1. Optimizing Wind Farm Construction Logistics
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 1 / 64
2. The Company (Ballast Nedam)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
• Amsterdamsche Ballast Maatschappij: 1877
• Nederlandse Aannemings Maatschappij: 1899
• Merged into Ballast Nedam: 1969
Hosted by:
01 November 2011, 2 / 64
3. The Company (Ballast Nedam)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 3 / 64
4. Offshore Wind – The Early Years
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Offshore Windfarm Lely
- Engineering, supply and installation of 4 foundations
Offshore Windfarm Dronten / Irene Vorrink
- Engineering, supply and installation of 28 foundations
32 foundations
1994 / 1996
Hosted by:
01 November 2011, 4 / 64
5. Offshore Wind Farm Egmond aan Zee
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Turn-key delivery of an Offshore Wind Farm in joint venture
with Vestas.
- Engineer, supply and installation of 37 foundations (1
xMeteo Mast, 36 turbine foundations.
- All offshore installations (foundations, turbines and
cables)
- 50% Electrical Scope
69 foundations
2006
Hosted by:
01 November 2011, 5 / 64
6. Rhyl Flats Offshore Wind Farm
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Installation of 25 foundations at the Rhyl Flats Offshore
Wind Farm in the Irish Sea.
Monopiles transported floating, transition piece
transported vertical on barges.
94 foundations
2008
Hosted by:
01 November 2011, 6 / 64
7. Gunfleet Sands Offshore Wind Farm
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Installation of 32 foundations at the Gunfleet Sands
Offshore Wind Farm.
Installation started during the 2nd half of 2008 and was
finalised during the first months of 2009.
Both monopiles and transition pieces were transported on
barges towards the HLV Svanen
126 foundations
2009
Hosted by:
01 November 2011, 7 / 64
8. Belwind, Sheringham Shoal and Baltic I
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Installation of 56 monopiles at the Belwind Offshore Wind
Farm.
Started in 2009, finalised in Q1/2010
Installation of 24 foundations at the Sheringham Shoal
Offshore Wind Farm.
Design and installation of 22 foundations at the Baltic I
Offshore Wind Farm in Germany.
Installation with jack-up vessel 228 foundations
2010
Hosted by:
01 November 2011, 8 / 64
9. Walney 2 and London Array Offshore Wind Farms
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Logistics and installation of 51 monopiles at the Walney 2
Offshore Wind Farm.
Floating transport of heaviest monopiles so far in offshore
wind. Maximum weight up to 805 tons.
Installation of 11 foundations at London Array ,monopile
and transition piece, at shallow locations beyond the 290 found.
limitation of the projects existing installation vessels,
Seaworker and Adventure
2011
Hosted by:
01 November 2011, 9 / 64
10. Future Projects (2012/2013)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Installation of 111 monopiles at the Anholt Offshore Wind 481 found.
Farm in Denmark during 2013
Engineering, supply and installation of 80 foundations at
the Butendiek Offshore Wind Farm in Germany during 2013.
