Code No: 07A60105 R07 Set No. 2
III B.Tech II Semester Examinations,APRIL 2011
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Explain the following general items of work involved in the estimation for a building
along with the process of calculations.
(a) Earthwork in excavation.
(b) Earthwork in filling.
(c) Brick flat soling.
(d) Cement concrete in foundation.
(e) Masonry work in foundation.
(f) Damp proof course.
(g) Masonry work in superstructure.
(h) 10 cm thick brickwork. [16]
2. Describe the procedure for the calculation of rate per unit sq.m of the following
items
(a) 2.5 cm cement concrete floor 1:2:4
(b) 2.5 cm cement concrete floor 1:11/2 :4 . [16]
3. Calculate the quantity of earth work for 200 meter length for a portion of a road
in a uniform ground the heights of banks at the two ends being 1.00 m and 1.60 m.
The formation width is 10 meters and side slopes 2:1 using.
(a) Mid - ordinate method and.
(b) Mean - sectional area method. [16]
4. Give the detailed specifications of the following items of works.
(a) Snowcem washing
(b) Lime concrete in foundation. [8+8]
5. Explain the following methods along with an example.
(a) Sinking fund method
(b) Straight line method. [16]
6. Explain the following estimates
(a) Detailed estimate
1
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 2
(b) Repair estimate
(c) Revised estimate and supplementary estimates due to reduction of cost
(d) Quantity estimate. [16]
7. Figure 1 shows longitudinal and cross sections at mid span and support of a RC
T - beam 26 cm by 40 cm over all including the slab thickness 10 cm. The beam
of which particulars are shown in the figure is continuous over two equal spans 4
m clear and supported on 30 cm walls. Prepare the details of bars for the beam,
giving a bar bending schedule and total weight of steel required. Assume other
data. [16]
Figure 1:
8. Explain the following clauses used in conditions of contract.
(a) Security deposit.
(b) Compensation for day. [16]
2
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 4
III B.Tech II Semester Examinations,APRIL 2011
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. List and explain any four approximate methods of estimating for buildings. [16]
2. Write down the material requirement for different proportions of cement concrete
for 10 cu.m. [16]
3. Give the detailed specifications of the following items of works.
(a) Brickwork I class
(b) Lime concrete in foundation. [8+8]
4. The formation width of a road embankment is 9.0m. The side slopes are 2.5:1. The
depths along the center line of road at 50.0m intervals are 1.2,1.1,1.4,1.2,0.9,1.5 and
1.0.m. It is required to calculate the quantity of earthwork by
(a) Prismoidal rule.
(b) Trapezoidal rule. [16]
5. Write a short note on the following with respect to contract document.
(a) Security deposit
(b) Retention money. [16]
6. Explain the following methods along with an example.
(a) Sinking fund method.
(b) Declining balance method. [16]
7. Figure 2 shows longitudinal and cross sections at mid span and support of a RC
T - beam 22 cm by 40 cm over all including the slab thickness 10 cm. The beam
of which particulars are shown in the figure is continuous over two equal spans 4
m clear and supported on 30 cm walls. Prepare the details of bars for the beam,
giving a bar bending schedule and total weight of steel required. Assume other
data. [16]
.8. Estimate the quantities for the following items for the figure 3 given below using
long and short wall method. [16]
(a) Earth work excavation in foundation.
3
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 4
Figure 2:
4
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 4
(b) Lime concrete in foundation.
(c) 1st class brick work in foundation and plinth.
(d) 2.5 cm thick damp proof course.
Figure 3:
5
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 1
III B.Tech II Semester Examinations,APRIL 2011
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Explain the following clauses used in conditions of contract.
(a) Maintenance period
(b) Arbitration
(c) Supply of water. [16]
2. Enumerate different methods for estimating building works along with a suitable
example. [16]
3. Give the detailed specifications of the following items of works.
(a) Earthwork in excavation in foundation.
(b) Coursed rubble stone masonry. [8+8]
4. Describe the procedure for the calculation of rate per unit sq.m of 6 mm thickness
