1. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
522,957.73
5,444,335.12
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,557.97
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
2. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 10.53 44,271.60 466,179.95
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
522,957.73
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.62 77,625.00 358,627.50
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,444,335.12
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,557.97
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
3. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
4. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
5. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
6.
7. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
8. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
547,307.11
5,420,426.62
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,998.85
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
9. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 11.08 44,271.60 490,529.33
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
547,307.11
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.31 77,625.00 334,719.00
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,420,426.62
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,998.85
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
10. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
11. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
12. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
13.
14. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
15. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
570,328.34
5,396,518.12
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,111.58
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
16. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 11.60 44,271.60 513,550.56
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
570,328.34
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.00 77,625.00 310,810.50
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,396,518.12
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,111.58
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
17. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
18. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
19. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
20.
21. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
22. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
594,235.00
5,372,609.62
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,109.74
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
23. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 12.14 44,271.60 537,457.22
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
594,235.00
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 3.70 77,625.00 286,902.00
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,372,609.62
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,109.74
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
24. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
25. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
26. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
27.
28. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA PERIGIK LANDU, KECAMATAN SEJANGKUNG
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
29. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
522,957.73
5,444,335.12
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,557.97
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
30. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 10.53 44,271.60 466,179.95
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
522,957.73
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.62 77,625.00 358,627.50
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,444,335.12
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,557.97
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
31. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
32. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
33. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
34.
35. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
36. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
547,307.11
5,420,426.62
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,998.85
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
37. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 11.08 44,271.60 490,529.33
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
547,307.11
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.31 77,625.00 334,719.00
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,420,426.62
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,998.85
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
38. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
39. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
40. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
41.
42. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
43. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
570,328.34
5,396,518.12
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,111.58
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
44. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 11.60 44,271.60 513,550.56
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
570,328.34
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.00 77,625.00 310,810.50
