4. 4
GRUPO
ORDEN
GRUPO
LOGISTICO
GRUPO
SANITARIO
GRUPO
ACCION SOCIAL
GRUPO
INTERVENCIÓN
GRUPO
ACCION SOCIAL
GRUPO
LOGISTICO
GRUPO
INTERVENCIÓN
GRUPO
SANITARIO
GRUPO
ORDEN
CECOPAL
DIRECTOR
Alcalde
COMITÉ ASESOR
(PEMU)
GABINETE DE PRENSA
(PEMU)
JEFE DE OPERACIONES
(PEMU)
JEFE DE PUESTO DE MANDO AVANZADO
(PEMU)
GABINETE DE PRENSA
Jefe de Gabinete de Prensa de
Consejería Presidencia
GABINETE DE PRENSA
Jefe de Gabinete de Prensa de Consejería
de Presidencia y de Delegación de
Gobierno
JEFE DE OPERACIONES
Director de CECARM
CECOP
DIRECTOR
Consejero de Presidencia
JEFE DE PUESTO DE MANDO AVANZADO
Jefe de Servicio de P.Civil
COMITÉ ASESOR
(según Plan SISMIMUR)
DIRECTOR
Consejero de Presidencia y
Delegado del Gobierno
CECOP - CECOPI
COMITÉ ASESOR
(según SISMIMUR)
JEFE DE OPERACIONES
Director de CECARM y Jefe de Unidad de P. Civil de Deleg. Gobierno
JEFE DE PUESTO DE MANDO AVANZADO
Jefe de Servicio de P.Civil CARM
NIVEL 0NIVEL 1NIVEL 2
GABINETE DE PRENSA
Jefe de Gabinete de Prensa de Delegación
de Gobierno y Consejería Presidencia
CECOPI
DIRECTOR
Delegado del Gobierno y
Consejero de Presidencia
COMITÉ ASESOR
JEFE DE OPERACIONES
Jefe de Unidad de P. Civil de Deleg. Gobierno y Director de CECARM
JEFE DE PUESTO DE MANDO AVANZADO
Jefe de Servicio de P.Civil CARM
NIVEL 3
GRUPO
EVALUACIÓN SÍSMICA
GRUPO
RESTAURACIÓN
SERVICIOS ESENCIALES
GRUPO
EVALUACIÓN SÍSMICA
GRUPO
RESTAURACIÓN
SERVICIOS ESENCIALES
PLAN
SISMIMUR
5. 5
• Emergency state level 1 at 17:40, 35 minutes after the
first earthquake happened
• Emergency state level 2 at 19:20, 33 minutes after
the second earthquake
7. 7
PUESTO DE MANDO
AVANZADO
MANDO DEL GRUPO DE
INTERVENCIÓN
COORDINADOR DEL
GRUPO DE EVALUACIÓN
SÍSMICA
COORDINADOR DEL
GRUPO DE
RESTABLECIMIENTO DE
SERVICIOS ESENCIALES
COORDINADOR DEL
GRUPO SANITARIO
MANDO DEL GRUPO DE
ORDEN
COORDINADOR DEL
GRUPO LOGÍSTICO
COORDINADOR DEL
GRUPO ACCIÓN SOCIAL
Advanced
Command
Position
Intervention Team
Command
Seismic evaluation team
Coordinator
Essential recovery
services group
Coordinator
Health group Coordinator
Order group Command
Logistic group
Coordinator
Social action group
Coordinator
9. 9
MANDO DEL GRUPO DE
INTERVENCIÓN
EQUIPO DE BOMBEROS
EQUIPO DE BÚSQUEDA
Y RESCATE
EQUIPO DE CONTROL
DE EDIFICIOS
Intervention
group Command
Firefighters
Team
Building control
Team
Search&Res
cue Team
13. 13
COORDINADOR DEL
GRUPO DE ORDEN
PATRULLA
GUARDIA CIVIL
PATRULLA POLICÍA
LOCAL
PATRULLA POLICÍA
NACIONAL
EQUIPO FORENSE
State Police: 506
forces
GC Patrols: 445
forces
Police: 90 forces
per day
Forensic Team;
identification and
autopsy of 8
victims in 24
hours
14. 14
COORDINADOR DEL
GRUPO DE
RESTABLECIMIENTO DE
SERVICIOS ESENCIALES
EQUIPO DE
RESTABLECIMIENTO DE
AGUA POTABLE
EQUIPO DE
RESTABLECIMIENTO DE
GAS
EQUIPO DE
RESTABLECIMIENTO DE
ELECTRICIDAD
EQUIPO DE
RESTABLECIMIENTO DE
TELEFONÍA, RADIO Y TV
EQUIPO DE
RESTABLECIMIENTO DE
CARRETERAS
EQUIPO DE
RESTABLECIMIENTO DE
SANEAMIENTO
EQUIPO DE
RESTABLECIMIENTO DE
VÍAS URBANAS
Coordinator
Drinkable water Team
Gas recovery Team
Phone, radio, TV
recovery Team
Roads recovery Team
Streets & Lanes
recovery Team
Water&Sanitati
on recovery
Team
Electricity recovery Team
15. 15
TUNNEL: both viaducts on A-7 motorway over Guadalentín
river were affected. It took 30 hours to repair. Motorway cut
between km 593 and 595
TRAIN: railway between Lorca and Águilas kept closed since
11th to 25th May due to buildings collapse risk on the railway
GAS: HC Energía, gas distributor in Lorca, closed 1.200 natural
gas taps on the city. On May 17th service was recovered.