plastering, 12 mm plastering thickness and 20 mm plastering thickness. [16]
5. Prepare a detailed estimate for earthwork for a portion of a road from the following
data.
Distance in m RL of ground RL of the formation
0 114.50 115.00
100 114.75
200 115.25
300 115.20
400 116.10 Upward gradient 1 in 200 up to 600 m
500 116.85
600 118.00
700 118.25 Downward gradient 1 in 400
800 118.10
900 117.80
1000 117.75
1100 117.90
1200 117.50
Formation width of road is 8m, side slopes are 2:1 in banking and 1 1/2 :1 in cutting.
Draw L-section and cross sections. [16]
6. Draw reinforcement details along with curtailment lengths in the following slabs.
6
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 1
(a) Simply supported.
(b) Continuous over several spans. [8+8]
7. A three storied building is standing on a plot of land measuring 900 sq.m. The
plinth area of each storey is 450 sq.m. The building is of R.C.C framed structure
and the future life may be taken as 70 years. The building fetches a gross rent of
Rs.1600.00 per month. Work out the capitalized value of the property on the basis
of 6% net yield. For sinking fund 3% compound interest may be assumed. Cost
of land may be taken Rs.40.00 per sq.m. Other datas required may be assumed
suitably. [16]
8. List and explain any four general items of work involved in the estimation for a
building with its process calculation. [16]
7
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 3
III B.Tech II Semester Examinations,APRIL 2011
ESTIMATING AND COSTING
Civil Engineering
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Give the detailed specifications of the following items of works.
(a) Asbestos cement corrugated sheet roofing.
(b) Lime concrete in foundation. [8+8]
2. (a) How do you classify the labour based on skills?
(b) List various types of labour used in construction. [8+8]
3. Draw the canal sections for the following cases along with usual notations.
(a) Fully in excavation
(b) Partly in excavation and partly in embankment
(c) Fully in embankment. [16]
4. A colonizer intends to purchase a land of 100,000 sq m area located in the suburb
of a big city to develop it into plots of 700 sq.m each after providing necessary
roads and parks and other amenities. The current sale price of small plots in the
Neighbourhood is Rs.25.00 per sq.m. The colonizer wants a net profit of 25%.
Work out the maximum price of the land at which the colonizer may purchase the
land. [16]
5. Write down unit of measurement, unit rate of payment and mode of measurement
for the following general items of work.
(a) Ballies.
(b) Wood Piles..
(c) M. S. Structural works, R. S. J., Channels, Angles, Tee or bar etc.
(d) Steel work in Trusses.
(e) Cast ironwork Brackets, gratings, frames, pulley, manhole covers etc.
(f) Bolts including nuts and washers.
(g) Collapsible Gate.
(h) Steel rolling shutters, grills. [16]
6. Write a short note on the following:
(a) Informal tender
(b) Acceptance of tender
8
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 3
(c) Unbalanced tender. [16]
7. Figure 4 shows longitudinal and cross sections at mid span and support of a RC
T - beam 24 cm by 40 cm over all including the slab thickness 10 cm. The beam
of which particulars are shown in the figure is continuous over two equal spans 4
m clear and supported on 30 cm walls. Prepare the details of bars for the beam,
giving a bar bending schedule and total weight of steel required. Assume other
data. [16]
Figure 4:
8. Prepare a preliminary estimate for a framed four storied office building having
a carpet area of 400 sq m for each floor. Assume areas occupied by corridor,
verandah, lavatories, staircase etc as 25% of built up area and that occupied by
walls and columns as 8.5% of the same. The following details may be sued for
estimation
(a) Built-up area rate for ground floor (excluding foundation) = Rs1,500/- per sq
m
(b) Built-up area rate for 1st and 2nd floor = Rs1,650/- per sq m
9
www.jntuworld.com
www.jntuworld.com
JNTUW
ORLD
Code No: 07A60105 R07 Set No. 3
(c) Built-up area rate for 3rd floor = Rs1,800/- per sq m
(d) Extra for foundation = 20% of superstructure cost
(e) Extra for special architectural treatment = 1% of building cost
(f) Extra for water supply and sanitary = 7% of building cost
(g) Extra for electrical installation = 8% of building cost
(h) Extra for work charge establishment = 10% of overall cost
(i) Extra for other source = 5% of building cost. [16]
10
www.jntuworld.com
www.jntuworld.com

