LITTLE ROCK UPDATE




September 2010
Little Rock, Arkansas




     New area under development
New coil storage area
     New site provides huge area for steel storage

     Up to 350,000 tons of coil can be stored

     Ideal hard surface for coil storage

     Less than 1 mile from main Welspun facility

     Both facilities on the same rail spur

     Potential location for additional capacity – induction bends
Spiral Mill Performance

 Continued excellent safety record

 Completed pipe making for the Ruby Project.

 Commenced the KXL Project and on target

 Ongoing improvements

      Additional welding line installation

      Welding improvements, NDT upgrades, debottlenecking...

 Production    windows available now!
Coating Mill Performance

 Productivity in the last two consecutive months…..

     10% above original targets

 Recent Improvements

      ID coating curing chamber fully operational

      New paint kitchen to reduce downtime

      Outbound rack debottlenecked

      SAP system upgraded and streamlined

      New offline stripping station

      Additional supervision

 Coating repairs reduced to less than 0.5%
Storage, Loading and Shipment
 800 acres of land available for storage

 Have completed seven different projects – load out by truck,

barge, rail depending on final location

 All loading of pipe undertaken by vacuum cranes

 The facility is served by UP, BNSF and CN

 Little Rock Port Authority undergoing expansion to allow

multiple unit trains to be built simultaneously

More Related Content

What's hot

City Council March 22 - 50th Street & Grape Creek Road Construction
City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 -  50th Street & Grape Creek Road Construction
City Council March 22 - 50th Street & Grape Creek Road Construction City of San Angelo Texas
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b ProjectsAnandhan Annasamy
 
Jan. 28: Waste Management Daily Progress Report
Jan. 28: Waste Management Daily Progress ReportJan. 28: Waste Management Daily Progress Report
Jan. 28: Waste Management Daily Progress ReportHonolulu Civil Beat
 
Balpara Project Highlights 2015
Balpara Project Highlights 2015Balpara Project Highlights 2015
Balpara Project Highlights 2015Sean Blanche
 
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing WorkoverSELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing WorkoverKevin Kelley
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
BDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDKBDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDKKevin Kelley
 
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Stephen Flood
 
Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery
Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery
Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery Prosperity Goldfields
 
Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...
Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...
Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...Michael Hewitt, GISP
 
West Coast Lines closures through Watford Junction 2014/5
West Coast Lines closures through Watford Junction 2014/5West Coast Lines closures through Watford Junction 2014/5
West Coast Lines closures through Watford Junction 2014/5Stephen Lloyd Jones
 
THE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTERTHE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTERJRM Technology
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayoMark Rannel Gamayo
 
Substation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind FarmSubstation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind Farmpbnrambollcom
 

What's hot (17)

City Council March 22 - 50th Street & Grape Creek Road Construction
City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 -  50th Street & Grape Creek Road Construction
City Council March 22 - 50th Street & Grape Creek Road Construction
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
Jan. 28: Waste Management Daily Progress Report
Jan. 28: Waste Management Daily Progress ReportJan. 28: Waste Management Daily Progress Report
Jan. 28: Waste Management Daily Progress Report
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
Balpara Project Highlights 2015
Balpara Project Highlights 2015Balpara Project Highlights 2015
Balpara Project Highlights 2015
 
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing WorkoverSELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Dowling Road High Service Pump Station
Dowling Road High Service Pump StationDowling Road High Service Pump Station
Dowling Road High Service Pump Station
 
BDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDKBDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDK
 
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
 
Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery
Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery
Prosperity Goldfields: Defining Nunavut's Best New Gold Discovery
 
Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...
Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...
Shawn Simmers, Cambria Cogen, "The Synergies Between CFB Power Generation and...
 
West Coast Lines closures through Watford Junction 2014/5
West Coast Lines closures through Watford Junction 2014/5West Coast Lines closures through Watford Junction 2014/5
West Coast Lines closures through Watford Junction 2014/5
 
PatnowII
PatnowIIPatnowII
PatnowII
 
THE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTERTHE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTER
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayo
 
Substation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind FarmSubstation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind Farm
 

Viewers also liked

AMM 5th Annual Pipe Conference Welspun Presentation
AMM 5th Annual Pipe Conference Welspun PresentationAMM 5th Annual Pipe Conference Welspun Presentation
AMM 5th Annual Pipe Conference Welspun PresentationJoel Johnson
 
Little Rock Update June 2012
Little Rock Update June 2012Little Rock Update June 2012
Little Rock Update June 2012Joel Johnson
 
Welspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengths
Welspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengthsWelspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengths
Welspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengthsJoel Johnson
 
Welspun Little Rock 2011
Welspun Little Rock 2011Welspun Little Rock 2011
Welspun Little Rock 2011Joel Johnson
 
Phmsa Inspection Welspun Little Rock
Phmsa Inspection Welspun Little RockPhmsa Inspection Welspun Little Rock
Phmsa Inspection Welspun Little RockJoel Johnson
 
