Climate change and occupational safety and health.
Top5 initiatives (2)
1. Taking India to the World
Integrity
Commitment
Passion
Seamlessness
Speed
1
“TOP-5 initiative in FY-15”
2. Integrity Commitment SpeedPassion Seamlessness
Taking India to the World
OBJECTIVE
Flood ControlFlood Control
PHR improvement.PHR improvement.
THR replacementTHR replacement
Boiler Efficiency:Boiler Efficiency:
Availability of BAC- addition of 2nos of new screwAvailability of BAC- addition of 2nos of new screw
Availability of CSF- Replacement of static ash cooler for Unit-3Availability of CSF- Replacement of static ash cooler for Unit-3
Coal sizing and HomogeneityCoal sizing and Homogeneity
Boiler-02 flue gas and air circuit revampingBoiler-02 flue gas and air circuit revamping
Auxiliary ReductionAuxiliary Reduction
VFD installation in Unit-3 &5 PA fans- 6 no by Mar-15VFD installation in Unit-3 &5 PA fans- 6 no by Mar-15
Installation of VFD in CT fanInstallation of VFD in CT fan
HPBP spry valve passing- Over hauling of Unit 2,3&4 spray control valves.HPBP spry valve passing- Over hauling of Unit 2,3&4 spray control valves.
BFP recirculation valve passing –BFP recirculation valve passing –
Replacement of air heater tubes.Replacement of air heater tubes.
Condenser cleanness.Condenser cleanness.
Stringent Operational practice.Stringent Operational practice.
3. Taking India to the World
Integrity
Commitment
Passion
Seamlessness
Speed
3
“TOP-5 initiative in FY-15”
PHR
Improvement
Initiative Action taken
Implement
ation
Status Responsibilty
1.THR improvement
Completion of U2 TG
overhauling
Revival of HPH-4&5
performance for U2&3
Condensor cleaning for
U2&3(chem),4&5(high pr
waterjet)
U2&3 HPBP system
overhauling
2.Boiler Efficiency
1.Availability of BAC
(addition of 2 nos of new
screw)
2.Availability of CSF
(Replacement of static ash
cooler for Unit-3)
3.Coal sizing and Homogeneity
4.Boiler-2 flue gas and air
circuit revamping.
4. Taking India to the World
Integrity
Commitment
Passion
Seamlessness
Speed
4
“TOP-5 initiative in FY-15”
Auxiliary Reduction
Initiative Action taken
Implementation
Status Responsibilty
1.VFD
1. Installation in Unit 3 &5 PA
fans(6 Nos) by Mar-15
2.Installation of VFD in CT
fan
2.HPBP
1.Over hauling of Unit-2,3&4
spray control valves
3.BFP
1.Overhauling of recirculation
valve.
4.Condenser cleanness
5. Air heater tubes
1.Replacement of tubes after
inspection
6.Stringent Operational
practice.
3.Coal sizing and
Homogeneity
4.Boiler-2 flue gas and air
circuit revamping.
5. Integrity Commitment SpeedPassion Seamlessness
Taking India to the World
OBJECTIVE
EOHS&HR INITIATIVE:EOHS&HR INITIATIVE:
Installation and Commisioning of on-line BOD,COD,TDS monitoring system in floodInstallation and Commisioning of on-line BOD,COD,TDS monitoring system in flood
control pit.control pit.
Compliance to on-line data transmission of stack(U5) & Ambient air quality (2 stations)Compliance to on-line data transmission of stack(U5) & Ambient air quality (2 stations)
parameters to SPCB completed.parameters to SPCB completed.
LOTO system implemented for U1LOTO system implemented for U1
””Theme of the month “ celebrationTheme of the month “ celebration
Solar street light for plant and colony.Solar street light for plant and colony.
Sprinkler network along the ash silo.Sprinkler network along the ash silo.
Awareness programme was conducted on road safety in IRC premises.Awareness programme was conducted on road safety in IRC premises.
Lifting tools,tackles &Pressure vessels testing was carried out for U5.Lifting tools,tackles &Pressure vessels testing was carried out for U5.
Supervisory devlopement through introduction of talent management initiative.Supervisory devlopement through introduction of talent management initiative.
Monthly communication meeting with supervisory group .Monthly communication meeting with supervisory group .
..