SlideShare a Scribd company logo
1 of 42
Haemus Sh.p.k.   www.haemus.net  Workshop Operativ Oportunitetet e ofruara nga  programi  “ Adriatic IPA CBC” Durres, 28 /08/2009 10.00 – 13.00
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Programacioni i Ri i Fondeve EU 2007-2013 Politika e Kohezionit (3 Objektiva): 347.41 miliarde €       Objektivi 1:   Objektivi 2 :    Objektivi 3: Konvergjenca Kompetitivitet   Kooperimi Territorial Evropian   dhe Punesim    I.  Nderkufitar: IV A   II.  Nderkombetar: IV B   III.  Inter-rajonal . IV C
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 OB.3  Kooperimi Territorial Evropian  : Situata  Financiare 8,5 Miliarde € ose  2,52% e totalit Nga te cilat: 6,44 Miliarde per Kooperimin Nderkufitar 1,83 Miliarde per Kooperimin Nderkombetar 445 Milione per Kooperimin Inter-Rajonal
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 IPA Adriatic CBC Programme Interreg IVA IPA – Instrumenti i Para-Aderimit Fondi IPA zevendeson instrumentet e meparshem te para-aderimit dhe perfaqeson nje baze ligjore unike per gjithe fazen e para-aderimit. Turkey Instruments PHARE ISPA CARDS SAPARD IPA
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 IPA – INSTRUMENTI I PARA-ADERIMIT Rregullorja  IPA parashikon  5 komponente: I . Asistenca e Tranzicionit dhe Ngritja e Institucioneve II.  Bashkëpunimi Ndërkufitar Vetem per Vendet kandidate: III. Zhvillimi Rajonal; IV. Resurset Njerezore;  V.  Zhvillimi Rural.
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 IPA  Allocation (€ Million) 2007 2008 2009 Croatia  138.5 146.0 151.2 Macedonia 58,5 70.2 81.8 Turkey 497.2 538.7 566.4 Albania 61.0 70.7 81.2 Bosnia H. 62.1 74.8 89.1 Montenegro  31.4 32.6 33.3 Serbia 186.7 190.9 194.8 Kosovo 63.3 64.7 66.1
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 DY RESURSE FINANCIAR FESR:  Vendet Anetare EU  IPA:  Vendet Kandidate dhe Kandidate te Mundshem TOT resurseve  (Perfshire National Co-Financing)   : 290 ml €  DY RESURSE FINANCIARE POR TE NJEJTAT RREGULLA! ADRIATIC IPA CBC Si do te financohet Programi?
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Adriatic IPA CBC Programme
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Adriatic IPA CBC Programme Zonat Pjesemarrese   Gorizia, Trieste, Udine, Padova, Rovigo, Venezia, Ferrara, Forlì-Cesena, Ravenna, Rimini, Ancona, Ascoli Piceno, Macerata, Pesaro-Urbino, Chieti, Pescara, Teramo, Campobasso, Bari, Brindisi, Foggia, Lecce, Pordenone, L’Aquila, Taranto , Isernia Qarqet : Fier, Durrës, Lezhë, Shkodër, Tiranë, Vlorë Bileća, Čapljina, Čitluk, Gacko, Grude, Jablanica, Konjic, Kupres, Livno, Ljubinje, Ljubuški, Mostar, Neum, Nevesinje, Posušje, Prozor/Rama, Ravno, Široki Brijeg, Stolac, Berkovići, Tomislavgrad, Trebinje and Istočni Mostar, Sarajevo Economic Region, North-West Economic Region, Central Bih Economic Region Dubrovnik-Neretva,Istra; Lika-Senj, Primorje-Gorski kotar; Šibenik-Knin; Split-Dalmatia and Zadar, Karlovac County. Whole territory (in phasing out) Kerkyra, Thesprotia Obalno-kraška, Goriška regija, Notranjsko-kraška regija.
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 ORDINARY projects Bottom up approach Financial  Threshold : MINIMUM  Total Budget:  € 500,000 MAXIMUM  Total Budget :  € 5,000,000   MAXIMUM budget per beneficiary: 60% of the project total budget MINIMUM budget per beneficiary: €  100,000 IPA Adriatic CBC Programme Projektet Ordinare
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 STRATEGIC Project Financial  thresholds : MINIMUM  total budget:  € 5.000.000 MAXIMUM  total budget:  € 12.500.000 Top-down approach Bottom up approach IPA Adriatic CBC Programme Projekete Strategjike
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 OVERALL OBJECTIVE: Strengthening  of  sustainable development capabilities of the Adriatic region through a concerted strategy of action between the partners of the eligible territories PRIORITY 1: Economic, Social and Institutional Cooperation   PRIORITY 2: Natural and Cultural Resources and Risks Prevention PRIORITY 3: Accessibility and networks
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 PRIORITY 1: Economic, Social and Institutional Cooperation MEASURE 1.1 Research and innovation MEASURE 1.2 Financial support to innovative SMEs MEASURE 1.3 Social, Labour and Health Networks MEASURE 1.4 Institutional cooperation
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 PRIORITY 2: Natural and Cultural Resources and Risks Prevention MEASURE 2.1 Protection and Enhancement of the Marine and Coastal Environment MEASURE 2.2 Natural and Cultural Resource Management and Prevention of Natural and Technological Risks MEASURE 2.3 Energy Saving and Renewable Energy Resources MEASURE 2.4 Sustainable tourism
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 MEASURE 3.1 Physical infrastructures MEASURE 3.2 Sustainable Mobility  Systems MEASURE 3.3 Communication networks PRIORITY 3: Accessibility and networks
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Pergatitja e Projektit!
