/ND-CP of 2015
Circular No. 03/2015/TT-BKHDT of 2015
- Decree 50/2021/ND-CP of 2021
Circular 11/2019/TT-BKHDT of 2020
Comprehensive and Progressive Agreement for Trans-Pacific Partnership
EU-Vietnam Free Trade Agreement of 2020
4. Please list any mandatory standard tender documents and/or standard contract terms that the Procuring Entity
must use for a contract like the one described in Section 1.
Contract terms must specify:
a/ Applied legal bases;
b/ Language used in the contract;
c/ Content and volume of work;
d/ Quality, technical requirements of work; pre-acceptance test and handover conditions;
dd/ Contract performance duration and schedule;
e/ Contract price, advance payment, currency used in payment, and payment for the contract;
g/ Contract performance security, contract advance guarantee;
h/ Adjustment of the construction contract;
i/ Rights and obligations of the parties to the construction contract;
k/ Liability for violations of the contract, rewards and fines for violations of the contract; l/ Suspension and
termination of the contract;
m/ Settlement of disputes over the contract;
n/ Risks and force majeure events; o/ Settlement and liquidation of the contract;
p/ Other contents.
All standards are listed in Bidding Law and Article 141 Construction Law.
5. Are you aware of any change (in practice or in laws/regulations/procedures) related to public procurement
between May 2, 2020 and May 1, 2021? For example: amendments to applicable public procurement laws, enactment
and/or implementation of new regulations, implementation or improvement of e-procurement platforms, changes to the
bid security and performance guarantee framework, etc.
Yes. The implementation of the EU- Vietnam Free Trade Agreement from 1 August 2020
3
6. Are you aware of any regulatory or administrative measures (in practice or in
laws/regulations/procedures/contract management) related to public procurement that has been implemented
between May 2, 2020 and May 1, 2021 to respond to the COVID-19 pandemic?
Digitization of interactions between officials and private sector
7. If one or several electronic procurement portal(s) (i.e., an official website(s) specifically and exclusively dedicated
to public procurement) are in operation, please mark which platform would most commonly be used by the
Procuring Entity.
http://muasamcong.mpi.gov.vn
8. Out of all road works contracts with the Procuring Entity, how many are procured through the portal you listed
in Q.7?
More than 75%
9. Which of the following information about road works contracts procured by the Procuring Entity is made
publicly available in machine-readable format? (i.e, data format that can be processed by a computer, such as
XSL, CSV, JSON, XML, etc.)
Estimated cost – as calculated by the Procuring Entity at the time of advertising.
II. PHASES OF THE PROCUREMENT PROCESS
Phase 1: Budgeting and Needs Assessment
1. According to the legal framework, when the Procuring Entity prepares to advertise a new procurement
opportunity for a contract like the one described in Section 1, which of the following are used to estimate the
contract value and projected length of works?
Market analysis, standardized unit cost, project-spcific technical drawings, feasibility study, similar projects from prvious
years
Legal basis: 58/2016/TT-BTC
2. In practice, is the estimated contract value/budget published in the tender notice/tender documents?
Yes
3. Is the Procuring Entity required to have already allocated budget to a specific project before tendering?
Yes, there is a specific budget allocation
4. How often does the Procuring Entity award a contract without having all the necessary funds?
Occasionally (between 25-50%)
Phase 2: from Advertisement to Bid Submission
5. According to the legal framework, would open tendering (i.e. the process in which any business can submit a
bid) be the default method of procurement in Vietnam for a contract like the one described in Section 1?
4
Yes, according to Article 20 of Law on Bidding No. 43/2013/QH13 of 2013.
6. According to the legal framework, can the Procuring Entity require bidders to participate in a prequalification
process specific to that contract before being able to submit their economic offer?
Yes, according to Articles 22 and 44 of Decree No. 63 of 2014.
a. How often would this happen for a contract like the one described in Section 1? Rarely (10-25%)
b. In practice, how many days would be necessary for BidCo to receive a decision on its prequalification from the
moment it submitted all the necessary documents? 30 days
c. In your experience, as of May 1, 2021, has Covid-19 impacted the frequency of prequalification and the time
you indicated above? Yes - Longer processing time of dossier - case on case basis.
d. According to the legal framework, must the contractor be registered with the Procuring Entity in order to bid
for a contract like the one described in Section 1? Yes, according to Article 5.1(d), Bidding Law
7. In practice, what is the most common method of procurement for a contract like the one described in Section 1?
Open tendering is the default by law and also the most common in practice
8. Does the legal framework define the situations in which each procurement method should be used?
Yes, according to Articles 21-27 of Law on Bidding No. 43/2013/QH13 of 2013.
9. Does the legal framework prohibit dividing contracts to circumvent thresholds for open tendering?
Yes, according to Article 89.6.k of Law on Bidding No. 43/2013/QH13 of 2013.
a. In practice, how often does this happen? Often (between 50-90%)
10. Which of the following materials need to be made publicly available by the Procuring Entity?
Procurement plans, Model procurement documents and materials/standard contract conditions, Tender notices,
Tender documents and technical specifications, Notices of award/bidding results
11. According to the legal framework, is there a minimum time limit between the advertisement of the tender
notice and the submission deadline for an open tendering procedure like the one described in Section 1?
Yes, Article 6, Decree No. 25/2020/ND-CP
a. In practice, how many days would pass between the advertisement of the tender notice and the submission
deadline for a contract like the one described in Section 1? 30-40 days
b. How often does the Procuring Entity modify the tender documents for any reason after advertisement, but
before the submission deadline? Rarely (between 10-25%)
c. In practice, by how many days would the timeframe you indicated in Q.21.a be extended due to these
modifications? 0 days
12. Does the legal framework establish the minimum content of the tender notice and tender documents?
Yes, according to Articles 218-219 of Commercial Law No. 36/2005/Qh11; and Circular No. 03/2015/TT-BKHDT of
2015.
5
13. Which aspects of subcontracting is regulated by the applicable legal framework?
Features, disclosure, liability, according to Article 4 of Law on Bidding No. 43/2013/QH13 of 2013; and Article 128 of
Decree No. 63/2014/ND-CP of 2014.
14. According to the legal framework, if the intent to subcontract was not disclosed in the bid, what is the
contractor who decides to subcontract after the contract is signed required to do?
Inform the procuring entity and seek its approval
15. According to the legal framework, how clarification requests from potential bidders should be addressed?
The procuring entity will answer, but it is not always required to communicate the answer to all other bidders.
16. According to the legal framework, is BidCo required to provide a form of bid guarantee?
Yes, according to Article 11.1 of Law on Bidding No. 43/2013/QH13 of 2013.
a. If bid guarantee is not required by law, would it usually be requested in practice by the Procuring Entity for
a contract like the one described in Section 1? Yes
17. In practice, which instrument would BidCo most commonly use as a bid guarantee?
Bank guarantee/Letter of credit, Bid security declaration
Phase 3: from Bid Opening to Contract Signing
18. Does the legal framework establish a timeframe for the Procuring Entity to proceed to bid opening once the
deadline for bid submission has been reached?
Yes, according to Article 14.4(a) of Decree No. 63/2014/ND-CP
a. In practice, how many days after the deadline for bid submission does the Procuring Entity proceed to bid
opening? 0 day
19. In practice, in a case comparable to the case study scenario, how many days would pass between bid opening
and public notice of award (i.e. the moment in which all tenderers, participants and relevant parties are notified of the
award decision), considering that no complaints/challenges/protests have been filed?
60 days
a. In your experience, as of May 1, 2021, has Covid-19 impacted the process and time to award a contract that you
indicated in Q.29? No
b. In practice, between bid opening and public notice of award, how often does the Procuring Entity ask
questions/additions to bidders on the documents they submitted? Occasionally (between 25-50%)
c. In practice, by how many days would the timeframe you indicated in Q.29 be extended due to
questions/additions asked by the Procuring Entity? 45 days
6
20. Is there a standstill (or pause) period between public notice of award and contract signing to allow
unsuccessful bidders to challenge the award decision?
No, standstill is only triggered by objection.
21. In practice, in a case comparable to the case study scenario, how many days would pass on average between
public notice of award and contract signing?
30-40 days
a. In your experience, as of May 1, 2021, has Covid-19 impacted the process and time to sign the contract that
you indicated in Q.31?
No
22. In practice, how many days would pass on average between contract signing, receipt of a notice to proceed with
the works, and the commencement of the works? 30 days
23. Selection committee – Which of the following characteristics are regulated by the applicable legal framework?
The number of members of the committee
The education requirements of members of the committee
