SlideShare a Scribd company logo
1 of 72
Business Analytics at TVS Motors
Agenda
• Group introduction
• Why BI
• BI journey at TVS Motors
Group profile
TVS Motor Company
• 3 manufacturing units
• One vehicle rolled-out every 10 seconds
PT TVS Motor Company - Indonesia
• 1.5 lakh vehicle capacity
• In-house designed
Sundaram -Clayton
• Three manufacturing Units
• 8 warehouses in USA and Europe
Wabco TVS
• Three manufacturing Units
Group profile
Harita Seating Systems
• Seats for Two-wheelers to Trains
• 4 manufacturing units
Sundaram Auto Components
• High precision Plastic and Rubber components
• 5 manufacturing units
Harita NTI
• Bio degradable plastics, Petroleum from plastic wastes
• Corrosive preventive applications
5
Products-Motorcycle
Sold 7 million till March 2010
TVS StaR City
TVS StaR Sport
TVS Flame TVS Apache RTR
TVS JIVE
TVS Wego TVS Scooty Pep+
TVS Scooty Streak
Products-Scooter
Sold 2.3 million till March 2010
TVS Wego
7
Products – Mopeds
Sold 6.2 million till March 2009
TVS XL SUPER TVS XL SUPER HD
2001
SAP R3
Evolution of IT in TVS Motor
2002
Intranet
2003
DMS/CRM
• Upgrade to ECC 6.0
• Business benefit - 6 times of IT establishment cost
• Enterprise portal
• Web 2.0
•SAP BW / HR PAYROLL
• SAP in group companies
2004
2005
2006
XI, SOLMAN,
Sales on SMS
2007
PLM
SAP EP
2008-10
Web 2.0
PMS
Digitized
dashboard
ERP
•Year - 2001
•All modules
•Over 600 + users
CRM
•Year - 2004
•ERP for Dealers
•Over 700 +
implementations
BI
• Year-2004
• SAP
• MS
TVS Motors BI Journey
• Customer buying behavior
• Profiling customer
Marketing
• Planning
• Supply chain visibility
Sales
• Project Planning- New Products
• Operations Monitoring
Manufacturing
Top 3 Areas – BI Usage
• Browser • Mobile • Touch
Simplicity is height of Sophistication
No training required for ATM and e-mails
Simple
Flexible
Access
anywhere/anytime
Success of BI deployment
Critical Success Factors
Speed
Look and feel
Ease of Use
Insights
What is Business Intelligence ?
People - Passive information receiver to proactive
information seekers and
IT from “transaction automation tool” to “IT as a
Transformation Platform for Business Innovation and
Best in Class Operational Efficiency “
Business Intelligence is an
Analytical tool
Reporting tool
A Decision support tool
A common platform and not restricted to any
particular application
Example : Sales
NEED FOR BI
• SAP data – Complex reporting req
• Dealership Data from dealers
• CRM info
• Dashboards for each user.
• Avoid person dependent Reporting
Functionalities reqd. in BI
• Reporting
• Broadcasting
• Analytics
• Alerts
• Spend Analysis
BI Journey at TVSM
• Implemented BIW 3.0 in 2004
– Sales and Production modules implemented
– Solution not user friendly and not used widely
BI Journey at TVSM
• Upgrade to BI.7.0 in 2007
– SAP- Sales , Production
– Non SAP –DMS(Oracle) and MSSQL data
integration
– CRM Data
– BeX Reports developed
BI –Journey cont..
• Adoption of Web Application Designer to
make reports more user friendly
• BI analytics – Clustering of Customer data to
understanding the customer usage pattern.
BI –Journey Cont..
• Implementation of Enterprise Portal
• Personalized dashboard for All Employees
– Completed for sales staff
How BI works ??
Data captured, compiled and stored in all the above
mentioned various sources are
Analyzed
Integrated
Centrally stored
Provides output in the required format
For Whom BI will be useful ?
For Business Managers and Decision makers
(Micro level and Ad-hoc reports)
For Sr. Managers (Macro level reports)
When we need BI ?
“One can’t predict the need – any
time for any informed business
decision”
Where the BI can be accessed ?
It can be used thro Internet…..
At any time
At any where
At any place
Advantages of BI
Data access at any place
Updated and accurate data
Graphical view of information
Trend analysis with colour codification
Direct export to excel
Reduce dependency on paper reports
Easy for transmission thro mail
Centralized data storage
Customer
Type of
customer
Gender Income Profession
How he buys
Trade-in Hypothecation
Understanding Customer
Exchange vehicle analysis – DMS Data
HP Company Analysis – DMS data
Clustering of Customer data
Clustering of Customer data
Sales
Past Trend
Achievement Growth
Future
Planning
SCM visibility
Quarterly
planning
Sales Performance
Employee Personalized Portal
Vehicle Sales Dashboard •Top 20 dealers
•Bottom 20 Dealers
•Model - wise sales
•Zero Billing dealers
Tracking stock at Dealerships
Opening Stock
Plan