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Pse falimentojne pjesa me e madhe e Projekteve Evropiane? 1. Mungesa e lidhjeve te qarta midis projektit dhe prioriteteve kryesore strategjike te aplikantit; 2.mungesa e drejtimit dhe e lidershipit; 3.mungesa e perfshirjes se Stakeholder-s; 4.mungesa e nje qasje te orjentuar ndaj menaxhimit te projektit dhe menaxhimit te riskut; 5. vemendje jo e mjaftueshme, ne fazen e implementimit, ne ndarjen e  fazave menaxhuese te projektit; 6.vleresimi i propozimeve te projektit eshte diktuar me shume nga vlera fillestare se nga investimi me afat te gjate; 7.mungesa e integrimit ne project team te e te gjithe stakeholder-s.
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net  - IPA Adriatic CBC Operational Programme 2007-2013. - IPA Adriatic CBC Implementation Manual. -  Council Regulation (EC) n. 1085/2006 of 17 July 2006 establishing an  Instrument for Preaccession Assistance (hereinafter “IPA Regulation”). -  Commission Regulation (EC) n. 718/2007 of 12 June 2007 implementing Council Regulation (EC) no. 1085/2006 establishing an Instrument for Pre-accession Assistance (hereinafter “IPA Implementing Regulation”). -  Commission Regulation (EC) n. 1998/2006 of 15 December 2006 on the application of Articles 87 and 88 of the Treaty to  de minimis  aid. -  External aid rules for the award of service, supply and work contracts, established in the Chapter 3 of Part 2, Title IV of Regulation (EC, Euratom) No 1605/2002 and Chapter 3 of Part 2, Title III of Regulation (EC, Euratom) No 2342/2002, as well as Commission Decision C (2007) 2034 of 24 May 2007 on the rules and procedures applicable to service, supply and work contracts financed by the general budget of the European Communities for the purposes of cooperation with third countries. - IPA Adriatic Management and Accounting Manual  –  Duhet te dale! Ilir Qose, Durres 28/08/2009 Cilet jane dokumentat qe duhen lexuar para fillimit te pergatitjes se Projektit?
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 - Te pakten 1 Partner EU + 1 Partner  nga vendet kandidate  ose ato kandidate mundshme!   (2 Countries: 1 point; from 3 to 4 Countries: 2 points; from 5 to 7 points: 3 points; 8 Countries: 5 points). -  Maksimumi 15 partnere!  Partneriteti.
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009 Si duhet te jete Kooperimi midis partnereve?
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net  a) Public bodies :   national, regional, local authorities and other public bodies. Public bodies are organizations founded and governed by public law, and their main purpose is to fulfil public needs. Ilir Qose, Durres 28/08/2009 Cilat jane kategorite e partnereve/perfituesve qe mund te marrin pjese?
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009 Cilat jane kategorite e partnereve/perfituesve qe mund te marrin pjese?
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009 Cilat jane kategorite e partnereve/perfituesve qe mund te marrin pjese?
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 ,[object Object],[object Object],[object Object],[object Object]
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009 Lead Partneri!
Haemus Sh.p.k.   www.haemus.net  State aid rules must be applied under the IPA Adriatic CBC  Programme both in Member States and non Member States ! !!!  The main requirement to consider a Beneficiary subject to the State aid regime is the nature of the activities it intends to implement and not its legal status (public or private). Cdo partner  VETEDEKLARON  nese aktivitet qe do te ndermarre brenda nje projekti jane te tilla qe duhet ti nenshtrohen De Minimis Rule ose jo ! Nese nje aktivitet hyn ne aktivitetet qe I nenshtrohen De Minimis Rule partneri duhet te garantoje 15% te buxhetit te tij nga resurset e veta! Ilir Qose, Durres 28/08/2009 State Aid & De Minimis Rule
Haemus Sh.p.k.   www.haemus.net  Prokurimet publike duhen bere  qofte per entet publike qofte per ato private duke respektuar rregullat e PRAG! http://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/index_en.htm Ilir Qose, Durres 28/08/2009 Prokurimet Publike!
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Buxheti  i Projektit! Financial  Threshold : MINIMUM  Total Budget:  € 500,000 MAXIMUM  Total Budget :  € 5,000,000   MAXIMUM budget per beneficiary: 60% of the project total budget <85%  nga Programi! >15 Ko-Financim!
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 ! Duhet te parashikohet alokimi i te pakten 30%  te buxhetit te projektit brenda 31/10/2010!
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Ko-financimi! ! Perfituesi duhet te tregoje origjinen e kofincimit ne “Letter of Intent”
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009 a)  Shpenzimet  e pergatitjes se Projektit;
Haemus Sh.p.k.   www.haemus.net  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Ilir Qose, Durres 28/08/2009 b) Shpenzimet e implementimit te projektit;
Haemus Sh.p.k.   www.haemus.net  Ilir Qose, Durres 28/08/2009 Implementimi i Projektit!
Haemus Sh.p.k.   www.haemus.net  Formulari i Aplikimit! Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net    Info mbi Programin: www.adriaticipacbc.org Ilir Qose, Durres 28/08/2009
Haemus Sh.p.k.   www.haemus.net  Per Info kontaktoni: Haemus Sh.p.k. L. Nr.1, Rruga Taulantia   (2  Kullat Binjake, mbi Raiffeisen Bank ) Durres – Albania  Tel.Fax.  +355.52.235167  Mob. +355.67.2045400 E-mail :  [email_address] Ilir Qose, Durres 28/08/2009 faleminderit  !