The professional requirements of members of the committee
The process to appoint the members of the committee
Legal basis: Article 116 of Decree No.63/2014/ND-CP
24. Are employees of the Procuring Entity required to follow a mandatory code of conduct or ethics that includes
topics like screening procedures, conflict of interest, training requirements, etc.?
No
25. According to the legal framework, which award criterion would be used for a contract like the one described in
Section 1?
At the discretion of the Procuring Entity, according to Articles 39.1, 39.2 and 39.3 of Law on Bidding No.
43/2013/QH13 of 2013.
26. In practice, how often is the award decision based solely on price and not on best value for money?
Very often (> 90%)
27. Does the legal framework establish criteria to identify abnormally low bids?
No
28. Does the legal framework define what constitutes a non-substantial error?
7
Yes - Article 4.18 and 4.19 and 42 of Law on Bidding No. 43/2013/QH13 of 2013; and Article 17 of Decree 63/2014/ND-
CP of 2014.
a. In practice, how often does the Procuring Entity require bidders to amend their offers (because of mistakes,
arithmetic errors, etc.)? Rarely (10-25%)
b. In practice, in these cases would the bidder be given the opportunity to rectify such error before
disqualification? Yes - Article 17 of Decree No. 63/2014/ND-CP
29. According to the legal framework, when a bidder is excluded because it did not meet the selection criteria, is it
provided with an explanation of the reasons for the exclusion in writing?
Yes, the bidder must always be provided with an explanation in writing
Legal basis: 63/2014/ND-CP
30. According to the legal framework, when a bidder loses, is it provided with an explanation of the reasons for the
loss in writing?
Yes, the bidder must always be provided with an explanation in writing
Legal basis: 63/2014/ND-CP
Phase 4: Contract Management
31. According to the legal framework, is BidCo required to provide a performance guarantee deposit that
ensures a source of compensation in case of failure to perform its contractual obligations?
Yes, according to Articles 66 and 72 of Law on Bidding No. 43/2013/QH13 of 2013.
a. If a performance guarantee is not required by law, would it usually be requested in practice by the Procuring
Entity for a contractlike the one described in Section 1? Yes
32. In practice, which instrument would BidCo most commonly use as a performance guarantee?
Cash/Certified check
Certificate of deposit
Bank Guarantee/Letter of Credit
33. In practice, how long does it usually take for the Procuring Entity to return the performance guarantee in full
once the works have been completed and accepted by the Procuring Entity?
Within 20 days
34. Which aspects of contract management are regulated by the applicable legal framework?
8
Renegotiations. Legal basis: Article 67 Law on Bidding, Article 93 Decree 63/2014/ND-CP
35.How often would a contract like the one described in Section 1 be renegotiated?
Rarely (10-25%)
36. If the contract described in Section 1 were more complex (i.e., lengthier and/or more costly execution, more
complex scope or object, etc.), how often would it be renegotiated?
Occasionally (between 25-50%)
37. According to the legal framework, is there a maximum percentage of price/quantity increase for changing
(variation) orders?
No
38. According to the legal framework, is there a percentage of price increase above which the procuring entity is not
allowed to renegotiate and is always required to re-tender?
No
39. In practice, are the results of contract renegotiations made publicly available?
No
40. In practice, how many days would pass on average from the moment one of the parties requests/initiates a
renegotiation of the contract until a new contract amendment is signed?
30 – Dependent on the negotiation process
a. In your experience, as of May 1, 2021, has Covid-19 impacted the frequency of contract renegotiations and the
time to authorize them? No
41. How often do bidders submit unrealistically low bids to win the contract, confident of having a possibility to
renegotiate at a later stage?
Often (between 50-90%)
42. How often are "emergencies" used as a reason to renegotiate?
Very rarely (< 10% of cases)
43. How often would a changing (variation) order/price adjustment (i.e. a modification below a certain threshold or
clearly defined in the terms of the contract) take place in a contract like the one described in Section 1?
Occasionally (between 25-50%)
a. In practice, how many days would pass on average from the moment that the modification becomes necessary
until a changing (variation) order/price adjustment is issued? 30 days – case by case basis
9
44. How often would additional works related to the initial contract (i.e. works by the original contractor that have
become necessary and that were not included in the initial procurement) be awarded to the same contractor
through direct award?
Occasionally (between 25-50%)
a. In practice, how many days would pass on average from the moment additional works become necessary until
they are awarded to the same original contractor? 30 days
Phase 5: Payment, Delays and Quality Assessment
45. According to the legal framework, is there a limit to how much the Procuring Entity can pay upfront for the
contractor to hire workers, buy materials, and start operations in a contract like the one described in Section 1?
No
a. In practice, how much would usually be paid upfront for a contract like the one described in Section 1? 10-50%
b. In practice, if an advance payment is usually issued, does the contractor have to provide a guarantee for receiving
this payment? Yes
c. In practice, how many calendar days will be necessary for BidCo to receive the advance payment once the
request has been submitted to the Procuring Entity? 10-20 days
46. During the execution of the contract, does the legal framework establish a timeframe within which the
Procuring Entity must process the payment once an invoice is received?
Yes, according to Article 19 of Decree No. 37/2015/ND-CP of 2015.
a. In practice, how many calendar days will be necessary on average for BidCo to receive payment once the invoice
has been delivered to the relevantauthority? 30 days
b. In practice, how many people would need to authorize payment within the procuring entity before payment is
made? 2
c. In practice, how often will BidCo receive payment within the timeframe established by the legal framework?
Often (between 50-90%)
d. According to the legal framework, is the company entitled to claim interest on late payments if the Procuring
Entity does not pay within thelegally-established timeframe?
Yes, according to Article 94 of Decree No. 63/2014/ND-CP of 2014.
e. How often would such interest on late payment be paid to thecompany? Often (between 50-90%)
f. In practice, for a contract like the one described in Section 1, how many days would pass on average between the
moment BidCo notifies the Procuring Entity that the works are completed and a formal agreement between them
stipulating that the works are indeed finished and comply with the contract specifications (i.e. a certificate of
completion of works)? 60 days
10
g. In your experience, as of May 1, 2021, has Covid-19 impacted the time to certify the completion of works?Yes,
on-site visits are subject to quanrantine regulations by provincial authorities
h. How often do disagreements between the Procuring Entity and BidCo on the completed works delay the process
of reaching a formal agreement that the works are finished? Occasionally (between 25-50%)
i. In practice, by how many days would the aforementioned time be extended to resolve this disagreement and
obtain a certificate of completion of works from the Procuring Entity? 90 days
47. Assuming that BidCo delivers works complying with the quality standards agreed-upon in the contract, within
budget and on time, what strategies, if any, does the Procuring Entity use to delay or avoid payment?
Bureaucracy/ Paperworks inspection
a. How often would BidCo resort to informal payments to facilitate payment? Very rarely (< 10% of cases)
b. In practice, how often is a portion of the payment retained to guarantee the works for a predetermined amount
of time? Occasionally (between 25-50%)
INSPECTIONS AND WARRANTIES
1. Does the Procuring Entity have guidelines or protocols regulating inspections on the quality of the works?
Yes
Legal basis: Decree 06/2021/
2. According to the legal framework, is BidCo required to provide a guarantee upon completion of the works?
Yes
Legal basis: Decree 06/2021/ND- CP
3. If a post-completion guarantee is not required by law would it usually be requested in practice by the Procuring
Entity for a contract like the one described in Section 1?
Yes
4. In practice, which instrument of post-completion guarantee would the Procuring Entity most commonly
request?
Retention of the whole performance guarantee
5. In practice, how long after completion of the works is BidCo required to maintain the instrument you indicated
above?
12-18 months
Formal Challenges throughout the ProcurementProcess
11
According to the legal framework, who has legal standing to challenge the contract award?
Bidders
Organizations/Individuals with legitimate interests (i.e. neighbors)
Organizations that protect public goods (i.e. environment NGO)
Research – COVID-19 Recovery
In order to continue public procurement services and the implementation of contracts without interruption, has
the economy introduced (or already had put in place) any measures?
Full tender file digitized, but not on the cloud
Full contract management documents digitized, but not on thecloud
Different payment deadlines for SMEs
Mobile payment system
***
For more information on the above, please do not hesitate to contact the author Dr. Oliver Massmann under
omassmann@duanemorris.com. Dr. Oliver Massmann is the General Director of Duane Morris Vietnam LLC, Member to
the Supervisory Board of PetroVietnam Insurance JSC and the only foreign lawyer presenting in Vietnamese language to
members of the NATIONAL ASSEMBLY OF VIETNAM.
12