Welspun Little Rock September 2011 Update
Welspun Little Rock September 2011 UpdateWelspun Little Rock September 2011 Update
Welspun Little Rock September 2011 UpdateJoel Johnson
 
Welspun OTC Reception
Welspun OTC ReceptionWelspun OTC Reception
Welspun OTC ReceptionJoel Johnson
 
Ad Worldpipeline Magazine June 09
Ad   Worldpipeline Magazine   June 09Ad   Worldpipeline Magazine   June 09
Ad Worldpipeline Magazine June 09Joel Johnson
 
Welspun Rio Pipeline Dinner
Welspun Rio Pipeline DinnerWelspun Rio Pipeline Dinner
Welspun Rio Pipeline DinnerJoel Johnson
 
1 Sept 2009 First Ruby Pipe
1 Sept 2009 First Ruby Pipe1 Sept 2009 First Ruby Pipe
1 Sept 2009 First Ruby PipeJoel Johnson
 
Welspun First Vessel Loading
Welspun First Vessel LoadingWelspun First Vessel Loading
Welspun First Vessel LoadingJoel Johnson
 
Welspun New Mill Ready To Roll 6 To 20 Inch Soon!
Welspun New Mill   Ready To Roll 6 To 20 Inch Soon!Welspun New Mill   Ready To Roll 6 To 20 Inch Soon!
Welspun New Mill Ready To Roll 6 To 20 Inch Soon!Joel Johnson
 
World Pipeline Magazine Aug 09
World Pipeline Magazine   Aug 09World Pipeline Magazine   Aug 09
World Pipeline Magazine Aug 09Joel Johnson
 
Welspun OTC Party 2012
Welspun OTC Party 2012Welspun OTC Party 2012
Welspun OTC Party 2012Joel Johnson
 
UTP Product Range Rev 04
UTP Product Range Rev 04UTP Product Range Rev 04
UTP Product Range Rev 04Joel Johnson
 
Borusan mannesmann amm presentation
Borusan mannesmann amm presentationBorusan mannesmann amm presentation
Borusan mannesmann amm presentationJoel Johnson
 

Viewers also liked (16)

AMM 5th Annual Pipe Conference Welspun Presentation
AMM 5th Annual Pipe Conference Welspun PresentationAMM 5th Annual Pipe Conference Welspun Presentation
AMM 5th Annual Pipe Conference Welspun Presentation
 
Little Rock Update June 2012
Little Rock Update June 2012Little Rock Update June 2012
Little Rock Update June 2012
 
Welspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengths
Welspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengthsWelspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengths
Welspun New LSAW Mill - 18" to 60" Diameter - up to 60\'/18m lengths
 
Welspun Little Rock 2011
Welspun Little Rock 2011Welspun Little Rock 2011
Welspun Little Rock 2011
 
Phmsa Inspection Welspun Little Rock
Phmsa Inspection Welspun Little RockPhmsa Inspection Welspun Little Rock
Phmsa Inspection Welspun Little Rock
 
Welspun Little Rock September 2011 Update
Welspun Little Rock September 2011 UpdateWelspun Little Rock September 2011 Update
Welspun Little Rock September 2011 Update
 
Welspun OTC Reception
Welspun OTC ReceptionWelspun OTC Reception
Welspun OTC Reception
 
Ad Worldpipeline Magazine June 09
Ad   Worldpipeline Magazine   June 09Ad   Worldpipeline Magazine   June 09
Ad Worldpipeline Magazine June 09
 
Welspun Rio Pipeline Dinner
Welspun Rio Pipeline DinnerWelspun Rio Pipeline Dinner
Welspun Rio Pipeline Dinner
 
1 Sept 2009 First Ruby Pipe
1 Sept 2009 First Ruby Pipe1 Sept 2009 First Ruby Pipe
1 Sept 2009 First Ruby Pipe
 
Welspun First Vessel Loading
Welspun First Vessel LoadingWelspun First Vessel Loading
Welspun First Vessel Loading
 
Welspun New Mill Ready To Roll 6 To 20 Inch Soon!
Welspun New Mill   Ready To Roll 6 To 20 Inch Soon!Welspun New Mill   Ready To Roll 6 To 20 Inch Soon!
Welspun New Mill Ready To Roll 6 To 20 Inch Soon!
 
World Pipeline Magazine Aug 09
World Pipeline Magazine   Aug 09World Pipeline Magazine   Aug 09
World Pipeline Magazine Aug 09
 
Welspun OTC Party 2012
Welspun OTC Party 2012Welspun OTC Party 2012
Welspun OTC Party 2012
 
UTP Product Range Rev 04
UTP Product Range Rev 04UTP Product Range Rev 04
UTP Product Range Rev 04
 
Borusan mannesmann amm presentation
Borusan mannesmann amm presentationBorusan mannesmann amm presentation
Borusan mannesmann amm presentation
 

Similar to Slideshare September 2010

Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020MomentumPR
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardInnovation Norway
 
Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020MomentumPR
 
Canada Silver Cobalt Works Presentation May 7th 2020
Canada Silver Cobalt Works Presentation May 7th 2020Canada Silver Cobalt Works Presentation May 7th 2020
Canada Silver Cobalt Works Presentation May 7th 2020MomentumPR
 
CCW - Canada Cobalt Works Presentation - August 2018
CCW - Canada Cobalt Works Presentation - August  2018CCW - Canada Cobalt Works Presentation - August  2018
CCW - Canada Cobalt Works Presentation - August 2018MomentumPR
 
Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020MomentumPR
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019MomentumPR
 
CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018MomentumPR
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
Power+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbournePower+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbourneJohn Rimac
 
Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019MomentumPR
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...Global CCS Institute
 
Innovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technologyInnovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technologyIgor Sidorenko
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptkahayami
 
Creative Engineers, Inc. Alkali Metal Experience
Creative Engineers, Inc. Alkali Metal ExperienceCreative Engineers, Inc. Alkali Metal Experience
Creative Engineers, Inc. Alkali Metal ExperienceJay Grassel
 
Data Cabling Reference Sites Winter 2010 (2)
Data Cabling Reference Sites Winter 2010 (2)Data Cabling Reference Sites Winter 2010 (2)
Data Cabling Reference Sites Winter 2010 (2)shaunbarnes
 
X007 E Data Cabling Reference Sites Winter 2010
X007 E  Data Cabling Reference Sites Winter 2010X007 E  Data Cabling Reference Sites Winter 2010
X007 E Data Cabling Reference Sites Winter 2010alex_hudson1
 
ENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIESENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIESiQHub
 

Similar to Slideshare September 2010 (20)

Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020Canada Cobalt-Presentation-march-10-2020
Canada Cobalt-Presentation-march-10-2020
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin Shipyard
 
Ccs project network update
Ccs project network updateCcs project network update
Ccs project network update
 
Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020Canada cobalt-presentation-january-10-2020
Canada cobalt-presentation-january-10-2020
 
Canada Silver Cobalt Works Presentation May 7th 2020
Canada Silver Cobalt Works Presentation May 7th 2020Canada Silver Cobalt Works Presentation May 7th 2020
Canada Silver Cobalt Works Presentation May 7th 2020
 
CCW - Canada Cobalt Works Presentation - August 2018
CCW - Canada Cobalt Works Presentation - August  2018CCW - Canada Cobalt Works Presentation - August  2018
CCW - Canada Cobalt Works Presentation - August 2018
 
Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020Canada cobalt-presentation-january-3-2020
Canada cobalt-presentation-january-3-2020
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019
 
CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
Power+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbournePower+Generation+Project+-+Melbourne
Power+Generation+Project+-+Melbourne
 
Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
Innovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technologyInnovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technology
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
 
Creative Engineers, Inc. Alkali Metal Experience
Creative Engineers, Inc. Alkali Metal ExperienceCreative Engineers, Inc. Alkali Metal Experience
Creative Engineers, Inc. Alkali Metal Experience
 
Data Cabling Reference Sites Winter 2010 (2)
Data Cabling Reference Sites Winter 2010 (2)Data Cabling Reference Sites Winter 2010 (2)
Data Cabling Reference Sites Winter 2010 (2)
 
X007 E Data Cabling Reference Sites Winter 2010
X007 E  Data Cabling Reference Sites Winter 2010X007 E  Data Cabling Reference Sites Winter 2010
X007 E Data Cabling Reference Sites Winter 2010
 
ENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIESENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIES
 
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
 

Slideshare September 2010

  • 2. Little Rock, Arkansas New area under development
  • 3. New coil storage area  New site provides huge area for steel storage  Up to 350,000 tons of coil can be stored  Ideal hard surface for coil storage  Less than 1 mile from main Welspun facility  Both facilities on the same rail spur  Potential location for additional capacity – induction bends
  • 4. Spiral Mill Performance  Continued excellent safety record  Completed pipe making for the Ruby Project.  Commenced the KXL Project and on target  Ongoing improvements  Additional welding line installation  Welding improvements, NDT upgrades, debottlenecking...  Production windows available now!
  • 5. Coating Mill Performance  Productivity in the last two consecutive months….. 10% above original targets  Recent Improvements  ID coating curing chamber fully operational  New paint kitchen to reduce downtime  Outbound rack debottlenecked  SAP system upgraded and streamlined  New offline stripping station  Additional supervision  Coating repairs reduced to less than 0.5%
  • 6. Storage, Loading and Shipment  800 acres of land available for storage  Have completed seven different projects – load out by truck, barge, rail depending on final location  All loading of pipe undertaken by vacuum cranes  The facility is served by UP, BNSF and CN  Little Rock Port Authority undergoing expansion to allow multiple unit trains to be built simultaneously