BOB MOORE FARMS
Due Diligence and Feasibility Analysis
June 14, 2023
AGENDA
Team
Summary
Prioritized Variables
Site Geology / Civil
Site Geometry
Zoning Analysis
New Approach
Dashboard
Market Demand
Community Impact
Development Overview
Development Approach
Discussion
Development Budget
01
02
03
04
05
06
07
08
09
10
11
12
13
14
THE TEAM
• Project Management Advisors, Inc., Development Management
• Black Oak Partners, Owner Consultant
• Hitchcock Landscape Architecture, Architect
• Humphrys & Partners Architects, Landscape Design/Land Planning
• Smith Roberts Baldischwiler, LLC, Civil Engineering
• Engineering Consulting Services, Geotechnical Engineering
• DBG Construction, General Contractor
• Rieger Law Group, PLLC, Legal
• Zonda Advisory, Residential Market Analysis
• Price Edwards, Retail Market Analysis
• Avenue 5 Residential, Multifamily Market Analysis
SUMMARY
90-day due diligence and feasibility
assignment to assess the viability to
begin Phase I of a multi-phase,
mixed-use development.
[Located on 237 acres southwest of the intersection
of I-35 and W. Main St., Norman, Oklahoma.]
Site Geology/Civil
Capacity of site relative to soils,
stormwater management
requirements and topography
Market Demand
Impact of market demand on
development potential
Community Input
Impact immediate neighbors will
have on potential to develop
Site Geometry
Shape of site and how it impacts
development
Zoning Potential
City of Norman will
permit/recommendation
PRIORITIZED
VARIABLES
INITIAL SITE
PLAN
• Not market responsive
• Not inclusive of civil considerations
• Does not address retail problems
• Traffic circulation concerns
• Does not maximize greenspace
• Program density not inclusive of
neighborhood tolerance
• Building types not economically
viable
• 4-story elevator
SITE GEOLOGY/CIVIL
TOPOGRAPHY
SITE GEOLOGY/CIVIL
SOILS
Design Parameter Column Footing Wall Footing
Net Allowable Bearing Pressure 2,000 psf 2,000 psf
Bearing Soil Material Natural Soil or Compacted Fill Natural Soil or Compacted Fill
Minimum Width 24 inches 18 inches
Minimum Footing Embedment Depth
(below slab or finished grade)
24 inches 24 inches
Estimated Total Settlement Less than 1-inch Less than 1-inch
Estimated Differential Settlement Less than ¾ inches between columns Less than ¾ inches per 30 linear feet
SITE GEOLOGY/CIVIL
SOILS
1
2
3
1
Exist. D.A.1
to DP#1
DP#1
Exist. Detention
Pond #1
2
Exist. D.A.2
to DP#2
DP#2
3
D.A. 3 Bypass
TD
Total Developed
Runoff
Exist. Detention
Pond #2
SITE GEOLOGY/CIVIL
REGIONAL STORMWATER
SITE GEOLOGY/CIVIL
ONSITE STORMWATER
• Regional stormwater flows south along I-35
and into South detention pond
• Stormwater from the north half of the site
flows into detention pond which in turn flows
downstream into south detention pond
• All water from the south detention pond
essential sheet drains onto southern half into
the Canadian River
SITE GEOLOGY/CIVIL
REGIONAL STORMWATER
D.A to DP#1
D.A. 3 Bypass
1
DP #1
2
D.A. 2 to
DP#2
DP
3S TD
Total Developed
Runoff
Combined
Detention Pond
• Accommodation of regional drainage
• Suitable for 100 yr. flood event
• Consolidated storm retention areas
• Fits geometry of the land site
• Maximized developable land
Storm Event Q100 Historic (cfs) Q100 Developed (cfs)
2 Year 555 542
5 Year 766 713
10 Year 903 875
25 Year 1,214 1,149
50 Year 1,576 1,396
100 Year 1,893 1,668
SITE GEOLOGY/CIVIL
SUMMARY
