The document provides disassembly and assembly instructions for a final drive on an excavator. It involves removing over 30 individual parts in 26 steps, including removing bearings, gears, seals, and housing components. Assembly involves installing these same parts in reverse order, with specifics on bearing preload procedure and shim selection to achieve proper fit between components. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 323 d ln excavator (prefix cyd) service repair manual (cyd000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of 323D LN and 323D S excavators. It involves removing over 30 individual parts in 23 steps, including the carrier assembly, ring gears, main housing, and bearings. Cleanliness is important during disassembly and assembly. O-rings and seals should always be replaced. Parts should be lubricated before assembly and bearings are to be preloaded using a press to the correct thickness of shims.
Caterpillar cat 323 d s excavator (prefix cyd) service repair manual (cyd0000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists 23 steps for disassembly, including removing the final drive cover, carrier assembly, ring gears, and other components. It then lists 32 steps for assembly, beginning with installing bearings in the main housing and determining the correct shim thickness. Other steps include installing seals, pins, and gears to reassemble the final drive.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8usejkdmmd8i
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...nkog14651119
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, shims, and aligning the main housing and motor housing, requiring precision measurements to set proper bearing preload. The process is detailed over multiple pages with illustrations to ensure correct reassembly.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...yu5676962
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It describes:
1) Removing over 30 components of the final drive including the carrier assembly, ring gears, sun gear, and housing pieces.
2) Disassembling the carrier assembly into individual planetary gears, shafts, and washers.
3) Cleaning all parts thoroughly before assembly to prevent damage.
4) Assembling the components in reverse order, ensuring proper torque and alignment of parts.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...hdjsjndndnd
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar cat 323 d ln excavator (prefix cyd) service repair manual (cyd000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of 323D LN and 323D S excavators. It involves removing over 30 individual parts in 23 steps, including the carrier assembly, ring gears, main housing, and bearings. Cleanliness is important during disassembly and assembly. O-rings and seals should always be replaced. Parts should be lubricated before assembly and bearings are to be preloaded using a press to the correct thickness of shims.
Caterpillar cat 323 d s excavator (prefix cyd) service repair manual (cyd0000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists 23 steps for disassembly, including removing the final drive cover, carrier assembly, ring gears, and other components. It then lists 32 steps for assembly, beginning with installing bearings in the main housing and determining the correct shim thickness. Other steps include installing seals, pins, and gears to reassemble the final drive.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8usejkdmmd8i
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...nkog14651119
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, shims, and aligning the main housing and motor housing, requiring precision measurements to set proper bearing preload. The process is detailed over multiple pages with illustrations to ensure correct reassembly.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...yu5676962
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It describes:
1) Removing over 30 components of the final drive including the carrier assembly, ring gears, sun gear, and housing pieces.
2) Disassembling the carrier assembly into individual planetary gears, shafts, and washers.
3) Cleaning all parts thoroughly before assembly to prevent damage.
4) Assembling the components in reverse order, ensuring proper torque and alignment of parts.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...hdjsjndndnd
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujskemdidk8u
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It lists 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. It then lists 13 steps for assembly, including installing bearings, determining shim thickness, installing seals and other components, and testing rotation. The purpose is to provide maintenance technicians with a procedure to fully disassemble and reassemble the final drive.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8seodkdmdmed3
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. Cleanliness is emphasized. The assembly procedure reverses the disassembly steps and provides additional details like applying anti-seize lubricant and determining shim thickness to preload the bearings.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...ze6074xunong
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, gears, and shims in reverse order while ensuring proper bearing preload using press tools and measurements. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...gongfuao7509
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...tingrm81805
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujjsekmdm3ed
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. The assembly procedure similarly lists over 30 steps to reinstall the parts in reverse order, noting the importance of cleanliness and replacing all seals and O-rings. Proper lubrication and use of pressing/lifting tools are emphasized.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. The assembly section has 13 steps, including pressing bearings into the main housing, determining the correct shim thickness, installing seals and pins, and attaching the main housing to the motor housing. Precise cleaning and use of replacement parts is emphasized throughout.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix WBJ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, planetary gears, and seals. The assembly section has 13 steps, including pressing in bearings, installing seals and pins, and using shims to set proper bearing preload when installing the main housing onto the motor housing. Cleanliness is emphasized throughout to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The disassembly process involves removing 37 individual components in a specific order, including gears, shafts, seals, washers, and housings. The assembly section provides instructions for installing these components in reverse order and notes on cleaning, lubricating, and setting proper bearing preload using shims.
