The document describes the Kombat copper project in Namibia. It details past production at the mine, including 12 Mt mined at 2.3% copper, 1.9% lead and 18 g/t silver. An inferred resource of 1.7 Mt remains at 1.93% copper and 16 g/t silver. The project also includes the nearby Tsumeb mine which historically produced 30 Mt at 4.3% copper, 13.9% lead/zinc and 95 g/t silver. Exploration results are presented and the project is situated in a region with other base and precious metals mines.
Mechanical Broom Manufacturers by Atlas IndustriesAtlas Industries
Mechanical Brooms manufactured by ATLAS have a sweeping width of 2.5 meters. These road sweepers are equipped with nylon bristles for efficient and durable cleaning of road.
Mechanical Broom Manufacturers by Atlas IndustriesAtlas Industries
Mechanical Brooms manufactured by ATLAS have a sweeping width of 2.5 meters. These road sweepers are equipped with nylon bristles for efficient and durable cleaning of road.
Production of Transformed Red Mud and Application in Mining Waste Treatment -...J.J.P. (Hans) Zijlstra
PDF of 12 pages, 29 figures, 3 tables on production of transformed red mud powder and pellets with examples of treatment of heavy metal contaminated mining waste water and solids.
5. 5
Asis Far West Sector
Inferred Resource of 1.7Mt @ 1.93%
Cu and 16g/t Ag (2.15% Cu Eq.)
#1 Shaft
Kombat
Town
#3 Shaft
Tailings
Mill
Asis Far
West Shaft
0 3.5km