The document describes the Kombat copper project in Namibia. It details past production at the mine, including 12 Mt mined at 2.3% copper, 1.9% lead and 18 g/t silver. An inferred resource of 1.7 Mt remains at 1.93% copper and 16 g/t silver. The project also includes the nearby Tsumeb mine which historically produced 30 Mt at 4.3% copper, 13.9% lead/zinc and 95 g/t silver. Exploration results are presented and the project is situated in a region with other base and precious metals mines.
5. 5
Asis Far West Sector
Inferred Resource of 1.7Mt @ 1.93%
Cu and 16g/t Ag (2.15% Cu Eq.)
#1 Shaft
Kombat
Town
#3 Shaft
Tailings
Mill
Asis Far
West Shaft
0 3.5km