Caterpillar Cat 325D L Excavator (Prefix GBR) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions to disassemble a final drive over 33 steps. Key steps include removing the cover, gears, carrier assemblies, planetary gears, and seals. Cleanliness is important to prevent dirt entering during disassembly. Various tools are required including a transmission repair stand, link brackets, retaining ring pliers, and a slide hammer puller. The total weight of disassembled parts is provided.
Caterpillar Cat 323D L Excavator (Prefix JLG) Service Repair Manual Instant D...fujkskemdmdm4r
1. The document provides instructions for removing and installing inlet and exhaust valve seat inserts for a C6.4 engine. It describes the required tools and steps to remove the old inserts and install new ones.
2. Procedures are provided for removing, disassembling, and assembling the engine oil cooler. Parts are to be kept clean from contaminants to prevent damage.
3. Instructions are given for removing and installing the engine oil relief valve, including replacing the gasket. Cleanliness is important to prevent premature wear.
1) The document provides assembly instructions for a final drive on an excavator.
2) It involves over 40 steps to assemble bearings, seals, gears, carriers, housing and cover components.
3) Special tools and procedures are required to set bearing preloads, install seals, and test for leaks. Proper torque values and sealants are specified.
Caterpillar Cat 345D L Excavator (Prefix BYC) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a C13 engine, which powers a 345D L excavator. The procedures include removing the electric starting motor, flywheel, rear crankshaft seal, and other rear gear components. Detailed illustrations show the components and tools used. Precautions are provided to properly support heavy components and contain fluids.
Caterpillar Cat 336D L Excavator (Prefix MDS) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a piston pump (hydraulic fan) on a Caterpillar 336D L excavator. The disassembly process involves using tools to remove retaining rings, seals, bearings, pistons and other components. The assembly process specifies cleaning parts and provides 30 steps for installing components in the correct order and ensuring proper operation, including adjusting end play and installing springs and seals.
Caterpillar Cat 345D L Excavator (Prefix RAE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the travel motor of a 345D L excavator. It lists the required tools and gives step-by-step instructions for removing components like the head, brake piston, rotating group, and seals. The instructions emphasize cleaning parts and ensuring they are reinstalled in their original locations to avoid damage and contamination.
Caterpillar Cat 345D L Excavator (Prefix PBT) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the swing drive of a 345D L excavator. It lists the required tools and gives step-by-step procedures to remove components such as the carrier assembly, ring gear, and bearings. Cleanliness is emphasized during assembly, with seals, O-rings and other parts replaced as needed. The instructions ensure the swing drive is properly disassembled and reassembled.
Caterpillar Cat 345D L Excavator (Prefix RAJ) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a travel motor. It lists the required tools and gives step-by-step instructions to remove components like the head, plates, seals, and piston assemblies. The disassembly process is described in 31 steps. The assembly section then lists 13 steps to reinstall components in reverse order, making sure to clean parts and apply new seals and lubricants.
This document provides instructions for removing and installing fuel injection pumps and disassembling and assembling fuel ratio control components on a Caterpillar 3406C diesel engine. The steps include using various tools to remove the fuel injection pumps from the pump housing, install new pumps, and check pump installation. Instructions are also provided to disassemble the fuel ratio control housing by removing bolts, springs, diaphragms and other parts and cleaning components before reassembly.