Billing
Retails
Closing stock at dealer
YTD Billing/Retails
Performance and growth dashboard
Month on Month sales dashboards
Planning based on sales trend
Sales and growth indicators
Manufacturing
Inventory
Red,Grey,
Green
inventory
Vendor stock
visibility
Project
Planning
State of Build WBS tracking
BI in Manufacturing
PRODUCTION BY MODEL REPORT
INVENTORY ANALYSIS REPORT - Month wise
Inventory Not in BOM and No plan
Excess to the maximum Norm
With in Maximum Norm
INVENTORY ANALYSIS REPORT – Week wise
Inventory Not in BOM and No plan
Excess to the maximum Norm
With in Maximum Norm
47
Business Objectives:
- To reduce inventory by Rs.100
crores in 4 months
- To improve free cash flow
Business Issues:
- Due to recession, conserving cash
very important
- Non availability of a dashboard to
identify to identify low hanging fruits
Solution
- Classification of inventory as
follows
a. Qty & Value as per norms -
GREEN
b. Qty & value above norms
but usable for existing
products – GREY
c. Items not required for the
current production plan –
RED
- Dashboard developed in SAP BI
with facility to drill down
upto part / buyer
Key Benefits
- Inventory reduced by Rs.100 crores
- Better inventory maintenance
Inventory dashboard
LINE STOPPAGE REPORT
LINE STOPPAGE REPORT
LINE STOPPAGE REPORT
CUSTOMER COLLECTION REPORT
Customer Collection for the Month of April 2009 for Indonesian
Dealers – Hierarchy wise
Business Objectives:
• To leverage IT for live data capturing
directly from bottleneck equipment in
Manufacturing line
• Capture cell utilization accurately for
capacity decisions
• To identify opportunity for output
improvement
Actions Implemented
• Digital data collected online
from bottleneck machine of the
cell and integrated with DAQ
software
Future Plans
To implement DAQ for Vehicle
assembly lines
Data acquisition system for Production monitoring
Background:
• Manual data recording of
Manufacturing cells’ output
• Delayed availability of production
output data for Managers
Benefits
• Low cost in house developed
software used for data
capturing
• Accurate hour-wise data
available for analysis and
improvement
• Able to obtain information on
machine utilization
• Patent filed for DAQ
Results Achieved
Further Improvement
To provide dash board for Plant
managers for real time data
monitoring for decision making
84
90 90
84
90
88
70
80
90
100
'07-
'08
'08-
'09
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
First hour output increased to 90%
UOM : %
Business Objectives:
• Reduce customer complaint
resolution time from 120 days to
30 days
• Reduce defect level by 70%
• Reduce warranty cost by 50%
Actions Implemented
• Implemented alert system thru’ statistical
control limit (Monthly PDCA to Daily PDCA)
• Implemented real time control system to
check for effectiveness of corrective action
• Implemented electronic job card based
report to identify nagging complaints
Future Plans
• Implement horizontal deployment of
above system in shop floor for all
critical parameters
• Digitization of FTA for all solved
problems
• Reliability prediction analysis by using
warranty data
• Establish MTTF / MTBF by using
electronic job card
• Establish transfer function for critical
performance parameters
On time correction of customer complaints
complaints
Background:
• Customer complaint capturing
process cycle 60 days
• Customer complaint resolution
process cycle 120 days
Benefits
•
Results Achieved
Further Improvement
• Daily PDCA to Hourly PDCA (Real
time basis) for customer complaints
Model From To %reduction
No. of part-complaints
identified and resolved
XL Super 17.5 4.1 76.6 12
XL Super HD 13.6 3.84 71.8 12
Sport 5.21 1.95 62.6 11
StaR City 8.15 3.41 58.2 13
PEP+ 8.02 4 50.1 10
Streak 5.43 3.8 30.0 3
0.16
0.40
0.42 0.45
0.0
0.1
0.2
0.3
0.4
0.5
Apr-07
Jun-07
Aug-07
Oct-07
Dec-07
Feb-08
Apr-08
Jun-08
Aug-08
Def./100
Veh.
Production month
3 months in age trend
Earlier – Reaction for
Customer complaint
Present – Reaction for
Customer complaint
Control limit
TVS-M QAD Jun-10
Warranty returns 3 months in age Model : XLSuper Series
UOM : Def./100 Veh
13.61
17.22
16.67
12.34
18.26
9.12
5.92
4.67 4.66
3.34
0
2
4
6
8
10
12
14
16
18
20
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Def/100
Veh.
Production month
3M
Implemented IT
support trigger
system
TVS-M QAD Jun-10
Warranty returns 5000 Kilometers in age Model : 3Wheeler - 2S
UOM : Def./100 Veh
119.15
106.91
97.69
77.51
68.10
83.59
49.10 48.41 47.71
46.64
30.07
22.51
21.21
0
25
50
75
100