MARKET DEMAND
RESIDENTIAL
North Side Rec Actual
Garden with Truck Under Garage
Garden w detach garage 576
Big House 250 66
Single Family Rental 60 48
TOTAL 610 690
South Side
Single Family Rental 140
Garden w tuck under garage 250
Garden w detach garage 300
Big House 250
TOTAL 940
2.60%
Projected annual population
growth over next 5 years
3.60%
Projected annual household
growth over next 5 years
2.90%
Jobs increase over next 5 years
0
Pipeline of future projects / units
1,550
Zonda recommended total
units for entire 237 acres
North Pad Sites
Behind an existing development along Maine St.
Potential Uses
• Fitness
• Physical Therapy
• Health Care
• Retail-office Tenants
• Destination Oriented Retailers
South Retail Sites
Limited visibility to I-35. Nearby restaurants have
not performed well. Not expected for traffic to
increase.
Potential Uses
• 1-acre pad site on the SEC of parcel
• 1-2 retail strip centers (8-10,000 s.f./ea.)
• Dry Cleaners
• Urgent Care
• Tax Preparation
• Insurance Office
• Nail Salon
MARKET DEMAND
COMMERCIAL
Concerns to the local community
• Traffic impact
• Additional renters within neighborhood
• Building Height
• Reduced greenspace
• Impact to property values
• Crime / perception
• Schools / Civic impact
COMMUNITY
IMPACT
Benefits to the local community:
• Downzoning/reduction in intensity
relative to current zoning
• New construction will stabilize/lift
property values
• Parkland, walking trails, ponds
• Retention of greenspace
• Farmer’s market concept
COMMUNITY
IMPACT
Big House Concept
SITE GEOMETRY
PUD 9798-11
(Zero Lot line Single Family)
C-2
(Broad Commercial)
ZONING
CURRENT
ZONING
FUTURE
Market Factors Impacting Zoning Considerations
Key Norman, OK Housing Drivers:
• University of Oklahoma SEC move and the need for additional
dwelling units per intent to increase student body
• Supply of housing need within Norman - Increasing demand with
insufficient rental supply
• Significant vacant commercial space currently within the
Norman market
• The market currently cannot absorb the intensity of C2 zoning
allowable uses
• PUD Zoning Considerations
• SDA 1 – Multi-family: RM-6 - Highest density MF zoning (Norman)
• SDA 2 - Big House: RM-6 - Highest density MF zoning (Norman)
• SDA 3 - SFR: R-1 - Single Family Zoning
• SDA 4 - Commercial - Generally echoes C-1/C-2 allowable uses
NEW APPROACH
NEW SITE PLAN
NEW APPROACH
Rethinking the land plan:
• Creekdale Dr. extension
• Norman Center Ct. extension
• Commercial district
• Reclaimed detention land to max site
Living at Norman Landing:
• Greenbelt and trails
• Targeted parks and open spaces
• Cultivated ponds connected to trails
• Dog park
• Multiple playgrounds
• Farmhouse concept/coffee
• Farmer’s market
Creekdale Dr.
Reclaimed
Detention
Land
Project Description
Total Phase I Phase II Phase III Retail
Land (Acre) 43 18.60 15.2 4.70 4.70
Land (SF)
SF SF SF SF SF
% of Total Land 100% 43% 35% 11% 11%
Gross SF
SF
414,579 SF 268,408 SF 68,640 SF 26,316 SF
Net SF
SF
355,216 SF 227,821 SF 68,640 SF 25,000 SF
Units 690 390 252 48
Parking Spaces
624 403 96
Parking Ratio 1.77 1.60 1.60 2.00 N/A
NEW APPROACH
PROJECT DESCRIPTION
Site Geology/Civil
• Civil engineering and
site hydrology are
principal drivers.
• Regional storm water
drainage not to code
per Norman.
• New impervious cover
requires roughly 25%
increase in
detention/retention.
• Retention area chosen