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,396,518.12
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,111.58
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
45. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
46. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
47. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
48.
49. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
50. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
594,235.00
5,372,609.62
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,109.74
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
51. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 12.14 44,271.60 537,457.22
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
594,235.00
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 3.70 77,625.00 286,902.00
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,372,609.62
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,109.74
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
52. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
53. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
54. A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.070 103,500.00 7,245.00
2. Tukang Besi L.02 OH 0.070 116,437.50 8,150.63
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 15,395.63
B BAHAN
1. Besi beton (polos/ulir) Kg 10.500 12,343.50 129,606.75
2. Kawat beton Kg 0.150 18,966.00 2,844.90
Jumlah Harga Bahan 132,451.65
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 147,847.28
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 147,847.28
G Harga Satuan Pekerjaan Per 1 Kg 14,784.73
B.25.C 1m2 Pasang Bekisting Dinding Beton Biasa
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.360 103,500.00 37,260.00
2. Tukang Kayu L.02 OH 0.180 116,437.50 20,958.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 58,218.75
B BAHAN
1. Papan kayu kls III m3 0.0140 1,547,250.00 21,661.50
2. Kayu Kls III kg 0.0050 1,624,500.00 8,122.50
3. Paku 2" - 5" Liter 0.3000 17,730.00 5,319.00
4. Minyak Bekesting m3 0.2000 22,152.75 4,430.55
Jumlah Harga Bahan 39,533.55
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 97752.3
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 97,752.30
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
55.
56. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA MEKAR JAYA, KECAMATAN SAJAD
TA : 2021
HARGA
(Rp)
I
1 Kayu kelas III (Kasau ) M3
(Kasau 5/7 - 4 m ) 1,624,500.00
2 M3
(tebal 2 cm - 4 m) 1,547,250.00
3 Kayu Bulat Dia. 10/12 cm x 4 M Btg 12,750.00
4 Kayu Bulat Dia. 8/10 cm x 4 M Btg 11,092.50
5 Lbr 66,750.00
6 Lbr 84,750.00
7 Lbr 84,750.00
8 Batu Kali/Batu Gunung M3
320,250.00
9 M3
uk. 1-2 cm 505,642.50
10 M3
119,175.00
11 M3
108,225.00
12 M3
84,525.00
13 Zak 77,692.50
14 Besi Beton 12 mm Kg SNI 12,343.50
15 Besi Beton 10 mm Kg SNI 12,343.50
16 Besi Beton 8 mm Kg SNI 12,343.50
17 Besi Beton 6 mm Kg SNI 12,343.50
18 Kawat Ikat Beton Kg 18,966.00
19 Kg 17,730.00
II
1 Pipa PVC Ø3" - 4 m Type AW M SNI 159,720.00
2 Pipa PVC Ø1 1/2" - 4 m M SNI 31,350.00
3 Pipa PVC Ø2" - 4 m M SNI 77,137.50
4 Pipa PVC Ø3" - 4 m M SNI 159,720.00
5 Tee PVC Ø1 1/2" Bh 6,000.00
6 Bh 26,250.00
7 Elbow PVC Ø1 1/2" Bh 5,250.00
8 Bh 6,750.00
9 Bh 18,750.00
10 Bh 26,250.00
III
1 Minyak Begisting Ltr 22,152.75
2 Bh 100.00
V
1 Sewa Mesin Sedot Air Ls 1,500,000.00
2 Sewa Mesin Molen Ls 250,000.00
IV
1 HOK 116,437.50
2 HOK 103,500.00
3 HOK 155,250.00
4 HOK 142,312.50
HARGA SATUAN BARANG JASA
NO NAMA BAHAN SAT SPESIFIKASI
BAHAN PERPIPAAN
BAHAN LAIN-LAIN
Pasir Urug
Tee PVC Ø2"
Elbow PVC Ø2"
Elbow PVC Ø3"
Elbow PVC Ø4"
BAHAN BANGUNAN
Batu Pecah
Pasir Kasar
Pasir Pasang
Semen 50 kg
Paku Campur
UPAH
Pekerja
Tukang
kepala tukang
Mandor
SEWA ALAT
Material Media Filter AF (Botol Plastik)
Triplek 9 mm
Triplek 4 mm
Triplek 3 mm
Papan Kelas III
57. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA TANJUNG MEKAR, KECAMATAN SAMBAS
TAHUN ANGGARAN : 2021
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANGKI SEPTIK
C. PEKERJAAN MEDIA FILTER AF
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
E. PEKERJAAN PEMASANGAN PIPA
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
G BIAYA OPERASIONAL PEKERJAAN (5%)
Sambas, Desember 2021
Diperiksa Oleh : Dibuat Oleh :
KEPALA BIDANG Konsultan Perencana
PENYEHATAN LINGKUNGAN PERMUKIMAN CV. RIZHARY PRATAMA KONSULTAN
PEJABAT PEMBUAT KOMITMEN (PPK)
SYAMSURI, ST AHMAD SYARIFUDIN
NIP. 19770729 201001 1 007 Direktur
450,000.00
178,425.00
REKAPITULASI ANGGARAN BIAYA
NO URAIAN PEKERJAAN BIAYA
522,957.73
5,444,335.12
367,500.00
1,083,286.12
954,054.00
TOTAL BIAYA (Rp) 9,000,557.97
Rp
DIBULATKAN (Rp) 9,000,000.00
Rp
TERBILANG : Sembilan Juta Rupiah
58. KEGIATAN : PERENCANAAN TEKNIS DAK SANITASI TAHUN 2022 PAKET I
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PERDESAAN MINIMAL 50 KK
LOKASI : DESA TANJUNG MEKAR, KECAMATAN SAMBAS
TAHUN ANGGARAN : 2021
( RP ) ( RP )
A. PEKERJAAN PERSIAPAN
1 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) SMK3 - 1.00 54,000.00 54,000.00
2 Pengukuran Dan Pemasangan Bowplank A.2.2.1.4.a M' 10.53 44,271.60 466,179.95
3 Papan Plank Proyek - Lsm 0.02 150,000.00 2,777.78
522,957.73
B. PEKERJAAN TANKI SEPTIK
4 Pek. Galian A.2.3.1.1 M³ 4.62 77,625.00 358,627.50
5 Pek. Cerucuk Penahan Galian 10/12 cm x 4 M Lsm Btg 8.00 11,092.50 88,740.00
6 Pek. Cerucuk Bawah Lantai 8/10 cm x 4 M Lsm Btg 9.63 12,750.00 122,718.75
7 Pek. Urugan Pasir (5 cm) A.2.3.1.11 M³ 0.15 132,480.00 20,401.92
