More Related Content
Similar to measurement of refractory.pptx
Similar to measurement of refractory.pptx (20)
measurement of refractory.pptx
- 14. • The relative refractory period
• The functional refractory period
• The effective refractory period
- 15. • The AV node RRP (AVNRRP)
• The AV node FRP (AVNFRP)
• The AV node ERP (AVNERP)
- 16. • The ventricular RRP (VRRP)
• The ventricular FRP (VFRP)
• The ventricular ERP (VERP)
Editor's Notes
- ii. 592+1044 (1636) < 2x896 (1792)
iii. 550+1044 (1594) < 2x900 (1800)
iv. 530+1000 (1530) < 1780
- Exceed – melebihi
Elicited - ditimbulkan
- Exceed – melebihi
Elicited - ditimbulkan