to create an amenity in
lieu of an eyesore
Market Demand
• Market limitation
for north and
south sites = 1,550
units.
• Retail/commercial
demand is quite
limited. Retail
district fronting
new road will
boost potential.
Site Geometry
• Rebalanced site is
maximized to
accommodate
residential
development.
• Development site
is maximized
Community Input
• Greenbelt designed
to minimize
community
impact/frustration.
• Amenities (other than
pools) open to the
public.
Zoning Potential
• Reducing intensity of
potential development
and creating a
community that
neighbors will accept
• Transition from
commercial to
residential zoning with
a mix of MF zoning
and single-family
zoning
NEW APPROACH
INPUTS AND OUTCOMES
DASHBOARD
DEVELOPMENT OVERVIEW
PHASE I PHASE II PHASE III
Cash on Cash
Five-year average 10.0% 10.1% 10.3%
Cost to build
$/NRSF
$202 $209 $222
Starting Rents/SF $1.81 $1.80 $1.70
Total Project Cost $71MM $47MM $15MM
NOI at Sale Event $7.6MM $5.1MM $1.6MM
CAP Rate at Sale Event
5.00% 5.25% 5.50%
Net Sales Proceeds/
Levered Exit Profit $151MM/$108MM $96MM/$61MM $30MM/$20MM
Development Budget
Total $ Phase I Phase II Phase III Retail
Total Land Costs 6,211,159 $2,863,683 $2,176,641 $636,862 $533,973
Total Hard Costs $120,982,083 $61,633,661 $41,016,633.61 $12,878,396 $5,433,464.31
Total FF&E Cost $500,000 $265,362 $173,608 $44,116 $16,914
Total Soft Costs $10,300,780 $4,987,788 $3,148,367.68 $1,334,832 $829,792.37
Total Financing Costs $3,654,601 $2,021,232 $1,103,555.52 $353,305 $176,498.57
Total Project Costs $139,375,350 $71,771,727 $47,618,805 $15,247,513 $6,990,642
DEVELOPMENT BUDGET
NEXT
STEPS…
DEVELOPMENT APPROACH CONSIDERATIONS
FEE DEVELOPMENT FULLY INTEGRATED PMA JV DEVELOPER
Speed to Market ✔
Yes – but not available at all times
✔
24/7 Strategic “Sounding Board.”
✘
Upfront Learning Curve.
Market Knowledge
✔
If local developer chosen then yes.
But if national or regional not likely.
✔
Local Market Presence.
National Relationships.
✘
Expert in Their Market.
Consistent Project Delivery
✘
No guarantee.
✔
Leadership and Team is Structured for
Longevity Across Project Portfolio.
✘
Varying Project Teams = Inconsistency.
Communication/Reporting
✘
Not customized. Designed to suit needs of
developer.
✔
Transparent model. Proactive. Meaningful
Reports. Customized for Bob Moore Farms.
✘
Filtered Communication.
Scalability
✘
Not designed to scale. Typically one-off with
no particular relationship focus.
✔
Agile Organization. Thoughtfully Structured
Teams. Deep Bench. Reliable and Prepared to
Respond to Evolving Needs.
✘
Difficulty Keeping Up With Immediate
Demand.
One at a Time.
Strategic Business Advisory
✘
Interests are not aligned. Not necessarily
structured to provide objective advisory
services.
✔
Deal-Agnostic Strategic Consulting.
Holistic Industry and Portfolio-Level
Perspective.
✘
Narrow “Deal-Only” Perspective.
Common Service Agreement
✘
Potential conflicts of interest and complicated
agreement that will need to be negotiated.
✔
Master Agreement.
Added Level of Consistency.
✘
Conflict of Business Interest.
Complicated JV agreements.
Guarantees ✘
Excluded
✘
Excluded.
✔
Cost/Completion Guarantee.
Cost Effective
✘
Expensive. Typically 3% to 5% of total project
costs. May include bonus and/or equity
upside.
✔
(< 3%) & No Promote Fee.
Financial Alignment.
✘
(>3%) + Promote Fee.
Opportunity for Misalignment.
DISCUSSION