8 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-100 B.02.a M³ 0.15 1,034,779.39 159,356.03
9 Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Lantai Kerja ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.39 1,230,844.76 473,875.23
10 Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
4.86 97,752.30 474,831.80
b - Pembesian Dia.10 A.4.1.1.17 Kg 47.04 14,784.73 695,414.07
c Pek. Dinding ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 1.21 1,230,844.76 1,494,707.11
11 Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.45 97,752.30 43,988.54
b - Pembesian Dia.10 A.4.1.1.17 Kg 27.56 14,784.73 407,457.30
c Pek. Penutup Atas ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.34 1,230,844.76 412,333.00
12 Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225
a - Bekisting B.25.c M2
0.08 97,752.30 8,146.03
b - Pembesian Dia.10 A.4.1.1.17 Kg 3.70 14,784.73 54,733.07
c Pek. Tutup Manhole ( Camp 1Pc : 2Psr : 3Krl ) K-225 B.07.a M³ 0.05 1,230,844.76 61,542.24
13 Pek. Plat Media Filter K-225
a - Bekisting B.25.c M2
0.06 97,752.30 5,376.38
b - Pembesian Dia.10 A.4.1.1.17 Kg 5.98 14,784.73 88,485.13
c Pek. Plat Media Filter K-225 B.07.a M³ 0.02 1,230,844.76 22,155.21
5,444,335.12
C. PEKERJAAN MEDIA FILTER AF
1 Material Filter AF Lsm Bh 2,450.00 100.00 245,000.00
2 Pemasangan Media Filter Lsm Bh 2,450.00 50.00 122,500.00
367,500.00
D. PEKERJAAN BAK KONTROL DAN GREASTRAP
1 Bak Kontrol 60 cm x 60 cm Beton K-225 B.25.c M2 0.17 1,230,844.76 211,705.30
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
2 Greasetrap 50 cm x 50 cm Beton K-225 B.25.c M2 0.13 1,230,844.76 160,009.82
- Bekesting A.4.1.1.17 Kg 1.40 97,752.30 136,853.22
- Pembesian B.07.a Kg 14.81 14,784.73 218,932.28
1,083,286.12
E. PEKERJAAN PEMASANGAN PIPA
1 Pek. Pemasangan Pipa PVC tipe AW Ø 3" Basic.Price M 4.00 159,720.00 638,880.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
2 Pek. Pemasangan Pipa PVC tipe AW Ø 2" Basic.Price M 4.00 77,137.50 308,550.00
- Pek. Galian Pipa A.2.3.1.1 M³ 0.04 77,625.00 3,105.00
- Pek. Timbunan Kembali A.2.3.1.9 M³ 0.004 51,750.00 207.00
954,054.00
F. PEKERJAAN PENGADAAN ALAT/SEWA DAN AKSESORIS
1 Pengadaan Pipa Hawa (Pipa PVC Ø 1 1/2") Basic.Price Btg 0.50 31,350.00 15,675.00
2 Pengadaan Aksesoris Pipa
- Tee Pipa PVC Ø1 1/2" Basic.Price Bh 1.00 6,000.00 6,000.00
- Tee Pipa PVC Ø 2" Basic.Price Bh 5.00 26,250.00 131,250.00
- Elbow Pipa PVC Ø 2" Basic.Price Bh 1.00 6,750.00 6,750.00
- Elbow Pipa PVC Ø 3" Basic.Price Bh 1.00 18,750.00 18,750.00
178,425.00
G BIAYA OPERASIONAL PEKERJAAN (5%)
1 Biaya Operasioal (5%) Lsm Ls 1.00 450,000.00
450,000.00
9,000,557.97
9,000,000.00
Rp
VOLUME
ANALISA
RANCANGAN ANGGARAN BIAYA
NO SAT
TOTAL BIAYA
URAIAN PEKERJAAN
HARGA SATUAN
JUMLAH BIAYA (Rp)
DIBULATKAN (Rp)
SUB TOTAL A
SUB TOTAL B
SUB TOTAL C
SUB TOTAL D
SUB TOTAL E
SUB TOTAL F
SUB TOTAL G
59. A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 103,500.00 10,350.00
2. Tukang Kayu L.02 OH 0.100 116,437.50 11,643.75
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 21,993.75
B BAHAN
1. Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 1.000 11,092.50 11,092.50
2. Paku 2" - 3" Kg 0.020 17,730.00 354.60
3. Kayu papan klas III m³ 0.007 1,547,250.00 10,830.75
Jumlah Harga Bahan 22,277.85
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 44,271.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 44,271.60
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.750 103,500.00 77,625.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 77,625.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 77,625.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 77,625.00
A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.500 103,500.00 51,750.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 51,750.00
B BAHAN
-
Jumlah Harga Bahan -
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 51,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 51,750.00
ANALISA HARGA SATUAN PEKERJAAN
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
60. A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 0.300 103,500.00 31,050.00
2. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 31,050.00
B BAHAN
1. Pasir Urug m3 1.200 84,525.00 101,430.00
Jumlah Harga Bahan 101,430.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 132,480.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 132,480.00
B.02.a Pembuatan 1 m³ beton mutu fc 7,4 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 247.000 1,553.85 383,800.95
2. Pasir beton m3 0.621 119,175.00 74,007.68
3. kerikil (maks 30 mm) m3 0.740 505,642.50 374,175.45
4. Air Ltr 215.000 -
Jumlah Harga Bahan 831,984.08
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,034,779.39
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,034,779.39
B.07.a Pembuatan 1 m³ beton mutu fc 19,3 Mpa Setara 1 Pc : 2Pb : 3 Kr
Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1. Pekerja L.01 OH 1.650 103,500.00 170,775.00
2. Tukang Batu L.02 OH 0.275 116,437.50 32,020.31
3. Kepala Tukang L.03 OH - 155,250.00 -
4. Mandor L.04 OH - 142,312.50 -
Jumlah Harga Tenaga Kerja 202,795.31
B BAHAN
1. Semen portland Kg 371.000 1,553.85 576,478.35
2. Pasir beton Kg 698.000 85.13 59,417.25
3. kerikil (maks 30 mm) Kg 1,047.000 374.55 392,153.85
4. Air Ltr 215.000 - -
Jumlah Harga Bahan 1,028,049.45
C PERALATAN
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 1,230,844.76
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 1,230,844.76
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien