Jul 2005 – May 2010 : TRW (Ningbo) Components & Fastening Systems Co., Ltd
Position (Jan 2007~May 2010) : Regional Quality Manager (Resp. for Ningbo and Langfang plant quality)
Report to : Global Quality director: Jens Gorzellik (German) and China GM
Number of subordinates : Ningbo: 61 (14 Eng.; 34 insp.; 13 customer service);
Langfang: 27 (1 mgr, 5 Eng.; 21 insp.)
TRW Automotive ranksamong the world'stop 10 largest and most diversified suppliersof automotivesystems, modulesand componentsto global
vehicle manufacturersand related aftermarkets. TRW Automotiveisthe leader in active andpassive safety systems for the global automotiveindustry,
and itscustomers comprise all major vehiclemanufacturersthroughout theworld. Productsinclude integrated vehicle control and driver assist systems,
braking systems, steering systems, suspension systems, occupant safety systems, electronics, engine valves, fastening systemsand aftermarket
replacement parts. The company's2010 saleswere $14.4 billion (USD). Ningbo planthasabout 630employees.
Responsibilities:
 Comply with TRW group quality strategy to establish Ningbo and Langfang plant quality Annual targets and schedule
related quality activities. Ensure plantoperation activities under rightprocedure. Organize ManagementReview
meeting accordingly.
 Leading process qualitycontinual improvementand Total Non-conformityQuality Costdown activities. (Lean
production B2B launched in NB and LF in 2008.And B2B activities standardized in routine daily activities).
 Maintain customer’ s relationship and take in charge of communicating with customer and getcustomer feedback
for Customer Satisfaction Improvement.Mainly for customer feedback qualityinformation investigate,analyze and
reply with 8D or 5 Phases report(s).
 Participate new project developmentand manage the projectQuality risk.Organize Projects quality risk review
meeting to review all projects quality risks and solve the problem from technical direction. And drive TRW group new
projectdeveloping procedure GDPIM (Global Developmentand ProductIntroduction Management) deployin NB
and LF.
 Give pre-assessmentand recommendations for New Projects Suppliers nomination.Major tasks to suppliers’
managementare responsible for supplier incoming inspection,tracking routine supplier qualityimprovement,
monthlyquality performance statistics and supplier annual audit,etc.
 Lead and drive companyprocedures optimizing and constructing continuously.Organize ISO/TS 16949 Internal
Audit and prepare for Party II / III audit.
 Be responsible for customer field Warranty issues dispose and reply.
Achievements:
Achieve VW Group China A Supplier audit in March 31st to April 2nd, 2009 and FAW VW and SVW A Supplier audit in
middle of2009 (from 2007 C to 2008 B and B+).
Be the 9th of 100 GM global QSB Model suppliers in Dec,2008.
Improve customer qualityNCTs (Non-conformance Tickets) from 48 of 2007 to 19 of 2008. And NCTs total number is
10 NCTs in 2009Y.
Through series ofSupplier ImprovementPlan and activities,improved Supplier PPM from 817 PPM of 2007 to 298
PPM in 2008.And the First Halfof 2009Y average is 118PPM.First Halfof 2010:34PPM;
Safe launched SGM Epsilon LWB/SWB in 2008Y. DFV: DF-BF air vents and ashtrayproject and FAW HQE project
air vents in 2008Year.
Went to GM Australian Melbourne, successfullyto persuade GM Holden to sign Holden projects PPAPs in July~Aug,
2008.
As managementrepresentative gain the DQS recognition and high appraising during Feb 9~11th,2008 ISO/TS16949
certificate changing Re-assessmentAudit. And DQS posted this reporton their global web site.
2009 年通过北京大众 VGC,上海大众 SVW 和一汽大众 FAW-VW 的 A 级供应商审核;
2008 年获得通用汽车全球 QSB100 个模范供应商第九名;
2007 年通过 DQS 认证机构 ISO/TS16949 换证审核,并被 DQS 在其网站公开表扬;
供应商 PPM 值 2007 年 817 降到 2008 年 298PPM,2009 年 118PPM,2010 年上半年 34PPM;
2008 年因为金融危机,澳大利亚通用拒绝切换 TRW 已经批产的 Holden 项目 15 个出风口零件,导致项目投
资不能回收,集团公司 7~8 月份指派我和项目经理去澳大利亚和客户就项目技术和质量问题进行沟通,并最
终说服客户对 PPAP 签字认可

