SlideShare a Scribd company logo
1 of 2
Mumtaz Hussain
Contact Dubai – UAE: 097155-3094868
E-Mail: mumtaz.1974@hotmail.com
OBJECTIVE:
I desire to join in Electrical field of company that has vision for growth and advancement for a Long term career.
Profile Snapshot:
As a Electrical profession with almost 10 years of experience including 7 years of overseas experience in the field of
132/11 KV substation expertise.
PROFESSIONAL EXPERIENCE
GULF EXPERINCE JAN 2007 onwards
Overseas (Siemens Pakistan Dubai project)
• DEWA 132/11KV SUBSTATIONS Oct, 2012 On words
Areas of Responsibility / Task As a “Electrical supervisor”
 Working with Siemens SNAGS and warranty team for maintenance of Energize Substations.
Areas of Responsibility / Task As a “Team Leader” Jan, 2012 To Sep,30 2012
 Electrical Cabling work
 Steel structure and concreting work
 Foam work
 Rail track installation
 Base plate fixing
 Welding work
Overseas (Siemens Pakistan Dubai project)
• DEWA 132/11KV SUBSTATION - D.B.T.H 16-04-2010 TO Dec,2011
• DEWA 132/11KV SUBSTATION - DIP -6 Dec 2008 TO 15-4-2010
• DEWA 132/11KV SUBSTATION - Jebel Ali Airport Nov 2007 TO Oct 2008
Areas of Responsibility / Task As a “Electrical supervisor”
 11kv panel erection
 LVAC panel erection
 Protection panel erection
 Batteries installation
 B.M.S(BATTERY SYSTEM)Installation
 E.T(1,2,3) Installation
 I.D.T (1,2,3) Installation
 Capacitor Bank installation (1,2,3,4,5,6)
 H,V Panel installation
 ALL temporary power supply and D.B ,SMDB WORKS
 Cable laying and termination (all power and control cables)
 ALL Cable laying and termination works
 G.I.S Installation work with GERMAN SUPERVISOR
 CORE Cutting works
 all earthling cables laying and connoted disconnected links
 Earthling cables module joint welding
 Earthling bar tin tinning
 11kv room .1 to room.2 earthling bar tin coating and fixing
 Capacitor banks cables(70 mm)tinning and insulation
 Cables ladder tray and all size perforated tray fixing work
 A.B.B and A.V.R antenna fixed work
Overseas (ALSTOM ) Dubai Metro
Engineering Coner Electromech L.L.C Dec, 21 2005 To Oct 31,2007
Areas of Responsibility / Task As a “A/c Mechanic”
 Central A/C Installation & commissioning work
 PU Unit installation & commissioning work
 Chiller A/C plant installation, commissioning and maintenance work
PAKISTAN EXPERIENCE
DESCON ENGINEERING LTD Jan 2004 TO DEC 2005
 As a saw Welder
PECO (Pakistan Engineering Co. Ltd
 Installation and testing of transmission tower. Jan 2002 TO DEC 2004
Qualification:
 Secondary School certificate B.I.S Education board of multan in 1991
 DIPLOMA OF ASSOCIATE ENGINEER PUNJAB BOARD OF TECHNICAL EDUCATION,LAHORE in ,1995
 Fluent in English and Urdu (Reading, Writing and Speaking
 Valid UAE driving license.
Personal Information:
Date of Birth : 15 May 1974
Nationality : Pakistani
Marital Status : Married
Contact No :055-3094868

More Related Content

What's hot (20)

Electrical Resume
Electrical ResumeElectrical Resume
Electrical Resume
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Ivan Andreas Kembau
Ivan Andreas KembauIvan Andreas Kembau
Ivan Andreas Kembau
 
Master CEI Presentation
Master CEI PresentationMaster CEI Presentation
Master CEI Presentation
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Ismail farooq
Ismail farooq  Ismail farooq
Ismail farooq
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Profile - Somasekharan
Profile - SomasekharanProfile - Somasekharan
Profile - Somasekharan
 
AlwynGeorgeEmploymentReferenceLetter
AlwynGeorgeEmploymentReferenceLetterAlwynGeorgeEmploymentReferenceLetter
AlwynGeorgeEmploymentReferenceLetter
 
F Bryce CV
F Bryce CVF Bryce CV
F Bryce CV
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
R Venkatesan
R VenkatesanR Venkatesan
R Venkatesan
 
Eng.Ahmed-CV
Eng.Ahmed-CVEng.Ahmed-CV
Eng.Ahmed-CV
 
Abhilash CV
Abhilash CVAbhilash CV
Abhilash CV
 
CV_Jamie Allen
CV_Jamie AllenCV_Jamie Allen
CV_Jamie Allen
 
2014 Delucchi Brochure
2014 Delucchi Brochure2014 Delucchi Brochure
2014 Delucchi Brochure
 
Ed's Resume June 2016
Ed's Resume June 2016Ed's Resume June 2016
Ed's Resume June 2016
 
