PROIZVODNJA ENERGIJE
• 2010. Švedska proizvela 153 bilijuna kWh
- 38 % nuklearne elektrane (57.6 bilijuna kWh)
- 47 % hidroelektrane (71.5 bilijuna kWh
ZBRINJAVANJE OTPADA
• 1977. - The Swedish Nuclear Fuel and Waste Management Company
• Klasifikacija radioaktivnog otpada (IAEA)
- trajnost zračenja
- rastući intenzitet zračenja
- količina topline koju otpad oslobađa
• Odlagališta za radioaktivni otpad
 privremena skladišta
 odlagališta za nisko i srednje-radioaktivni otpad
 odlagališta za visoko-radioaktivni otpad
• Odlagališta: CLAB, SFR
CLAB (1985.)
• Privremeno skladište za iskorištena goriva
• 1985. godine, na lokaciji Oskarshamn
• Kapacitet – 8000 tona
• Zbog velike radioaktivnosti i topline istrošeno se gorivo prvo odlaže u
bazene (dubine 30 m)
• Kasnije se prevozi u odlagalište na poluotoku Simpevarp
• Odlagalište može primiti 300 tona uranija/god (nuklearni reaktor proizvodi
od 15 do 25 tona/god)
SFR
• Završno skladište za kratkotrajni
radioaktivni otpad
• 1988. godine, Forsmark
• Kapacitet: 60 000 m3
• Otpad se pakira u metalne ili betonske
spremnike i skladišti u kamenim
trezorima
na dubini od 50 m
• Pod stalnim nadzorom
• Ovdje se skladišti i otpad iz zdravstva,
industrije i istraživačkih postrojenja
LABORATORIJI
- CANISTER
- ÄSPÖ HARD ROCK
- BENTONITE
CANISTER LABORATORY
• Mjesto gdje se razvija tehnologija
izrade bakrenih posuda u kojima
se odlaže potrošeno nuklearno
gorivo.
ÄSPÖ HARD ROCK LABORATORY
• Podzemni laboratorij za ispitivanje
stijena na otoku Äspö.
• Nalazi se na dubini od 460 m.
• Mjesto gdje se provode testiranja u
stvarnom okruženju.
• Objekt u potpunosti nalikuje na
buduće odlagalište.
• Otvoren je za javnost.
• Laboratorij je dio Äspö laboratorija.
• Provode se testiranja bentonitne gline pri različitim količinama
vode.
BENTONITE LABORATORY
TRANSPORT
• Smještaj nuklearnih elektrana uz obalu
Nuklearna elektrana FORSMARK
ŽUTA LINIJA – nisko i srednje jak
radioaktivan otpad
CRVENA LINIJA – nuklearno gorivo
TRANSPORT – Brod SIGYN
• DULJINA: 90 m
• ŠIRINA: 18 m
• NOSIVOST: 2.044 t
• BRUTO TEŽINA: 4.166 t
• TOVARNI KAPACITET: 1.400 t
• GAZ S PUNIM OPTEREĆENJEM: 4 m
• BRZINA: 12 čvorova
• BROJ ČLANOVA POSADE: 12
TRANSPORT
Bačve za temeljne komponente:
oMASA: 70 t
oDULJINA: 6.15 m
oPROMJER: 1.95 m
oDEBLJINA STIJENKE: 33 cm
oMATERIJAL: Kovani čelik
oKAPACITET: 5 t
Kontejner za operativni otpad:
oMASA: 58 t
oMASA SA TERETOM: 120 t
oDULJINA: 7.28 m
oŠIRINA: 3.70 m
oDEBLJINA STIJENKE: 7-20 cm
oMATERIJAL: Čelik
oKAPACITET: 12 modula
3 betonska spremnika
TRANSPORT
Bačve za nuklearno gorivo:
oMASA: 80 t
oDULJINA: 6.15 m
oPROMJER: 1.95 m
oDEBLJINA STIJENKE: 32 cm
oMATERIJAL: Kovani čelik sa nehrđajućim premazom
oKAPACITET: 17 BWR spremnika za gorivo
7 PWR spremnika za gorivo
BWR: PWR:
TRANSPORT - UKRCAJ
• Koristi se metoda RO-RO (roll on/roll off)
• Teret se ukrcava u brod preko krmene rampe
ili podići ga dizalicom na brod
• Po ukrcaju teret se sidri
• Kapacitet skladišnog prostora:
• - do 10 bačvi
• - 1-2 terminalna vozila
• - do 6 kontejnera
• Zidovi teretnog prostora ne propuštaju zračenje
• Razina zračenja se prati instrumentima
• Godišnje brod obavi 30-40 putovanja
ŠVEDSKI SISTEM ODLAGANJA RADIOAKTIVNOG
UPOTREBLJENO GORIVA I OTPADA
Metoda konačnog odlaganja
Metoda se temelji na tri zaštitne barijere.