More Related Content
Similar to Caterpillar Cat 323D LN and 323D S Excavator (Prefix CYD) Service Repair Manual Instant Download.pdf
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujskemdidk8u
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It lists 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. It then lists 13 steps for assembly, including installing bearings, determining shim thickness, installing seals and other components, and testing rotation. The purpose is to provide maintenance technicians with a procedure to fully disassemble and reassemble the final drive.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8seodkdmdmed3
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. Cleanliness is emphasized. The assembly procedure reverses the disassembly steps and provides additional details like applying anti-seize lubricant and determining shim thickness to preload the bearings.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...ze6074xunong
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, gears, and shims in reverse order while ensuring proper bearing preload using press tools and measurements. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...gongfuao7509
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...tingrm81805
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujjsekmdm3ed
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. The assembly procedure similarly lists over 30 steps to reinstall the parts in reverse order, noting the importance of cleanliness and replacing all seals and O-rings. Proper lubrication and use of pressing/lifting tools are emphasized.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. The assembly section has 13 steps, including pressing bearings into the main housing, determining the correct shim thickness, installing seals and pins, and attaching the main housing to the motor housing. Precise cleaning and use of replacement parts is emphasized throughout.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix WBJ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, planetary gears, and seals. The assembly section has 13 steps, including pressing in bearings, installing seals and pins, and using shims to set proper bearing preload when installing the main housing onto the motor housing. Cleanliness is emphasized throughout to prevent contamination.
Similar to Caterpillar Cat 323D LN and 323D S Excavator (Prefix CYD) Service Repair Manual Instant Download.pdf (12)
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The disassembly process involves removing 37 individual components in a specific order, including gears, shafts, seals, washers, and housings. The assembly section provides instructions for installing these components in reverse order and notes on cleaning, lubricating, and setting proper bearing preload using shims.
Caterpillar Cat 325D L Excavator (Prefix GBR) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions to disassemble a final drive over 33 steps. Key steps include removing the cover, gears, carrier assemblies, planetary gears, and seals. Cleanliness is important to prevent dirt entering during disassembly. Various tools are required including a transmission repair stand, link brackets, retaining ring pliers, and a slide hammer puller. The total weight of disassembled parts is provided.
Caterpillar Cat 323D L Excavator (Prefix JLG) Service Repair Manual Instant D...fujkskemdmdm4r
1. The document provides instructions for removing and installing inlet and exhaust valve seat inserts for a C6.4 engine. It describes the required tools and steps to remove the old inserts and install new ones.
2. Procedures are provided for removing, disassembling, and assembling the engine oil cooler. Parts are to be kept clean from contaminants to prevent damage.
3. Instructions are given for removing and installing the engine oil relief valve, including replacing the gasket. Cleanliness is important to prevent premature wear.
1) The document provides assembly instructions for a final drive on an excavator.
2) It involves over 40 steps to assemble bearings, seals, gears, carriers, housing and cover components.
3) Special tools and procedures are required to set bearing preloads, install seals, and test for leaks. Proper torque values and sealants are specified.
Caterpillar Cat 345D L Excavator (Prefix BYC) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a C13 engine, which powers a 345D L excavator. The procedures include removing the electric starting motor, flywheel, rear crankshaft seal, and other rear gear components. Detailed illustrations show the components and tools used. Precautions are provided to properly support heavy components and contain fluids.
Caterpillar Cat 336D L Excavator (Prefix MDS) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a piston pump (hydraulic fan) on a Caterpillar 336D L excavator. The disassembly process involves using tools to remove retaining rings, seals, bearings, pistons and other components. The assembly process specifies cleaning parts and provides 30 steps for installing components in the correct order and ensuring proper operation, including adjusting end play and installing springs and seals.
Caterpillar Cat 345D L Excavator (Prefix RAE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the travel motor of a 345D L excavator. It lists the required tools and gives step-by-step instructions for removing components like the head, brake piston, rotating group, and seals. The instructions emphasize cleaning parts and ensuring they are reinstalled in their original locations to avoid damage and contamination.
Caterpillar Cat 345D L Excavator (Prefix PBT) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the swing drive of a 345D L excavator. It lists the required tools and gives step-by-step procedures to remove components such as the carrier assembly, ring gear, and bearings. Cleanliness is emphasized during assembly, with seals, O-rings and other parts replaced as needed. The instructions ensure the swing drive is properly disassembled and reassembled.
Caterpillar Cat 345D L Excavator (Prefix RAJ) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a travel motor. It lists the required tools and gives step-by-step instructions to remove components like the head, plates, seals, and piston assemblies. The disassembly process is described in 31 steps. The assembly section then lists 13 steps to reinstall components in reverse order, making sure to clean parts and apply new seals and lubricants.
This document provides instructions for removing and installing fuel injection pumps and disassembling and assembling fuel ratio control components on a Caterpillar 3406C diesel engine. The steps include using various tools to remove the fuel injection pumps from the pump housing, install new pumps, and check pump installation. Instructions are also provided to disassemble the fuel ratio control housing by removing bolts, springs, diaphragms and other parts and cleaning components before reassembly.