More Related Content

What's hot

Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...
Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...
Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...
FSR Communications and Media
 
Omassmann doing business in vietnam
Omassmann doing business in vietnamOmassmann doing business in vietnam
Omassmann doing business in vietnam
Dr. Oliver Massmann
 

What's hot (20)

LAWYER IN VIETNAM DR OLIVER MASSMANN NEW DRAFT DECREE ON PERSONAL DATA PROTEC...
LAWYER IN VIETNAM DR OLIVER MASSMANN NEW DRAFT DECREE ON PERSONAL DATA PROTEC...LAWYER IN VIETNAM DR OLIVER MASSMANN NEW DRAFT DECREE ON PERSONAL DATA PROTEC...
LAWYER IN VIETNAM DR OLIVER MASSMANN NEW DRAFT DECREE ON PERSONAL DATA PROTEC...
 
LAWYER IN VIETNAM - VIETNAM - Mergers & Acquisitions Country Comparative Guide
LAWYER IN VIETNAM - VIETNAM - Mergers & Acquisitions Country Comparative GuideLAWYER IN VIETNAM - VIETNAM - Mergers & Acquisitions Country Comparative Guide
LAWYER IN VIETNAM - VIETNAM - Mergers & Acquisitions Country Comparative Guide
 
VIETNAM WILL MOVE ON - Dr. Oliver Massmann in interview with Vietnam Economic...
VIETNAM WILL MOVE ON - Dr. Oliver Massmann in interview with Vietnam Economic...VIETNAM WILL MOVE ON - Dr. Oliver Massmann in interview with Vietnam Economic...
VIETNAM WILL MOVE ON - Dr. Oliver Massmann in interview with Vietnam Economic...
 
Lawyer in Vietnam Dr. Oliver Massmann Opportunities for cooperation between G...
Lawyer in Vietnam Dr. Oliver Massmann Opportunities for cooperation between G...Lawyer in Vietnam Dr. Oliver Massmann Opportunities for cooperation between G...
Lawyer in Vietnam Dr. Oliver Massmann Opportunities for cooperation between G...
 
VIETNAM – INVESTMENT IN THE HEALTHCARE AND MEDICAL DEVICE SECTORS
VIETNAM – INVESTMENT IN THE HEALTHCARE AND MEDICAL DEVICE SECTORSVIETNAM – INVESTMENT IN THE HEALTHCARE AND MEDICAL DEVICE SECTORS
VIETNAM – INVESTMENT IN THE HEALTHCARE AND MEDICAL DEVICE SECTORS
 
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
 
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM – THE RISING DIGITAL ECONOMY - ...
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM – THE RISING DIGITAL ECONOMY - ...Lawyer in Vietnam Dr. Oliver Massmann VIETNAM – THE RISING DIGITAL ECONOMY - ...
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM – THE RISING DIGITAL ECONOMY - ...
 
Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...
Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...
Anthony M. Collins - Recent Developments in EU Case Law on Electronic Communi...
 
Lawyer in Vietnam Dr. Oliver Massmann - Mergers & Acquisitions in Vietnam - 2...
Lawyer in Vietnam Dr. Oliver Massmann - Mergers & Acquisitions in Vietnam - 2...Lawyer in Vietnam Dr. Oliver Massmann - Mergers & Acquisitions in Vietnam - 2...
Lawyer in Vietnam Dr. Oliver Massmann - Mergers & Acquisitions in Vietnam - 2...
 
VIETNAM – ENERGY SECURITY AND EFFICIENCY – ISSUES AND SOLUTIONS BACKED UP BY ...
VIETNAM – ENERGY SECURITY AND EFFICIENCY – ISSUES AND SOLUTIONS BACKED UP BY ...VIETNAM – ENERGY SECURITY AND EFFICIENCY – ISSUES AND SOLUTIONS BACKED UP BY ...
VIETNAM – ENERGY SECURITY AND EFFICIENCY – ISSUES AND SOLUTIONS BACKED UP BY ...
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)
 
Lawyer in Vietnam Dr. Oliver Massmann WORLD BANK/IFC IS UPGRADING VIETNAM ON ...
Lawyer in Vietnam Dr. Oliver Massmann WORLD BANK/IFC IS UPGRADING VIETNAM ON ...Lawyer in Vietnam Dr. Oliver Massmann WORLD BANK/IFC IS UPGRADING VIETNAM ON ...
Lawyer in Vietnam Dr. Oliver Massmann WORLD BANK/IFC IS UPGRADING VIETNAM ON ...
 
VIETNAM - PUBLIC-PRIVATE-PARTNERSHIPS (PPP) AND CPTPP AND EVFTA/IPA DISPUTE S...
VIETNAM - PUBLIC-PRIVATE-PARTNERSHIPS (PPP) AND CPTPP AND EVFTA/IPA DISPUTE S...VIETNAM - PUBLIC-PRIVATE-PARTNERSHIPS (PPP) AND CPTPP AND EVFTA/IPA DISPUTE S...
VIETNAM - PUBLIC-PRIVATE-PARTNERSHIPS (PPP) AND CPTPP AND EVFTA/IPA DISPUTE S...
 
PPT, T Pusnar Third ENP East public procurement conference, Tbilisi, 6 Novemb...
PPT, T Pusnar Third ENP East public procurement conference, Tbilisi, 6 Novemb...PPT, T Pusnar Third ENP East public procurement conference, Tbilisi, 6 Novemb...
PPT, T Pusnar Third ENP East public procurement conference, Tbilisi, 6 Novemb...
 
World bank - Public Procurement in Vietnam
World bank  - Public Procurement in VietnamWorld bank  - Public Procurement in Vietnam
World bank - Public Procurement in Vietnam
 
Vietnam – Public – Private Partnerships – 2015
Vietnam – Public – Private Partnerships – 2015Vietnam – Public – Private Partnerships – 2015
Vietnam – Public – Private Partnerships – 2015
 
Omassmann doing business in vietnam
Omassmann doing business in vietnamOmassmann doing business in vietnam
Omassmann doing business in vietnam
 
VIETNAM – ENVIRONMENT – SUSTAINABLE INVESTMENT - WHAT MUST BE DONE:
VIETNAM – ENVIRONMENT – SUSTAINABLE INVESTMENT - WHAT MUST BE DONE:VIETNAM – ENVIRONMENT – SUSTAINABLE INVESTMENT - WHAT MUST BE DONE:
VIETNAM – ENVIRONMENT – SUSTAINABLE INVESTMENT - WHAT MUST BE DONE:
 
VIETNAM - CUSTOMS REFORM AND WTO TRADE FACILITATION AGREEMENT (“TFA”) - HOW ...
VIETNAM - CUSTOMS REFORM AND WTO TRADE FACILITATION AGREEMENT (“TFA”) -  HOW ...VIETNAM - CUSTOMS REFORM AND WTO TRADE FACILITATION AGREEMENT (“TFA”) -  HOW ...
VIETNAM - CUSTOMS REFORM AND WTO TRADE FACILITATION AGREEMENT (“TFA”) - HOW ...
 
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
 

Similar to VIETNAM – THE WORLD BANK GROUP IS ASKING DUANE MORRIS ABOUT PUBLIC PROCUREMENT

Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
Joy Irman
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
cesarqueiroz
 
Adb procurement guidelines icb-a
Adb procurement guidelines   icb-aAdb procurement guidelines   icb-a
Adb procurement guidelines icb-a
Joy Irman
 

Similar to VIETNAM – THE WORLD BANK GROUP IS ASKING DUANE MORRIS ABOUT PUBLIC PROCUREMENT (20)

Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
 
Lawyer in Vietnam Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS O...
Lawyer in Vietnam Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS O...Lawyer in Vietnam Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS O...
Lawyer in Vietnam Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS O...
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
LAW ON PUBLIC PROCUREMENT CONTRACTS
LAW ON PUBLIC PROCUREMENT CONTRACTSLAW ON PUBLIC PROCUREMENT CONTRACTS
LAW ON PUBLIC PROCUREMENT CONTRACTS
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN – PUBLIC PROCUREMENT – THE WORLD BANK I...
LAWYER IN VIETNAM DR. OLIVER MASSMANN – PUBLIC PROCUREMENT – THE WORLD BANK I...LAWYER IN VIETNAM DR. OLIVER MASSMANN – PUBLIC PROCUREMENT – THE WORLD BANK I...
LAWYER IN VIETNAM DR. OLIVER MASSMANN – PUBLIC PROCUREMENT – THE WORLD BANK I...
 
tamil nadu tenders act.pptx
tamil nadu tenders act.pptxtamil nadu tenders act.pptx
tamil nadu tenders act.pptx
 
Topic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptxTopic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptx
 