More Related Content

Viewers also liked

2008 Q3 TRW Auto Earnings Presentation
2008 Q3 TRW Auto Earnings Presentation 2008 Q3 TRW Auto Earnings Presentation
2008 Q3 TRW Auto Earnings Presentation finance18
 
The Loyalty Awards 2015 - automotive Diamonds wins
The Loyalty Awards 2015 - automotive Diamonds winsThe Loyalty Awards 2015 - automotive Diamonds wins
The Loyalty Awards 2015 - automotive Diamonds winsBahar Sabet
 
2005 Q4 TRW Auto Earnings Presentation
 	2005 Q4 TRW Auto Earnings Presentation  	2005 Q4 TRW Auto Earnings Presentation
2005 Q4 TRW Auto Earnings Presentation finance18
 
2008 Q1 TRW Auto Earnings Presentation
2008 Q1 TRW Auto Earnings Presentation 2008 Q1 TRW Auto Earnings Presentation
2008 Q1 TRW Auto Earnings Presentation finance18
 
Interview with Harald Walter, TRW / Germany
Interview with Harald Walter, TRW / Germany Interview with Harald Walter, TRW / Germany
Interview with Harald Walter, TRW / Germany Maria Willamowius
 
TRW presented in PC Game Car Mechanic Simulator 2015
TRW presented in PC Game Car Mechanic Simulator 2015TRW presented in PC Game Car Mechanic Simulator 2015
TRW presented in PC Game Car Mechanic Simulator 2015Bahar Sabet
 
trw automotive holdings annual reports 2005
trw automotive holdings annual reports 2005trw automotive holdings annual reports 2005
trw automotive holdings annual reports 2005finance18
 
Hand-Over Alex Ashmore to Neil Fryer - New Vice President TRW Aftermarket
Hand-Over Alex Ashmore to Neil Fryer - New Vice President TRW AftermarketHand-Over Alex Ashmore to Neil Fryer - New Vice President TRW Aftermarket
Hand-Over Alex Ashmore to Neil Fryer - New Vice President TRW AftermarketBahar Sabet
 
TRW Software Feasibility Proposal Presentation
TRW Software Feasibility Proposal PresentationTRW Software Feasibility Proposal Presentation
TRW Software Feasibility Proposal PresentationMuhammad Maqsood ur Rehman
 
TRW_PECHAKUCHA
TRW_PECHAKUCHATRW_PECHAKUCHA
TRW_PECHAKUCHAEvan Tan
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity Waleed Attalla
 
Productivity, Productivity, Productivity
Productivity, Productivity, ProductivityProductivity, Productivity, Productivity
Productivity, Productivity, ProductivityFabian Alcantara
 

Viewers also liked (16)

2008 Q3 TRW Auto Earnings Presentation
2008 Q3 TRW Auto Earnings Presentation 2008 Q3 TRW Auto Earnings Presentation
2008 Q3 TRW Auto Earnings Presentation
 
The Loyalty Awards 2015 - automotive Diamonds wins
The Loyalty Awards 2015 - automotive Diamonds winsThe Loyalty Awards 2015 - automotive Diamonds wins
The Loyalty Awards 2015 - automotive Diamonds wins
 
2005 Q4 TRW Auto Earnings Presentation
 	2005 Q4 TRW Auto Earnings Presentation  	2005 Q4 TRW Auto Earnings Presentation
2005 Q4 TRW Auto Earnings Presentation
 
2008 Q1 TRW Auto Earnings Presentation
2008 Q1 TRW Auto Earnings Presentation 2008 Q1 TRW Auto Earnings Presentation
2008 Q1 TRW Auto Earnings Presentation
 
Interview with Harald Walter, TRW / Germany
Interview with Harald Walter, TRW / Germany Interview with Harald Walter, TRW / Germany
Interview with Harald Walter, TRW / Germany
 
TRW presented in PC Game Car Mechanic Simulator 2015
TRW presented in PC Game Car Mechanic Simulator 2015TRW presented in PC Game Car Mechanic Simulator 2015
TRW presented in PC Game Car Mechanic Simulator 2015
 
trw automotive holdings annual reports 2005
trw automotive holdings annual reports 2005trw automotive holdings annual reports 2005
trw automotive holdings annual reports 2005
 
TRW CV123
TRW CV123TRW CV123
TRW CV123
 
Hand-Over Alex Ashmore to Neil Fryer - New Vice President TRW Aftermarket
Hand-Over Alex Ashmore to Neil Fryer - New Vice President TRW AftermarketHand-Over Alex Ashmore to Neil Fryer - New Vice President TRW Aftermarket
Hand-Over Alex Ashmore to Neil Fryer - New Vice President TRW Aftermarket
 