Iz privremenog skladišta do konačnog odlagališta
Privremena pohrana istrošenog nuklearnog goriva je na privremenom skladištu
(Clab) u Oskarshamn, gdje se nalazi u velikim bazenima koje hlade goriva i štite
okoliš od zračenja.
Nakon privremenog skladištenja gorivo će biti prebačeno u SKB-ov zatvoreni
objekt i smješteni u nepropusnim bakrenim posudama s umecima lijevanog
željeza.
Biti će prevezeni do konačnog spremišta koje se planira graditi u Forsmarku.
Posude s otpadnim gorivom će se potom spustiti u sustavu horizontalnih tunela,
na dubinu od oko 450 m.
Konačno odlaganje
Tuneli će biti dugi oko 250 metara, udaljeni oko 40 metara. U podnožju tunela bit
će rupe za odlaganje udaljene šest metara. Bakrene posude će biti smještene u
rupama za odlaganje i ugrađene u tampon od bentonitne gline.
KONCEPT
Posude
Bakrene posude će biti duge 5 m i promjera 1 m. Težiti će 25 i 27 tona kada se napune
nuklearnim otpadom. Vanjsko kućište je 5cm debeli sloj bakra za zaštitu od korozije, a
unutra je sloj od lijevanog željeza koji mu daje dodatnu snagu.
Spremnik je dizajniran da izdrži korozije i sve mehaničke sile uzrokovane kretanja u
stijeni.
Tampon
Prije nego se posuda upušta u konačno
odlagalište, otpad se posloži u rupe u blokovima
koji sadrže prstenove od bentonitne gline.
Zadatak tampona u posljednjem odlagalištu je da:
1. Spriječi korozivne tvari da dopru do kanistra.
2. Zaštiti spremnik u slučaju malih pokreta u stijeni.
3. Odgoditi širenje radioaktivnih tvari koje mogu
isteći iz posude koja je postala propusna.
Stijena
Stijena će izolirati otpad od čovjeka i okoliša.
Švedsko kristalno podzemlje nije neprobojno.
Postoje prijelomi u stijeni kroz koju prolazi
podzemna voda na različite načine. Ove zone
također djeluju kao amortizeri za apsorpciju
prirodnih pokreta u stijeni.
HVALA NA PAŽNJI!

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 

Waste management

  • 2. PROIZVODNJA ENERGIJE • 2010. Švedska proizvela 153 bilijuna kWh - 38 % nuklearne elektrane (57.6 bilijuna kWh) - 47 % hidroelektrane (71.5 bilijuna kWh
  • 3. ZBRINJAVANJE OTPADA • 1977. - The Swedish Nuclear Fuel and Waste Management Company • Klasifikacija radioaktivnog otpada (IAEA) - trajnost zračenja - rastući intenzitet zračenja - količina topline koju otpad oslobađa • Odlagališta za radioaktivni otpad  privremena skladišta  odlagališta za nisko i srednje-radioaktivni otpad  odlagališta za visoko-radioaktivni otpad • Odlagališta: CLAB, SFR
  • 4. CLAB (1985.) • Privremeno skladište za iskorištena goriva • 1985. godine, na lokaciji Oskarshamn • Kapacitet – 8000 tona • Zbog velike radioaktivnosti i topline istrošeno se gorivo prvo odlaže u bazene (dubine 30 m) • Kasnije se prevozi u odlagalište na poluotoku Simpevarp • Odlagalište može primiti 300 tona uranija/god (nuklearni reaktor proizvodi od 15 do 25 tona/god)
  • 5. SFR • Završno skladište za kratkotrajni radioaktivni otpad • 1988. godine, Forsmark • Kapacitet: 60 000 m3 • Otpad se pakira u metalne ili betonske spremnike i skladišti u kamenim trezorima na dubini od 50 m • Pod stalnim nadzorom • Ovdje se skladišti i otpad iz zdravstva, industrije i istraživačkih postrojenja
  • 6. LABORATORIJI - CANISTER - ÄSPÖ HARD ROCK - BENTONITE
  • 7. CANISTER LABORATORY • Mjesto gdje se razvija tehnologija izrade bakrenih posuda u kojima se odlaže potrošeno nuklearno gorivo.
  • 8. ÄSPÖ HARD ROCK LABORATORY • Podzemni laboratorij za ispitivanje stijena na otoku Äspö. • Nalazi se na dubini od 460 m. • Mjesto gdje se provode testiranja u stvarnom okruženju. • Objekt u potpunosti nalikuje na buduće odlagalište. • Otvoren je za javnost.