Blackburn Resume
Blackburn ResumeBlackburn Resume
Blackburn Resume
 
cv umar
cv umarcv umar
cv umar
 
CURRICULUM VITAEDave
CURRICULUM VITAEDaveCURRICULUM VITAEDave
CURRICULUM VITAEDave
 

Similar to mumtaz CV (1)

Similar to mumtaz CV (1) (20)

ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
Engr Wasim Khan CV
Engr Wasim Khan CVEngr Wasim Khan CV
Engr Wasim Khan CV
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Mohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque ResumeMohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque Resume
 
Mohammed Ali_CV
Mohammed Ali_CVMohammed Ali_CV
Mohammed Ali_CV
 
Allan Borja CV
Allan Borja CVAllan Borja CV
Allan Borja CV
 
SENIOR LAND SURVEYOR
SENIOR LAND SURVEYORSENIOR LAND SURVEYOR
SENIOR LAND SURVEYOR
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Alvin latest cv 2015
Alvin latest cv 2015Alvin latest cv 2015
Alvin latest cv 2015
 
CV 10-Feb PDF
CV 10-Feb PDFCV 10-Feb PDF
CV 10-Feb PDF
 
mohannad abed samaneh cv
mohannad abed samaneh cvmohannad abed samaneh cv
mohannad abed samaneh cv
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916VIJEESH CV, ELECTRICAL ENGINEER 0916
VIJEESH CV, ELECTRICAL ENGINEER 0916
 
Abid cv
Abid cvAbid cv
Abid cv
 
ZUBAIR BAIG
ZUBAIR BAIGZUBAIR BAIG
ZUBAIR BAIG
 
ENDI_MAFI_UTIH_resume
ENDI_MAFI_UTIH_resume ENDI_MAFI_UTIH_resume
ENDI_MAFI_UTIH_resume
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 

mumtaz CV (1)

  • 1. Mumtaz Hussain Contact Dubai – UAE: 097155-3094868 E-Mail: mumtaz.1974@hotmail.com OBJECTIVE: I desire to join in Electrical field of company that has vision for growth and advancement for a Long term career. Profile Snapshot: As a Electrical profession with almost 10 years of experience including 7 years of overseas experience in the field of 132/11 KV substation expertise. PROFESSIONAL EXPERIENCE GULF EXPERINCE JAN 2007 onwards Overseas (Siemens Pakistan Dubai project) • DEWA 132/11KV SUBSTATIONS Oct, 2012 On words Areas of Responsibility / Task As a “Electrical supervisor”  Working with Siemens SNAGS and warranty team for maintenance of Energize Substations. Areas of Responsibility / Task As a “Team Leader” Jan, 2012 To Sep,30 2012  Electrical Cabling work  Steel structure and concreting work  Foam work  Rail track installation  Base plate fixing  Welding work Overseas (Siemens Pakistan Dubai project) • DEWA 132/11KV SUBSTATION - D.B.T.H 16-04-2010 TO Dec,2011 • DEWA 132/11KV SUBSTATION - DIP -6 Dec 2008 TO 15-4-2010 • DEWA 132/11KV SUBSTATION - Jebel Ali Airport Nov 2007 TO Oct 2008 Areas of Responsibility / Task As a “Electrical supervisor”  11kv panel erection  LVAC panel erection  Protection panel erection  Batteries installation  B.M.S(BATTERY SYSTEM)Installation  E.T(1,2,3) Installation  I.D.T (1,2,3) Installation  Capacitor Bank installation (1,2,3,4,5,6)  H,V Panel installation  ALL temporary power supply and D.B ,SMDB WORKS  Cable laying and termination (all power and control cables)  ALL Cable laying and termination works
  • 2.  G.I.S Installation work with GERMAN SUPERVISOR  CORE Cutting works  all earthling cables laying and connoted disconnected links  Earthling cables module joint welding  Earthling bar tin tinning  11kv room .1 to room.2 earthling bar tin coating and fixing  Capacitor banks cables(70 mm)tinning and insulation  Cables ladder tray and all size perforated tray fixing work  A.B.B and A.V.R antenna fixed work Overseas (ALSTOM ) Dubai Metro Engineering Coner Electromech L.L.C Dec, 21 2005 To Oct 31,2007 Areas of Responsibility / Task As a “A/c Mechanic”  Central A/C Installation & commissioning work  PU Unit installation & commissioning work  Chiller A/C plant installation, commissioning and maintenance work PAKISTAN EXPERIENCE DESCON ENGINEERING LTD Jan 2004 TO DEC 2005  As a saw Welder PECO (Pakistan Engineering Co. Ltd  Installation and testing of transmission tower. Jan 2002 TO DEC 2004 Qualification:  Secondary School certificate B.I.S Education board of multan in 1991  DIPLOMA OF ASSOCIATE ENGINEER PUNJAB BOARD OF TECHNICAL EDUCATION,LAHORE in ,1995  Fluent in English and Urdu (Reading, Writing and Speaking  Valid UAE driving license. Personal Information: Date of Birth : 15 May 1974 Nationality : Pakistani Marital Status : Married Contact No :055-3094868