More Related Content

What's hot

Cambio climático y Energía. Luis Gonzalez Reyes
Cambio climático y Energía. Luis Gonzalez ReyesCambio climático y Energía. Luis Gonzalez Reyes
Cambio climático y Energía. Luis Gonzalez ReyesEcologistas en Accion
 
Implement cobit in your organization
Implement cobit in your organizationImplement cobit in your organization
Implement cobit in your organizationCheikh Hamallah DJIBA
 
Ch 4 powerpoint
Ch 4 powerpointCh 4 powerpoint
Ch 4 powerpointhrpowell
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management OverviewDavidMcLachlan1
 
Iso 20000 standard implementation
Iso 20000 standard implementationIso 20000 standard implementation
Iso 20000 standard implementationIITSW Company
 
CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)
CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)
CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)Muhammad Azmy
 
Infographic - How a PMO/PPM tool like PM3 gives one version of the truth
Infographic - How a PMO/PPM tool like PM3 gives one version of the truth Infographic - How a PMO/PPM tool like PM3 gives one version of the truth
Infographic - How a PMO/PPM tool like PM3 gives one version of the truth Bestoutcome
 
Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing PresentationVernon Benjamin
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner
 
Internal Control & Risk Management Framework
Internal Control & Risk Management FrameworkInternal Control & Risk Management Framework
Internal Control & Risk Management FrameworkTreasury Consulting LLP
 
ISO 27001:2013 Mandatory documents and records
ISO 27001:2013 Mandatory documents and recordsISO 27001:2013 Mandatory documents and records
ISO 27001:2013 Mandatory documents and recordsManoj Vakekattil
 
APMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal StrategyAPMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal StrategyBid to Win Ltd
 

What's hot (20)

Ethics in Audit
Ethics in AuditEthics in Audit
Ethics in Audit
 
CISA Training - Chapter 5 - 2016
CISA Training - Chapter 5 - 2016CISA Training - Chapter 5 - 2016
CISA Training - Chapter 5 - 2016
 
Cambio climático y Energía. Luis Gonzalez Reyes
Cambio climático y Energía. Luis Gonzalez ReyesCambio climático y Energía. Luis Gonzalez Reyes
Cambio climático y Energía. Luis Gonzalez Reyes
 
ISA 315 (Revised) - Exposure Draft Webinar
ISA 315 (Revised) - Exposure Draft WebinarISA 315 (Revised) - Exposure Draft Webinar
ISA 315 (Revised) - Exposure Draft Webinar
 
Implement cobit in your organization
Implement cobit in your organizationImplement cobit in your organization
Implement cobit in your organization
 
ISO 27701
ISO 27701ISO 27701
ISO 27701
 
Ch 4 powerpoint
Ch 4 powerpointCh 4 powerpoint
Ch 4 powerpoint
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview
 
Iso 20000 standard implementation
Iso 20000 standard implementationIso 20000 standard implementation
Iso 20000 standard implementation
 
CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)
CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)
CONTROL & AUDIT INFORMATION SYSTEM (HALL, 2015)
 
Infographic - How a PMO/PPM tool like PM3 gives one version of the truth
Infographic - How a PMO/PPM tool like PM3 gives one version of the truth Infographic - How a PMO/PPM tool like PM3 gives one version of the truth
Infographic - How a PMO/PPM tool like PM3 gives one version of the truth
 
Project closure
Project closureProject closure
Project closure
 
Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing Presentation
 
Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)Gartner's Maturity Model For Programme Portfolio Management (PPM)
Gartner's Maturity Model For Programme Portfolio Management (PPM)
 
Risk ITTO
Risk ITTORisk ITTO
Risk ITTO
 
Internal Control & Risk Management Framework
Internal Control & Risk Management FrameworkInternal Control & Risk Management Framework
Internal Control & Risk Management Framework
 
SOX- IT Perspective
SOX- IT PerspectiveSOX- IT Perspective
SOX- IT Perspective
 
ISO 27001:2013 Mandatory documents and records
ISO 27001:2013 Mandatory documents and recordsISO 27001:2013 Mandatory documents and records
ISO 27001:2013 Mandatory documents and records
 
APMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal StrategyAPMP Foundation: Developing Proposal Strategy
APMP Foundation: Developing Proposal Strategy
 
IT Security & Governance Template
IT Security & Governance TemplateIT Security & Governance Template
IT Security & Governance Template
 

Similar to Bob Moore Farms_Due Diligence Presentation_6.14.23.pptx

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
Creating great neighborhoods along el camino real
Creating great neighborhoods along el camino realCreating great neighborhoods along el camino real
Creating great neighborhoods along el camino realgbeltalliance
 
USQ Neighborhood Park
USQ Neighborhood Park USQ Neighborhood Park
USQ Neighborhood Park us2unionsquare
 