  • 9. • Laboratorij je dio Äspö laboratorija. • Provode se testiranja bentonitne gline pri različitim količinama vode. BENTONITE LABORATORY
  • 10. TRANSPORT • Smještaj nuklearnih elektrana uz obalu Nuklearna elektrana FORSMARK ŽUTA LINIJA – nisko i srednje jak radioaktivan otpad CRVENA LINIJA – nuklearno gorivo
  • 11. TRANSPORT – Brod SIGYN • DULJINA: 90 m • ŠIRINA: 18 m • NOSIVOST: 2.044 t • BRUTO TEŽINA: 4.166 t • TOVARNI KAPACITET: 1.400 t • GAZ S PUNIM OPTEREĆENJEM: 4 m • BRZINA: 12 čvorova • BROJ ČLANOVA POSADE: 12
  • 12. TRANSPORT Bačve za temeljne komponente: oMASA: 70 t oDULJINA: 6.15 m oPROMJER: 1.95 m oDEBLJINA STIJENKE: 33 cm oMATERIJAL: Kovani čelik oKAPACITET: 5 t Kontejner za operativni otpad: oMASA: 58 t oMASA SA TERETOM: 120 t oDULJINA: 7.28 m oŠIRINA: 3.70 m oDEBLJINA STIJENKE: 7-20 cm oMATERIJAL: Čelik oKAPACITET: 12 modula 3 betonska spremnika
  • 13. TRANSPORT Bačve za nuklearno gorivo: oMASA: 80 t oDULJINA: 6.15 m oPROMJER: 1.95 m oDEBLJINA STIJENKE: 32 cm oMATERIJAL: Kovani čelik sa nehrđajućim premazom oKAPACITET: 17 BWR spremnika za gorivo 7 PWR spremnika za gorivo BWR: PWR:
  • 14. TRANSPORT - UKRCAJ • Koristi se metoda RO-RO (roll on/roll off) • Teret se ukrcava u brod preko krmene rampe ili podići ga dizalicom na brod • Po ukrcaju teret se sidri • Kapacitet skladišnog prostora: • - do 10 bačvi • - 1-2 terminalna vozila • - do 6 kontejnera • Zidovi teretnog prostora ne propuštaju zračenje • Razina zračenja se prati instrumentima • Godišnje brod obavi 30-40 putovanja
  • 15. ŠVEDSKI SISTEM ODLAGANJA RADIOAKTIVNOG UPOTREBLJENO GORIVA I OTPADA
  • 16.
  • 17.
  • 18.
  • 19. Metoda konačnog odlaganja Metoda se temelji na tri zaštitne barijere. Iz privremenog skladišta do konačnog odlagališta Privremena pohrana istrošenog nuklearnog goriva je na privremenom skladištu (Clab) u Oskarshamn, gdje se nalazi u velikim bazenima koje hlade goriva i štite okoliš od zračenja. Nakon privremenog skladištenja gorivo će biti prebačeno u SKB-ov zatvoreni objekt i smješteni u nepropusnim bakrenim posudama s umecima lijevanog željeza. Biti će prevezeni do konačnog spremišta koje se planira graditi u Forsmarku. Posude s otpadnim gorivom će se potom spustiti u sustavu horizontalnih tunela, na dubinu od oko 450 m. Konačno odlaganje Tuneli će biti dugi oko 250 metara, udaljeni oko 40 metara. U podnožju tunela bit će rupe za odlaganje udaljene šest metara. Bakrene posude će biti smještene u rupama za odlaganje i ugrađene u tampon od bentonitne gline.
  • 20. KONCEPT Posude Bakrene posude će biti duge 5 m i promjera 1 m. Težiti će 25 i 27 tona kada se napune nuklearnim otpadom. Vanjsko kućište je 5cm debeli sloj bakra za zaštitu od korozije, a unutra je sloj od lijevanog željeza koji mu daje dodatnu snagu. Spremnik je dizajniran da izdrži korozije i sve mehaničke sile uzrokovane kretanja u stijeni.
  • 21. Tampon Prije nego se posuda upušta u konačno odlagalište, otpad se posloži u rupe u blokovima koji sadrže prstenove od bentonitne gline. Zadatak tampona u posljednjem odlagalištu je da: 1. Spriječi korozivne tvari da dopru do kanistra. 2. Zaštiti spremnik u slučaju malih pokreta u stijeni. 3. Odgoditi širenje radioaktivnih tvari koje mogu isteći iz posude koja je postala propusna. Stijena Stijena će izolirati otpad od čovjeka i okoliša. Švedsko kristalno podzemlje nije neprobojno. Postoje prijelomi u stijeni kroz koju prolazi podzemna voda na različite načine. Ove zone također djeluju kao amortizeri za apsorpciju prirodnih pokreta u stijeni.
  • 22.
  • 23.