Ppra rules 2004
Ppra rules   2004Ppra rules   2004
Ppra rules 2004
 
UK Adjudicators Newsletter August 2021
UK Adjudicators Newsletter August 2021UK Adjudicators Newsletter August 2021
UK Adjudicators Newsletter August 2021
 
2021-10-13 Procurement Process-Day 01.pptx
2021-10-13 Procurement Process-Day 01.pptx2021-10-13 Procurement Process-Day 01.pptx
2021-10-13 Procurement Process-Day 01.pptx
 
2 procurement and legal aspects
2 procurement and legal aspects 2 procurement and legal aspects
2 procurement and legal aspects
 
Offset obligations in Brazil.ppt
Offset obligations in Brazil.pptOffset obligations in Brazil.ppt
Offset obligations in Brazil.ppt
 
Vietnam – Infrastructure and Waste Treatment Sector – Current Issues and Solu...
Vietnam – Infrastructure and Waste Treatment Sector – Current Issues and Solu...Vietnam – Infrastructure and Waste Treatment Sector – Current Issues and Solu...
Vietnam – Infrastructure and Waste Treatment Sector – Current Issues and Solu...
 
Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
 
BID DOCUMENT.doc
BID DOCUMENT.docBID DOCUMENT.doc
BID DOCUMENT.doc
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
 
TENDERS.pptx
TENDERS.pptxTENDERS.pptx
TENDERS.pptx
 
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
 
VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...
VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...
VIETNAM – AUTOMOTIVE SECTOR – CURRENT ISSUES AND SOLUTIONS FOR INVESTMENT AND...
 
Adb procurement guidelines icb-a
Adb procurement guidelines   icb-aAdb procurement guidelines   icb-a
Adb procurement guidelines icb-a
 

More from Dr. Oliver Massmann

More from Dr. Oliver Massmann (20)

Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
 
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
 
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key Highlights
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
 

Recently uploaded

一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
Airst S
 
COPYRIGHTS - PPT 01.12.2023 part- 2.pptx
COPYRIGHTS - PPT 01.12.2023 part- 2.pptxCOPYRIGHTS - PPT 01.12.2023 part- 2.pptx
COPYRIGHTS - PPT 01.12.2023 part- 2.pptx
RRR Chambers
 
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
bd2c5966a56d
 
Contract law. Indemnity
Contract law.                     IndemnityContract law.                     Indemnity
Contract law. Indemnity
mahikaanand16
 
一比一原版埃克塞特大学毕业证如何办理
一比一原版埃克塞特大学毕业证如何办理一比一原版埃克塞特大学毕业证如何办理
一比一原版埃克塞特大学毕业证如何办理
Airst S
 
一比一原版赫瑞瓦特大学毕业证如何办理
一比一原版赫瑞瓦特大学毕业证如何办理一比一原版赫瑞瓦特大学毕业证如何办理
一比一原版赫瑞瓦特大学毕业证如何办理
Airst S
 

Recently uploaded (20)

Performance of contract-1 law presentation
Performance of contract-1 law presentationPerformance of contract-1 law presentation
Performance of contract-1 law presentation
 
Hely-Hutchinson v. Brayhead Ltd .pdf
Hely-Hutchinson v. Brayhead Ltd         .pdfHely-Hutchinson v. Brayhead Ltd         .pdf
Hely-Hutchinson v. Brayhead Ltd .pdf
 
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
 
Police Misconduct Lawyers - Law Office of Jerry L. Steering
Police Misconduct Lawyers - Law Office of Jerry L. SteeringPolice Misconduct Lawyers - Law Office of Jerry L. Steering
Police Misconduct Lawyers - Law Office of Jerry L. Steering
 
8. SECURITY GUARD CREED, CODE OF CONDUCT, COPE.pptx
8. SECURITY GUARD CREED, CODE OF CONDUCT, COPE.pptx8. SECURITY GUARD CREED, CODE OF CONDUCT, COPE.pptx
8. SECURITY GUARD CREED, CODE OF CONDUCT, COPE.pptx
 
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURYA SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
 
ARTICLE 370 PDF about the indian constitution.
ARTICLE 370 PDF about the  indian constitution.ARTICLE 370 PDF about the  indian constitution.
ARTICLE 370 PDF about the indian constitution.
 
COPYRIGHTS - PPT 01.12.2023 part- 2.pptx
COPYRIGHTS - PPT 01.12.2023 part- 2.pptxCOPYRIGHTS - PPT 01.12.2023 part- 2.pptx
COPYRIGHTS - PPT 01.12.2023 part- 2.pptx
 
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
$ Love Spells^ 💎 (310) 882-6330 in Utah, UT | Psychic Reading Best Black Magi...
 
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
 
Independent Call Girls Pune | 8005736733 Independent Escorts & Dating Escorts...
Independent Call Girls Pune | 8005736733 Independent Escorts & Dating Escorts...Independent Call Girls Pune | 8005736733 Independent Escorts & Dating Escorts...
Independent Call Girls Pune | 8005736733 Independent Escorts & Dating Escorts...
 
Contract law. Indemnity
Contract law.                     IndemnityContract law.                     Indemnity
Contract law. Indemnity
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction Fails
 
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptxKEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
KEY NOTE- IBC(INSOLVENCY & BANKRUPTCY CODE) DESIGN- PPT.pptx
 
一比一原版埃克塞特大学毕业证如何办理
一比一原版埃克塞特大学毕业证如何办理一比一原版埃克塞特大学毕业证如何办理
一比一原版埃克塞特大学毕业证如何办理
 
Relationship Between International Law and Municipal Law MIR.pdf
Relationship Between International Law and Municipal Law MIR.pdfRelationship Between International Law and Municipal Law MIR.pdf
Relationship Between International Law and Municipal Law MIR.pdf
 
一比一原版赫瑞瓦特大学毕业证如何办理
一比一原版赫瑞瓦特大学毕业证如何办理一比一原版赫瑞瓦特大学毕业证如何办理
一比一原版赫瑞瓦特大学毕业证如何办理
 
The doctrine of harmonious construction under Interpretation of statute
The doctrine of harmonious construction under Interpretation of statuteThe doctrine of harmonious construction under Interpretation of statute
The doctrine of harmonious construction under Interpretation of statute
 
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxIBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
 
WhatsApp 📞 8448380779 ✅Call Girls In Nangli Wazidpur Sector 135 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Nangli Wazidpur Sector 135 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Nangli Wazidpur Sector 135 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Nangli Wazidpur Sector 135 ( Noida)
 

