SlideShare a Scribd company logo
1 of 6
Download to read offline
Page 1 of 6
Mohamed RoshdiHassanHassan
Summary of
Qualifications
 A highly resourceful, flexible, innovative, and
enthusiastic Technical Office Management / project
manager with 14 year experience.
 Possessing considerable experience of managing
projects from beginning to end, defining the project
Plan, timeline, scope and executing the analysis before
providing detailed recommendations.
 Having an impressive track record of delivering major
operational improvement and of orchestrating people,
Schedules and resources for optimum productivity,
efficiency and quality.
 Keen to find a challenging position within an ambitious
company where I will be able to continue to increase my
project management skills
Performing the following issues:
 The ability to design all concrete structures
 Perform the necessary co-ordination between all the
departments.
 Perform and review Shop drawing , details and all
engineering service according to Saudi Arabia code and
other codes
 Project Management Plan ; Scope definition and Scope
Management for this Project
 Integration Management of the Project
 Development of the schedule , monitor and control
schedule
 Responsible for management of material and human
resources on sites
 Perform cost analysis and prepare budget for senior
management review
Address: AL-Khobar – Riyadh
Saudi Arabia.
Nationality: Egyptian
Mobile: +966581476342
E-mail: roshdyonway@cerconsa.com
roshdyonway@gmail .com
roshdyonway@yahoo.com
Page 2 of 6