Show me the money apa presentation 9-17-10
Show me the money   apa presentation 9-17-10Show me the money   apa presentation 9-17-10
Show me the money apa presentation 9-17-10SJO Land Consultants LLC
 
New Construction Project for 56 Unit Townhomes in Titusville, Florida
New Construction Project for 56 Unit Townhomes in Titusville, FloridaNew Construction Project for 56 Unit Townhomes in Titusville, Florida
New Construction Project for 56 Unit Townhomes in Titusville, FloridaRudi Gevorgyan
 
City council presentation 05.14.12 revised
City council presentation 05.14.12 revisedCity council presentation 05.14.12 revised
City council presentation 05.14.12 revisedcityofevanston
 
LRA_presentation2011[1]
LRA_presentation2011[1]LRA_presentation2011[1]
LRA_presentation2011[1]Nathon Chacon
 
Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15Sonja Reichertz
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
Clean Water in Real Estate Development
Clean Water in Real Estate DevelopmentClean Water in Real Estate Development
Clean Water in Real Estate DevelopmentBuzzards Bay Coalition
 
2015 08 04_Marvin L Clermont_Reduced
2015 08 04_Marvin L Clermont_Reduced2015 08 04_Marvin L Clermont_Reduced
2015 08 04_Marvin L Clermont_ReducedMarvin Clermont, MCRP
 
20160225 Adaptation Planning the Punta Gorda Experience
20160225 Adaptation Planning the Punta Gorda Experience20160225 Adaptation Planning the Punta Gorda Experience
20160225 Adaptation Planning the Punta Gorda ExperienceMitchell Austin, AICP
 

Similar to Bob Moore Farms_Due Diligence Presentation_6.14.23.pptx (20)

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
Creating great neighborhoods along el camino real
Creating great neighborhoods along el camino realCreating great neighborhoods along el camino real
Creating great neighborhoods along el camino real
 
SNEAPA 2013 Friday g3 1_45_what is important to us
SNEAPA 2013 Friday g3 1_45_what is important to usSNEAPA 2013 Friday g3 1_45_what is important to us
SNEAPA 2013 Friday g3 1_45_what is important to us
 
USQ Neighborhood Park
USQ Neighborhood Park USQ Neighborhood Park
USQ Neighborhood Park
 
Show me the money apa presentation 9-17-10
Show me the money   apa presentation 9-17-10Show me the money   apa presentation 9-17-10
Show me the money apa presentation 9-17-10
 
New Construction Project for 56 Unit Townhomes in Titusville, Florida
New Construction Project for 56 Unit Townhomes in Titusville, FloridaNew Construction Project for 56 Unit Townhomes in Titusville, Florida
New Construction Project for 56 Unit Townhomes in Titusville, Florida
 
City council presentation 05.14.12 revised
City council presentation 05.14.12 revisedCity council presentation 05.14.12 revised
City council presentation 05.14.12 revised
 
LRA_presentation2011[1]
LRA_presentation2011[1]LRA_presentation2011[1]
LRA_presentation2011[1]
 
City Council December 4, 2012 Planning
City Council December 4, 2012 PlanningCity Council December 4, 2012 Planning
City Council December 4, 2012 Planning
 
Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
Clean Water in Real Estate Development
Clean Water in Real Estate DevelopmentClean Water in Real Estate Development
Clean Water in Real Estate Development
 
F3 Village Development
F3 Village DevelopmentF3 Village Development
F3 Village Development
 
2015 08 04_Marvin L Clermont_Reduced
2015 08 04_Marvin L Clermont_Reduced2015 08 04_Marvin L Clermont_Reduced
2015 08 04_Marvin L Clermont_Reduced
 
Metz Lateral Conservation Project
Metz Lateral Conservation ProjectMetz Lateral Conservation Project
Metz Lateral Conservation Project
 
EIA.pptx
EIA.pptxEIA.pptx
EIA.pptx
 
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
 
City Council March 5, 2013 Planning
City Council March 5, 2013 PlanningCity Council March 5, 2013 Planning
City Council March 5, 2013 Planning
 
20160225 Adaptation Planning the Punta Gorda Experience
20160225 Adaptation Planning the Punta Gorda Experience20160225 Adaptation Planning the Punta Gorda Experience
20160225 Adaptation Planning the Punta Gorda Experience
 

