DESCON ENGINEERING SERVICES & TECHNOLOGY (PVT) Limited
HSE Internship Report
Submitted by: IKRAM ALI ZARDARI
Internship Report submitted to:
o Madam Samina Wasim (Head
QHSE)
o Mr.Hafiz M.Sultan Ayub (HSE
Engineer)
Internship Report
1 | P a g e
DEST HSE
Table of Contents
 Introduction to engineering HSE & process safety concept in project lifecycle
 HSE management system overview
 Risk Management Techniques
 HAZOP
 Process safety in Project Life Cycle
 Overview of Loss Prevention Engineering
 Fire Water Networking
 Hydraulics of fire water system
Internship Report
2 | P a g e
DEST HSE
Acknowledgement:
I was selected in Future Leadership Internship Program (FLIP) offered by DESCON after
online test clearance. On the first day of my internship at DESCON, the presentation
regarding the DESCON (design & construction) future leadership internship program (FLIP)
& orientation on the health & safety was also presented & we had informed to follow all the
rules & regulations while staying at DESCON.
After the presentation, we had sent to our respective departments. As I am chemical
engineering student (final year),So I was assigned to do internship in Health Safety &
Environment (HSE) Department under-supervision of Madam Samina Wasim (HSE Head)
&Mr. Hafiz Muhammad Sultan Ayub (HSE Engineer). I was given the Internship Plan&
attendance sheet to maintain every day from your supervisor. I am grateful both of them.
This report indicates the worth of my training at the DesconEngineering Services
&Technology (DEST).
My time was spent as below:
1 hour session daily for new topic coverage
&
1 hour for group discussion on given topic
Internship Report
3 | P a g e
DEST HSE
Executive Summary:
On the very first day of my internship, I was introduced through my supervisor and I was also
familiarized by him to the health Safety & Environment (HSE) Department. This department
is consisted of following dynamic experienced engineers as:
Departmental Head: Samina Wasim
Lead Engineer: M.Khizar Nawaz
HSE Engineer: Hafiz M.Sultan Ayub
HSE Engineer-1: Mehak Khalil
My internship plan was made by Head of the department (Madam Samina Wasim)
sequentially from the basics to the remarkable approach as to acquire more related
knowledge (HSE) in short period of internship.
I got theoretical &practical experience in the area of Health Safety & Environment, many
valuable skills and practical knowledge was gained during internship. Throughout internship
many assignments were assigned to me by my supervisor in order to implement my
theoretical knowledge into practical field such as:
 Study of Hazard identification & risk assessment, to evaluate causes, consequences &
its control
 Risk management system (manage the risk through proper channel)
 Loss prevention engineering techniques (eradication of the loss in the plant )
 HAZOP study (Hazard & operability), in which I attained the knowledge that how
systematic techniques are taken into consideration to identify potential hazards &
operability problems & how to prepare the HAZOP study for any kind of process in
operation.
 Fire water system networking
 Hydraulics of fire water system
 Fire & Gas detection system & Mobile fire-fighting equipment.
Internship Report
4 | P a g e
DEST HSE
Safety Concept in Project Cycle:
1. Project Initiation
2. Project Planning
3. Project Execution (Commissioning)
4. Project Closure (De-Commissioning)
Projectlife cycle
Initiation-Starting
the project
Planning-
Organizing &
preparing
Execution-
Carrying out the
work
Closure- Closing
the project
Internship Report
5 | P a g e
DEST HSE
Risk Management Techniques:
Risk management techniques are an essential but often overlooked prerequisites to
successful active trading. After all, a trader who has generated substantial profits over his or
her lifetime can lose it all in just one or two bad trades if proper risk management isn't
employed. This article will discuss some simple strategies that can be used to protect your
trading profits.
Risk
Management
Technique
Identify
Assess
Evaluate
Control &
Monitor
Internship Report
6 | P a g e
DEST HSE
HAZOP (Hazard & Operability) Study:
 Systematic technique to identify potential hazards & operability techniques based on
team effort
 Node (any part of the complex plant is under considered)
 Based upon guide words
 It is for safety & hazards main concern & problem degrade the plant performance
 System centered approach
 Evaluate possible deviations from design intent
 Potential cause
 Deduce consequences
Guide words vs. meaning
Guide Word Meaning
NO OR NOT Complete negation of the design intent
MORE Quantitative increase
LESS Quantitative decrease
AS WELL AS Qualitative modification/increase
PART OF Qualitative modification/decrease
REVERSE Logical opposite of the design intent
OTHER THAN /
INSTEAD
Complete substitution
EARLY Relative to the clock time
LATE Relative to the clock time
BEFORE Relating to order or sequence
AFTER Relating to order or sequence
Internship Report
7 | P a g e
DEST HSE
Overview Loss Prevention Engineering:
An engineering involved to prevent (eradicate) the loss of (personnel, property, equipment,
product) etc. from the process carrying out, called loss prevention engineering.
This engineering involves:
 Fire potential equipment
 Fire zoning
 Fire water calculation
 Fire spray densities
 Fire & smoke detector
 Specific path for emergency evacuation
 Specific signs
 Location of hydrants/monitors
Fire Water System Networking:
 Protect life and property by installing required equipment's.
 Fire Zone Mapping
 Fire water (FW) Demand Calculation
 Calculations are done that where to place the hydrants and hoses so that they can
be operated manually.
 Two devises should provide coverage to equipment at a time.
 Water storage tank in bulk quantities
Hydraulics of Fire Water System:
A proper or appropriate approach to be familiar & authentic knowledge regarding the fire &
water for the actual amount of the water supplied for the extinguishing of the fire according to
the following parameters taken into considerations:
 Flow rate
 Pressure
Internship Report
8 | P a g e
DEST HSE
 Temperature
 Size of the pipe
 Thickness of the pipe
 Temperature
 Pressure
Conclusion:
Throughout my internship tenure at Health Safety & Environment department DEST
Business Area (BA) at DESCON, I became inspired and visualized by the rules & regulations
& especially the Cleanliness is its topmost pace. The culture of the organization, dedication
of the employees towards their duties is found common.
Last but not least,
RISE & SHINE DESCON….
THANKING YOU DESCON 

More Related Content

What's hot

PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...Gaurav Singh Rajput
 
Laporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal Aceh
Laporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal AcehLaporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal Aceh
Laporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal AcehAzwan Putra
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentationLucy Reimer
 
INTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docxINTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docxPaulosMekuria
 
Rescue kit - Lifegear Safetech
Rescue kit - Lifegear SafetechRescue kit - Lifegear Safetech
Rescue kit - Lifegear Safetechlifegear1
 
Near Miss Report Card.pptx
Near Miss Report Card.pptxNear Miss Report Card.pptx
Near Miss Report Card.pptxssuser37bf5d
 
Sr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVSr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVMohamed Abosereei
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statisticsArber Dogani
 
Internship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdInternship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdMalay Nasit
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
Ppt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPpt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPushpendra Bansi
 
Summer Training Project Report On BPC Ltd.
Summer Training Project Report On BPC Ltd.Summer Training Project Report On BPC Ltd.
Summer Training Project Report On BPC Ltd.Peush Prabhakar
 

What's hot (20)

Water cooler monthly
Water cooler monthlyWater cooler monthly
Water cooler monthly
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
 
Laporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal Aceh
Laporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal AcehLaporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal Aceh
Laporan Kerja Praktek PT. Meridan Sejati Surya Plantation Bangsal Aceh
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
INTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docxINTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docx
 
Rescue kit - Lifegear Safetech
Rescue kit - Lifegear SafetechRescue kit - Lifegear Safetech
Rescue kit - Lifegear Safetech
 
Near Miss Report Card.pptx
Near Miss Report Card.pptxNear Miss Report Card.pptx
Near Miss Report Card.pptx
 
Sr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVSr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CV
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 
Internship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdInternship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt Ltd
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Ppt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansiPpt on hydra assembly by pushpendra bansi
Ppt on hydra assembly by pushpendra bansi
 
ISO/DIS 45001:2017 OH&S manual (preview)
ISO/DIS 45001:2017 OH&S manual (preview)ISO/DIS 45001:2017 OH&S manual (preview)
ISO/DIS 45001:2017 OH&S manual (preview)
 
In-Plant Training Report
In-Plant Training ReportIn-Plant Training Report
In-Plant Training Report
 
Summer Training Project Report On BPC Ltd.
Summer Training Project Report On BPC Ltd.Summer Training Project Report On BPC Ltd.
Summer Training Project Report On BPC Ltd.
 
Permit To Work.ppt
Permit To Work.pptPermit To Work.ppt
Permit To Work.ppt
 
Hazop Study
Hazop StudyHazop Study
Hazop Study
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 

Viewers also liked

Viewers also liked (20)

Italian food XP | BTO 2016 | Favia Coccia
Italian food XP | BTO 2016 | Favia CocciaItalian food XP | BTO 2016 | Favia Coccia
Italian food XP | BTO 2016 | Favia Coccia
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
Resume
ResumeResume
Resume
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
 
Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)
 
ABDUL HASEEB
ABDUL HASEEBABDUL HASEEB
ABDUL HASEEB
 
faheem cv
faheem cvfaheem cv
faheem cv
 
CV
CVCV
CV
 
Arslan Raza-Area Engineer-Civil
Arslan Raza-Area Engineer-CivilArslan Raza-Area Engineer-Civil
Arslan Raza-Area Engineer-Civil
 
hasnain
hasnainhasnain
hasnain
 
Headworks on River Jehlum and Chinnab
Headworks on River Jehlum and ChinnabHeadworks on River Jehlum and Chinnab
Headworks on River Jehlum and Chinnab
 
USMAN ALI draftsman
USMAN ALI draftsmanUSMAN ALI draftsman
USMAN ALI draftsman
 
Sr. Draftsman_adusman CV
Sr. Draftsman_adusman CVSr. Draftsman_adusman CV
Sr. Draftsman_adusman CV
 
NIAZ ALI KHAN CV UPDATE
NIAZ ALI KHAN CV UPDATENIAZ ALI KHAN CV UPDATE
NIAZ ALI KHAN CV UPDATE
 
Czarapata hunter pechakucha
Czarapata hunter pechakuchaCzarapata hunter pechakucha
Czarapata hunter pechakucha
 
Mu0010 manpower planning and resourcing
Mu0010 manpower planning and resourcingMu0010 manpower planning and resourcing
Mu0010 manpower planning and resourcing
 
How to Use a Shock Collar Correctly
How to Use a Shock Collar CorrectlyHow to Use a Shock Collar Correctly
How to Use a Shock Collar Correctly
 
Tokyo_Final Report_26_05_2014
Tokyo_Final Report_26_05_2014Tokyo_Final Report_26_05_2014
Tokyo_Final Report_26_05_2014
 
El valor de la escucha
El valor de la escuchaEl valor de la escucha
El valor de la escucha
 
AICHE 15 VORTEX + MASS TRANSFER
AICHE 15   VORTEX + MASS TRANSFERAICHE 15   VORTEX + MASS TRANSFER
AICHE 15 VORTEX + MASS TRANSFER
 

Similar to Internship report (Ikram Ali)

PetroSync - Process Safety Management
PetroSync - Process Safety ManagementPetroSync - Process Safety Management
PetroSync - Process Safety ManagementPetroSync
 
Adepp Training 2009
Adepp Training 2009Adepp Training 2009
Adepp Training 2009adepp
 
PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR MANE
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud EL Bahnsy
 
Seminar 141120202109-conversion-gate02
Seminar 141120202109-conversion-gate02Seminar 141120202109-conversion-gate02
Seminar 141120202109-conversion-gate02Ashraf Rady
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctpHeshantha Kosala Perera
 
Shivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Yadav
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxalutarep1
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxalutarep1
 
Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Gaurav Singh Rajput
 
Risk Analysis and.pdf
Risk Analysis and.pdfRisk Analysis and.pdf
Risk Analysis and.pdfCesarPuma10
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Yuvraj Shrivastava
 
Engineering hazards
Engineering hazardsEngineering hazards
Engineering hazardsNc Das
 

Similar to Internship report (Ikram Ali) (20)

PetroSync - Process Safety Management
PetroSync - Process Safety ManagementPetroSync - Process Safety Management
PetroSync - Process Safety Management
 
Adepp Training 2009
Adepp Training 2009Adepp Training 2009
Adepp Training 2009
 
Adepp Training 2009
Adepp Training 2009Adepp Training 2009
Adepp Training 2009
 
ADEPP Training 2009
ADEPP Training 2009ADEPP Training 2009
ADEPP Training 2009
 
PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - Copy
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1
 
ANEESH THOMAS CV
ANEESH THOMAS CVANEESH THOMAS CV
ANEESH THOMAS CV
 
Seminar 141120202109-conversion-gate02
Seminar 141120202109-conversion-gate02Seminar 141120202109-conversion-gate02
Seminar 141120202109-conversion-gate02
 
Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
ADEPP_Training_2009.ppt
ADEPP_Training_2009.pptADEPP_Training_2009.ppt
ADEPP_Training_2009.ppt
 
Shivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety Professional
 
HSE Engineer
HSE  EngineerHSE  Engineer
HSE Engineer
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
 
Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput
 
Risk Analysis and.pdf
Risk Analysis and.pdfRisk Analysis and.pdf
Risk Analysis and.pdf
 
Latest update CV
Latest update CVLatest update CV
Latest update CV
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
Engineering hazards
Engineering hazardsEngineering hazards
Engineering hazards
 

Internship report (Ikram Ali)

  • 1. DESCON ENGINEERING SERVICES & TECHNOLOGY (PVT) Limited HSE Internship Report Submitted by: IKRAM ALI ZARDARI Internship Report submitted to: o Madam Samina Wasim (Head QHSE) o Mr.Hafiz M.Sultan Ayub (HSE Engineer)
  • 2. Internship Report 1 | P a g e DEST HSE Table of Contents  Introduction to engineering HSE & process safety concept in project lifecycle  HSE management system overview  Risk Management Techniques  HAZOP  Process safety in Project Life Cycle  Overview of Loss Prevention Engineering  Fire Water Networking  Hydraulics of fire water system
  • 3. Internship Report 2 | P a g e DEST HSE Acknowledgement: I was selected in Future Leadership Internship Program (FLIP) offered by DESCON after online test clearance. On the first day of my internship at DESCON, the presentation regarding the DESCON (design & construction) future leadership internship program (FLIP) & orientation on the health & safety was also presented & we had informed to follow all the rules & regulations while staying at DESCON. After the presentation, we had sent to our respective departments. As I am chemical engineering student (final year),So I was assigned to do internship in Health Safety & Environment (HSE) Department under-supervision of Madam Samina Wasim (HSE Head) &Mr. Hafiz Muhammad Sultan Ayub (HSE Engineer). I was given the Internship Plan& attendance sheet to maintain every day from your supervisor. I am grateful both of them. This report indicates the worth of my training at the DesconEngineering Services &Technology (DEST). My time was spent as below: 1 hour session daily for new topic coverage & 1 hour for group discussion on given topic
  • 4. Internship Report 3 | P a g e DEST HSE Executive Summary: On the very first day of my internship, I was introduced through my supervisor and I was also familiarized by him to the health Safety & Environment (HSE) Department. This department is consisted of following dynamic experienced engineers as: Departmental Head: Samina Wasim Lead Engineer: M.Khizar Nawaz HSE Engineer: Hafiz M.Sultan Ayub HSE Engineer-1: Mehak Khalil My internship plan was made by Head of the department (Madam Samina Wasim) sequentially from the basics to the remarkable approach as to acquire more related knowledge (HSE) in short period of internship. I got theoretical &practical experience in the area of Health Safety & Environment, many valuable skills and practical knowledge was gained during internship. Throughout internship many assignments were assigned to me by my supervisor in order to implement my theoretical knowledge into practical field such as:  Study of Hazard identification & risk assessment, to evaluate causes, consequences & its control  Risk management system (manage the risk through proper channel)  Loss prevention engineering techniques (eradication of the loss in the plant )  HAZOP study (Hazard & operability), in which I attained the knowledge that how systematic techniques are taken into consideration to identify potential hazards & operability problems & how to prepare the HAZOP study for any kind of process in operation.  Fire water system networking  Hydraulics of fire water system  Fire & Gas detection system & Mobile fire-fighting equipment.
  • 5. Internship Report 4 | P a g e DEST HSE Safety Concept in Project Cycle: 1. Project Initiation 2. Project Planning 3. Project Execution (Commissioning) 4. Project Closure (De-Commissioning) Projectlife cycle Initiation-Starting the project Planning- Organizing & preparing Execution- Carrying out the work Closure- Closing the project
  • 6. Internship Report 5 | P a g e DEST HSE Risk Management Techniques: Risk management techniques are an essential but often overlooked prerequisites to successful active trading. After all, a trader who has generated substantial profits over his or her lifetime can lose it all in just one or two bad trades if proper risk management isn't employed. This article will discuss some simple strategies that can be used to protect your trading profits. Risk Management Technique Identify Assess Evaluate Control & Monitor
  • 7. Internship Report 6 | P a g e DEST HSE HAZOP (Hazard & Operability) Study:  Systematic technique to identify potential hazards & operability techniques based on team effort  Node (any part of the complex plant is under considered)  Based upon guide words  It is for safety & hazards main concern & problem degrade the plant performance  System centered approach  Evaluate possible deviations from design intent  Potential cause  Deduce consequences Guide words vs. meaning Guide Word Meaning NO OR NOT Complete negation of the design intent MORE Quantitative increase LESS Quantitative decrease AS WELL AS Qualitative modification/increase PART OF Qualitative modification/decrease REVERSE Logical opposite of the design intent OTHER THAN / INSTEAD Complete substitution EARLY Relative to the clock time LATE Relative to the clock time BEFORE Relating to order or sequence AFTER Relating to order or sequence
  • 8. Internship Report 7 | P a g e DEST HSE Overview Loss Prevention Engineering: An engineering involved to prevent (eradicate) the loss of (personnel, property, equipment, product) etc. from the process carrying out, called loss prevention engineering. This engineering involves:  Fire potential equipment  Fire zoning  Fire water calculation  Fire spray densities  Fire & smoke detector  Specific path for emergency evacuation  Specific signs  Location of hydrants/monitors Fire Water System Networking:  Protect life and property by installing required equipment's.  Fire Zone Mapping  Fire water (FW) Demand Calculation  Calculations are done that where to place the hydrants and hoses so that they can be operated manually.  Two devises should provide coverage to equipment at a time.  Water storage tank in bulk quantities Hydraulics of Fire Water System: A proper or appropriate approach to be familiar & authentic knowledge regarding the fire & water for the actual amount of the water supplied for the extinguishing of the fire according to the following parameters taken into considerations:  Flow rate  Pressure
  • 9. Internship Report 8 | P a g e DEST HSE  Temperature  Size of the pipe  Thickness of the pipe  Temperature  Pressure Conclusion: Throughout my internship tenure at Health Safety & Environment department DEST Business Area (BA) at DESCON, I became inspired and visualized by the rules & regulations & especially the Cleanliness is its topmost pace. The culture of the organization, dedication of the employees towards their duties is found common. Last but not least, RISE & SHINE DESCON…. THANKING YOU DESCON 