More Related Content

Similar to Adriatic IPA CBC ne Shqip

Synergies between ESIF funds, Horizon 2020 and other research programmes
Synergies between ESIF funds, Horizon 2020 and other research programmesSynergies between ESIF funds, Horizon 2020 and other research programmes
Synergies between ESIF funds, Horizon 2020 and other research programmesParma Couture
 
OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...
OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...
OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...Fing
 
Panorama of the European Union: n. 49/2014, summer edition
Panorama of the European Union: n. 49/2014, summer editionPanorama of the European Union: n. 49/2014, summer edition
Panorama of the European Union: n. 49/2014, summer editionParma Couture
 
Synergy 4 - European Union on the Horizon
Synergy 4  - European Union on the HorizonSynergy 4  - European Union on the Horizon
Synergy 4 - European Union on the HorizonNALED Serbia
 
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...tejcagampang
 
The Cyprus Investment Story: Competing in the New World
The Cyprus Investment Story: Competing in the New WorldThe Cyprus Investment Story: Competing in the New World
The Cyprus Investment Story: Competing in the New WorldPhilip Ammerman
 
How to plan EC-funded projects
How to plan EC-funded projectsHow to plan EC-funded projects
How to plan EC-funded projectsInka Pibilova
 
Terr Africa Early Actions Gothenburg 16 April 2009
Terr Africa Early Actions Gothenburg 16 April 2009Terr Africa Early Actions Gothenburg 16 April 2009
Terr Africa Early Actions Gothenburg 16 April 2009guest502056
 