VIETNAM – THE WORLD BANK GROUP IS ASKING DUANE MORRIS ABOUT PUBLIC PROCUREMENT

  • 1. 1 VIETNAM – THE WORLD BANK GROUP IS ASKING DUANE MORRIS ABOUT PUBLIC PROCUREMENT Case StudyAssumptions BidCo Is one of the companies participating in the call for tender and meets all solvency, technical and administrative requirements to compete; Is a privately and domestically-owned medium-sized Limited Liability Company (or its most common legal equivalent); Operates in Ho Chi Minh City; Is up to date with all regulations and is in good standing with all relevant authorities, including those related to taxes; Has all licenses and permits needed to operate in this technical area; Has already responded to a public call for tender and is already registered with the procuring entity defined below. Contract Entails resurfacing 20 km of a flat two-lane road (not a highway and not under concession), connecting Ho Chi Minh City to another city within Vietnam (and within the same state, region or province as Ho Chi Minh City, if applicable), with an asphalt overlay of 40 to 59 mm (or its most common equivalent in Vietnam); Value: USD 2.5 Million (equivalent to VND 56,997,352,120); Does not include any other work (such as site clearance, subsoil drainage, bridgework or further routine maintenance). Procuring Entity Is the agency in charge of procuring construction works for the authority that owns the road describedabove; Is the sole funder of the works, has budget for the works and is solvent. Procurement Process Is an open, unrestricted, and competitive public call for tender for resurfacing a road like the one described above; Is completed without complaints/challenges/protests frominterested parties; Ends with the awarding of the contract to BidCo, whose bid satisfied all technical and administrative criteria and offered the best value for money. 1. What is the entity that conducts procurement for the authority that owns the majority of roads comparable to the one described above? Directorate for Roads of Vietnam within the Ministry of Transport 2. How many open, unrestricted and competitive public calls for tenders for roadwork contracts were completed in the last 5 years by the Procuring Entity you selected in Q.1? More than 51 3. Please provide a list of the laws, regulations and other binding materials (including guidelines and manuals) that regulate public procurement in Vietnam. Please include legislation or other binding materials promulgated at the national/federal level as well as any additional legislation that is applicable to the Procuring Entity you selected in Q.1.
  • 2. 2 Circular No. 04/2017/TT-BKHDT of 2017 Circular No. 05/2020/TT-BKHDT of 2020 Law on Bidding No. 43/2013/QH13 of 2013 Decree No. 63/2014/ND-CP of 2013 Law on Investment in the form of Public-Private Partnership of 2020 Decree No.25/2020/ND-CP of 2020 Commercial Law No. 36/2005/QH11 of 2005 Decree No. 37/2015/ND-CP of 2015 Circular No. 03/2015/TT-BKHDT of 2015 - Decree 50/2021/ND-CP of 2021 Circular 11/2019/TT-BKHDT of 2020 Comprehensive and Progressive Agreement for Trans-Pacific Partnership EU-Vietnam Free Trade Agreement of 2020 4. Please list any mandatory standard tender documents and/or standard contract terms that the Procuring Entity must use for a contract like the one described in Section 1. Contract terms must specify: a/ Applied legal bases; b/ Language used in the contract; c/ Content and volume of work; d/ Quality, technical requirements of work; pre-acceptance test and handover conditions; dd/ Contract performance duration and schedule; e/ Contract price, advance payment, currency used in payment, and payment for the contract; g/ Contract performance security, contract advance guarantee; h/ Adjustment of the construction contract; i/ Rights and obligations of the parties to the construction contract; k/ Liability for violations of the contract, rewards and fines for violations of the contract; l/ Suspension and termination of the contract; m/ Settlement of disputes over the contract; n/ Risks and force majeure events; o/ Settlement and liquidation of the contract; p/ Other contents. All standards are listed in Bidding Law and Article 141 Construction Law. 5. Are you aware of any change (in practice or in laws/regulations/procedures) related to public procurement between May 2, 2020 and May 1, 2021? For example: amendments to applicable public procurement laws, enactment and/or implementation of new regulations, implementation or improvement of e-procurement platforms, changes to the bid security and performance guarantee framework, etc. Yes. The implementation of the EU- Vietnam Free Trade Agreement from 1 August 2020
  • 3. 3 6. Are you aware of any regulatory or administrative measures (in practice or in laws/regulations/procedures/contract management) related to public procurement that has been implemented between May 2, 2020 and May 1, 2021 to respond to the COVID-19 pandemic? Digitization of interactions between officials and private sector 7. If one or several electronic procurement portal(s) (i.e., an official website(s) specifically and exclusively dedicated to public procurement) are in operation, please mark which platform would most commonly be used by the Procuring Entity. http://muasamcong.mpi.gov.vn 8. Out of all road works contracts with the Procuring Entity, how many are procured through the portal you listed in Q.7? More than 75% 9. Which of the following information about road works contracts procured by the Procuring Entity is made publicly available in machine-readable format? (i.e, data format that can be processed by a computer, such as XSL, CSV, JSON, XML, etc.) Estimated cost – as calculated by the Procuring Entity at the time of advertising. II. PHASES OF THE PROCUREMENT PROCESS Phase 1: Budgeting and Needs Assessment 1. According to the legal framework, when the Procuring Entity prepares to advertise a new procurement opportunity for a contract like the one described in Section 1, which of the following are used to estimate the contract value and projected length of works? Market analysis, standardized unit cost, project-spcific technical drawings, feasibility study, similar projects from prvious years Legal basis: 58/2016/TT-BTC 2. In practice, is the estimated contract value/budget published in the tender notice/tender documents? Yes 3. Is the Procuring Entity required to have already allocated budget to a specific project before tendering? Yes, there is a specific budget allocation 4. How often does the Procuring Entity award a contract without having all the necessary funds? Occasionally (between 25-50%) Phase 2: from Advertisement to Bid Submission 5. According to the legal framework, would open tendering (i.e. the process in which any business can submit a bid) be the default method of procurement in Vietnam for a contract like the one described in Section 1?