Recently uploaded

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 

Recently uploaded (20)

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 

Bob Moore Farms_Due Diligence Presentation_6.14.23.pptx

  • 1. BOB MOORE FARMS Due Diligence and Feasibility Analysis June 14, 2023
  • 2. AGENDA Team Summary Prioritized Variables Site Geology / Civil Site Geometry Zoning Analysis New Approach Dashboard Market Demand Community Impact Development Overview Development Approach Discussion Development Budget 01 02 03 04 05 06 07 08 09 10 11 12 13 14
  • 3. THE TEAM • Project Management Advisors, Inc., Development Management • Black Oak Partners, Owner Consultant • Hitchcock Landscape Architecture, Architect • Humphrys & Partners Architects, Landscape Design/Land Planning • Smith Roberts Baldischwiler, LLC, Civil Engineering • Engineering Consulting Services, Geotechnical Engineering • DBG Construction, General Contractor • Rieger Law Group, PLLC, Legal • Zonda Advisory, Residential Market Analysis • Price Edwards, Retail Market Analysis • Avenue 5 Residential, Multifamily Market Analysis
  • 4. SUMMARY 90-day due diligence and feasibility assignment to assess the viability to begin Phase I of a multi-phase, mixed-use development. [Located on 237 acres southwest of the intersection of I-35 and W. Main St., Norman, Oklahoma.]
  • 5. Site Geology/Civil Capacity of site relative to soils, stormwater management requirements and topography Market Demand Impact of market demand on development potential Community Input Impact immediate neighbors will have on potential to develop Site Geometry Shape of site and how it impacts development Zoning Potential City of Norman will permit/recommendation PRIORITIZED VARIABLES
  • 6. INITIAL SITE PLAN • Not market responsive • Not inclusive of civil considerations • Does not address retail problems • Traffic circulation concerns • Does not maximize greenspace • Program density not inclusive of neighborhood tolerance • Building types not economically viable • 4-story elevator
  • 9. Design Parameter Column Footing Wall Footing Net Allowable Bearing Pressure 2,000 psf 2,000 psf Bearing Soil Material Natural Soil or Compacted Fill Natural Soil or Compacted Fill Minimum Width 24 inches 18 inches Minimum Footing Embedment Depth (below slab or finished grade) 24 inches 24 inches Estimated Total Settlement Less than 1-inch Less than 1-inch Estimated Differential Settlement Less than ¾ inches between columns Less than ¾ inches per 30 linear feet SITE GEOLOGY/CIVIL SOILS
  • 10. 1 2 3 1 Exist. D.A.1 to DP#1 DP#1 Exist. Detention Pond #1 2 Exist. D.A.2 to DP#2 DP#2 3 D.A. 3 Bypass TD Total Developed Runoff Exist. Detention Pond #2 SITE GEOLOGY/CIVIL REGIONAL STORMWATER
  • 11. SITE GEOLOGY/CIVIL ONSITE STORMWATER • Regional stormwater flows south along I-35 and into South detention pond • Stormwater from the north half of the site flows into detention pond which in turn flows downstream into south detention pond • All water from the south detention pond essential sheet drains onto southern half into the Canadian River
  • 12. SITE GEOLOGY/CIVIL REGIONAL STORMWATER D.A to DP#1 D.A. 3 Bypass 1 DP #1 2 D.A. 2 to DP#2 DP 3S TD Total Developed Runoff Combined Detention Pond
  • 13. • Accommodation of regional drainage • Suitable for 100 yr. flood event • Consolidated storm retention areas • Fits geometry of the land site • Maximized developable land Storm Event Q100 Historic (cfs) Q100 Developed (cfs) 2 Year 555 542 5 Year 766 713 10 Year 903 875 25 Year 1,214 1,149 50 Year 1,576 1,396 100 Year 1,893 1,668 SITE GEOLOGY/CIVIL SUMMARY
  • 14. MARKET DEMAND RESIDENTIAL North Side Rec Actual Garden with Truck Under Garage Garden w detach garage 576 Big House 250 66 Single Family Rental 60 48 TOTAL 610 690 South Side Single Family Rental 140 Garden w tuck under garage 250 Garden w detach garage 300 Big House 250 TOTAL 940 2.60% Projected annual population growth over next 5 years 3.60% Projected annual household growth over next 5 years 2.90% Jobs increase over next 5 years 0 Pipeline of future projects / units 1,550 Zonda recommended total units for entire 237 acres