Crowdfunding Framework In France Presentation 4 june 2014 Berlin
Crowdfunding Framework In France Presentation 4 june 2014 BerlinCrowdfunding Framework In France Presentation 4 june 2014 Berlin
Crowdfunding Framework In France Presentation 4 june 2014 BerlinFabien Risterucci
 
La réponse de Cecilia Malmström
La réponse de Cecilia MalmströmLa réponse de Cecilia Malmström
La réponse de Cecilia MalmströmPaperjam_redaction
 

Similar to Adriatic IPA CBC ne Shqip (20)

Introduction to EU Funding System
Introduction to EU Funding SystemIntroduction to EU Funding System
Introduction to EU Funding System
 
HOMER: Results and beyond
HOMER: Results and beyond HOMER: Results and beyond
HOMER: Results and beyond
 
Synergies between ESIF funds, Horizon 2020 and other research programmes
Synergies between ESIF funds, Horizon 2020 and other research programmesSynergies between ESIF funds, Horizon 2020 and other research programmes
Synergies between ESIF funds, Horizon 2020 and other research programmes
 
OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...
OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...
OpenDataWeek Marseille 2013 : Luca Gerretta -- Harmonising open data policies...
 
Panorama of the European Union: n. 49/2014, summer edition
Panorama of the European Union: n. 49/2014, summer editionPanorama of the European Union: n. 49/2014, summer edition
Panorama of the European Union: n. 49/2014, summer edition
 
Stamkos neoklis cv
Stamkos neoklis cvStamkos neoklis cv
Stamkos neoklis cv
 
Ev 20130514 mi_en
Ev 20130514 mi_enEv 20130514 mi_en
Ev 20130514 mi_en
 
Synergy 4 - European Union on the Horizon
Synergy 4  - European Union on the HorizonSynergy 4  - European Union on the Horizon
Synergy 4 - European Union on the Horizon
 
Post Cotonou, EU-Africa and the EU-SADC EPA: Key issues and debates
Post Cotonou, EU-Africa and the EU-SADC EPA: Key issues and debatesPost Cotonou, EU-Africa and the EU-SADC EPA: Key issues and debates
Post Cotonou, EU-Africa and the EU-SADC EPA: Key issues and debates
 
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
 
The Cyprus Investment Story: Competing in the New World
The Cyprus Investment Story: Competing in the New WorldThe Cyprus Investment Story: Competing in the New World
The Cyprus Investment Story: Competing in the New World
 
How to plan EC-funded projects
How to plan EC-funded projectsHow to plan EC-funded projects
How to plan EC-funded projects
 
Terr Africa Early Actions Gothenburg 16 April 2009
Terr Africa Early Actions Gothenburg 16 April 2009Terr Africa Early Actions Gothenburg 16 April 2009
Terr Africa Early Actions Gothenburg 16 April 2009
 
Who is Who
Who is Who Who is Who
Who is Who
 
COFARM Summary Report
COFARM Summary Report COFARM Summary Report
COFARM Summary Report
 
INTERREG IV C-Ministry of Regional Development-ERIK Action-2009
INTERREG IV C-Ministry of Regional Development-ERIK Action-2009INTERREG IV C-Ministry of Regional Development-ERIK Action-2009
INTERREG IV C-Ministry of Regional Development-ERIK Action-2009
 
Crowdfunding Framework In France Presentation 4 june 2014 Berlin
Crowdfunding Framework In France Presentation 4 june 2014 BerlinCrowdfunding Framework In France Presentation 4 june 2014 Berlin
Crowdfunding Framework In France Presentation 4 june 2014 Berlin
 
Paxis manual
Paxis manualPaxis manual
Paxis manual
 
Rules
RulesRules
Rules
 
La réponse de Cecilia Malmström
La réponse de Cecilia MalmströmLa réponse de Cecilia Malmström
La réponse de Cecilia Malmström
 

Recently uploaded

Emotional Freedom Technique Tapping Points Diagram.pdf
Emotional Freedom Technique Tapping Points Diagram.pdfEmotional Freedom Technique Tapping Points Diagram.pdf
Emotional Freedom Technique Tapping Points Diagram.pdfaprilross605
 
2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing YogaRaphaël Semeteys
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...Cara Menggugurkan Kandungan 087776558899
 