 Assist engineers in designing layout and site research
 Act as liaison between builders and contractors to
ensure adequate supply of resources
 Coordinate with site inspectors to check the ongoing
project status and development
 Maintain reports of contractors for proper execution of
key projects on a daily basis
 Check the material quality as per prescribed standards
 Provide inputs for budget planning
 Responsible for crew training and internal scheduling
Professional
experience
Working as A Technical Office Manager in
CERCON General Contracting Company since
12 July 2014 till now
 Responsible for redesign, Perform and review Shop
drawing , details and all engineering service according to
Saudi Arabia code and ACI318 code for a program of
Courts and Notary Buildings in the Eastern Zone
 Responsible for redesign, Perform and review Shop
drawing , details and all engineering service according to
Saudi Arabia code and ACI318 code for a project
ADMINISTRATIVE , SERVICE & RESIDENTIAL BUILDINGS –
MODA
 Responsible for redesign, Perform and review Shop
drawing , details and all engineering service according to
Saudi Arabia code and ACI318 code for project GRAIN
SILOS & FLOUR MILLS ORGANIZATION
 Responsible for redesign, Perform and review Shop
drawing , details and all engineering service according to
Saudi Arabia code and ACI318 code for Naif Academy for
National Security Project
 Working as A Technical Office Manager in A Head Office in
Company and manage technical requirements for all
company projects
Page 3 of 6
Professional
experience
 Working as Supervisor and designer civil
engineer in Ehsan Al Abad Consultancy
Engineering Office since September 2012- till
July 2014.
 responsible for the Design, supervision of the
construction of various industrial, commercial and
recreational buildings and land development
 Design and supervision Abdullah Ali Reda commercial
Building in Al-khobar Dhahran Street near Saudi post.
 Design and supervision OFFICE BUILDING (high
building) in AL-KHOBAR, K.S.A. OWNER MR.
GHASSAN AL MULHIM
 Design and supervision commercial- house- Building
in AL-KHOBAR, K.S.A. OWNER Esar Real Estate
Development
 Design and supervision four 4 houses- Building in
Shubaily AL-KHOBAR, K.S.A
 Working as Project Engineer in ( ARCHITECTURE
DIMENSIONS ENGINEERING OFFICE
ENG. MOHD F. AL DARAAN ) since 2010- till 2012.
 Responsible for the Design, supervision of the
construction of various industrial, commercial and
recreational buildings and land development.
 PRINCE TALAL Palace
 Pre-cast ( VILLAS COMPOUND ) OWNER ARABIAN
REAL STATE COMPANY.
 COMPOUND VILLAS OWNER MR. MOHAMMED BIN
AHMAD ALTHOMERY.
 Supervision of the construction Precast Hypermarket
Lulu Dammam.
 Project Manager Al jazeera Hospital Khobar
 COMPOUND VILLAS
 Design Tower in Dammam OWNER SAUDI RAMA
COMPANY
Page 4 of 6
Professional
experience
 Working as Project manager Al Sarh Contracting
Company since 2006 –2010.
 Design and construction four factories in Egypt Ain Sukhna
Design and construction Twenty-five villa fifth assembly in Cairo
 Design and supervision Multi-story Building Compound in
Zagazig city.
 Design and construction of Tower(14 story) an administrative
body of agrarian reform
 Design and construction of stamps storage building of sharkia
post in Egypt.
 Repairing and remodeling of non central building of sharkia post
IN Egypt.
 Repairing , maintenance and special treatment of slabs of Sadat
building in Zagazig in Egypt.
 Executing of underground main work of electrical for Mit
elkorashy vellage in Egypt.
 Repairing and maintenance of eath of financial debartment
building andemployee affairc building to national post
organization in Egypt
 Repairing , maintenance and special treatment of slabs and
columns of Almashora unit for Aids patient pelongs to sharkia
health Affairs directory in Alnahall in Egypt.
 Working a Structural Engineer's in office Badr
Engineering Consultants since January 2005 to
October 2006
 Design and construction thirteen school education is compulsory
belonging to the body educational buildings in Egypt.
 Design of eight government hospitals under the Ministry of Health
in Egypt.
 Design and construction a dozen Villa in Tenth of Ramadan in
Egypt.
 Design of five villas fifth assembly in Egypt.
 Design of three residential compounds in Tenth of Ramadan.
 Design and construction Twenty-three high building city of
Zagazig, Egypt.
Page 5 of 6
 Working as Project Engineer In Sokhna Port IN
EGYPT since January 2004 to January 2005.
 Design and Execute fiber glass factory Egypt suez economic and
trade cooperation zone North west suez bay – block no 3
 Working as Site Engineer In Al mostafa Contracting
Company Aug 2003 – Jul 2004.
 Executing of Electrical panel of Abou Elakhdar for electrical
company of Canal in Egypt .
 Design and construction of Thirty-two units of Summer resort for
doctors in Elarish – IN EGYPT.
Professional
Knowledge
 Technical Office Management.
 design all concrete structures
 Project manager Professional.
 Perform the necessary coordination between all the
departments
 Civil Engineering.
 Bid studies.
 Scheduling.
 Coordination between all contractors
 Experience of selection and assign a good labors and
Contractor selection
Basic
Knowledge
& Computer
Skills
 AutoCAD Drafting.
 SAP2000
 ETABS
 SAFE
 prokon
 CSi col
 PCA column
 Primavera 6.
 Microsoft Win XP, Vista, Win7.
 MS Office.
 Ability to fast learn engineering software.
Education
Faculty of Engineering, Zagazig University
Bachelor degree of Civil Engineering.(2003)
 Project: Structural analysis with computer (Design of tall buildings ,
cable state bridge )
 Grade: good.
 Project Grade: Excellent (Full mark).
Page 6 of 6
Languages  Arabic: mother tongue.
 English: good.
Interests &
skills
 Ability to travel and work under pressure for long time.
 Good communication & presentation skills.
 Reading, traveling.
Personal
information
 Nationality: Egyptian.
 Date of Birth: 14th
October 1974
 Marital Status: Married.
 Children: five.
 Military status: Finished.
 Driving license: Valid (Egyptian & Saudi).

More Related Content

What's hot (20)

nagy Azmy's CV1
nagy  Azmy's CV1nagy  Azmy's CV1
nagy Azmy's CV1
 
Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)
 
Civil Engineer Mohammad Suwi
Civil Engineer Mohammad SuwiCivil Engineer Mohammad Suwi
Civil Engineer Mohammad Suwi
 
2016 ENG cv
2016 ENG cv2016 ENG cv
2016 ENG cv
 
7. curriculum vitae
7. curriculum vitae7. curriculum vitae
7. curriculum vitae
 
CV Eng. 2015
CV Eng. 2015CV Eng. 2015
CV Eng. 2015
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
Supervisor civil - 2019 - oiland gas
Supervisor  civil - 2019 - oiland gasSupervisor  civil - 2019 - oiland gas
Supervisor civil - 2019 - oiland gas
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Raj Cv
Raj CvRaj Cv
Raj Cv
 
AHMED C.V 2016
AHMED C.V  2016AHMED C.V  2016
AHMED C.V 2016
 
Arch.Msaeed 2017
Arch.Msaeed 2017Arch.Msaeed 2017
Arch.Msaeed 2017
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineer
 