Caterpillar Cat 345C and 345C L Excavator (Prefix BWY) Service Repair Manual ...fujkskemdmdm4r
This document provides instructions for disassembling and assembling a travel motor. The disassembly procedure involves 31 steps to remove parts like the head, plates, disks, seals, pistons, and housing. The assembly procedure reverses the disassembly with 13 steps like installing seals, spacers, pistons, plates and tightening components. Precautions are provided to keep parts clean and in correct orientation to prevent contamination of the hydraulic system.
Caterpillar Cat 345C and 345C L Excavator (Prefix TBA) Service Repair Manual ...fujkskemdmdm4r
This document provides instructions for disassembling and assembling a travel motor. The disassembly procedure involves 31 steps to remove parts like the head, pins, plates, seals, pistons, disks, and bearings. The assembly procedure reverses the disassembly process in 30 steps and provides notes about cleaning parts, applying lubricant, and ensuring proper orientation of components like washers. Tools required are listed for both procedures.
Caterpillar Cat 345D L Excavator (Prefix MLK) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for assembling and installing a travel motor. It outlines 34 steps for assembling components like pistons, seals, plates, and bearings. It also describes using tools to measure clearances and distances during assembly. Finally, it details installing the assembled travel motor using lifting devices and bolts, and connecting hydraulic hose assemblies.
The document provides instructions for removing and installing the drive shaft group with retarder on a 621E, 623E, or 627E tractor. It describes disconnecting hydraulic lines and removing bolts, covers, and housing to access the drive shaft group. Special care must be taken when removing plates and springs from the retarder, as they are under pressure. The process is reversed for installation, reconnecting hydraulic lines and replacing removed components.
Caterpillar Cat 336D2 and 336D2 L Excavator (Prefix WBC) Service Repair Manua...fujkskemdmdm4r
The document provides instructions for removing and installing various engine components, including:
- Valve guides are removed from the cylinder head using a valve guide driver tool. New guides are installed using driver tools until the proper height is reached.
- Valve seat inserts are removed from the cylinder head using extractors. New inserts are installed using a driver tool after being cooled.
- The engine oil filter base, oil filter, and oil cooler are removed. Hoses are disconnected and bolts removed to access these components.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission housing, installing planetary gears and carriers, and attaching the transmission cover, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
The document provides step-by-step instructions for disassembling and assembling the final drives of a 350L excavator. Key steps include removing the final drives and travel motors, disassembling the internal components of the final drives which include multiple planetary gear sets, carriers, and a sun gear, and then reassembling the final drives in reverse order. Proper cleaning, application of lubricants, and torque specifications are noted throughout to ensure correct reassembly.
Caterpillar Cat 350 and 350 L Excavator (Prefix 8HK) Service Repair Manual In...fujkskemdmdm4r
The document provides instructions for removing and installing various engine components on a 350-A EXCAVATOR 8HK excavator powered by a 3306 engine, including:
- Removing the cylinder head by first removing the fuel injection lines, exhaust manifold, rocker shaft and pushrods, then removing bolts and lifting the cylinder head off the engine block.
- Instructions for disassembling, assembling, and installing the rocker shaft, including removing/installing rocker arms, supports, springs and O-rings.
- Steps for installing a compression brake on the engine, including installing brackets, bolts and connecting wires.
Caterpillar Cat 345D L Excavator (Prefix YEE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various engine components on a Caterpillar 345D L excavator, including:
- Removing and installing the rear gear group. This involves removing several gears, seals, bolts and bearings. Precise positioning of bearings is required during installation.
- Removing the flywheel using lifting equipment and tools. The flywheel weighs approximately 79 kg.
- Removing and installing the crankshaft rear seal using bolts, sealant and cleaning of parts. Proper inspection of the crankshaft surface is also noted.