More Related Content

Viewers also liked

Cost estimating & Costing
Cost estimating & CostingCost estimating & Costing
Cost estimating & CostingGanesh Murugan
 
estimating costing 130910014923-phpapp01
estimating costing 130910014923-phpapp01estimating costing 130910014923-phpapp01
estimating costing 130910014923-phpapp01murali444
 
ANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IAlok Kumar
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 

Viewers also liked (7)

Tenders for construction
Tenders for constructionTenders for construction
Tenders for construction
 
Cost estimating & Costing
Cost estimating & CostingCost estimating & Costing
Cost estimating & Costing
 
estimating costing 130910014923-phpapp01
estimating costing 130910014923-phpapp01estimating costing 130910014923-phpapp01
estimating costing 130910014923-phpapp01
 
ANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-I
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 

Similar to 07 a60105 estimatingandcosting

07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural designimaduddin91
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural designimaduddin91
 
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)Make Mannan
 
tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdfKSLDESIGN
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project reportPraba Haran
 
Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014Surender Verma
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesignimaduddin91
 

Similar to 07 a60105 estimatingandcosting (20)

8th Semester (June; July-2015) Civil Engineering Question Paper
8th Semester (June; July-2015) Civil Engineering Question Paper8th Semester (June; July-2015) Civil Engineering Question Paper
8th Semester (June; July-2015) Civil Engineering Question Paper
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural design
 
6th Semester (July-2016) Civil Engineering Question Paper
6th Semester (July-2016) Civil Engineering Question Paper6th Semester (July-2016) Civil Engineering Question Paper
6th Semester (July-2016) Civil Engineering Question Paper
 
7th Semester (July-2016) Civil Engineering Question Paper
7th Semester (July-2016) Civil Engineering Question Paper7th Semester (July-2016) Civil Engineering Question Paper
7th Semester (July-2016) Civil Engineering Question Paper
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural design
 
6th Semester Civil Engineering Question Papers June/july 2018
6th Semester Civil Engineering Question Papers June/july 20186th Semester Civil Engineering Question Papers June/july 2018
6th Semester Civil Engineering Question Papers June/july 2018
 
6th Semester Civil Engineering (2013-December) Question Papers
6th Semester Civil Engineering (2013-December) Question Papers6th Semester Civil Engineering (2013-December) Question Papers
6th Semester Civil Engineering (2013-December) Question Papers
 
7th Semester Civil Engineering Question Papers June/july 2018
7th Semester Civil Engineering Question Papers June/july 20187th Semester Civil Engineering Question Papers June/july 2018
7th Semester Civil Engineering Question Papers June/july 2018
 
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
6th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
 
8th Semester (July-2016) Civil Engineering Question Paper
8th Semester (July-2016) Civil Engineering Question Paper8th Semester (July-2016) Civil Engineering Question Paper
8th Semester (July-2016) Civil Engineering Question Paper
 
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
 
6th Semester (June; July-2015) Civil Engineering Question Paper
6th Semester (June; July-2015) Civil Engineering Question Paper6th Semester (June; July-2015) Civil Engineering Question Paper
6th Semester (June; July-2015) Civil Engineering Question Paper
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
5th Semester (July-2016) Civil Engineering Question Paper
5th Semester (July-2016) Civil Engineering Question Paper5th Semester (July-2016) Civil Engineering Question Paper
5th Semester (July-2016) Civil Engineering Question Paper
 
tender6-7_040616.pdf
tender6-7_040616.pdftender6-7_040616.pdf
tender6-7_040616.pdf
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project report
 
Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign
 
Blt4021
Blt4021Blt4021
Blt4021
 
Car park bq
Car park bqCar park bq
Car park bq
 

More from imaduddin91

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplicationsimaduddin91
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringimaduddin91
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplicationsimaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineeringimaduddin91
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsimaduddin91
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringimaduddin91
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagementimaduddin91
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplicationsimaduddin91
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagementimaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineeringimaduddin91
 
Statistical metods
Statistical metodsStatistical metods
Statistical metodsimaduddin91
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference conceptsimaduddin91
 
Base 9.1 preparation guide
Base 9.1 preparation guideBase 9.1 preparation guide
Base 9.1 preparation guideimaduddin91
 
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)imaduddin91
 
Analysis and design of reinforced concrete bridge structures copy
Analysis and design of reinforced concrete bridge structures copyAnalysis and design of reinforced concrete bridge structures copy
Analysis and design of reinforced concrete bridge structures copyimaduddin91
 

More from imaduddin91 (20)

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplications
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineering
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplications
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineering
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
Statistical metods
Statistical metodsStatistical metods
Statistical metods
 
Sas cheat
Sas cheatSas cheat
Sas cheat
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference concepts
 
Base 9.1 preparation guide
Base 9.1 preparation guideBase 9.1 preparation guide
Base 9.1 preparation guide
 
Column design1
Column design1Column design1
Column design1
 
Chapter4
Chapter4Chapter4
Chapter4
 
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
The m&f complete guide to beginning bodybuilding (muscle and fitness) (1)
 
Analysis and design of reinforced concrete bridge structures copy
Analysis and design of reinforced concrete bridge structures copyAnalysis and design of reinforced concrete bridge structures copy
Analysis and design of reinforced concrete bridge structures copy
 