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptxSIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptxStephenMino
 
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdfExploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdfMindful Wellness Journey
 
communication-skills-training-excerpt.pdf
communication-skills-training-excerpt.pdfcommunication-skills-training-excerpt.pdf
communication-skills-training-excerpt.pdfErmiyas33
 
Social Learning Theory presentation.pptx
Social Learning Theory presentation.pptxSocial Learning Theory presentation.pptx
Social Learning Theory presentation.pptxumef01177
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterssuserdfec6a
 
March 2023 Recommendations for newsletter
March 2023 Recommendations for newsletterMarch 2023 Recommendations for newsletter
March 2023 Recommendations for newsletterssuserdfec6a
 

Recently uploaded (9)

Emotional Freedom Technique Tapping Points Diagram.pdf
Emotional Freedom Technique Tapping Points Diagram.pdfEmotional Freedom Technique Tapping Points Diagram.pdf
Emotional Freedom Technique Tapping Points Diagram.pdf
 
2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
 
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptxSIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
 
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdfExploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
 
communication-skills-training-excerpt.pdf
communication-skills-training-excerpt.pdfcommunication-skills-training-excerpt.pdf
communication-skills-training-excerpt.pdf
 
Social Learning Theory presentation.pptx
Social Learning Theory presentation.pptxSocial Learning Theory presentation.pptx
Social Learning Theory presentation.pptx
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletter
 
March 2023 Recommendations for newsletter
March 2023 Recommendations for newsletterMarch 2023 Recommendations for newsletter
March 2023 Recommendations for newsletter
 