2013
Hosted by:
01 November 2011, 10 / 64
11. Overview designed and installed foundations - 2011
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Number of foundations 290
Designed by Ballast Nedam 91
Installed by Ballast Nedam 290
Installed by HLV Svanen 235
Number of monopiles 290
Number of transition pieces 148
Type of contracts
Installation contracts
Engineering and installation contracts
Full EPC foundation contracts
Turn-key offshore wind farm project
Track record
- On time
- 100% availabilty
- Reliable cycle times
Hosted by:
01 November 2011, 11 / 64
12. Project Example: Walney 2 Offshore Wind Farm
(Summer 2011)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 12 / 64
13. Walney 2 Offshore Wind Farm
(Logistics summary)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 13 / 64
14. Onshore Operations
(Site Barrow-in-Furness UK)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 14 / 64
15. Onshore Operations
(Site Barrow-in-Furness / UK)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 15 / 64
16. Onshore Operations
(Logistical flow)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 16 / 64
17. Onshore Operations
(Launching Monopiles)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 17 / 64
18. Onshore Operations
(Launching Monopiles)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 18 / 64
19. Transport to Site
(Floating Monopiles)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 19 / 64
20. Transport to Site
(Floating Monopiles)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 20 / 64
21. Transport to Site
(Transition Pieces on barges)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 21 / 64
22. Offshore Operations
(Docking Monopile)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 22 / 64
23. Offshore Operations
(Upending Monopile)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 23 / 64
24. Offshore Operations
(Upending Monopile)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 24 / 64
25. Offshore Operations
(Releasing Plugs & Pile Contingency Floatation Units)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 25 / 64
26. Offshore Operations
(Releasing plugs & Pile Contingency Floatation Units)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 26 / 64
27. Offshore Operations
(Hammering Monopile)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 27 / 64
28. Offshore Operations
(Hammering Monopile)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 28 / 64
29. Offshore Operations
(Transition Piece Installation)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 29 / 64
30. Weather Conditions / Working Windows
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 30 / 64
31. Weather Conditions / Working Windows
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 31 / 64
32. Weather Conditions / Working Windows
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Gross cycle time :
- net cycle time
- unworkable weather
- (logistic) delays
Focus
3 weeks of delay during the project can easily results in 8
weeks delay at the end which is 1/3 of the onshore and
offshore running cost
April May June July August September October November
24 w eeks
1
2
3
8
Hosted by:
01 November 2011, 32 / 64
33. Project Engineering Solutions
(Feeding concepts)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
1
3
2
Hosted by:
01 November 2011, 33 / 64
34. Project Engineering Solutions
(Rigging & Temporary Works)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 34 / 64
35. Human Resources
(mixing experience & ambitions)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 35 / 64
36. Human Resources
(1-BN concept / in-house specialities)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 36 / 64
37. Planning & Logistics
(Traditional Planning)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 37 / 64
38. Planning & Logistics
(Relevant Factors: nett. duration / logistical delays / repairs / weather)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Progress HLV Svanen + floating piles
(Bligh Bank Offshore Wind Farm from 01 Sep 2009 to 05 Feb 2010)
10,0
9,0
8,0
7,0
6,0
duration (days)
5,0
4,0
3,0
2,0
1,0
,0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
foundation (1 to 56)
nett duration (20% / average 12,5hrs) logistical delay (13%) repairs (1%) unworkable weather (66%)
Hosted by:
01 November 2011, 38 / 64
39. Logistical Modelling
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 39 / 64
40. Logistical Modelling
(Input data)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 40 / 64
41. Logistical Modelling
(Input data)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 41 / 64
42. Logistical Modelling
(Input data: substructure components)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 42 / 64
43. Logistical Modelling
(Input data: substructure components)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 43 / 64
44. Logistical Modelling
(Input data: substructure components)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 44 / 64
45. Logistical Modelling
(Input data: marine spread)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 45 / 64
46. Logistical Modelling
(Input data: marine spread)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 46 / 64
47. Logistical Modelling
(Input data: sub-cycle times / durations)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 47 / 64
48. Logistical Modelling
(Input data: sub-cycle times / durations)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 48 / 64
49. Logistical Modelling
(Input data: local conditions)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 49 / 64
50. Logistical Modelling
(Input data: local conditions)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 50 / 64
51. Logistical Modelling
(Input data: local conditions)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 51 / 64
52. Logistical Modelling
(Input data: weather)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 52 / 64
53. Logistical Modelling
(Output)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 53 / 64
54. Logistical Modelling
(Output: utilization rates)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 54 / 64
55. Logistical Modelling
(Output: cycle time charts)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 55 / 64
56. Logistical Modelling
(Output: waiting times)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 56 / 64
57. Logistical Modelling
(Output: resource tracking)
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 57 / 64
59. Logistical Modelling
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 59 / 64
60. Walney 2
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
24 hour time lapse movie available at:
www.youtube.com/watch?v=YIAovkexkYo
Hosted by:
01 November 2011, 60 / 64
61. Developments Offshore Wind
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
A total of 1,247 offshore turbines are now installed and grid connected in European waters, bringing total
installed capacity to 3,294MW, spread across 49 wind farms in nine European countries.
Hosted by:
01 November 2011, 61 / 64
62. Future Locations
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 62 / 64
63. Logistical Challenges
who we are what we did how we do it critical factors mastering logistics all comes together future challenges
Hosted by:
01 November 2011, 63 / 64