HOSPITALS: Rafael Méndez Hospital, with capacity for 257
beds, was cleared for safety reasons, althoug not importants
structural damages were detected. Emergency room was re-
opened on May 13rd.
Phone: On May 13rd Movistar and Vodafone repeaters were
installed. They were requested since the second earthquake
16. 16
COORDINADOR DEL
GRUPO LOGÍSTICO
EQUIPO DE MAQUINARIA
CIVIL
EQUIPO DE
ILUMINACIÓN Y
CLIMATIZACIÓN
EQUIPO DE OTROS
SUMINISTROS
EQUIPO DE
AVITUALLAMIENTO
EQUIPO DE
COMBUSTIBLES
EQUIPO DE APOYO
LOGÍSTICO AÉREO
EQUIPO DE
COMUNICACIONES
EQUIPO DE
ALOJAMIENTO
Coordinator
Civil equipment Team
Provisioning Team
Supplies Team
Logistic air support Team
Communications Team
Lodging Team
Fuel Team
Ilumination&climate Team
17. 17
• Some camps were established at the
heavy damaged districts:
– Las Viñas, San Fernando, Sutullena, Instituto
Ibáñez
• The main camp were at “Huerto de la
Rueda” trade fair. 4.000 people took
refuge there
18. 18
Seismic researching
team: IGN- IGM
Cultural Legacy damage
evaluation Team: Technics
from State, Region, City
Councils
Housing damage evaluation
Team: Téch people from
CARM, City Councils,
proffesional colleges,
volunteers, UME
COORDINADOR DEL
GRUPO DE EVALUACIÓN
SÍSMICA
EQUIPO DE
INVESTIGACIÓN SÍSMICA
EQUIPO DE
EVALUACIÓN DE DAÑOS
EN VIVIENDAS
EQUIPO DE DERRIBO Y
DESESCOMBRO
EQUIPO DE
EVALUACIÓN DE DAÑOS
EN PATRIMONIO
CULTURAL
Demolition and clear-up
Companies
19. 19
Coordination of 200 arquitects, building
engineers, volunteers, Regional and Local
Administrations and Military Emergency
Unit
• 80% buildings were damaged
• City divided in 29 sectors grid
• Initial evaluation for buildings structural
wellness. Colour code (green, yellow, red)
about facilities access risks
22. 22
Special group ready to take care of victims, specially in social aspects,
related with the emergency situation
COORDINADOR DEL
GRUPO DE ACCIÓN
SOCIAL
EQUIPO DE
EVACUACIÓN Y
ALBERGUE
EQUIPO DE ATENCIÓN
ESPECIAL
EQUIPO PSICOLÓGICO
EQUIPO DE SUMINISTRO
DE ROPA
EQUIPO DE
ALIMENTACIÓN
EQUIPO DE LIMPIEZA E
HIGIENE
Evacuation&Acommodation
Feeding Team
Clothing supply Team
Psychological Team
Cleaning Team
Special attention team
Coordinator
23. 23
On May 18th, population with no home, registered in the city of Lorca,
were lodged in a second camp, “La Torrecilla”.
Camp capacity was about 1800 people. 1580 were finally lodged.
Distribution of people
per nationality