TRW Software Feasibility Proposal Presentation
TRW Software Feasibility Proposal PresentationTRW Software Feasibility Proposal Presentation
TRW Software Feasibility Proposal Presentation
 
TRW_PECHAKUCHA
TRW_PECHAKUCHATRW_PECHAKUCHA
TRW_PECHAKUCHA
 
what is Productivity
what is  Productivitywhat is  Productivity
what is Productivity
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
 
Productivity
ProductivityProductivity
Productivity
 
Productivity, Productivity, Productivity
Productivity, Productivity, ProductivityProductivity, Productivity, Productivity
Productivity, Productivity, Productivity
 
Productivity
ProductivityProductivity
Productivity
 

Similar to Resp and Ach in TRW

roland_berger_global_automotive_stamping_study_e_20170210 (1).pdf
roland_berger_global_automotive_stamping_study_e_20170210 (1).pdfroland_berger_global_automotive_stamping_study_e_20170210 (1).pdf
roland_berger_global_automotive_stamping_study_e_20170210 (1).pdfSnunkhaemEcharoj
 
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016Victor Pelaez
 
Challenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsChallenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsTimothy Wooi
 
Managing-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.ppt
Managing-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.pptManaging-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.ppt
Managing-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.pptHaithamNagy
 
Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17John Howe
 
Strategic management toyota case study presentation transcript
Strategic management toyota case study presentation transcriptStrategic management toyota case study presentation transcript
Strategic management toyota case study presentation transcriptMusabia Liaqat
 
3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...
3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...
3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...Investors_3M
 
IATF 16949 Training PPT.pdf
IATF 16949 Training PPT.pdfIATF 16949 Training PPT.pdf
IATF 16949 Training PPT.pdfMarcela786175
 
Brembo's financial analysis and relative valuation
Brembo's financial analysis and relative valuationBrembo's financial analysis and relative valuation
Brembo's financial analysis and relative valuationJacopo Farina
 
Brembo: Accounting, Finance & Control
Brembo: Accounting, Finance & ControlBrembo: Accounting, Finance & Control
Brembo: Accounting, Finance & ControlAndrea Dasciani
 
2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industry2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industryResearch Hub
 
List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents Global Manager Group
 
Smu mba om- solved assignments spring -2016
Smu mba  om- solved assignments spring -2016Smu mba  om- solved assignments spring -2016
Smu mba om- solved assignments spring -2016smumbahelp
 
Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015William Killion
 

Similar to Resp and Ach in TRW (20)

Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
roland_berger_global_automotive_stamping_study_e_20170210 (1).pdf
roland_berger_global_automotive_stamping_study_e_20170210 (1).pdfroland_berger_global_automotive_stamping_study_e_20170210 (1).pdf
roland_berger_global_automotive_stamping_study_e_20170210 (1).pdf
 
Resume 1
Resume 1Resume 1
Resume 1
 
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Challenges in Automotive Quality Standards
Challenges in Automotive Quality StandardsChallenges in Automotive Quality Standards
Challenges in Automotive Quality Standards
 
Managing-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.ppt
Managing-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.pptManaging-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.ppt
Managing-Organisation-Effectiveness-within-Vodafone-Europe-Paul-Chesworth.ppt
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17
 
Resume_-_Dennis15
Resume_-_Dennis15Resume_-_Dennis15
Resume_-_Dennis15
 
Strategic management toyota case study presentation transcript
Strategic management toyota case study presentation transcriptStrategic management toyota case study presentation transcript
Strategic management toyota case study presentation transcript
 
3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...
3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...
3M Company at Bank of America Merrill Lynch Global Industrials & EU Autos Con...
 
IATF 16949 Training PPT.pdf
IATF 16949 Training PPT.pdfIATF 16949 Training PPT.pdf
IATF 16949 Training PPT.pdf
 
Brembo's financial analysis and relative valuation
Brembo's financial analysis and relative valuationBrembo's financial analysis and relative valuation
Brembo's financial analysis and relative valuation
 
Brembo: Accounting, Finance & Control
Brembo: Accounting, Finance & ControlBrembo: Accounting, Finance & Control
Brembo: Accounting, Finance & Control
 
2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industry2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industry
 
List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents
 
Sushil Update
Sushil UpdateSushil Update
Sushil Update
 
Smu mba om- solved assignments spring -2016
Smu mba  om- solved assignments spring -2016Smu mba  om- solved assignments spring -2016
Smu mba om- solved assignments spring -2016
 
Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015
 

Resp and Ach in TRW

  • 1. Jul 2005 – May 2010 : TRW (Ningbo) Components & Fastening Systems Co., Ltd Position (Jan 2007~May 2010) : Regional Quality Manager (Resp. for Ningbo and Langfang plant quality) Report to : Global Quality director: Jens Gorzellik (German) and China GM Number of subordinates : Ningbo: 61 (14 Eng.; 34 insp.; 13 customer service); Langfang: 27 (1 mgr, 5 Eng.; 21 insp.) TRW Automotive ranksamong the world'stop 10 largest and most diversified suppliersof automotivesystems, modulesand componentsto global vehicle manufacturersand related aftermarkets. TRW Automotiveisthe leader in active andpassive safety systems for the global automotiveindustry, and itscustomers comprise all major vehiclemanufacturersthroughout theworld. Productsinclude integrated vehicle control and driver assist systems, braking systems, steering systems, suspension systems, occupant safety systems, electronics, engine valves, fastening systemsand aftermarket replacement parts. The company's2010 saleswere $14.4 billion (USD). Ningbo planthasabout 630employees. Responsibilities:  Comply with TRW group quality strategy to establish Ningbo and Langfang plant quality Annual targets and schedule related quality activities. Ensure plantoperation activities under rightprocedure. Organize ManagementReview meeting accordingly.  Leading process qualitycontinual improvementand Total Non-conformityQuality Costdown activities. (Lean production B2B launched in NB and LF in 2008.And B2B activities standardized in routine daily activities).  Maintain customer’ s relationship and take in charge of communicating with customer and getcustomer feedback for Customer Satisfaction Improvement.Mainly for customer feedback qualityinformation investigate,analyze and reply with 8D or 5 Phases report(s).  Participate new project developmentand manage the projectQuality risk.Organize Projects quality risk review meeting to review all projects quality risks and solve the problem from technical direction. And drive TRW group new projectdeveloping procedure GDPIM (Global Developmentand ProductIntroduction Management) deployin NB and LF.  Give pre-assessmentand recommendations for New Projects Suppliers nomination.Major tasks to suppliers’ managementare responsible for supplier incoming inspection,tracking routine supplier qualityimprovement, monthlyquality performance statistics and supplier annual audit,etc.  Lead and drive companyprocedures optimizing and constructing continuously.Organize ISO/TS 16949 Internal Audit and prepare for Party II / III audit.  Be responsible for customer field Warranty issues dispose and reply. Achievements: Achieve VW Group China A Supplier audit in March 31st to April 2nd, 2009 and FAW VW and SVW A Supplier audit in middle of2009 (from 2007 C to 2008 B and B+). Be the 9th of 100 GM global QSB Model suppliers in Dec,2008. Improve customer qualityNCTs (Non-conformance Tickets) from 48 of 2007 to 19 of 2008. And NCTs total number is 10 NCTs in 2009Y. Through series ofSupplier ImprovementPlan and activities,improved Supplier PPM from 817 PPM of 2007 to 298 PPM in 2008.And the First Halfof 2009Y average is 118PPM.First Halfof 2010:34PPM; Safe launched SGM Epsilon LWB/SWB in 2008Y. DFV: DF-BF air vents and ashtrayproject and FAW HQE project air vents in 2008Year. Went to GM Australian Melbourne, successfullyto persuade GM Holden to sign Holden projects PPAPs in July~Aug, 2008.
  • 2. As managementrepresentative gain the DQS recognition and high appraising during Feb 9~11th,2008 ISO/TS16949 certificate changing Re-assessmentAudit. And DQS posted this reporton their global web site. 2009 年通过北京大众 VGC,上海大众 SVW 和一汽大众 FAW-VW 的 A 级供应商审核; 2008 年获得通用汽车全球 QSB100 个模范供应商第九名; 2007 年通过 DQS 认证机构 ISO/TS16949 换证审核,并被 DQS 在其网站公开表扬; 供应商 PPM 值 2007 年 817 降到 2008 年 298PPM,2009 年 118PPM,2010 年上半年 34PPM; 2008 年因为金融危机,澳大利亚通用拒绝切换 TRW 已经批产的 Holden 项目 15 个出风口零件,导致项目投 资不能回收,集团公司 7~8 月份指派我和项目经理去澳大利亚和客户就项目技术和质量问题进行沟通,并最 终说服客户对 PPAP 签字认可