Hagar EL Ebiari_CV
Hagar EL Ebiari_CVHagar EL Ebiari_CV
Hagar EL Ebiari_CV
 
uss
ussuss
uss
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1
 
Mohamed Sabry CV
Mohamed Sabry CVMohamed Sabry CV
Mohamed Sabry CV
 
Safwat El-Safty Architect Engneer CV
Safwat El-Safty Architect Engneer CVSafwat El-Safty Architect Engneer CV
Safwat El-Safty Architect Engneer CV
 

Similar to MOHAMED ROSHDI CV

Similar to MOHAMED ROSHDI CV (20)

TECHNICAL MANAGER
TECHNICAL MANAGERTECHNICAL MANAGER
TECHNICAL MANAGER
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabily
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
04-2016
04-201604-2016
04-2016
 
السي في
السي فيالسي في
السي في
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
hatim marouf 4
hatim marouf 4hatim marouf 4
hatim marouf 4
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
Arch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfArch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sf
 
Ibrahim al kishki -cv
Ibrahim al kishki -cvIbrahim al kishki -cv
Ibrahim al kishki -cv
 
M.samy CV
M.samy CVM.samy CV
M.samy CV
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Cv said mohamed_1810
Cv said mohamed_1810Cv said mohamed_1810
Cv said mohamed_1810
 
Resume - Moustapha Omar
Resume - Moustapha OmarResume - Moustapha Omar
Resume - Moustapha Omar
 
CV GENDY 2016
CV GENDY 2016CV GENDY 2016
CV GENDY 2016
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
 
Mohamed Atef Abbas C.V
Mohamed Atef Abbas C.VMohamed Atef Abbas C.V
Mohamed Atef Abbas C.V
 