125
150 Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Def/100
Veh.
Production month
5000 Kms
Implemented IT
support trigger
system
Business Objectives:
• Provide project management tool to
manage multiple projects & resources and
integrate functional & supplier plans
• Provide project management dashboard
Actions Implemented
• Implemented SAP project system
and cProjects
• Project templates provided
• Time logging functionality
integrated with project system
• Tracking Reports developed
• Alerts developed
• Training provided to all the
members of NPD functions
Future Plans
• Portfolio and resource management
• Innovation process management
Project Management
Background:
• Every year,
• Around 25 major NPD projects
implemented.
• Approximately 700 engineering
change projects implemented
• Around 2000 improvement
projects carried out
• Around 500 members are involved in NPD
projects
• Most of the projects are delayed due to
improper planning
• Changes to the project plan is cumbersome
• Project progress tracking is paper based
Benefits
• Dynamic project management
leading to better control over the
project.
Results Achieved
• Paper based project management
eliminated
• Versions & change details available
for analysis
• Tracking of bottleneck activity
• Alerts to all project members for any
pending activity and activities due
for the next 6 weeks
Further Improvement
• Integration of supplier plans with the
NPD project plans
• Make the system user friendly
Business Objectives:
• Provide part development dashboard
of status to all project members
• Capture versions of the State Of
Builds at various stages of
development
Actions Implemented
• Dashboard with drill down
provided by
• Collating information
from various
applications
Future Plans
Capture the snap shot version of
the State Of Build at various
points of time during the
prototype builds
State Of Build application
Background:
• The NPI process has Alpha, Beta &
QP stages.
• Prototype vehicles to be built as per
planned State Of Build.
• Record is useful in analyzing the
failure modes during Alpha, Beta and
QP.
• The State Of Build information is not
readily available
Benefits
-Project team takes timely
decisions on building prototypes
and analysis of the failures.
- Provides visibility of progress
status
Results Achieved –
• The State Of Build report made
available to all the project
team members
• The drill down links provided to
know the details
• Improved productivity
Further Improvement –
- Add Quality Status, Ordering
status, PPAP status etc.
- Have Versions State Of Builds at
various stages of NPD
Business Objectives:
• Electronic Workflow to obtain comments
and approval
• Should be able to know the progress
status of the approval
Actions Implemented –
• Workflow provided for DR0
approval in the intranet
• Flexibility built in to accommodate
2W, 3W and ASEAN approval
• Lead time report for all stages
and each product provided
• The report captures comments
from all the members
Future Plans
• Development of workflows for
DR1 to DR5
DR workflow
Background:
• Each project starts with a Product
Development Initiation approval
• There are around 25 major NPDs being
initiated on an average.
• System for Initiating the product
development to cater to the above
• The product initiation process is paper
based
• The comments given in the form of
Post-it-stickers often get lost.
• Cumbersome process to obtain
approval
Benefits
• Facilitate review online / live
• Elimination of physical movement
of paper from desk to desk
• Transparency of comments &
feedback to all stakeholders
• Timely approval of DR0
Results Achieved –
-The lead time for product initiation
approval reduced
- Paper saving
Further Improvement –
• Extend DR0 Approval workflows
for exports and institutional sales
requirements
• Concept change approval
workflows
• Workflows for DR1, DR1A, DR2,
DR3, DR4 and DR5 stage gates
Dashboard in Dealership Management
Exception Broadcasting
De-grown Customers
Top/Bottom
Customers
Zero
Inventory
Zero Sales
Poor Service
level
MAP Based Sales Info
All India Data
MAP driven Report
Dealer level sales figures
SALES INFORMATION ON MAP
Zone wise, state wise and dealer wise sales info on MAP
Billing Details output - Area Level / Segment wise Drill down
Billing Details output - Model wise Drill down
BI- PLATFORMS UNDER
EVALUATION
BO
COGNOS
MICROSTRATEGY
SAP ACE 2008
For Implementing SAP PLM Solutions
SAP ACE 2007
For innovative use of SAP Netweaver
Thank You

More Related Content

Similar to BI_TVS.ppt

Systematix_Credential_Presentation_latest (1)
Systematix_Credential_Presentation_latest (1)Systematix_Credential_Presentation_latest (1)
Systematix_Credential_Presentation_latest (1)Alex Hunt
 
EzDataMunch_Corporate_Linkedin
EzDataMunch_Corporate_LinkedinEzDataMunch_Corporate_Linkedin
EzDataMunch_Corporate_LinkedinAnupama Desai, PMP
 
Use BI to Beat the Competition
Use BI to Beat the CompetitionUse BI to Beat the Competition
Use BI to Beat the Competitionwww.panorama.com
 
Real-time, Big-data Marketing Solution
Real-time, Big-data Marketing SolutionReal-time, Big-data Marketing Solution
Real-time, Big-data Marketing Solution기형 남
 
Dynamics 365 finance and operations case study
Dynamics 365 finance and operations case studyDynamics 365 finance and operations case study
Dynamics 365 finance and operations case studyNandita Nityanandam
 
Qliktechcorporateoverview
QliktechcorporateoverviewQliktechcorporateoverview
Qliktechcorporateoverviewivango1
 
Qlik Tech Corporate Overview
Qlik Tech Corporate OverviewQlik Tech Corporate Overview
Qlik Tech Corporate Overviewbwalh
 
Qlik Tech Corporate Overview
Qlik Tech Corporate OverviewQlik Tech Corporate Overview
Qlik Tech Corporate Overviewdduker
 
QlikView - a company overview
QlikView - a company overviewQlikView - a company overview
QlikView - a company overviewmikejohnsonca
 
Qlik Tech Corporate Overview
Qlik Tech Corporate OverviewQlik Tech Corporate Overview
Qlik Tech Corporate Overviewben_baldyga
 
20/10 Vision: Building A 21st Century Market Research Organization
20/10 Vision: Building A 21st Century Market Research Organization20/10 Vision: Building A 21st Century Market Research Organization
20/10 Vision: Building A 21st Century Market Research OrganizationGregory Weiss
 
Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...
Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...
Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...Polestar Solutions
 
Deep.bi - Real-time, Deep Data Analytics Platform For Ecommerce
Deep.bi - Real-time, Deep Data Analytics Platform For EcommerceDeep.bi - Real-time, Deep Data Analytics Platform For Ecommerce
Deep.bi - Real-time, Deep Data Analytics Platform For EcommerceDeep.BI
 
WebXpress Business Intelligence Capability
WebXpress Business Intelligence CapabilityWebXpress Business Intelligence Capability
WebXpress Business Intelligence CapabilityWebXpress.IN
 
MSP Best Practice Integrating your RMM with your PSA Solution for Maximum Pr...
MSP Best Practice  Integrating your RMM with your PSA Solution for Maximum Pr...MSP Best Practice  Integrating your RMM with your PSA Solution for Maximum Pr...
MSP Best Practice Integrating your RMM with your PSA Solution for Maximum Pr...Kaseya
 
EzDataMunch_Corporate_Qlikview2015
EzDataMunch_Corporate_Qlikview2015EzDataMunch_Corporate_Qlikview2015
EzDataMunch_Corporate_Qlikview2015milanmvd
 

Similar to BI_TVS.ppt (20)

Systematix_Credential_Presentation_latest (1)
Systematix_Credential_Presentation_latest (1)Systematix_Credential_Presentation_latest (1)
Systematix_Credential_Presentation_latest (1)
 
auto_brochure
auto_brochureauto_brochure
auto_brochure
 
Technology Trends for Manufacturers in India
Technology Trends for Manufacturers in IndiaTechnology Trends for Manufacturers in India
Technology Trends for Manufacturers in India
 
CP Brochure Final
CP Brochure FinalCP Brochure Final
CP Brochure Final
 
EzDataMunch_Corporate_Linkedin
EzDataMunch_Corporate_LinkedinEzDataMunch_Corporate_Linkedin
EzDataMunch_Corporate_Linkedin
 
Use BI to Beat the Competition
Use BI to Beat the CompetitionUse BI to Beat the Competition
Use BI to Beat the Competition
 
Real-time, Big-data Marketing Solution
Real-time, Big-data Marketing SolutionReal-time, Big-data Marketing Solution
Real-time, Big-data Marketing Solution
 
Dynamics 365 finance and operations case study
Dynamics 365 finance and operations case studyDynamics 365 finance and operations case study
Dynamics 365 finance and operations case study
 
Qliktechcorporateoverview
QliktechcorporateoverviewQliktechcorporateoverview
Qliktechcorporateoverview
 
Qlik Tech Corporate Overview
Qlik Tech Corporate OverviewQlik Tech Corporate Overview
Qlik Tech Corporate Overview
 
Qlik Tech Corporate Overview
Qlik Tech Corporate OverviewQlik Tech Corporate Overview
Qlik Tech Corporate Overview
 
QlikView - a company overview
QlikView - a company overviewQlikView - a company overview
QlikView - a company overview
 
Qlik Tech Corporate Overview
Qlik Tech Corporate OverviewQlik Tech Corporate Overview
Qlik Tech Corporate Overview
 
20/10 Vision: Building A 21st Century Market Research Organization
20/10 Vision: Building A 21st Century Market Research Organization20/10 Vision: Building A 21st Century Market Research Organization
20/10 Vision: Building A 21st Century Market Research Organization
 
Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...
Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...
Empowered an Automotive Giant with Qlik-driven Advanced Reporting PDF by Pole...
 
Deep.bi - Real-time, Deep Data Analytics Platform For Ecommerce
Deep.bi - Real-time, Deep Data Analytics Platform For EcommerceDeep.bi - Real-time, Deep Data Analytics Platform For Ecommerce
Deep.bi - Real-time, Deep Data Analytics Platform For Ecommerce
 
WebXpress Business Intelligence Capability
WebXpress Business Intelligence CapabilityWebXpress Business Intelligence Capability
WebXpress Business Intelligence Capability
 
Sage ERP X3: Distribution Industry
Sage ERP X3: Distribution IndustrySage ERP X3: Distribution Industry
Sage ERP X3: Distribution Industry
 
MSP Best Practice Integrating your RMM with your PSA Solution for Maximum Pr...
MSP Best Practice  Integrating your RMM with your PSA Solution for Maximum Pr...MSP Best Practice  Integrating your RMM with your PSA Solution for Maximum Pr...
MSP Best Practice Integrating your RMM with your PSA Solution for Maximum Pr...
 
EzDataMunch_Corporate_Qlikview2015
EzDataMunch_Corporate_Qlikview2015EzDataMunch_Corporate_Qlikview2015
EzDataMunch_Corporate_Qlikview2015
 

Recently uploaded

BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024AHOhOops1
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptVlademirGebDubouzet1
 
John Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair ManualJohn Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair ManualExcavator
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /WhatsappsBeautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsappssapnasaifi408
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girlsshivangimorya083
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Roomdivyansh0kumar0
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024AHOhOops1
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsFifth Gear Automotive
 
办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一mkfnjj
 
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...Niya Khan
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCRsoniya singh
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai Motor Group
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERunosafeads
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一hnfusn
 
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...Garima Khatri
 

Recently uploaded (20)

BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.ppt
 
John Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair ManualJohn Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair Manual
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /WhatsappsBeautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These Symptoms
 
办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一
 
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRC
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
 
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Servicesauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
 
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
 

BI_TVS.ppt

  • 2. Agenda • Group introduction • Why BI • BI journey at TVS Motors
  • 3. Group profile TVS Motor Company • 3 manufacturing units • One vehicle rolled-out every 10 seconds PT TVS Motor Company - Indonesia • 1.5 lakh vehicle capacity • In-house designed Sundaram -Clayton • Three manufacturing Units • 8 warehouses in USA and Europe Wabco TVS • Three manufacturing Units
  • 4. Group profile Harita Seating Systems • Seats for Two-wheelers to Trains • 4 manufacturing units Sundaram Auto Components • High precision Plastic and Rubber components • 5 manufacturing units Harita NTI • Bio degradable plastics, Petroleum from plastic wastes • Corrosive preventive applications
  • 5. 5 Products-Motorcycle Sold 7 million till March 2010 TVS StaR City TVS StaR Sport TVS Flame TVS Apache RTR TVS JIVE
  • 6. TVS Wego TVS Scooty Pep+ TVS Scooty Streak Products-Scooter Sold 2.3 million till March 2010 TVS Wego
  • 7. 7 Products – Mopeds Sold 6.2 million till March 2009 TVS XL SUPER TVS XL SUPER HD
  • 8. 2001 SAP R3 Evolution of IT in TVS Motor 2002 Intranet 2003 DMS/CRM • Upgrade to ECC 6.0 • Business benefit - 6 times of IT establishment cost • Enterprise portal • Web 2.0 •SAP BW / HR PAYROLL • SAP in group companies 2004 2005 2006 XI, SOLMAN, Sales on SMS 2007 PLM SAP EP 2008-10 Web 2.0 PMS Digitized dashboard
  • 9. ERP •Year - 2001 •All modules •Over 600 + users CRM •Year - 2004 •ERP for Dealers •Over 700 + implementations BI • Year-2004 • SAP • MS TVS Motors BI Journey
  • 10. • Customer buying behavior • Profiling customer Marketing • Planning • Supply chain visibility Sales • Project Planning- New Products • Operations Monitoring Manufacturing Top 3 Areas – BI Usage
  • 11. • Browser • Mobile • Touch Simplicity is height of Sophistication No training required for ATM and e-mails
  • 13. Critical Success Factors Speed Look and feel Ease of Use Insights
  • 14. What is Business Intelligence ? People - Passive information receiver to proactive information seekers and IT from “transaction automation tool” to “IT as a Transformation Platform for Business Innovation and Best in Class Operational Efficiency “
  • 15. Business Intelligence is an Analytical tool Reporting tool A Decision support tool A common platform and not restricted to any particular application
  • 17. NEED FOR BI • SAP data – Complex reporting req • Dealership Data from dealers • CRM info • Dashboards for each user. • Avoid person dependent Reporting
  • 18. Functionalities reqd. in BI • Reporting • Broadcasting • Analytics • Alerts • Spend Analysis
  • 19. BI Journey at TVSM • Implemented BIW 3.0 in 2004 – Sales and Production modules implemented – Solution not user friendly and not used widely
  • 20. BI Journey at TVSM • Upgrade to BI.7.0 in 2007 – SAP- Sales , Production – Non SAP –DMS(Oracle) and MSSQL data integration – CRM Data – BeX Reports developed
  • 21. BI –Journey cont.. • Adoption of Web Application Designer to make reports more user friendly • BI analytics – Clustering of Customer data to understanding the customer usage pattern.
  • 22. BI –Journey Cont.. • Implementation of Enterprise Portal • Personalized dashboard for All Employees – Completed for sales staff
  • 23. How BI works ?? Data captured, compiled and stored in all the above mentioned various sources are Analyzed Integrated Centrally stored Provides output in the required format
  • 24. For Whom BI will be useful ? For Business Managers and Decision makers (Micro level and Ad-hoc reports) For Sr. Managers (Macro level reports)
  • 25. When we need BI ? “One can’t predict the need – any time for any informed business decision”
  • 26. Where the BI can be accessed ? It can be used thro Internet….. At any time At any where At any place
  • 27. Advantages of BI Data access at any place Updated and accurate data Graphical view of information Trend analysis with colour codification Direct export to excel Reduce dependency on paper reports Easy for transmission thro mail Centralized data storage
  • 28. Customer Type of customer Gender Income Profession How he buys Trade-in Hypothecation Understanding Customer
  • 29.
  • 31. HP Company Analysis – DMS data
  • 34. Sales Past Trend Achievement Growth Future Planning SCM visibility Quarterly planning Sales Performance
  • 36. Vehicle Sales Dashboard •Top 20 dealers •Bottom 20 Dealers •Model - wise sales •Zero Billing dealers
  • 37. Tracking stock at Dealerships Opening Stock Plan Billing Retails Closing stock at dealer YTD Billing/Retails
  • 39. Month on Month sales dashboards
  • 40. Planning based on sales trend
  • 41. Sales and growth indicators
  • 42.
  • 45. INVENTORY ANALYSIS REPORT - Month wise Inventory Not in BOM and No plan Excess to the maximum Norm With in Maximum Norm
  • 46. INVENTORY ANALYSIS REPORT – Week wise Inventory Not in BOM and No plan Excess to the maximum Norm With in Maximum Norm
  • 47. 47 Business Objectives: - To reduce inventory by Rs.100 crores in 4 months - To improve free cash flow Business Issues: - Due to recession, conserving cash very important - Non availability of a dashboard to identify to identify low hanging fruits Solution - Classification of inventory as follows a. Qty & Value as per norms - GREEN b. Qty & value above norms but usable for existing products – GREY c. Items not required for the current production plan – RED - Dashboard developed in SAP BI with facility to drill down upto part / buyer Key Benefits - Inventory reduced by Rs.100 crores - Better inventory maintenance Inventory dashboard
  • 51. CUSTOMER COLLECTION REPORT Customer Collection for the Month of April 2009 for Indonesian Dealers – Hierarchy wise
  • 52. Business Objectives: • To leverage IT for live data capturing directly from bottleneck equipment in Manufacturing line • Capture cell utilization accurately for capacity decisions • To identify opportunity for output improvement Actions Implemented • Digital data collected online from bottleneck machine of the cell and integrated with DAQ software Future Plans To implement DAQ for Vehicle assembly lines Data acquisition system for Production monitoring Background: • Manual data recording of Manufacturing cells’ output • Delayed availability of production output data for Managers Benefits • Low cost in house developed software used for data capturing • Accurate hour-wise data available for analysis and improvement • Able to obtain information on machine utilization • Patent filed for DAQ Results Achieved Further Improvement To provide dash board for Plant managers for real time data monitoring for decision making 84 90 90 84 90 88 70 80 90 100 '07- '08 '08- '09 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar First hour output increased to 90% UOM : %
  • 53. Business Objectives: • Reduce customer complaint resolution time from 120 days to 30 days • Reduce defect level by 70% • Reduce warranty cost by 50% Actions Implemented • Implemented alert system thru’ statistical control limit (Monthly PDCA to Daily PDCA) • Implemented real time control system to check for effectiveness of corrective action • Implemented electronic job card based report to identify nagging complaints Future Plans • Implement horizontal deployment of above system in shop floor for all critical parameters • Digitization of FTA for all solved problems • Reliability prediction analysis by using warranty data • Establish MTTF / MTBF by using electronic job card • Establish transfer function for critical performance parameters On time correction of customer complaints complaints Background: • Customer complaint capturing process cycle 60 days • Customer complaint resolution process cycle 120 days Benefits • Results Achieved Further Improvement • Daily PDCA to Hourly PDCA (Real time basis) for customer complaints Model From To %reduction No. of part-complaints identified and resolved XL Super 17.5 4.1 76.6 12 XL Super HD 13.6 3.84 71.8 12 Sport 5.21 1.95 62.6 11 StaR City 8.15 3.41 58.2 13 PEP+ 8.02 4 50.1 10 Streak 5.43 3.8 30.0 3 0.16 0.40 0.42 0.45 0.0 0.1 0.2 0.3 0.4 0.5 Apr-07 Jun-07 Aug-07 Oct-07 Dec-07 Feb-08 Apr-08 Jun-08 Aug-08 Def./100 Veh. Production month 3 months in age trend Earlier – Reaction for Customer complaint Present – Reaction for Customer complaint Control limit
  • 54. TVS-M QAD Jun-10 Warranty returns 3 months in age Model : XLSuper Series UOM : Def./100 Veh 13.61 17.22 16.67 12.34 18.26 9.12 5.92 4.67 4.66 3.34 0 2 4 6 8 10 12 14 16 18 20 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Def/100 Veh. Production month 3M Implemented IT support trigger system
  • 55. TVS-M QAD Jun-10 Warranty returns 5000 Kilometers in age Model : 3Wheeler - 2S UOM : Def./100 Veh 119.15 106.91 97.69 77.51 68.10 83.59 49.10 48.41 47.71 46.64 30.07 22.51 21.21 0 25 50 75 100 125 150 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Def/100 Veh. Production month 5000 Kms Implemented IT support trigger system
  • 56. Business Objectives: • Provide project management tool to manage multiple projects & resources and integrate functional & supplier plans • Provide project management dashboard Actions Implemented • Implemented SAP project system and cProjects • Project templates provided • Time logging functionality integrated with project system • Tracking Reports developed • Alerts developed • Training provided to all the members of NPD functions Future Plans • Portfolio and resource management • Innovation process management Project Management Background: • Every year, • Around 25 major NPD projects implemented. • Approximately 700 engineering change projects implemented • Around 2000 improvement projects carried out • Around 500 members are involved in NPD projects • Most of the projects are delayed due to improper planning • Changes to the project plan is cumbersome • Project progress tracking is paper based Benefits • Dynamic project management leading to better control over the project. Results Achieved • Paper based project management eliminated • Versions & change details available for analysis • Tracking of bottleneck activity • Alerts to all project members for any pending activity and activities due for the next 6 weeks Further Improvement • Integration of supplier plans with the NPD project plans • Make the system user friendly
  • 57. Business Objectives: • Provide part development dashboard of status to all project members • Capture versions of the State Of Builds at various stages of development Actions Implemented • Dashboard with drill down provided by • Collating information from various applications Future Plans Capture the snap shot version of the State Of Build at various points of time during the prototype builds State Of Build application Background: • The NPI process has Alpha, Beta & QP stages. • Prototype vehicles to be built as per planned State Of Build. • Record is useful in analyzing the failure modes during Alpha, Beta and QP. • The State Of Build information is not readily available Benefits -Project team takes timely decisions on building prototypes and analysis of the failures. - Provides visibility of progress status Results Achieved – • The State Of Build report made available to all the project team members • The drill down links provided to know the details • Improved productivity Further Improvement – - Add Quality Status, Ordering status, PPAP status etc. - Have Versions State Of Builds at various stages of NPD
  • 58. Business Objectives: • Electronic Workflow to obtain comments and approval • Should be able to know the progress status of the approval Actions Implemented – • Workflow provided for DR0 approval in the intranet • Flexibility built in to accommodate 2W, 3W and ASEAN approval • Lead time report for all stages and each product provided • The report captures comments from all the members Future Plans • Development of workflows for DR1 to DR5 DR workflow Background: • Each project starts with a Product Development Initiation approval • There are around 25 major NPDs being initiated on an average. • System for Initiating the product development to cater to the above • The product initiation process is paper based • The comments given in the form of Post-it-stickers often get lost. • Cumbersome process to obtain approval Benefits • Facilitate review online / live • Elimination of physical movement of paper from desk to desk • Transparency of comments & feedback to all stakeholders • Timely approval of DR0 Results Achieved – -The lead time for product initiation approval reduced - Paper saving Further Improvement – • Extend DR0 Approval workflows for exports and institutional sales requirements • Concept change approval workflows • Workflows for DR1, DR1A, DR2, DR3, DR4 and DR5 stage gates
  • 61.
  • 62.
  • 63. MAP Based Sales Info All India Data
  • 64. MAP driven Report Dealer level sales figures
  • 65. SALES INFORMATION ON MAP Zone wise, state wise and dealer wise sales info on MAP
  • 66. Billing Details output - Area Level / Segment wise Drill down
  • 67. Billing Details output - Model wise Drill down
  • 69.
  • 70. SAP ACE 2008 For Implementing SAP PLM Solutions
  • 71. SAP ACE 2007 For innovative use of SAP Netweaver