Adriatic IPA CBC ne Shqip

  • 1. Haemus Sh.p.k. www.haemus.net Workshop Operativ Oportunitetet e ofruara nga programi “ Adriatic IPA CBC” Durres, 28 /08/2009 10.00 – 13.00
  • 2.
  • 3. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Programacioni i Ri i Fondeve EU 2007-2013 Politika e Kohezionit (3 Objektiva): 347.41 miliarde € Objektivi 1: Objektivi 2 : Objektivi 3: Konvergjenca Kompetitivitet Kooperimi Territorial Evropian dhe Punesim I. Nderkufitar: IV A II. Nderkombetar: IV B III. Inter-rajonal . IV C
  • 4. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 OB.3 Kooperimi Territorial Evropian : Situata Financiare 8,5 Miliarde € ose 2,52% e totalit Nga te cilat: 6,44 Miliarde per Kooperimin Nderkufitar 1,83 Miliarde per Kooperimin Nderkombetar 445 Milione per Kooperimin Inter-Rajonal
  • 5. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 IPA Adriatic CBC Programme Interreg IVA IPA – Instrumenti i Para-Aderimit Fondi IPA zevendeson instrumentet e meparshem te para-aderimit dhe perfaqeson nje baze ligjore unike per gjithe fazen e para-aderimit. Turkey Instruments PHARE ISPA CARDS SAPARD IPA
  • 6. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 IPA – INSTRUMENTI I PARA-ADERIMIT Rregullorja IPA parashikon 5 komponente: I . Asistenca e Tranzicionit dhe Ngritja e Institucioneve II.  Bashkëpunimi Ndërkufitar Vetem per Vendet kandidate: III. Zhvillimi Rajonal; IV. Resurset Njerezore; V. Zhvillimi Rural.
  • 7. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 IPA Allocation (€ Million) 2007 2008 2009 Croatia 138.5 146.0 151.2 Macedonia 58,5 70.2 81.8 Turkey 497.2 538.7 566.4 Albania 61.0 70.7 81.2 Bosnia H. 62.1 74.8 89.1 Montenegro 31.4 32.6 33.3 Serbia 186.7 190.9 194.8 Kosovo 63.3 64.7 66.1
  • 8. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009
  • 9. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 DY RESURSE FINANCIAR FESR: Vendet Anetare EU IPA: Vendet Kandidate dhe Kandidate te Mundshem TOT resurseve (Perfshire National Co-Financing) : 290 ml € DY RESURSE FINANCIARE POR TE NJEJTAT RREGULLA! ADRIATIC IPA CBC Si do te financohet Programi?
  • 10. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Adriatic IPA CBC Programme
  • 11. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Adriatic IPA CBC Programme Zonat Pjesemarrese Gorizia, Trieste, Udine, Padova, Rovigo, Venezia, Ferrara, Forlì-Cesena, Ravenna, Rimini, Ancona, Ascoli Piceno, Macerata, Pesaro-Urbino, Chieti, Pescara, Teramo, Campobasso, Bari, Brindisi, Foggia, Lecce, Pordenone, L’Aquila, Taranto , Isernia Qarqet : Fier, Durrës, Lezhë, Shkodër, Tiranë, Vlorë Bileća, Čapljina, Čitluk, Gacko, Grude, Jablanica, Konjic, Kupres, Livno, Ljubinje, Ljubuški, Mostar, Neum, Nevesinje, Posušje, Prozor/Rama, Ravno, Široki Brijeg, Stolac, Berkovići, Tomislavgrad, Trebinje and Istočni Mostar, Sarajevo Economic Region, North-West Economic Region, Central Bih Economic Region Dubrovnik-Neretva,Istra; Lika-Senj, Primorje-Gorski kotar; Šibenik-Knin; Split-Dalmatia and Zadar, Karlovac County. Whole territory (in phasing out) Kerkyra, Thesprotia Obalno-kraška, Goriška regija, Notranjsko-kraška regija.
  • 12. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 ORDINARY projects Bottom up approach Financial Threshold : MINIMUM Total Budget: € 500,000 MAXIMUM Total Budget : € 5,000,000 MAXIMUM budget per beneficiary: 60% of the project total budget MINIMUM budget per beneficiary: € 100,000 IPA Adriatic CBC Programme Projektet Ordinare
  • 13. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 STRATEGIC Project Financial thresholds : MINIMUM total budget: € 5.000.000 MAXIMUM total budget: € 12.500.000 Top-down approach Bottom up approach IPA Adriatic CBC Programme Projekete Strategjike
  • 14.
  • 15. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 OVERALL OBJECTIVE: Strengthening of sustainable development capabilities of the Adriatic region through a concerted strategy of action between the partners of the eligible territories PRIORITY 1: Economic, Social and Institutional Cooperation PRIORITY 2: Natural and Cultural Resources and Risks Prevention PRIORITY 3: Accessibility and networks
  • 16. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 PRIORITY 1: Economic, Social and Institutional Cooperation MEASURE 1.1 Research and innovation MEASURE 1.2 Financial support to innovative SMEs MEASURE 1.3 Social, Labour and Health Networks MEASURE 1.4 Institutional cooperation
  • 17. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 PRIORITY 2: Natural and Cultural Resources and Risks Prevention MEASURE 2.1 Protection and Enhancement of the Marine and Coastal Environment MEASURE 2.2 Natural and Cultural Resource Management and Prevention of Natural and Technological Risks MEASURE 2.3 Energy Saving and Renewable Energy Resources MEASURE 2.4 Sustainable tourism
  • 18. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 MEASURE 3.1 Physical infrastructures MEASURE 3.2 Sustainable Mobility Systems MEASURE 3.3 Communication networks PRIORITY 3: Accessibility and networks