MOHAMED ROSHDI CV

  • 1. Page 1 of 6 Mohamed RoshdiHassanHassan Summary of Qualifications  A highly resourceful, flexible, innovative, and enthusiastic Technical Office Management / project manager with 14 year experience.  Possessing considerable experience of managing projects from beginning to end, defining the project Plan, timeline, scope and executing the analysis before providing detailed recommendations.  Having an impressive track record of delivering major operational improvement and of orchestrating people, Schedules and resources for optimum productivity, efficiency and quality.  Keen to find a challenging position within an ambitious company where I will be able to continue to increase my project management skills Performing the following issues:  The ability to design all concrete structures  Perform the necessary co-ordination between all the departments.  Perform and review Shop drawing , details and all engineering service according to Saudi Arabia code and other codes  Project Management Plan ; Scope definition and Scope Management for this Project  Integration Management of the Project  Development of the schedule , monitor and control schedule  Responsible for management of material and human resources on sites  Perform cost analysis and prepare budget for senior management review Address: AL-Khobar – Riyadh Saudi Arabia. Nationality: Egyptian Mobile: +966581476342 E-mail: roshdyonway@cerconsa.com roshdyonway@gmail .com roshdyonway@yahoo.com
  • 2. Page 2 of 6   Assist engineers in designing layout and site research  Act as liaison between builders and contractors to ensure adequate supply of resources  Coordinate with site inspectors to check the ongoing project status and development  Maintain reports of contractors for proper execution of key projects on a daily basis  Check the material quality as per prescribed standards  Provide inputs for budget planning  Responsible for crew training and internal scheduling Professional experience Working as A Technical Office Manager in CERCON General Contracting Company since 12 July 2014 till now  Responsible for redesign, Perform and review Shop drawing , details and all engineering service according to Saudi Arabia code and ACI318 code for a program of Courts and Notary Buildings in the Eastern Zone  Responsible for redesign, Perform and review Shop drawing , details and all engineering service according to Saudi Arabia code and ACI318 code for a project ADMINISTRATIVE , SERVICE & RESIDENTIAL BUILDINGS – MODA  Responsible for redesign, Perform and review Shop drawing , details and all engineering service according to Saudi Arabia code and ACI318 code for project GRAIN SILOS & FLOUR MILLS ORGANIZATION  Responsible for redesign, Perform and review Shop drawing , details and all engineering service according to Saudi Arabia code and ACI318 code for Naif Academy for National Security Project  Working as A Technical Office Manager in A Head Office in Company and manage technical requirements for all company projects
  • 3. Page 3 of 6 Professional experience  Working as Supervisor and designer civil engineer in Ehsan Al Abad Consultancy Engineering Office since September 2012- till July 2014.  responsible for the Design, supervision of the construction of various industrial, commercial and recreational buildings and land development  Design and supervision Abdullah Ali Reda commercial Building in Al-khobar Dhahran Street near Saudi post.  Design and supervision OFFICE BUILDING (high building) in AL-KHOBAR, K.S.A. OWNER MR. GHASSAN AL MULHIM  Design and supervision commercial- house- Building in AL-KHOBAR, K.S.A. OWNER Esar Real Estate Development  Design and supervision four 4 houses- Building in Shubaily AL-KHOBAR, K.S.A  Working as Project Engineer in ( ARCHITECTURE DIMENSIONS ENGINEERING OFFICE ENG. MOHD F. AL DARAAN ) since 2010- till 2012.  Responsible for the Design, supervision of the construction of various industrial, commercial and recreational buildings and land development.  PRINCE TALAL Palace  Pre-cast ( VILLAS COMPOUND ) OWNER ARABIAN REAL STATE COMPANY.  COMPOUND VILLAS OWNER MR. MOHAMMED BIN AHMAD ALTHOMERY.  Supervision of the construction Precast Hypermarket Lulu Dammam.  Project Manager Al jazeera Hospital Khobar  COMPOUND VILLAS  Design Tower in Dammam OWNER SAUDI RAMA COMPANY
  • 4. Page 4 of 6 Professional experience  Working as Project manager Al Sarh Contracting Company since 2006 –2010.  Design and construction four factories in Egypt Ain Sukhna Design and construction Twenty-five villa fifth assembly in Cairo  Design and supervision Multi-story Building Compound in Zagazig city.  Design and construction of Tower(14 story) an administrative body of agrarian reform  Design and construction of stamps storage building of sharkia post in Egypt.  Repairing and remodeling of non central building of sharkia post IN Egypt.  Repairing , maintenance and special treatment of slabs of Sadat building in Zagazig in Egypt.  Executing of underground main work of electrical for Mit elkorashy vellage in Egypt.  Repairing and maintenance of eath of financial debartment building andemployee affairc building to national post organization in Egypt  Repairing , maintenance and special treatment of slabs and columns of Almashora unit for Aids patient pelongs to sharkia health Affairs directory in Alnahall in Egypt.  Working a Structural Engineer's in office Badr Engineering Consultants since January 2005 to October 2006  Design and construction thirteen school education is compulsory belonging to the body educational buildings in Egypt.  Design of eight government hospitals under the Ministry of Health in Egypt.  Design and construction a dozen Villa in Tenth of Ramadan in Egypt.  Design of five villas fifth assembly in Egypt.  Design of three residential compounds in Tenth of Ramadan.  Design and construction Twenty-three high building city of Zagazig, Egypt.
  • 5. Page 5 of 6  Working as Project Engineer In Sokhna Port IN EGYPT since January 2004 to January 2005.  Design and Execute fiber glass factory Egypt suez economic and trade cooperation zone North west suez bay – block no 3  Working as Site Engineer In Al mostafa Contracting Company Aug 2003 – Jul 2004.  Executing of Electrical panel of Abou Elakhdar for electrical company of Canal in Egypt .  Design and construction of Thirty-two units of Summer resort for doctors in Elarish – IN EGYPT. Professional Knowledge  Technical Office Management.  design all concrete structures  Project manager Professional.  Perform the necessary coordination between all the departments  Civil Engineering.  Bid studies.  Scheduling.  Coordination between all contractors  Experience of selection and assign a good labors and Contractor selection Basic Knowledge & Computer Skills  AutoCAD Drafting.  SAP2000  ETABS  SAFE  prokon  CSi col  PCA column  Primavera 6.  Microsoft Win XP, Vista, Win7.  MS Office.  Ability to fast learn engineering software. Education Faculty of Engineering, Zagazig University Bachelor degree of Civil Engineering.(2003)  Project: Structural analysis with computer (Design of tall buildings , cable state bridge )  Grade: good.  Project Grade: Excellent (Full mark).
  • 6. Page 6 of 6 Languages  Arabic: mother tongue.  English: good. Interests & skills  Ability to travel and work under pressure for long time.  Good communication & presentation skills.  Reading, traveling. Personal information  Nationality: Egyptian.  Date of Birth: 14th October 1974  Marital Status: Married.  Children: five.  Military status: Finished.  Driving license: Valid (Egyptian & Saudi).