Caterpillar Cat 350 and 350 L Excavator (Prefix 3ML) Service Repair Manual In...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the governor of a 350-A excavator powered by a 3306 engine. The disassembly process involves removing 34 parts from the governor including the fuel ratio control, housing, springs, levers, pins, plates, screws, solenoid, shaft and other components. The assembly process describes installing these 34 parts in the reverse order and includes ensuring parts are clean and lubricated before installation. Special tools are required for some steps.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Dahua provides a comprehensive guide on how to install their security camera systems. Learn about the different types of cameras and system components, as well as the installation process.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
2. Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 439-3938 Link Bracket 2
C 154-6181 Forcing Bolt 1
D 439-3940 Link Bracket 2
E
5F-7366 Forcing Bolt 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
F - Loctite 5127 1
Start By:
a. Remove the final drive.
Note: Cleanliness is an important factor. Before the disassembly procedure, thoroughly
clean the exterior of the component. This action will prevent dirt from entering the internal
mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the original locations.
2/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and
final drive sprocket is approximately 312 kg (688 lb).
3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from cover (2), and fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. The weight of cover (2) is approximately 32 kg (70 lb). Remove cover
(2).
Illustration 3 g00708091
3/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 5. Remove thrust plate (3) from cover (2).
6. Remove plugs (4) from cover (2).
Illustration 4 g00708235
7. Remove O-ring seals (5) from both plugs (4) that were in the cover.
Illustration 5 g00708092
8. Remove spacer (6) from carrier assembly (7).
9. Remove sun gear (8) from carrier assembly (7).
10. Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of
carrier assembly (7) is approximately 14 kg (30 lb).
4/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g01304883
11. Disassemble carrier assembly (7), as follows.
a. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
Illustration 7 g00708144
b. Remove planetary shaft (9) with spring pin (10) from the carrier assembly.
c. Remove spring pin (10) from planetary shaft (9) with a hammer and a punch.
Illustration 8 g00708218
d. Remove thrust washers (11) and planetary gear (13) from the carrier assembly.
5/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. e. Remove bearing (12) from planetary gear (13).
12. Repeat Steps 11.a through 11.e in order to remove the remaining planetary gears from the
carrier assembly.
Illustration 9 g00708162
13. Remove sun gear (14) from carrier assembly (15).
Illustration 10 g00708325
14. Remove spacer (16).
Illustration 11 g00708184
6/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Note: It will be necessary to pry ring gears (17) away from main housing (18) in order to
install the lifting slings.
15. Fasten a suitable lifting device to ring gears (17), as shown. Remove the ring gears from
main housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 12 g00708360
16. Use a screwdriver or a chisel in order to separate two ring gears (17).
Note: Two ring gears (17) are held together with Tooling (F). It may be necessary to heat
ring gears (17) in order to soften the sealant. Do not heat over 135 °C (275 °F) for more
than thirty minutes.
Illustration 13 g00708172
17. Position a 12.7 mm (0.50 inch) shackle under carrier assembly (15).
18. Fasten a suitable lifting device to the shackle.
19. Slowly lift carrier assembly (15) from the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Disassemble carrier assembly (15), as follows.
7/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 14 g00708175
a. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 15 g00708370
Illustration 16 g00708220
b. Remove planetary shaft (19) with spring pin (20) from the carrier assembly.
c. Remove spring pin (20) from planetary shaft (19) with a hammer and a punch.
d. Remove thrust washers (21) and planetary gear (23) from the carrier assembly.
e. Remove bearings (22) from planetary gear (23).
8/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 21. Repeat Steps 20.a through 20.e in order to remove the remaining planetary gears from the
carrier.
Illustration 17 g00708186
22. Remove O-ring seal (24) from main housing (18).
Illustration 18 g00708187
23. Remove bolts (25) from gear (26).
Illustration 19 g00708202
24. Use Tooling (C) in order to remove gear (26) from main housing (18).
9/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Note: The motor housing will separate from main housing (18) once gear (26) is removed.
Make sure that the motor housing is supported.
Illustration 20 g00708211
25. Remove shims (27) from the main housing.
Illustration 21 g00708212
26. Fasten Tooling (D) and a suitable lifting device to main housing (18), as shown.
27. Use a hammer and a punch in order to separate main housing (18) and the final drive
sprocket from motor housing (28). The combined weight of main housing (18) and the final
drive sprocket is approximately 82 kg (180 lb).