  • 19. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Pergatitja e Projektit!
  • 20. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Pse falimentojne pjesa me e madhe e Projekteve Evropiane? 1. Mungesa e lidhjeve te qarta midis projektit dhe prioriteteve kryesore strategjike te aplikantit; 2.mungesa e drejtimit dhe e lidershipit; 3.mungesa e perfshirjes se Stakeholder-s; 4.mungesa e nje qasje te orjentuar ndaj menaxhimit te projektit dhe menaxhimit te riskut; 5. vemendje jo e mjaftueshme, ne fazen e implementimit, ne ndarjen e fazave menaxhuese te projektit; 6.vleresimi i propozimeve te projektit eshte diktuar me shume nga vlera fillestare se nga investimi me afat te gjate; 7.mungesa e integrimit ne project team te e te gjithe stakeholder-s.
  • 21. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009
  • 22. Haemus Sh.p.k. www.haemus.net - IPA Adriatic CBC Operational Programme 2007-2013. - IPA Adriatic CBC Implementation Manual. - Council Regulation (EC) n. 1085/2006 of 17 July 2006 establishing an Instrument for Preaccession Assistance (hereinafter “IPA Regulation”). - Commission Regulation (EC) n. 718/2007 of 12 June 2007 implementing Council Regulation (EC) no. 1085/2006 establishing an Instrument for Pre-accession Assistance (hereinafter “IPA Implementing Regulation”). - Commission Regulation (EC) n. 1998/2006 of 15 December 2006 on the application of Articles 87 and 88 of the Treaty to de minimis aid. - External aid rules for the award of service, supply and work contracts, established in the Chapter 3 of Part 2, Title IV of Regulation (EC, Euratom) No 1605/2002 and Chapter 3 of Part 2, Title III of Regulation (EC, Euratom) No 2342/2002, as well as Commission Decision C (2007) 2034 of 24 May 2007 on the rules and procedures applicable to service, supply and work contracts financed by the general budget of the European Communities for the purposes of cooperation with third countries. - IPA Adriatic Management and Accounting Manual – Duhet te dale! Ilir Qose, Durres 28/08/2009 Cilet jane dokumentat qe duhen lexuar para fillimit te pergatitjes se Projektit?
  • 23. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 - Te pakten 1 Partner EU + 1 Partner nga vendet kandidate ose ato kandidate mundshme! (2 Countries: 1 point; from 3 to 4 Countries: 2 points; from 5 to 7 points: 3 points; 8 Countries: 5 points). - Maksimumi 15 partnere! Partneriteti.
  • 24.
  • 25. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009
  • 26. Haemus Sh.p.k. www.haemus.net a) Public bodies : national, regional, local authorities and other public bodies. Public bodies are organizations founded and governed by public law, and their main purpose is to fulfil public needs. Ilir Qose, Durres 28/08/2009 Cilat jane kategorite e partnereve/perfituesve qe mund te marrin pjese?
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. Haemus Sh.p.k. www.haemus.net State aid rules must be applied under the IPA Adriatic CBC Programme both in Member States and non Member States ! !!! The main requirement to consider a Beneficiary subject to the State aid regime is the nature of the activities it intends to implement and not its legal status (public or private). Cdo partner VETEDEKLARON nese aktivitet qe do te ndermarre brenda nje projekti jane te tilla qe duhet ti nenshtrohen De Minimis Rule ose jo ! Nese nje aktivitet hyn ne aktivitetet qe I nenshtrohen De Minimis Rule partneri duhet te garantoje 15% te buxhetit te tij nga resurset e veta! Ilir Qose, Durres 28/08/2009 State Aid & De Minimis Rule
  • 32. Haemus Sh.p.k. www.haemus.net Prokurimet publike duhen bere qofte per entet publike qofte per ato private duke respektuar rregullat e PRAG! http://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/index_en.htm Ilir Qose, Durres 28/08/2009 Prokurimet Publike!
  • 33. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Buxheti i Projektit! Financial Threshold : MINIMUM Total Budget: € 500,000 MAXIMUM Total Budget : € 5,000,000 MAXIMUM budget per beneficiary: 60% of the project total budget <85% nga Programi! >15 Ko-Financim!
  • 34. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 ! Duhet te parashikohet alokimi i te pakten 30% te buxhetit te projektit brenda 31/10/2010!
  • 35. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Ko-financimi! ! Perfituesi duhet te tregoje origjinen e kofincimit ne “Letter of Intent”
  • 36.
  • 37.
  • 38.
  • 39. Haemus Sh.p.k. www.haemus.net Ilir Qose, Durres 28/08/2009 Implementimi i Projektit!
  • 40. Haemus Sh.p.k. www.haemus.net Formulari i Aplikimit! Ilir Qose, Durres 28/08/2009
  • 41. Haemus Sh.p.k. www.haemus.net Info mbi Programin: www.adriaticipacbc.org Ilir Qose, Durres 28/08/2009
  • 42. Haemus Sh.p.k. www.haemus.net Per Info kontaktoni: Haemus Sh.p.k. L. Nr.1, Rruga Taulantia   (2 Kullat Binjake, mbi Raiffeisen Bank ) Durres – Albania Tel.Fax. +355.52.235167 Mob. +355.67.2045400 E-mail : [email_address] Ilir Qose, Durres 28/08/2009 faleminderit !