1. Pre Installation debrief with club
1. Site order information
Location: Chiba, Japan
Club name: Tennis Training Centre
Address: 936-1 Hananoi
Kashiwa-Shi
Chiba, Japan
Postcode 277-0812
Shipping Address: Kyodo News Digital
1-7-1 Higashi-Shimbashi
Shiodome Media Tower 10F
Minato-ku
Tokyo, Japan 105-0021
Number of courts ordered (num of OV cameras): 1 indoor, 1 outdoor
Court numbers: 1 (outdoor)
Additional features (debrief/lobby/stream with/without scoreboard): 2 AIO Debrief stations
Surface: hard
Clubs Email: ???
Internet connection: ???
Comments:
Point of contact: e-mail: Tel:
Maintenance: e-mail: Tel:
IT personnel: e-mail: Tel:
2. 2. Installation schedule:
Starts: -- / -- / ---- 9:00 am
Ends: -- / -- / ----
Coach training: num
Staff training: num
PlaySight champion: name+contacts
3. Installation requirements
IT and maintenance guys should be on site during installation. At least at the
beginning to see that all is in line with PlaySIght’s requirements.
Courts should be free and not scheduled for club usage the whole
Installation period.
Lift or modular platform on site.
3. 4. Network requirements
Bandwidth and internet connection
5 mbps upload minimum
30 mbps download minimum
Network:
For wireless networks:
A minimum of 54Mb/s stable MiMo (Multiple In – Multiple Out)
"N" type wireless router
Maximum distance of router form the SmartCourt kiosk 100m (330ft) with no
obstructions
For wired networks:
CAT5 network cable
Maximum cable length from the switch/router 100m
Important note: All systemcomponents (SmartCourt kiosks, debriefing stations, Lobby
applications) must be on the same network.
Static IP
An internal static IP for each kiosk, debriefing, lobby station.
An internal static IP for each overview camera (minimum 2 per court) in case of streaming with
scoreboard installation configuration.
+Default getaway
+DNS
For live streaming of courts – one external static IP address for each streaming computer (one
streaming computer for every 3 live steaming courts).
Important note: All static IP's, gateway and DNS must be sent to PlaySight prior to Shipment of
systems.
4. 5. running cables
All CAT 6A cables should run from the brackets to where the kiosk is set up (6 cables
for 6 cameras).
Internet cable should run from club's internet port to the kiosks
Important note - not longer than 100 meters.
Must leave spear cable (about 1.5 meter) on both sides of the cable plugin's (cable
to camera, cable to kiosk).
5. 6. Camera placement
A. 4 Corner cameras:come inside housing, this cameras are the analytical
cameras in charge of the video analysis. They are placed on brackets that
are installedat the corner of the court by the club.
Bracket placement rules:
Preferred on the same height but can be placed on different heights as long as they
follow 3 rules.
1. Depth from baseline: 5-7.5 meters
2. Height from the ground: 4-5 meters
3. Distance from doubles line: 0-4
6.
7. All corner cameras (analytical cameras) should follow this figures.
??? metersfrom baseline
4.5 meter high
2,5 metersfrom the
Side doubles line.
??? metersfrom baseline
4.5 meter high
2,5 metersfrom the
Side doubles line.
8. ??? meters from baseline
4.5 meter high
2,5 metersfrom the
Side doubles line.
??? metersfrom baseline
4.5 meter high
2,5 metersfrom the
Side doubles line.
9. B. Overviewcameras
1. Live streamoverviewcamerawithmicrophone
Is installed directly to the wall with 3 screws that are drilled to the wall.
Overview rules:
Must be positioned with the smallest height difference as possible between the 2
cameras.
Dead Center of the court is the best view
Height from the ground: 3.5 – 7 meters
Exactly in the center
of the court
11. 7. Kiosk Placement on court
Example of how the station look likes and how cables connected to the kiosk
In the outdoor configuration it’s better to install the kiosk on the side where sun is mostly
present.
Internet & power
Required near the
kiosk
All cables run
from the cameras
to the kiosk
12. 8. Debriefing station
Please prepare some indoor (best for quiet debrief) place where it can be installed on wall or
on table. The place must have internet connection and power supply (we will provide )
Internet and power connection is required for the debriefing station.