07 a60105 estimatingandcosting

  • 1. JNTUW ORLD Code No: 07A60105 R07 Set No. 2 III B.Tech II Semester Examinations,APRIL 2011 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. Explain the following general items of work involved in the estimation for a building along with the process of calculations. (a) Earthwork in excavation. (b) Earthwork in filling. (c) Brick flat soling. (d) Cement concrete in foundation. (e) Masonry work in foundation. (f) Damp proof course. (g) Masonry work in superstructure. (h) 10 cm thick brickwork. [16] 2. Describe the procedure for the calculation of rate per unit sq.m of the following items (a) 2.5 cm cement concrete floor 1:2:4 (b) 2.5 cm cement concrete floor 1:11/2 :4 . [16] 3. Calculate the quantity of earth work for 200 meter length for a portion of a road in a uniform ground the heights of banks at the two ends being 1.00 m and 1.60 m. The formation width is 10 meters and side slopes 2:1 using. (a) Mid - ordinate method and. (b) Mean - sectional area method. [16] 4. Give the detailed specifications of the following items of works. (a) Snowcem washing (b) Lime concrete in foundation. [8+8] 5. Explain the following methods along with an example. (a) Sinking fund method (b) Straight line method. [16] 6. Explain the following estimates (a) Detailed estimate 1 www.jntuworld.com www.jntuworld.com
  • 2. JNTUW ORLD Code No: 07A60105 R07 Set No. 2 (b) Repair estimate (c) Revised estimate and supplementary estimates due to reduction of cost (d) Quantity estimate. [16] 7. Figure 1 shows longitudinal and cross sections at mid span and support of a RC T - beam 26 cm by 40 cm over all including the slab thickness 10 cm. The beam of which particulars are shown in the figure is continuous over two equal spans 4 m clear and supported on 30 cm walls. Prepare the details of bars for the beam, giving a bar bending schedule and total weight of steel required. Assume other data. [16] Figure 1: 8. Explain the following clauses used in conditions of contract. (a) Security deposit. (b) Compensation for day. [16] 2 www.jntuworld.com www.jntuworld.com
  • 3. JNTUW ORLD Code No: 07A60105 R07 Set No. 4 III B.Tech II Semester Examinations,APRIL 2011 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. List and explain any four approximate methods of estimating for buildings. [16] 2. Write down the material requirement for different proportions of cement concrete for 10 cu.m. [16] 3. Give the detailed specifications of the following items of works. (a) Brickwork I class (b) Lime concrete in foundation. [8+8] 4. The formation width of a road embankment is 9.0m. The side slopes are 2.5:1. The depths along the center line of road at 50.0m intervals are 1.2,1.1,1.4,1.2,0.9,1.5 and 1.0.m. It is required to calculate the quantity of earthwork by (a) Prismoidal rule. (b) Trapezoidal rule. [16] 5. Write a short note on the following with respect to contract document. (a) Security deposit (b) Retention money. [16] 6. Explain the following methods along with an example. (a) Sinking fund method. (b) Declining balance method. [16] 7. Figure 2 shows longitudinal and cross sections at mid span and support of a RC T - beam 22 cm by 40 cm over all including the slab thickness 10 cm. The beam of which particulars are shown in the figure is continuous over two equal spans 4 m clear and supported on 30 cm walls. Prepare the details of bars for the beam, giving a bar bending schedule and total weight of steel required. Assume other data. [16] .8. Estimate the quantities for the following items for the figure 3 given below using long and short wall method. [16] (a) Earth work excavation in foundation. 3 www.jntuworld.com www.jntuworld.com
  • 4. JNTUW ORLD Code No: 07A60105 R07 Set No. 4 Figure 2: 4 www.jntuworld.com www.jntuworld.com
  • 5. JNTUW ORLD Code No: 07A60105 R07 Set No. 4 (b) Lime concrete in foundation. (c) 1st class brick work in foundation and plinth. (d) 2.5 cm thick damp proof course. Figure 3: 5 www.jntuworld.com www.jntuworld.com
  • 6. JNTUW ORLD Code No: 07A60105 R07 Set No. 1 III B.Tech II Semester Examinations,APRIL 2011 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. Explain the following clauses used in conditions of contract. (a) Maintenance period (b) Arbitration (c) Supply of water. [16] 2. Enumerate different methods for estimating building works along with a suitable example. [16] 3. Give the detailed specifications of the following items of works. (a) Earthwork in excavation in foundation. (b) Coursed rubble stone masonry. [8+8] 4. Describe the procedure for the calculation of rate per unit sq.m of 6 mm thickness plastering, 12 mm plastering thickness and 20 mm plastering thickness. [16] 5. Prepare a detailed estimate for earthwork for a portion of a road from the following data. Distance in m RL of ground RL of the formation 0 114.50 115.00 100 114.75 200 115.25 300 115.20 400 116.10 Upward gradient 1 in 200 up to 600 m 500 116.85 600 118.00 700 118.25 Downward gradient 1 in 400 800 118.10 900 117.80 1000 117.75 1100 117.90 1200 117.50 Formation width of road is 8m, side slopes are 2:1 in banking and 1 1/2 :1 in cutting. Draw L-section and cross sections. [16] 6. Draw reinforcement details along with curtailment lengths in the following slabs. 6 www.jntuworld.com www.jntuworld.com
  • 7. JNTUW ORLD Code No: 07A60105 R07 Set No. 1 (a) Simply supported. (b) Continuous over several spans. [8+8] 7. A three storied building is standing on a plot of land measuring 900 sq.m. The plinth area of each storey is 450 sq.m. The building is of R.C.C framed structure and the future life may be taken as 70 years. The building fetches a gross rent of Rs.1600.00 per month. Work out the capitalized value of the property on the basis of 6% net yield. For sinking fund 3% compound interest may be assumed. Cost of land may be taken Rs.40.00 per sq.m. Other datas required may be assumed suitably. [16] 8. List and explain any four general items of work involved in the estimation for a building with its process calculation. [16] 7 www.jntuworld.com www.jntuworld.com
  • 8. JNTUW ORLD Code No: 07A60105 R07 Set No. 3 III B.Tech II Semester Examinations,APRIL 2011 ESTIMATING AND COSTING Civil Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. Give the detailed specifications of the following items of works. (a) Asbestos cement corrugated sheet roofing. (b) Lime concrete in foundation. [8+8] 2. (a) How do you classify the labour based on skills? (b) List various types of labour used in construction. [8+8] 3. Draw the canal sections for the following cases along with usual notations. (a) Fully in excavation (b) Partly in excavation and partly in embankment (c) Fully in embankment. [16] 4. A colonizer intends to purchase a land of 100,000 sq m area located in the suburb of a big city to develop it into plots of 700 sq.m each after providing necessary roads and parks and other amenities. The current sale price of small plots in the Neighbourhood is Rs.25.00 per sq.m. The colonizer wants a net profit of 25%. Work out the maximum price of the land at which the colonizer may purchase the land. [16] 5. Write down unit of measurement, unit rate of payment and mode of measurement for the following general items of work. (a) Ballies. (b) Wood Piles.. (c) M. S. Structural works, R. S. J., Channels, Angles, Tee or bar etc. (d) Steel work in Trusses. (e) Cast ironwork Brackets, gratings, frames, pulley, manhole covers etc. (f) Bolts including nuts and washers. (g) Collapsible Gate. (h) Steel rolling shutters, grills. [16] 6. Write a short note on the following: (a) Informal tender (b) Acceptance of tender 8 www.jntuworld.com www.jntuworld.com
  • 9. JNTUW ORLD Code No: 07A60105 R07 Set No. 3 (c) Unbalanced tender. [16] 7. Figure 4 shows longitudinal and cross sections at mid span and support of a RC T - beam 24 cm by 40 cm over all including the slab thickness 10 cm. The beam of which particulars are shown in the figure is continuous over two equal spans 4 m clear and supported on 30 cm walls. Prepare the details of bars for the beam, giving a bar bending schedule and total weight of steel required. Assume other data. [16] Figure 4: 8. Prepare a preliminary estimate for a framed four storied office building having a carpet area of 400 sq m for each floor. Assume areas occupied by corridor, verandah, lavatories, staircase etc as 25% of built up area and that occupied by walls and columns as 8.5% of the same. The following details may be sued for estimation (a) Built-up area rate for ground floor (excluding foundation) = Rs1,500/- per sq m (b) Built-up area rate for 1st and 2nd floor = Rs1,650/- per sq m 9 www.jntuworld.com www.jntuworld.com
  • 10. JNTUW ORLD Code No: 07A60105 R07 Set No. 3 (c) Built-up area rate for 3rd floor = Rs1,800/- per sq m (d) Extra for foundation = 20% of superstructure cost (e) Extra for special architectural treatment = 1% of building cost (f) Extra for water supply and sanitary = 7% of building cost (g) Extra for electrical installation = 8% of building cost (h) Extra for work charge establishment = 10% of overall cost (i) Extra for other source = 5% of building cost. [16] 10 www.jntuworld.com www.jntuworld.com