  • 4. 4 Yes, according to Article 20 of Law on Bidding No. 43/2013/QH13 of 2013. 6. According to the legal framework, can the Procuring Entity require bidders to participate in a prequalification process specific to that contract before being able to submit their economic offer? Yes, according to Articles 22 and 44 of Decree No. 63 of 2014. a. How often would this happen for a contract like the one described in Section 1? Rarely (10-25%) b. In practice, how many days would be necessary for BidCo to receive a decision on its prequalification from the moment it submitted all the necessary documents? 30 days c. In your experience, as of May 1, 2021, has Covid-19 impacted the frequency of prequalification and the time you indicated above? Yes - Longer processing time of dossier - case on case basis. d. According to the legal framework, must the contractor be registered with the Procuring Entity in order to bid for a contract like the one described in Section 1? Yes, according to Article 5.1(d), Bidding Law 7. In practice, what is the most common method of procurement for a contract like the one described in Section 1? Open tendering is the default by law and also the most common in practice 8. Does the legal framework define the situations in which each procurement method should be used? Yes, according to Articles 21-27 of Law on Bidding No. 43/2013/QH13 of 2013. 9. Does the legal framework prohibit dividing contracts to circumvent thresholds for open tendering? Yes, according to Article 89.6.k of Law on Bidding No. 43/2013/QH13 of 2013. a. In practice, how often does this happen? Often (between 50-90%) 10. Which of the following materials need to be made publicly available by the Procuring Entity? Procurement plans, Model procurement documents and materials/standard contract conditions, Tender notices, Tender documents and technical specifications, Notices of award/bidding results 11. According to the legal framework, is there a minimum time limit between the advertisement of the tender notice and the submission deadline for an open tendering procedure like the one described in Section 1? Yes, Article 6, Decree No. 25/2020/ND-CP a. In practice, how many days would pass between the advertisement of the tender notice and the submission deadline for a contract like the one described in Section 1? 30-40 days b. How often does the Procuring Entity modify the tender documents for any reason after advertisement, but before the submission deadline? Rarely (between 10-25%) c. In practice, by how many days would the timeframe you indicated in Q.21.a be extended due to these modifications? 0 days 12. Does the legal framework establish the minimum content of the tender notice and tender documents? Yes, according to Articles 218-219 of Commercial Law No. 36/2005/Qh11; and Circular No. 03/2015/TT-BKHDT of 2015.
  • 5. 5 13. Which aspects of subcontracting is regulated by the applicable legal framework? Features, disclosure, liability, according to Article 4 of Law on Bidding No. 43/2013/QH13 of 2013; and Article 128 of Decree No. 63/2014/ND-CP of 2014. 14. According to the legal framework, if the intent to subcontract was not disclosed in the bid, what is the contractor who decides to subcontract after the contract is signed required to do? Inform the procuring entity and seek its approval 15. According to the legal framework, how clarification requests from potential bidders should be addressed? The procuring entity will answer, but it is not always required to communicate the answer to all other bidders. 16. According to the legal framework, is BidCo required to provide a form of bid guarantee? Yes, according to Article 11.1 of Law on Bidding No. 43/2013/QH13 of 2013. a. If bid guarantee is not required by law, would it usually be requested in practice by the Procuring Entity for a contract like the one described in Section 1? Yes 17. In practice, which instrument would BidCo most commonly use as a bid guarantee? Bank guarantee/Letter of credit, Bid security declaration Phase 3: from Bid Opening to Contract Signing 18. Does the legal framework establish a timeframe for the Procuring Entity to proceed to bid opening once the deadline for bid submission has been reached? Yes, according to Article 14.4(a) of Decree No. 63/2014/ND-CP a. In practice, how many days after the deadline for bid submission does the Procuring Entity proceed to bid opening? 0 day 19. In practice, in a case comparable to the case study scenario, how many days would pass between bid opening and public notice of award (i.e. the moment in which all tenderers, participants and relevant parties are notified of the award decision), considering that no complaints/challenges/protests have been filed? 60 days a. In your experience, as of May 1, 2021, has Covid-19 impacted the process and time to award a contract that you indicated in Q.29? No b. In practice, between bid opening and public notice of award, how often does the Procuring Entity ask questions/additions to bidders on the documents they submitted? Occasionally (between 25-50%) c. In practice, by how many days would the timeframe you indicated in Q.29 be extended due to questions/additions asked by the Procuring Entity? 45 days
  • 6. 6 20. Is there a standstill (or pause) period between public notice of award and contract signing to allow unsuccessful bidders to challenge the award decision? No, standstill is only triggered by objection. 21. In practice, in a case comparable to the case study scenario, how many days would pass on average between public notice of award and contract signing? 30-40 days a. In your experience, as of May 1, 2021, has Covid-19 impacted the process and time to sign the contract that you indicated in Q.31? No 22. In practice, how many days would pass on average between contract signing, receipt of a notice to proceed with the works, and the commencement of the works? 30 days 23. Selection committee – Which of the following characteristics are regulated by the applicable legal framework? The number of members of the committee The education requirements of members of the committee The professional requirements of members of the committee The process to appoint the members of the committee Legal basis: Article 116 of Decree No.63/2014/ND-CP 24. Are employees of the Procuring Entity required to follow a mandatory code of conduct or ethics that includes topics like screening procedures, conflict of interest, training requirements, etc.? No 25. According to the legal framework, which award criterion would be used for a contract like the one described in Section 1? At the discretion of the Procuring Entity, according to Articles 39.1, 39.2 and 39.3 of Law on Bidding No. 43/2013/QH13 of 2013. 26. In practice, how often is the award decision based solely on price and not on best value for money? Very often (> 90%) 27. Does the legal framework establish criteria to identify abnormally low bids? No 28. Does the legal framework define what constitutes a non-substantial error?
  • 7. 7 Yes - Article 4.18 and 4.19 and 42 of Law on Bidding No. 43/2013/QH13 of 2013; and Article 17 of Decree 63/2014/ND- CP of 2014. a. In practice, how often does the Procuring Entity require bidders to amend their offers (because of mistakes, arithmetic errors, etc.)? Rarely (10-25%) b. In practice, in these cases would the bidder be given the opportunity to rectify such error before disqualification? Yes - Article 17 of Decree No. 63/2014/ND-CP 29. According to the legal framework, when a bidder is excluded because it did not meet the selection criteria, is it provided with an explanation of the reasons for the exclusion in writing? Yes, the bidder must always be provided with an explanation in writing Legal basis: 63/2014/ND-CP 30. According to the legal framework, when a bidder loses, is it provided with an explanation of the reasons for the loss in writing? Yes, the bidder must always be provided with an explanation in writing Legal basis: 63/2014/ND-CP Phase 4: Contract Management 31. According to the legal framework, is BidCo required to provide a performance guarantee deposit that ensures a source of compensation in case of failure to perform its contractual obligations? Yes, according to Articles 66 and 72 of Law on Bidding No. 43/2013/QH13 of 2013. a. If a performance guarantee is not required by law, would it usually be requested in practice by the Procuring Entity for a contractlike the one described in Section 1? Yes 32. In practice, which instrument would BidCo most commonly use as a performance guarantee? Cash/Certified check Certificate of deposit Bank Guarantee/Letter of Credit 33. In practice, how long does it usually take for the Procuring Entity to return the performance guarantee in full once the works have been completed and accepted by the Procuring Entity? Within 20 days 34. Which aspects of contract management are regulated by the applicable legal framework?