  • 15. North Pad Sites Behind an existing development along Maine St. Potential Uses • Fitness • Physical Therapy • Health Care • Retail-office Tenants • Destination Oriented Retailers South Retail Sites Limited visibility to I-35. Nearby restaurants have not performed well. Not expected for traffic to increase. Potential Uses • 1-acre pad site on the SEC of parcel • 1-2 retail strip centers (8-10,000 s.f./ea.) • Dry Cleaners • Urgent Care • Tax Preparation • Insurance Office • Nail Salon MARKET DEMAND COMMERCIAL
  • 16. Concerns to the local community • Traffic impact • Additional renters within neighborhood • Building Height • Reduced greenspace • Impact to property values • Crime / perception • Schools / Civic impact COMMUNITY IMPACT
  • 17. Benefits to the local community: • Downzoning/reduction in intensity relative to current zoning • New construction will stabilize/lift property values • Parkland, walking trails, ponds • Retention of greenspace • Farmer’s market concept COMMUNITY IMPACT Big House Concept
  • 19. PUD 9798-11 (Zero Lot line Single Family) C-2 (Broad Commercial) ZONING CURRENT
  • 20. ZONING FUTURE Market Factors Impacting Zoning Considerations Key Norman, OK Housing Drivers: • University of Oklahoma SEC move and the need for additional dwelling units per intent to increase student body • Supply of housing need within Norman - Increasing demand with insufficient rental supply • Significant vacant commercial space currently within the Norman market • The market currently cannot absorb the intensity of C2 zoning allowable uses • PUD Zoning Considerations • SDA 1 – Multi-family: RM-6 - Highest density MF zoning (Norman) • SDA 2 - Big House: RM-6 - Highest density MF zoning (Norman) • SDA 3 - SFR: R-1 - Single Family Zoning • SDA 4 - Commercial - Generally echoes C-1/C-2 allowable uses
  • 22. NEW APPROACH Rethinking the land plan: • Creekdale Dr. extension • Norman Center Ct. extension • Commercial district • Reclaimed detention land to max site Living at Norman Landing: • Greenbelt and trails • Targeted parks and open spaces • Cultivated ponds connected to trails • Dog park • Multiple playgrounds • Farmhouse concept/coffee • Farmer’s market Creekdale Dr. Reclaimed Detention Land
  • 23. Project Description Total Phase I Phase II Phase III Retail Land (Acre) 43 18.60 15.2 4.70 4.70 Land (SF) SF SF SF SF SF % of Total Land 100% 43% 35% 11% 11% Gross SF SF 414,579 SF 268,408 SF 68,640 SF 26,316 SF Net SF SF 355,216 SF 227,821 SF 68,640 SF 25,000 SF Units 690 390 252 48 Parking Spaces 624 403 96 Parking Ratio 1.77 1.60 1.60 2.00 N/A NEW APPROACH PROJECT DESCRIPTION
  • 24. Site Geology/Civil • Civil engineering and site hydrology are principal drivers. • Regional storm water drainage not to code per Norman. • New impervious cover requires roughly 25% increase in detention/retention. • Retention area chosen to create an amenity in lieu of an eyesore Market Demand • Market limitation for north and south sites = 1,550 units. • Retail/commercial demand is quite limited. Retail district fronting new road will boost potential. Site Geometry • Rebalanced site is maximized to accommodate residential development. • Development site is maximized Community Input • Greenbelt designed to minimize community impact/frustration. • Amenities (other than pools) open to the public. Zoning Potential • Reducing intensity of potential development and creating a community that neighbors will accept • Transition from commercial to residential zoning with a mix of MF zoning and single-family zoning NEW APPROACH INPUTS AND OUTCOMES
  • 26. DEVELOPMENT OVERVIEW PHASE I PHASE II PHASE III Cash on Cash Five-year average 10.0% 10.1% 10.3% Cost to build $/NRSF $202 $209 $222 Starting Rents/SF $1.81 $1.80 $1.70 Total Project Cost $71MM $47MM $15MM NOI at Sale Event $7.6MM $5.1MM $1.6MM CAP Rate at Sale Event 5.00% 5.25% 5.50% Net Sales Proceeds/ Levered Exit Profit $151MM/$108MM $96MM/$61MM $30MM/$20MM