10/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 22 g00708214
28. Remove Duo-Cone seal (29) from motor housing (28).
29. Remove alignment pins (30).
Illustration 23 g00708215
Illustration 24 g00708216
30. Remove Duo-Cone seal (31) from main housing (18).
31. Use Tooling (E) in order to remove bearings (32) and (33) from the main housing.
32. If necessary, remove the final drive sprocket from the main housing.
33. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 12 01:10:46 UTC+0800 2020
11/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. S/N - WNE1-UP
S/N - YSD1-UP
S/N - ZMF1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 439-3938 Link Bracket 2
D 439-3940 Link Bracket 2
G 126-3994 Duo-Cone Seal Installer 1
H - Loctite C5-A Anti-Seize Lubricant
F - Loctite High Flex From-In-Place Gasket
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned in
cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry
parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If
any parts are worn or damaged, use new parts for replacement. All disassembly and all
assembly procedures must be performed on a clean work surface and in a clean hydraulic
area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have
the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound
during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
1. Install the final drive sprocket if the sprocket was removed from the main housing.
2. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
2/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 1 g00708215
3. Apply Tooling (H) to the outer diameter of the bearings.
4. Install bearings (32) and (33) in main housing (18) with a suitable press.
5. Make sure that bearing (32) and bearing (33) contact the counter bore in the main housing.
6. Use the following procedure to preload the bearings and determine the correct thickness of
shims.
Illustration 2 g00713058
a. Fasten Tooling (D) and a suitable lifting device to main housing (18). Install the main
housing on the motor housing.
b. Put the main housing and the motor housing in a suitable press.
Illustration 3 g00709278
(a) Bearing surface
(b) Housing surface
c. Use a suitable press and a spacer in order to apply a load of 4000 kg (8819 lb) on the
bearings. Rotate the housing in order to seat the bearings.
d. Reduce the load on the bearings to 1000 ± 100 kg (2205 ± 221 lb).
3/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. e. Use a depth micrometer in order to measure the step length between the bearing
surface and the housing surface. Take measurements at several different locations
around the housing. Compute the average of the measured dimensions and record the
number. Call this Dimension (Y).
Illustration 4 g00709276
f. Use a depth micrometer in order to measure the step length of gear (26). Take
measurements at several different locations around the gear. Compute the average of
the measured dimensions and record the number. Call this Dimension (X).
g. The thickness of the shims is equal to (X − Y) ± 0.05 mm (0.002 inch).
Note: Use no more than two shims. If two shims are required, install the thinner shim
next to the gear.
h. Remove the main housing from the motor housing.
Illustration 5 g01021370
7. Use Tooling (G) in order to install Duo-Cone seal (31) in main housing (18). Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.
4/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 6 g01021371
8. Use Tooling (G) in order to install Duo-Cone seal (29) in motor housing (28).
Illustration 7 g00708214
9. Apply Tooling (H) to the surfaces that contact pins (30).
10. Install alignment pins (30).
Note: Do not damage the Duo-Cone seals in the main housing or in the motor housing
during the assembly of the two components. After installation of the main housing on the
motor housing, there will be a small gap between the components. The gap is caused by the
Duo-Cone seals. This gap will be eliminated during installation of gear (26).
5/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 8 g00713058
11. Fasten Tooling (D) and a suitable lifting device to main housing (18). Install the main
housing on the motor housing.
Illustration 9 g00708211
12. Install shims (27) that were determined in Step 6.g in the main housing.
Note: If two shims are required, install the thinner shim next to the gear.
Illustration 10 g00708187
13. Install gear (26).
14. Install bolts (25) in gear (26). Install the bolts in an even pattern until the gear is seated
against the bearing. Tighten bolts (25) in a crisscross pattern.
6/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 11 g00708186
15. Install O-ring seal (24) to main housing (18).
Illustration 12 g00708175
16. Assemble carrier assembly (15), as follows.
Illustration 13 g00708220
a. Install bearings (22) in planetary gear (23).
b. Install thrust washers (21) and planetary gear (23) in the carrier assembly.
7/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. c. Use a deburring tool in order to remove the metal burr from the openings in the
carrier. Install planetary shaft (19) in the carrier assembly.
d. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 14 g00513451
e. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
17. Repeat Steps 16.a through 16.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 15 g00708172
18. Install a lifting sling through the middle of carrier assembly (15). Fasten a 12.7 mm
(0.50 inch) shackle to the suitable lifting device.
19. Install carrier assembly (15) on the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
8/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 20. Remove the shackle and the suitable lifting device.