  • 8. 8 Renegotiations. Legal basis: Article 67 Law on Bidding, Article 93 Decree 63/2014/ND-CP 35.How often would a contract like the one described in Section 1 be renegotiated? Rarely (10-25%) 36. If the contract described in Section 1 were more complex (i.e., lengthier and/or more costly execution, more complex scope or object, etc.), how often would it be renegotiated? Occasionally (between 25-50%) 37. According to the legal framework, is there a maximum percentage of price/quantity increase for changing (variation) orders? No 38. According to the legal framework, is there a percentage of price increase above which the procuring entity is not allowed to renegotiate and is always required to re-tender? No 39. In practice, are the results of contract renegotiations made publicly available? No 40. In practice, how many days would pass on average from the moment one of the parties requests/initiates a renegotiation of the contract until a new contract amendment is signed? 30 – Dependent on the negotiation process a. In your experience, as of May 1, 2021, has Covid-19 impacted the frequency of contract renegotiations and the time to authorize them? No 41. How often do bidders submit unrealistically low bids to win the contract, confident of having a possibility to renegotiate at a later stage? Often (between 50-90%) 42. How often are "emergencies" used as a reason to renegotiate? Very rarely (< 10% of cases) 43. How often would a changing (variation) order/price adjustment (i.e. a modification below a certain threshold or clearly defined in the terms of the contract) take place in a contract like the one described in Section 1? Occasionally (between 25-50%) a. In practice, how many days would pass on average from the moment that the modification becomes necessary until a changing (variation) order/price adjustment is issued? 30 days – case by case basis
  • 9. 9 44. How often would additional works related to the initial contract (i.e. works by the original contractor that have become necessary and that were not included in the initial procurement) be awarded to the same contractor through direct award? Occasionally (between 25-50%) a. In practice, how many days would pass on average from the moment additional works become necessary until they are awarded to the same original contractor? 30 days Phase 5: Payment, Delays and Quality Assessment 45. According to the legal framework, is there a limit to how much the Procuring Entity can pay upfront for the contractor to hire workers, buy materials, and start operations in a contract like the one described in Section 1? No a. In practice, how much would usually be paid upfront for a contract like the one described in Section 1? 10-50% b. In practice, if an advance payment is usually issued, does the contractor have to provide a guarantee for receiving this payment? Yes c. In practice, how many calendar days will be necessary for BidCo to receive the advance payment once the request has been submitted to the Procuring Entity? 10-20 days 46. During the execution of the contract, does the legal framework establish a timeframe within which the Procuring Entity must process the payment once an invoice is received? Yes, according to Article 19 of Decree No. 37/2015/ND-CP of 2015. a. In practice, how many calendar days will be necessary on average for BidCo to receive payment once the invoice has been delivered to the relevantauthority? 30 days b. In practice, how many people would need to authorize payment within the procuring entity before payment is made? 2 c. In practice, how often will BidCo receive payment within the timeframe established by the legal framework? Often (between 50-90%) d. According to the legal framework, is the company entitled to claim interest on late payments if the Procuring Entity does not pay within thelegally-established timeframe? Yes, according to Article 94 of Decree No. 63/2014/ND-CP of 2014. e. How often would such interest on late payment be paid to thecompany? Often (between 50-90%) f. In practice, for a contract like the one described in Section 1, how many days would pass on average between the moment BidCo notifies the Procuring Entity that the works are completed and a formal agreement between them stipulating that the works are indeed finished and comply with the contract specifications (i.e. a certificate of completion of works)? 60 days
  • 10. 10 g. In your experience, as of May 1, 2021, has Covid-19 impacted the time to certify the completion of works?Yes, on-site visits are subject to quanrantine regulations by provincial authorities h. How often do disagreements between the Procuring Entity and BidCo on the completed works delay the process of reaching a formal agreement that the works are finished? Occasionally (between 25-50%) i. In practice, by how many days would the aforementioned time be extended to resolve this disagreement and obtain a certificate of completion of works from the Procuring Entity? 90 days 47. Assuming that BidCo delivers works complying with the quality standards agreed-upon in the contract, within budget and on time, what strategies, if any, does the Procuring Entity use to delay or avoid payment? Bureaucracy/ Paperworks inspection a. How often would BidCo resort to informal payments to facilitate payment? Very rarely (< 10% of cases) b. In practice, how often is a portion of the payment retained to guarantee the works for a predetermined amount of time? Occasionally (between 25-50%) INSPECTIONS AND WARRANTIES 1. Does the Procuring Entity have guidelines or protocols regulating inspections on the quality of the works? Yes Legal basis: Decree 06/2021/ 2. According to the legal framework, is BidCo required to provide a guarantee upon completion of the works? Yes Legal basis: Decree 06/2021/ND- CP 3. If a post-completion guarantee is not required by law would it usually be requested in practice by the Procuring Entity for a contract like the one described in Section 1? Yes 4. In practice, which instrument of post-completion guarantee would the Procuring Entity most commonly request? Retention of the whole performance guarantee 5. In practice, how long after completion of the works is BidCo required to maintain the instrument you indicated above? 12-18 months Formal Challenges throughout the ProcurementProcess
  • 11. 11 According to the legal framework, who has legal standing to challenge the contract award? Bidders Organizations/Individuals with legitimate interests (i.e. neighbors) Organizations that protect public goods (i.e. environment NGO) Research – COVID-19 Recovery In order to continue public procurement services and the implementation of contracts without interruption, has the economy introduced (or already had put in place) any measures? Full tender file digitized, but not on the cloud Full contract management documents digitized, but not on thecloud Different payment deadlines for SMEs Mobile payment system *** For more information on the above, please do not hesitate to contact the author Dr. Oliver Massmann under omassmann@duanemorris.com. Dr. Oliver Massmann is the General Director of Duane Morris Vietnam LLC, Member to the Supervisory Board of PetroVietnam Insurance JSC and the only foreign lawyer presenting in Vietnamese language to members of the NATIONAL ASSEMBLY OF VIETNAM.
  • 12. 12