  • 27. Development Budget Total $ Phase I Phase II Phase III Retail Total Land Costs 6,211,159 $2,863,683 $2,176,641 $636,862 $533,973 Total Hard Costs $120,982,083 $61,633,661 $41,016,633.61 $12,878,396 $5,433,464.31 Total FF&E Cost $500,000 $265,362 $173,608 $44,116 $16,914 Total Soft Costs $10,300,780 $4,987,788 $3,148,367.68 $1,334,832 $829,792.37 Total Financing Costs $3,654,601 $2,021,232 $1,103,555.52 $353,305 $176,498.57 Total Project Costs $139,375,350 $71,771,727 $47,618,805 $15,247,513 $6,990,642 DEVELOPMENT BUDGET
  • 29. DEVELOPMENT APPROACH CONSIDERATIONS FEE DEVELOPMENT FULLY INTEGRATED PMA JV DEVELOPER Speed to Market ✔ Yes – but not available at all times ✔ 24/7 Strategic “Sounding Board.” ✘ Upfront Learning Curve. Market Knowledge ✔ If local developer chosen then yes. But if national or regional not likely. ✔ Local Market Presence. National Relationships. ✘ Expert in Their Market. Consistent Project Delivery ✘ No guarantee. ✔ Leadership and Team is Structured for Longevity Across Project Portfolio. ✘ Varying Project Teams = Inconsistency. Communication/Reporting ✘ Not customized. Designed to suit needs of developer. ✔ Transparent model. Proactive. Meaningful Reports. Customized for Bob Moore Farms. ✘ Filtered Communication. Scalability ✘ Not designed to scale. Typically one-off with no particular relationship focus. ✔ Agile Organization. Thoughtfully Structured Teams. Deep Bench. Reliable and Prepared to Respond to Evolving Needs. ✘ Difficulty Keeping Up With Immediate Demand. One at a Time. Strategic Business Advisory ✘ Interests are not aligned. Not necessarily structured to provide objective advisory services. ✔ Deal-Agnostic Strategic Consulting. Holistic Industry and Portfolio-Level Perspective. ✘ Narrow “Deal-Only” Perspective. Common Service Agreement ✘ Potential conflicts of interest and complicated agreement that will need to be negotiated. ✔ Master Agreement. Added Level of Consistency. ✘ Conflict of Business Interest. Complicated JV agreements. Guarantees ✘ Excluded ✘ Excluded. ✔ Cost/Completion Guarantee. Cost Effective ✘ Expensive. Typically 3% to 5% of total project costs. May include bonus and/or equity upside. ✔ (< 3%) & No Promote Fee. Financial Alignment. ✘ (>3%) + Promote Fee. Opportunity for Misalignment.

Editor's Notes

  1. Adjust to most important to least SITE GEOLOGY / CIVIL MARKET DEMAND SITE GEOMETRY COMMUNITY INPUT ZONING
  2. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  3. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  4. Split image into two with image and text next to each other Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  5. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  6. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  7. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  8. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  9. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  10. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  11. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  12. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  13. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  14. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  15. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  16. Add what needs to be overlayed for Phase 1, II and III Phase I Number of Units Construction Start Phase II Number of Units Construction Start Phase III Number of Units Construction Start
  17. It will be a summary of all key variables and maybe even a risk indicator like the way we do our due diligence reports with a red, yellow or green box adjacent.  Key items would be: PROJECT: RISKS: Unit Mix/Density Development Unit Mix Pie Chart Political Phased Development Table  - Bar or line Graph Market RETURNS: Cash on Cash Returns Leveraged Return IRR FINANCIAL: Rent Growth Chart Cash Flow   Sophia’s various return thresholds relative to the target.  We can talk more about that tomorrow. Cost to construct by asset class. Rents per square foot by asset class. Site work cost per square foot. Zoning risk = low (green) Community risk = yellow (moderate) Market risk = TBD   We will come up with more, but that’s the idea. 
  18. Add bubble chart from Pg7 here