Illustration 16 g00713148
21. Apply Tooling (F) to the mating surface of ring gear (17b).
22. Install ring gear (17a) on ring gear (17b).
Illustration 17 g00708184
23. Fasten a suitable lifting device to ring gears (17), as shown. Install the ring gears to main
housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 18 g00708325
9/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 24. Install spacer (16) in the carrier assembly.
Illustration 19 g00708162
25. Install sun gear (14) in carrier assembly (15).
Illustration 20 g01304883
Illustration 21 g00708218
26. Assemble carrier assembly (7), as follows.
a. Install bearing (12) in planetary gear (13).
10/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. b. Install thrust washers (11) and planetary gear (13) in the carrier assembly.
c. Install planetary shaft (9) in the carrier assembly.
d. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
Illustration 22 g00513451
e. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
27. Repeat Steps 26.a through 26.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 23 g00708092
28. Install carrier assembly (7) in the ring gear. The weight of carrier assembly (7) is
approximately 14 kg (30 lb).
29. Install sun gear (8) in carrier assembly (7).
11/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 30. Install spacer (6) in carrier assembly (7).
Illustration 24 g00708235
31. Install new O-ring seals (5) on plugs (4) that were in the cover.
Illustration 25 g00708091
32. Install plugs (4) in cover (2). Tighten plugs (4) to a torque of 80 ± 10 N·m (59 ± 7 lb ft).
33. Install thrust plate (3) in cover (2).
34. Apply Tooling (F) to the mating surface of the ring gear.
12/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 26 g00708090
35. Fasten Tooling (B) and a suitable lifting device to cover (2), as shown. The weight of cover
(2) is approximately 32 kg (70 lb). Install cover (2).
36. Remove Tooling (B) and install the setscrews in cover (2).
Illustration 27 g00708089
37. Install bolts (1) and the washers that hold the cover in position. Tighten bolts (1) in a
crisscross pattern.
38. Remove the final drive from Tooling (A). The combined weight of the final drive and final
drive sprocket is approximately 310 kg (683 lb).
End By:
a. Install the final drive.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 12 01:11:45 UTC+0800 2020
13/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 323D LN EXCAVATOR CYD
Configuration: 323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 Engine
Disassembly and Assembly
323D Excavator Machine Systems
Media Number -RENR7500-07 Publication Date -01/02/2012 Date Updated -14/02/2012
i07192988
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7611 Handle As 2
8S-7615 Pin As 2
283-1495 Stand Assembly 2
B 439-3939 Link Bracket As 2
C - Loctite C5A Copper Anti-Seize -
Table 2
Torque Values of Bolts (3)
Bolt Size Torque
M16 90 ± 15 N·m (66 ± 11 lb ft) and turn an additional angle of 60 ± 5 degrees.
M20 150 ± 25 N·m (111 ± 18 lb ft) and turn an additional angle of 55 ± 5 degrees.
M24 250 ± 25 N·m (184 ± 18 lb ft) and turn an additional angle of 45 ± 5 degrees.
M30 500 ± 50 N·m (369 ± 37 lb ft) and turn an additional angle of 50 ± 5 degrees.
1/3
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
27. Illustration 1 g00712767
1. Attach Tooling (B) and a suitable lifting device to final drive (1). The weight of final drive
(1) and the sprocket is approximately 312 kg (688 lb). Position the final drive in the frame.
Illustration 2 g00712737
Note: Make sure that bolt holes (2) for the travel motor are in the correct position.
Note: Make sure that bolts (3), the washers, the motor housing, and the frame are clean and
free of protective coating and oil.
2. Before assembly remove all compounds, oil, and dust from the female threads.
3. Apply Tooling (C) to the threads of bolt (3). Install bolts (3) and the washers in the final
drive. Tighten bolts (3) to a torque specified in Table 2.
4. Refer to Service Magazine, M0083843, "An Improved Bolt Tightening Procedure for the
Critical Joints Is Now Used on All Excavators" for more detail information.
5. Remove Tooling (B) and the suitable lifting device from the final drive.
2/3
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 3 g00489826
Typical Example
6. Lift the side of the machine to remove Tooling (A).
End By:
a. Install the travel motor.
b. Connect the track assembly.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 12 01:12:44 UTC+0800 2020
3/3
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...